International Journal of Civil Engineering and Technology (IJCIET)
Volume 8, Issue 1, January 2017, pp. 273–280, Article ID: IJCIET_08_01_029
Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
ISSN Print: 0976-6308 and ISSN Online: 0976-6316
© IAEME Publication
OPTIMAL RESOURCES UTILIZATION IN
CONSTRUCTION INDUSTRY
J. RamaJogi
M. Tech Student, Department of Civil Engineering,
K L University, Vaddeswaram-522502, Andhra Pradesh, India
SS. Asadi
Associate Dean-Academics, Department of Civil Engineering,
K L University, Vaddeswaram-522502, Andhra Pradesh, India
ABSTRACT
Objectives: The main objective of the study is to discover the nature and degree of wastage, and
to find out the various causes of wastage. To quantify the effects of wastage and to propose a
technique for maximum utilization of resources. Resource planning and management is the most
important factor for profitability and competitiveness in today’s Indian construction industry.
Construction projects are a bit typical to achieve due to time limitations and predetermined
objective.
Methods: selection of the project, Identification of nature & extent of wastage, quantifying the
effects of wastage, Finding out various causes of wastage, Finding out the variation between
perceived & driven, Establishing waste control indices, Design control measures.
Findings: Without leveling the resources which are scheduled and procured, not any activity
can be performed according to fixed time program. Different types of resources are affecting the
project time and cost like material, money, machinery, space etc. In addition to this some degree of
waste of material, manpower and equipment is inevitable in the construction process. The main
goal of this study is to control the construction resources wastage within prescribed limit for
achieving the planned profitability level and productivity of construction industry.
Applications: Study also highlights the failure of quality due to waste in construction process
and therefore, it is desired to quantify wastage and analyze its effect with a view to promote
economy in construction.
Key words: Resource Planning, Management, Resource wastage, Construction, Profitability.
Cite this Article: J. RamaJogi and SS. Asadi, Optimal Resources utilization In Construction
Industry. International Journal of Civil Engineering and Technology, 8(1), 2017, pp. 273–280.
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
1. INTRODUCTION
The involvement of construction to the GDP at issue value in 2006-07 was Rs.1, 96,555/- crore, recording
an increase of 10.7% from the year 2010. The significance of construction activity in housing,
infrastructure and other accomplishments of buildings will be appreciated from the actual fact that the
element of construction includes nearly 60%-80% of the project value of infrastructure comes like housing,
J. RamaJogi and SS. Asadi
http://www.iaeme.com/IJCIET/index.asp 274 editor@iaeme.com
roads, etc. The employment elasticity of construction with regard to rate of employment and gross
domestic product in construction is determined to be high. In year 2009-2010 asset potential of the
construction business is calculable at Rs.380, 000 crores the share in the GDP works out be 12% in terms
of employment generation delivers 14% of employable subject. The manufacturing product (Construction
material, equipment’s and labor) accounts an approximate nearly 8.6% of GDP together with the gross
share. It is consequently established that construction, as afinancialentity has an impact on the economy of
the country and gross domestic product. Construction activity plays a vital role in sustaining the economy1
.
Construction projects involves a number of inter-related and inter-dependent activities2
. Present days,
due to fast changing environments impose number of legal, financial, logistic, ethical and environmental
constraints. They interact economically, socially and technically within the organization and systems.
These projects employ huge resources, but they will raise difficulties, risks and uncertainties. These
explore series of problems concerning resources alike ‘where they are going to arise from’, ‘how far they
