International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3543
S.W.O.T ANALYSIS: CURRENT STATUS OF CONSTRUCTION
Viklesh S. Ingle1, Hemant H. Salunkhe2
1Secound Year M.E Construction and Management D.Y.Patil Institute of Engineering and Technology, Ambi, Pune,
Maharashtra, India
2Professor Department of Civil Engineering Management D Y Patil Institute of Engineering and Technology, Ami,
Pune, Maharastra, India
----------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - This paper contains SWOT Analysis for a construction firm. Different constructions firms are taken into consideration
and their working conditions are analyzed. Learning the current situation of strength, Weakness, opportunity and Threats, will
contribute in explaining the in general condition of construction firm which will help to make decision and progressively help for
making strategy planning. SWOT Analysis provide an easier and quicker solution for determine the potential strength of thefirm.
On the basis of analysis Analytical Hierarchy Process (AHP) is being taken in initial stage for planning and the remaining work is
integrated in the form of flowchart. Integrating the work in smaller sections will make easier to perform the task and help in
determining the objectives of the paper. Comparison betweendifferentfirmandtheir workingscenariois doneon whichstabilityof
the firm is decided. Multiple criteria decision making Analysis process is also included for various decisions taken during of the
project. Over viewing of the project is done in a systematic manner in stage wise process which includes Analysisofstrategy, Delay
Analysis, Market Analysis, Environment Sustainable Design, Risk Management, Cost Comparison, Life Cycle Cost Analysis, and
Competitors Analysis. All these are analyzed by using Super decision software for analysis in various stages. I foundsuperdecision
making software for SWOT Analysis and obtain the required output.
Key Words: SWOT Analysis, AHP, MCDA
I. INTRODUCTION
SWOT Analysis:-
 Strength:-In build capacities of a construction firm to compete and grow strongly. One type of source for a
construction firm which will useful for obtaining their desired objectives and goals.
 Weakness: - In build deficiencies which will affect the growth of a construction firm and its survival. Some short of
deficiencies, limitations or defects which will affect the constructionfirmtokeepaway fromachievingtheirobjectives
and goals.
 Opportunity: - The chances and opening towards growth of that particular firm and are created during analysis
of strength and weakness.
 Threats:-These are being challenges which arise during swot analysis. They are sometimes considering at the initial
stages of planning or they are obtaining during working condition and alternating solution has to be giventothefirm.
An undesirable condition which is being created while dealing with strength and weakness of the construction firm
which will contribute towards damaging the strategic planning of the construction firm.
II. Literature Review
1. “A RULE BASED SWOT ANALYSIS APPLICATION: A CASE STUDY FOR INDONESIAN HIGHER EDUCATION
INSTITUTION” BY HusniThamrinaEndang , WahyuPamungkasb
SWOT Analysis was first introduced by Albert Humphery during 1960-1970 when he used to work at Stanford University to
develop methods which will contribute in companies in the United States in planning changes form. In the particular study
firstly SWOT has being introduced. SWOT Analysis is an attempt to determine the strength and the weakness of the firm.
Identification of opportunities for improvement and to find out the possible external difficulties that needs to be overcome.
Description of SWOT Analysis will help for making strategic planning for long term and short term.
HOUBEN is belonging to the first team that attempted to automation of SWOT Analysis.Provisionofknowledgebasedsystems
has been used. This includes a knowledge Engineer who has list of Questioner in his build system (automated). This was an
initial study which needs more improvement.
Kurtilla
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3544
Introduction and use of decision making techniqueswasdoneinconstructionofbuildingSWOTAnalysis.InitiallySWOTfactors
are arranged in a systematic manner. On the basis of importance they are categorized in various part and priority based data
has been developed.
1. “APPLICATION OF THE AHP IN PROJECT MANAGEMENT” BY Kamal M. Al- Harbi