are required’,‘where they should be housed’,’ when they should be inducted at site’, ‘when to mobilize’and
‘how to optimize their utilization’. Due to the nature of resource-driven in construction management, the
management of resources is really a difficult task. The project manager should develop an action plan for
controlling and directing resources of machines, workers and materials intimelyand coordinated manner in
order to deliver a project within the frame of limited time and funding.
2. RESOURCES MANAGEMENT
A resource is an individual that funds the execution of activities of a project such as manpower, material,
money, equipment, space or time3
.
2.1. Significance of Resources in construction projects
The important issue in successful application of a construction project not solely depends within the
amount and value of the work, but also depends on assets availableness. All the activities which are
concerned in the construction project needs specific amount of resources. Every activity of a project is
allotted with a specific resource and it should be completed among the time limitation, otherwise it may
impact overall period of the project. The cost and time are directly dependent on the resources availability.
The time which is needed might be determined by distributing the output related to the resources used on
the activity into the outlined amount of the work for the activity. The best combination of resources for
performing an activity in construction is predicated on ability of contractor’s to spot the interdependencies
of various resources.
2.2. Construction Resources and Cost
Construction resources and its cost awareness is one of the major aspects in taking resource optimization
process various components/resources and their percentage weightage is shown in following [Table 1],
[Figure 1].
Table 1 Entire Project Cost Break-up
Material 35%
Labor 30%
Equipment 15%
Profit 10%
Indirect Cost 05%
Over Head 05%
Optimal Resources
http://www.iaeme.com/IJCIET/index.
2.3. Labor Resources and Cost
Labor being consisting of about 15 to 20 percentage of
productivity4-7
check must be done which is as shown in [Figure 2], [Figure 3], [Figure 4], [Figure 5], and
the workers scenario of Indian construction industry was [Table 2].
Equipment, 15%
Profit, 10%
Indirect Cost, 5%
Material
Optimal Resources utilization In Construction Industry
IJCIET/index.asp 275
Figure 1 Project Cost Break-Up
Labor Resources and Cost
Labor being consisting of about 15 to 20 percentage of total construction
check must be done which is as shown in [Figure 2], [Figure 3], [Figure 4], [Figure 5], and
the workers scenario of Indian construction industry was [Table 2].
Figure 2 Scenario of Workers
Figure 3 Types of Labour
Material, 35%
Labor, 30%
Indirect Cost, 5%
Over Head, 5%
Project Cost Break-Up
Labor Equipment Profit Indirect Cost Over Head
33%
20%12%
3%
25%
7%
TYPE OF WORKERS
Concreting Carpentry
Barbender Welder
Helper Others
50%
20%
30%
0%
Types Of Labour
Independent
Departmental
Sub-Contract
editor@iaeme.com
total construction cost its analysis and
check must be done which is as shown in [Figure 2], [Figure 3], [Figure 4], [Figure 5], and
Over Head
http://www.iaeme.com/IJCIET/index.
Table 2.
Occupation
Technicians & Foreman
Skilled Workers
Unskilled Workers
Total
2.4. Material Resource and Cost
Materials use and reuse, recycling and reduction initiates in the development phases of any project. It
begins with the designer, continues over the engineer, the estimator, the purchaser, the project manager and
lastly to the contractors. Materials budget control and profitability initiates with a plan. But carefully
inspected operational techniques and construction practi
important costs in materials.
0
20
40
< 18
years
J. RamaJogi and SS. Asadi
IJCIET/index.asp 276
Figure 4 Gender Ratio
Figure 5 Age Group of workers
Table 2. Workers Scenario of Indian Construction Industry
Numbers In 1000’s In
1995
%
Numbers In 1000’s
In 2005
687 5.05
2241 16.48 3267
10670 78.46 25600
13598 100.0 29689
Material Resource and Cost
Materials use and reuse, recycling and reduction initiates in the development phases of any project. It
designer, continues over the engineer, the estimator, the purchaser, the project manager and
lastly to the contractors. Materials budget control and profitability initiates with a plan. But carefully
inspected operational techniques and construction practices, a plan can be developed and executed to save
20%
8%
39%
33%
Gender Ratio
Male
Female
Age Group
< 18
years
18 -
30
years
30 -
50
years
> 50
years
Age Group
Age Group
editor@iaeme.com
Workers Scenario of Indian Construction Industry
Numbers In 1000’s
In 2005
%
822 2.8
3267 11.0
25600 86.23
29689 100.0
Materials use and reuse, recycling and reduction initiates in the development phases of any project. It
designer, continues over the engineer, the estimator, the purchaser, the project manager and
lastly to the contractors. Materials budget control and profitability initiates with a plan. But carefully
ces, a plan can be developed and executed to save
Female
Optimal Resources utilization In Construction Industry
http://www.iaeme.com/IJCIET/index.asp 277 editor@iaeme.com
2.5. Cost due to waste
The cost of waste is quite merely the price of obtaining it to a low land and selling it. The price of waste
very is: Original material cost + Delivery price + Management cost+ handling charge+ Tipping fee+
Cleanup price + water transportation cost = Over-all cost of waste in construction.
3. METHODOLOGY
The methodology followed for the work is represented in [Figure 6]
Figure 6 Methodology followed
4. PROJECT ATTRIBUTES
Attributes of the Project presents the details of a residential project in terms of cost variances and wastages
in each attribute.
Type Of Project : Construction of Residential building
Built up area : 100000 sq.ft
Number of storey’s : Ground + Nine Floors
IDENTIFICATION OF NATURE&EXTENT OF
WASTAGE
QUANTIFYING THE EFFECTS OF
WASTAGE
FINDING OUT VARIOUS CAUSES
OF WASTAGE
FINDING OUT THE VARIATION BETWEEN
PRECIEVED & DRIVEN
ESTABLISHING WASTE CONTROL
INDICES
DESIGN CONTROL MEASURES
J. RamaJogi and SS. Asadi
http://www.iaeme.com/IJCIET/index.asp 278 editor@iaeme.com
4.1. Project Management
Project Scheduling was done by using MS Project Software.
4.2. Material Management
Materials were procured centrally for the whole of the project. Proper Inventory control was done and
ABC analysis of material management was used in order to have minimum inventory level.
4.3. Wastage Analysis
Based on the estimated inputs and actual inputs data, variance analysis was carried out. The wastage which
was perceived and the actual wastage as per the analysis tabulated below in the tables [Table 3], [Table 4].
It can be seen that the derived wastage is much less compared to the perceived wastage. This could be a
result of better project management as the project has sufficient staff to supervise different construction
activities.
Table 3 Estimated vs. Actual Consumption of materials and their variances
Sl. No Component Estimated Consumption Actual Consumption % variance
A STRUCTURE
1 Reinforced Steel 3690 MT 3892 MT 5.47
2 Brick work 4600 cu.m 4807 cu.m 4.5
3 M20 Concrete 32525 cu.m 33161.25 cu.m 1.95
a)Cement 28065 bags 29000 bags 3.33
b)aggregate (20mm) 4971.5 cu.m 5120.645 cu.m 3
c)aggregate (10mm) 20270 cu.m 20949.5 cu.m 3.35
d)Sand 15280 cu.m 15662 cu.m 2.5
4 Shuttering 248450 sq.ft 261140.75 sq.ft 5.10
B FINISHINGS
1 Internal Plaster 125000 sq.ft 138750 sq.ft 11
2 External Plaster 19000 sq.ft 20710 sq.ft 9
Table 4 Perceived wastage and the Actual wastage
ITEM PRECEIVED WASTAGE DERIVED WASTAGE
Cement 5 3.33
Reinforced Steel 10 5.47
Sand 10 2.5
Shuttering 10 5.5
Bricks 10 4.5
Optimal Resources utilization In Construction Industry
http://www.iaeme.com/IJCIET/index.asp 279 editor@iaeme.com
4.4. Wastage Cost Impact
The wastage in construction materials adds directly to the project cost considering the present day price of
construction materials, the additional cost due to wastage can be estimated as shown in [Table 5]
Table 5 Wastage and its cost impact
Sl. No Material Wastage Cost Impact
1 Cement 935 bags 935 bags X Rs.290 = Rs.271150
2 Reinforcement 202 MT 202MT X Rs.40000 = Rs.8080000
The above cost is just for the main contributor wastage i.e. Rs.8351150/-
4.5. Waste Control Indices
Waste Control Indices (WCI) for material can be developed as under the actual consumption of cement for
the project is 29000 bags whereas the estimated consumption is 28065 bags.