 MCDA( Multiple Criteria Decision Making):-
Various decisions have to taken by project owners for their benefits. Various elements are considered and factors
occurring during the working process are determined. These factors are categorized in a systematic manner.
Relationship of these factors is determined. Changes have to be made at the time of requirement. Activities of
construction firm are show in an integrated process which contains hierarchal stages. Skill of determining these
threats and solving them in initial stages will make ease to perform various task without any troubles and smooth
working of the project can be achieve for success of the project.
Schuyler
The capability of making a sound decision important is an essential condition for the success of a construction firm. Multi
criteria decision making problems focus on determining the problems.
 Multi Criteria Decision Making: - Situations which contains necessary conditions for different courses of action,
which cannot be solved by any of the simple methods is termed as Multi Criteria Decision Making. It is a skill of any
particular person to determine and provide a perfect solution for any type of situation which affects the working
condition.
 Analytical Hierarchy Process(AHP):-
It is a process which deals with organizing the data in an integrating process and successively helps for analyzing the
problem in detail. This process is representing in the form of a flowchart which describe the problem in a stage wise
process. This makes the problem Easy to understand and deal with it. This process is simple, easy and quick to
perform for any type of problem. It is useful in any type of field.
S = Strength W = Weakness
O = Opportunity T = Threats
Figure 1 SWOT ANALYSIS STRUCTURE
III. METHODS AND DATA COLLECTION:-
Stepwise procedure has being followed which is in the form of flowchart.
1) SWOT ANALYSIS is carried out on Internal and external Environment of construction firm and analytical hierarchal
method are followed by it.
2) These AHP methods integrate the whole process in a flowchart form which describestheactivitiesoftheconstruction
firm.
3) Here I have done site visit on construction firm and on meeting of meeting and description questions are prepared
and rating has being given to that particular firm to determine the stability of the construction firm.
4) Comparative analysis is done and data is prepared.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3545
While dealing with AHP models they provide priority factors along with their importance with respect to otherclassifications.
Prioritization mechanism can be obtain by using comparison matrix and by assigning comparison scale developed by Saaty
(1980) to provide the relative importance to the describing classes.
Table 1 Classification of factors for comparison
Importance Explanation
1 Equal Important
3 Moderate Important
5 Highly Important
 Procedure to determine the Priority and comparison of different classes
1. Number of comparison (n) = n
2. Comparison matrix = (n X n)
3. Eigen value =
…..
…..
……
This will provide Priority Vector and importance of that factor with respect to other factor. Relationship between
priority vector with respect to their weight or importance can be explained by using:
A = X w
Where w= Importance of the factor
4. Consistency Index (C.I) =
5. Consistency Ratio (C.R) =
Table2. Random index
n 1 2 3 4 5 6 7 8 9
RI 0.00 0.00 0.58 0.90 1.12 1.24 1.32 1.41 1.45
Figure 2 Methodology of SWOT Analysis
Goal of construction firm
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3546
Table 3 General factor used to determine SWOT Analysis
Strength(S) Weakness(W)
1. Staff Structure (S1)
2. Acceptability (S2)
3. Profitability (S3)
4. Specialty of project (S4)
5. SurroundingEnvironment(S5)
1. Working Condition (W1)
2. Budget (W2)
3. Reliability of Data (W3)
4. Record Maintenance (W4)
5. Schedule of Work (W5)
Opportunity(O) Threats(T)
1. Maintenancemanagement(O1)
2. Business strategy (O2)
3. Market Analysis (O3)
4. New methods of Working (O4)
5. Future Thinking (O5)
1. Conflicts (T1)
2. Disputes (T2)
3. Variable policy (T3)
4. Creditors (T4)
5. Competitors Analysis (T5)
1. SWOT Matrix of Gagan Nulife
 Eigen value : 5.52 Consistency Index :0.5075 Consistency Ratio : 0.875
2. Matrix of Strength of Gagan Nulife
Strength S1 S2 S3 S1 S2 S3 SUM AVERAGE
Staff structure S1 1 3 5 0.65 0.71 0.45 1.82 0.61