WCI (Cement) = Actual Consumption/Estimated Consumption = 29000/28065 = 1.033
This shows that WCI for cement for this project is 1.0333. The percent variance (wastage) of cement
for this project can be directly deducted from the figure of 1.0333 by multiplying this figure by 100 & then
subtracting 100 from it which was as follows
1.0333*100 = 103.33
103.33-100 = 3.33
This implies that “3.33” is the percentage wastage variance of the cement
5. CONCLUSIONS
• It was identified that the causes of wastage can be categorized in two aspects: construction methods and
construction management. Under these two categories these were the common issues like excess
preparation of motor, use of dry cement, high silt content in sand not removed, improper cutting and
utilization of steel, changes in design, specification and materials, poor workmanship.
• The results of this analysis illustrate the practices which was using in construction projects can be
adopted by lean principles for minimum utilization of resources by reducing the waste in the
construction industry.
6. RECOMMENDATIONS
The study brought out clearly that the use of machinery in construction produced the least wastage. Project
manager should properly select and plan the machinery and labor in order to eliminate the maximum
wastage and maximum utilization of resources. In addition to this, a new concept which is called as Lean
construction practices may be implemented in the construction industry rather than traditional
management. Workshops should be conducted for better understanding between Lean construction and
Traditional management. Also, managers should promote the lean construction into the people of the firm
which can bring an affordable savings to the firm. Managers and companies should change with time and
new technologies. This can be done by bringing change in culture of the organization by adopting the lean
principles mandatory, by enhancing new techniques and policies for waste minimization, and by partnering
with sub-contractors and suppliers to ensure that they follow Lean Construction methods.
J. RamaJogi and SS. Asadi
http://www.iaeme.com/IJCIET/index.asp 280 editor@iaeme.com
REFERENCES
[1] Report of The Working Group On Construction For The 11th Five Year Plan (2007-2012)
[2] BMTPC Estimate, Report of the working Group on Building Material and the 8th
Plan, Ministry of
Urban Development. Govt. India 1991
[3] Resource Management in Construction Projects – a case study, SK. Nagaraju, B. Sivakonda Reddy,
Prof. A. Ray Chaudhuri, IRACST (ESTIJ), ISSN: 2250-3498, Vol.2, No.4, August 2012, 660-665.
[4] Evaluate The Effective Resource Management through PERT Analysis, Aditi S. Baghele, P. P.
Bhangale, Prafulla Wankhede, IJRET, eISSN: 2319-1163, Vol.3, Special Issue: 9, June-2014, 5-9.
[5] Karaa, F. and Nasr, A. (1986). Resource Management in Construction. J. Constr. Eng. Manage.,
10.1061/ (ASCE) 0733-9364(1986)112:3(346), 346-357.
[6] Optimal Construction Resources Utilization: Reflections of Site Managers Attributes, Julius Ayodeji
Fapohunda, Prof. Paul Stephenson, the Pacific Journal of Science and Technology, Vol.11, No.2,
November 2010.
[7] Development of Resource-Driven Scheduling Model for Mass Housing Construction Projects, Ar. A.
Cindrela Devi and K. Ananthanarayanan, IACSIT, Vol.7, No.5, October 2015, 419-423
[8] Dineshkumar B, Dhivyamenaga T. Study on Lean Principle Application in Construction Industries.
Indian Journal of Science and Technology. 2016 Jan, 9(2), pp. 1-5.
[9] Nanda Kumaar A, Deventhiran K, Santhana Kumar M, Manoj Kumar M, Suresh R. Study
on Targeted Relationships between Contractors and Consultants in Construction Industry. Indian Journal
of Science and Technology.2016 Apr, 9(16), pp.1-6.
[10] Prasath Kumar V R,Balasubramanian M, Jagadish Raj S. Robotics in Construction Industry. Indian
Journal of Science and Technology. 2016 Jun, 9(23), pp. 1-6.
[11] Nadine Nabeel Abu Shaaban, Construction Industry on the Renewable Energy Bandwagon.
International Journal of Management, 7(4), 2016,pp.51-60.
[12] Prateek Jain and Ayush Srivastava, Problem Diagnosis and Possible Solutions for Contracting Firms In
Construction Industry. International Journal of Civil Engineering and Technology, 7(4), 2016, pp.121–
126.

More Related Content

What's hot

STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRYSTUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
IAEME Publication
 
6 things you should know about industrial engineering
6 things you should know about industrial engineering6 things you should know about industrial engineering
6 things you should know about industrial engineering
IE Saeed Shurrab
 
ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...
ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...
ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...
A Makwana
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Publishing House
 
Design and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using FeaDesign and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using Fea
ijtsrd
 

What's hot (20)

STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRYSTUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
 
“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...
 
The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
Engineering As Carrier Option
Engineering As Carrier OptionEngineering As Carrier Option
Engineering As Carrier Option
 
6 things you should know about industrial engineering
6 things you should know about industrial engineering6 things you should know about industrial engineering
6 things you should know about industrial engineering
 
Introduction to IE
Introduction to IEIntroduction to IE
Introduction to IE
 
THE APPLICATION OF PHYSICS AND MANAGEMENT TO INDUSTRIAL ENGINEERING
THE APPLICATION OF PHYSICS AND MANAGEMENT TO INDUSTRIAL ENGINEERINGTHE APPLICATION OF PHYSICS AND MANAGEMENT TO INDUSTRIAL ENGINEERING
THE APPLICATION OF PHYSICS AND MANAGEMENT TO INDUSTRIAL ENGINEERING
 
ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...
ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...
ANALYSIS OF FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT OF CONSTRUCTION FIRMS...
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
 
H012544751
H012544751H012544751
H012544751
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
 
Engineering
EngineeringEngineering
Engineering
 
Design and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using FeaDesign and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using Fea
 
Pioneers In Industrial Engineering
Pioneers In Industrial EngineeringPioneers In Industrial Engineering
Pioneers In Industrial Engineering
 
Me ppt
Me pptMe ppt
Me ppt
 
Future job scope of mechanical engineering
Future job scope of mechanical engineeringFuture job scope of mechanical engineering
Future job scope of mechanical engineering
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
 
Ijciet 10 02_082
Ijciet 10 02_082Ijciet 10 02_082
Ijciet 10 02_082
 

Similar to OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY

Similar to OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY (20)

EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONEFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Mechanized Construction- Relevance and Importance in India
Mechanized Construction- Relevance and Importance in IndiaMechanized Construction- Relevance and Importance in India
Mechanized Construction- Relevance and Importance in India
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
 
Study and Need of Risk Management for Construction Projects
Study and Need of Risk Management for Construction ProjectsStudy and Need of Risk Management for Construction Projects
Study and Need of Risk Management for Construction Projects
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 

More from IAEME Publication

A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
IAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
IAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
IAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 

OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY

  • 1. http://www.iaeme.com/IJCIET/index.asp 273 editor@iaeme.com International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 1, January 2017, pp. 273–280, Article ID: IJCIET_08_01_029 Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY J. RamaJogi M. Tech Student, Department of Civil Engineering, K L University, Vaddeswaram-522502, Andhra Pradesh, India SS. Asadi Associate Dean-Academics, Department of Civil Engineering, K L University, Vaddeswaram-522502, Andhra Pradesh, India ABSTRACT Objectives: The main objective of the study is to discover the nature and degree of wastage, and to find out the various causes of wastage. To quantify the effects of wastage and to propose a technique for maximum utilization of resources. Resource planning and management is the most important factor for profitability and competitiveness in today’s Indian construction industry. Construction projects are a bit typical to achieve due to time limitations and predetermined objective. Methods: selection of the project, Identification of nature & extent of wastage, quantifying the effects of wastage, Finding out various causes of wastage, Finding out the variation between perceived & driven, Establishing waste control indices, Design control measures. Findings: Without leveling the resources which are scheduled and procured, not any activity can be performed according to fixed time program. Different types of resources are affecting the project time and cost like material, money, machinery, space etc. In addition to this some degree of waste of material, manpower and equipment is inevitable in the construction process. The main goal of this study is to control the construction resources wastage within prescribed limit for achieving the planned profitability level and productivity of construction industry. Applications: Study also highlights the failure of quality due to waste in construction process and therefore, it is desired to quantify wastage and analyze its effect with a view to promote economy in construction. Key words: Resource Planning, Management, Resource wastage, Construction, Profitability. Cite this Article: J. RamaJogi and SS. Asadi, Optimal Resources utilization In Construction Industry. International Journal of Civil Engineering and Technology, 8(1), 2017, pp. 273–280. http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 1. INTRODUCTION The involvement of construction to the GDP at issue value in 2006-07 was Rs.1, 96,555/- crore, recording an increase of 10.7% from the year 2010. The significance of construction activity in housing, infrastructure and other accomplishments of buildings will be appreciated from the actual fact that the element of construction includes nearly 60%-80% of the project value of infrastructure comes like housing,
  • 2. J. RamaJogi and SS. Asadi http://www.iaeme.com/IJCIET/index.asp 274 editor@iaeme.com roads, etc. The employment elasticity of construction with regard to rate of employment and gross domestic product in construction is determined to be high. In year 2009-2010 asset potential of the construction business is calculable at Rs.380, 000 crores the share in the GDP works out be 12% in terms of employment generation delivers 14% of employable subject. The manufacturing product (Construction material, equipment’s and labor) accounts an approximate nearly 8.6% of GDP together with the gross share. It is consequently established that construction, as afinancialentity has an impact on the economy of the country and gross domestic product. Construction activity plays a vital role in sustaining the economy1 . Construction projects involves a number of inter-related and inter-dependent activities2 . Present days, due to fast changing environments impose number of legal, financial, logistic, ethical and environmental constraints. They interact economically, socially and technically within the organization and systems. These projects employ huge resources, but they will raise difficulties, risks and uncertainties. These explore series of problems concerning resources alike ‘where they are going to arise from’, ‘how far they are required’,‘where they should be housed’,’ when they should be inducted at site’, ‘when to mobilize’and ‘how to optimize their utilization’. Due to the nature of resource-driven in construction management, the management of resources is really a difficult task. The project manager should develop an action plan for controlling and directing resources of machines, workers and materials intimelyand coordinated manner in order to deliver a project within the frame of limited time and funding. 2. RESOURCES MANAGEMENT A resource is an individual that funds the execution of activities of a project such as manpower, material, money, equipment, space or time3 . 2.1. Significance of Resources in construction projects The important issue in successful application of a construction project not solely depends within the amount and value of the work, but also depends on assets availableness. All the activities which are concerned in the construction project needs specific amount of resources. Every activity of a project is allotted with a specific resource and it should be completed among the time limitation, otherwise it may impact overall period of the project. The cost and time are directly dependent on the resources availability. The time which is needed might be determined by distributing the output related to the resources used on the activity into the outlined amount of the work for the activity. The best combination of resources for performing an activity in construction is predicated on ability of contractor’s to spot the interdependencies of various resources. 2.2. Construction Resources and Cost Construction resources and its cost awareness is one of the major aspects in taking resource optimization process various components/resources and their percentage weightage is shown in following [Table 1], [Figure 1]. Table 1 Entire Project Cost Break-up Material 35% Labor 30% Equipment 15% Profit 10% Indirect Cost 05% Over Head 05%