Acceptability S2 0.33 1 5 0.22 0.24 0.45 0.91 0.30
Profitability S3 0.2 0.2 1 0.13 0.05 0.09 0.27 0.09
1.53 4.2 11
 Eigen value : 5.29 Consistency Index :0.5075 Consistency Ratio : 0.875
3. Matrix for Weakness of Gagan Nulife
Weakness W1 W2 W3 W1 W2 W3 SUM AVERAGE
Reliability of data W1 1 3 5 0.65 0.69 0.56 1.90 0.63
Record Maintenance W2 0.33 1 3 0.22 0.23 0.33 0.78 0.26
Schedule of work W3 0.2 0.3 1 0.13 0.08 0.11 0.32 0.11
1.53 4.3 9
 Eigen value : 3.26 Consistency Index :0.13 Consistency Ratio : 0.22
S W O T S W O T SUM AVERAGE
Strength S 1 3 3 5 0.54 0.56 0.58 0.36 2.03 0.54
Weakness W 0.33 1 1 3 0.18 0.19 0.19 0.21 0.77 0.18
Opportunity O 0.33 1 1 5 0.18 0.19 0.19 0.36 0.92 0.18
Threats T 0.2 0.33 0.2 1 0.11 0.06 0.04 0.07 0.28 0.11
1.87 5.33 5.20 14.00
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3547
4. Matrix for Opportunity of Gagan Nulife
Opportunity O1 O2 O3 O1 O2 O3 SUM AVERAGE
Maintenance Management O1 1 0.33 0.2 0.11 0.14 0.09 0.34 0.11
Business Strategy O2 3 1 1 0.33 0.43 0.45 1.22 0.41
Market Analysis O3 5 1 1 0.56 0.43 0.45 1.44 0.48
9 2.33 2.2
 Eigen value : 3.02 Consistency Index : 0.1 Consistency Ratio : 0.17
5. Matrix for Threats of Gagan Nulife
Threats T1 T2 T3 T1 T2 T3 SUM AVERAGE
Conflits T1 1 0.2 0.33 0.11 0.13 0.08 0.32 0.11
Creditors T2 5 1 3 0.56 0.65 0.69 1.90 0.63
Competitors Analysis T3 3 0.33 1 0.33 0.22 0.23 0.78 0.26
9 1.53 4.33
 Eigen value : 3.03 Consistency Index : 0.15 Consistency Ratio : 0.25
IV. Result
Overall synthesis of the report
Group Priority Factors Importance
with
respect to
Group
Overall
Priority
Strength 0.54 Staff Structure 0.61 0.3294
Acceptability 0.3 0.162
Profitability 0.09 0.0486
Weakness 0.18 Reliability of Data 0.63 0.1134
Record Maintenance 0.26 0.0468
Schedule of Work 0.11 0.0198
Opportunity 0.18 Maintenance Management 0.11 0.0198
Business Strategy 0.41 0.0738
Market Analysis 0.48 0.0864
Threats 0.11 Conflicts 0.11 0.0121
Creditors 0.63 0.0693
Competitors Analysis 0.26 0.0286
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3548
Overall Status of Gagan Nulife
Strength
Weakness
Opportunity
Threats
Figure 3 Synthesis of overall status of construction firm
On the basis of all above analysis we have evaluate strategic factors for a construction firm by using SWOT Analysis and
AHP Methods. It has been concluded that
Group Importance
Strength 54%
Weakness 18%
Opportunity 18%
Threats 11%
V. CONCLUSIONS
 SWOT Analysis deals with the current status and provide a satisfactory result which is the basic need of the construction
firm.
 Converting the problem in an AHP and dealing it is quite simple and beneficial. SWOT analysis could be helpful for a
construction firm in at any stage of the construction firm.
 Consistency level for a construction firm is in essential condition. This provides stability for the construction firm.
 Integrating the problem in a systematic manner could be helpful for understanding the problem in deal.
 Multi Criteria Decision Analysis provides support to SWOT Analysis and converts the complex problem into easy.
 Combination of SWOT Analysis and AHP help to decide the drawbacks of the construction firm.
REFERENCES
[1] Selection of the information systems’ development in enterprises by multi criteria decision making by Vensa Cancer.
[2] A combined application of SWOT Analysis and the analytical network method by Liaoji Zheng and HuiQing Liu.
[3] Safety risk assessment using Analytic Hierarchyprocess(AHP)duringplanningand budgetingofconstructionprojects
by Saman Aminbakhsh, Murat Gunduz, Rifat Sonmez
[4] Decision support system for selecting the proper project delivery methodusinganalytical hierarchyprocess(AHP) by
Ibrahim M. Mahdi, Khaled Alreshaid.
[5] Decision making – The Analytic Hierarchy and network processes (ANP/AHP) by Thomas L. Saaty.
[6] Exploring the potential for silvopasture adoption in south central Florida: an application of SWOT-AHP method by
Ram K. Shrestha, Janaki R.R. Alavalapati, Robert S. Kalmbacher
[7] Evaluation of project level environment impact assessmentandSWOTanalysisofEIAprocessinIndia byA.K.A.RATHI
[8] SWOT analysis for planned maintenance strategy – a case study by Malgorzata Jasiulewicz- kaczmarek
[9] Application of combined SWOT and AHP: A case study for a manufacturing Firm by Ali Gorener, Kerem Toker,
Korkmaz Ulucay.
[10] Application of AHP method in external strategic analysis of the selected organization by Terezie Bartuskova, Ales
Kresta