  • 3. Optimal Resources http://www.iaeme.com/IJCIET/index. 2.3. Labor Resources and Cost Labor being consisting of about 15 to 20 percentage of productivity4-7 check must be done which is as shown in [Figure 2], [Figure 3], [Figure 4], [Figure 5], and the workers scenario of Indian construction industry was [Table 2]. Equipment, 15% Profit, 10% Indirect Cost, 5% Material Optimal Resources utilization In Construction Industry IJCIET/index.asp 275 Figure 1 Project Cost Break-Up Labor Resources and Cost Labor being consisting of about 15 to 20 percentage of total construction check must be done which is as shown in [Figure 2], [Figure 3], [Figure 4], [Figure 5], and the workers scenario of Indian construction industry was [Table 2]. Figure 2 Scenario of Workers Figure 3 Types of Labour Material, 35% Labor, 30% Indirect Cost, 5% Over Head, 5% Project Cost Break-Up Labor Equipment Profit Indirect Cost Over Head 33% 20%12% 3% 25% 7% TYPE OF WORKERS Concreting Carpentry Barbender Welder Helper Others 50% 20% 30% 0% Types Of Labour Independent Departmental Sub-Contract editor@iaeme.com total construction cost its analysis and check must be done which is as shown in [Figure 2], [Figure 3], [Figure 4], [Figure 5], and Over Head
  • 4. http://www.iaeme.com/IJCIET/index. Table 2. Occupation Technicians & Foreman Skilled Workers Unskilled Workers Total 2.4. Material Resource and Cost Materials use and reuse, recycling and reduction initiates in the development phases of any project. It begins with the designer, continues over the engineer, the estimator, the purchaser, the project manager and lastly to the contractors. Materials budget control and profitability initiates with a plan. But carefully inspected operational techniques and construction practi important costs in materials. 0 20 40 < 18 years J. RamaJogi and SS. Asadi IJCIET/index.asp 276 Figure 4 Gender Ratio Figure 5 Age Group of workers Table 2. Workers Scenario of Indian Construction Industry Numbers In 1000’s In 1995 % Numbers In 1000’s In 2005 687 5.05 2241 16.48 3267 10670 78.46 25600 13598 100.0 29689 Material Resource and Cost Materials use and reuse, recycling and reduction initiates in the development phases of any project. It designer, continues over the engineer, the estimator, the purchaser, the project manager and lastly to the contractors. Materials budget control and profitability initiates with a plan. But carefully inspected operational techniques and construction practices, a plan can be developed and executed to save 20% 8% 39% 33% Gender Ratio Male Female Age Group < 18 years 18 - 30 years 30 - 50 years > 50 years Age Group Age Group editor@iaeme.com Workers Scenario of Indian Construction Industry Numbers In 1000’s In 2005 % 822 2.8 3267 11.0 25600 86.23 29689 100.0 Materials use and reuse, recycling and reduction initiates in the development phases of any project. It designer, continues over the engineer, the estimator, the purchaser, the project manager and lastly to the contractors. Materials budget control and profitability initiates with a plan. But carefully ces, a plan can be developed and executed to save Female
  • 5. Optimal Resources utilization In Construction Industry http://www.iaeme.com/IJCIET/index.asp 277 editor@iaeme.com 2.5. Cost due to waste The cost of waste is quite merely the price of obtaining it to a low land and selling it. The price of waste very is: Original material cost + Delivery price + Management cost+ handling charge+ Tipping fee+ Cleanup price + water transportation cost = Over-all cost of waste in construction. 3. METHODOLOGY The methodology followed for the work is represented in [Figure 6] Figure 6 Methodology followed 4. PROJECT ATTRIBUTES Attributes of the Project presents the details of a residential project in terms of cost variances and wastages in each attribute. Type Of Project : Construction of Residential building Built up area : 100000 sq.ft Number of storey’s : Ground + Nine Floors IDENTIFICATION OF NATURE&EXTENT OF WASTAGE QUANTIFYING THE EFFECTS OF WASTAGE FINDING OUT VARIOUS CAUSES OF WASTAGE FINDING OUT THE VARIATION BETWEEN PRECIEVED & DRIVEN ESTABLISHING WASTE CONTROL INDICES DESIGN CONTROL MEASURES
  • 6. J. RamaJogi and SS. Asadi http://www.iaeme.com/IJCIET/index.asp 278 editor@iaeme.com 4.1. Project Management Project Scheduling was done by using MS Project Software. 4.2. Material Management Materials were procured centrally for the whole of the project. Proper Inventory control was done and ABC analysis of material management was used in order to have minimum inventory level. 4.3. Wastage Analysis Based on the estimated inputs and actual inputs data, variance analysis was carried out. The wastage which was perceived and the actual wastage as per the analysis tabulated below in the tables [Table 3], [Table 4]. It can be seen that the derived wastage is much less compared to the perceived wastage. This could be a result of better project management as the project has sufficient staff to supervise different construction activities. Table 3 Estimated vs. Actual Consumption of materials and their variances Sl. No Component Estimated Consumption Actual Consumption % variance A STRUCTURE 1 Reinforced Steel 3690 MT 3892 MT 5.47 2 Brick work 4600 cu.m 4807 cu.m 4.5 3 M20 Concrete 32525 cu.m 33161.25 cu.m 1.95 a)Cement 28065 bags 29000 bags 3.33 b)aggregate (20mm) 4971.5 cu.m 5120.645 cu.m 3 c)aggregate (10mm) 20270 cu.m 20949.5 cu.m 3.35 d)Sand 15280 cu.m 15662 cu.m 2.5 4 Shuttering 248450 sq.ft 261140.75 sq.ft 5.10 B FINISHINGS 1 Internal Plaster 125000 sq.ft 138750 sq.ft 11 2 External Plaster 19000 sq.ft 20710 sq.ft 9 Table 4 Perceived wastage and the Actual wastage ITEM PRECEIVED WASTAGE DERIVED WASTAGE Cement 5 3.33 Reinforced Steel 10 5.47 Sand 10 2.5 Shuttering 10 5.5 Bricks 10 4.5
  • 7. Optimal Resources utilization In Construction Industry http://www.iaeme.com/IJCIET/index.asp 279 editor@iaeme.com 4.4. Wastage Cost Impact The wastage in construction materials adds directly to the project cost considering the present day price of construction materials, the additional cost due to wastage can be estimated as shown in [Table 5] Table 5 Wastage and its cost impact Sl. No Material Wastage Cost Impact 1 Cement 935 bags 935 bags X Rs.290 = Rs.271150 2 Reinforcement 202 MT 202MT X Rs.40000 = Rs.8080000 The above cost is just for the main contributor wastage i.e. Rs.8351150/- 4.5. Waste Control Indices Waste Control Indices (WCI) for material can be developed as under the actual consumption of cement for the project is 29000 bags whereas the estimated consumption is 28065 bags. WCI (Cement) = Actual Consumption/Estimated Consumption = 29000/28065 = 1.033 This shows that WCI for cement for this project is 1.0333. The percent variance (wastage) of cement for this project can be directly deducted from the figure of 1.0333 by multiplying this figure by 100 & then subtracting 100 from it which was as follows 1.0333*100 = 103.33 103.33-100 = 3.33 This implies that “3.33” is the percentage wastage variance of the cement 5. CONCLUSIONS • It was identified that the causes of wastage can be categorized in two aspects: construction methods and construction management. Under these two categories these were the common issues like excess preparation of motor, use of dry cement, high silt content in sand not removed, improper cutting and utilization of steel, changes in design, specification and materials, poor workmanship. • The results of this analysis illustrate the practices which was using in construction projects can be adopted by lean principles for minimum utilization of resources by reducing the waste in the construction industry. 6. RECOMMENDATIONS The study brought out clearly that the use of machinery in construction produced the least wastage. Project manager should properly select and plan the machinery and labor in order to eliminate the maximum wastage and maximum utilization of resources. In addition to this, a new concept which is called as Lean construction practices may be implemented in the construction industry rather than traditional management. Workshops should be conducted for better understanding between Lean construction and Traditional management. Also, managers should promote the lean construction into the people of the firm which can bring an affordable savings to the firm. Managers and companies should change with time and new technologies. This can be done by bringing change in culture of the organization by adopting the lean principles mandatory, by enhancing new techniques and policies for waste minimization, and by partnering with sub-contractors and suppliers to ensure that they follow Lean Construction methods.
  • 8. J. RamaJogi and SS. Asadi http://www.iaeme.com/IJCIET/index.asp 280 editor@iaeme.com REFERENCES [1] Report of The Working Group On Construction For The 11th Five Year Plan (2007-2012) [2] BMTPC Estimate, Report of the working Group on Building Material and the 8th Plan, Ministry of Urban Development. Govt. India 1991 [3] Resource Management in Construction Projects – a case study, SK. Nagaraju, B. Sivakonda Reddy, Prof. A. Ray Chaudhuri, IRACST (ESTIJ), ISSN: 2250-3498, Vol.2, No.4, August 2012, 660-665. [4] Evaluate The Effective Resource Management through PERT Analysis, Aditi S. Baghele, P. P. Bhangale, Prafulla Wankhede, IJRET, eISSN: 2319-1163, Vol.3, Special Issue: 9, June-2014, 5-9. [5] Karaa, F. and Nasr, A. (1986). Resource Management in Construction. J. Constr. Eng. Manage., 10.1061/ (ASCE) 0733-9364(1986)112:3(346), 346-357. [6] Optimal Construction Resources Utilization: Reflections of Site Managers Attributes, Julius Ayodeji Fapohunda, Prof. Paul Stephenson, the Pacific Journal of Science and Technology, Vol.11, No.2, November 2010. [7] Development of Resource-Driven Scheduling Model for Mass Housing Construction Projects, Ar. A. Cindrela Devi and K. Ananthanarayanan, IACSIT, Vol.7, No.5, October 2015, 419-423 [8] Dineshkumar B, Dhivyamenaga T. Study on Lean Principle Application in Construction Industries. Indian Journal of Science and Technology. 2016 Jan, 9(2), pp. 1-5. [9] Nanda Kumaar A, Deventhiran K, Santhana Kumar M, Manoj Kumar M, Suresh R. Study on Targeted Relationships between Contractors and Consultants in Construction Industry. Indian Journal of Science and Technology.2016 Apr, 9(16), pp.1-6. [10] Prasath Kumar V R,Balasubramanian M, Jagadish Raj S. Robotics in Construction Industry. Indian Journal of Science and Technology. 2016 Jun, 9(23), pp. 1-6. [11] Nadine Nabeel Abu Shaaban, Construction Industry on the Renewable Energy Bandwagon. International Journal of Management, 7(4), 2016,pp.51-60. [12] Prateek Jain and Ayush Srivastava, Problem Diagnosis and Possible Solutions for Contracting Firms In Construction Industry. International Journal of Civil Engineering and Technology, 7(4), 2016, pp.121– 126.