More Related Content

What's hot

IRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET Journal
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodIRJET Journal
 
TQM-diagram house of quality
TQM-diagram house of qualityTQM-diagram house of quality
TQM-diagram house of qualityChanna Khieng
 
Earned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of ProjectsEarned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of ProjectsRicardo Viana Vargas
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET Journal
 
Requirements Triage - Challenges and Solutions
Requirements Triage - Challenges and SolutionsRequirements Triage - Challenges and Solutions
Requirements Triage - Challenges and Solutionsijseajournal
 
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERSIT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERSijseajournal
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
76 s201903
76 s20190376 s201903
76 s201903IJRAT
 
Running head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticRunning head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticDIPESH30
 
DISSERTATION further improvement
DISSERTATION  further improvementDISSERTATION  further improvement
DISSERTATION further improvementHasib Ullah
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET Journal
 
Pugh matrix concept evaluation in Design
Pugh matrix concept evaluation in DesignPugh matrix concept evaluation in Design
Pugh matrix concept evaluation in DesignYogesh Prasad
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for ConstructionIRJET Journal
 

What's hot (20)

IRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value Engineering
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index Method
 
TQM-diagram house of quality
TQM-diagram house of qualityTQM-diagram house of quality
TQM-diagram house of quality
 
Earned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of ProjectsEarned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of Projects
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
 
Requirements Triage - Challenges and Solutions
Requirements Triage - Challenges and SolutionsRequirements Triage - Challenges and Solutions
Requirements Triage - Challenges and Solutions
 
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERSIT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
IT PROJECT SHOWSTOPPER FRAMEWORK: THE VIEW OF PRACTITIONERS
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
76 s201903
76 s20190376 s201903
76 s201903
 
Running head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticRunning head critical path method1 critical path method7critic
Running head critical path method1 critical path method7critic
 
DISSERTATION further improvement
DISSERTATION  further improvementDISSERTATION  further improvement
DISSERTATION further improvement
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
 
Pugh matrix concept evaluation in Design
Pugh matrix concept evaluation in DesignPugh matrix concept evaluation in Design
Pugh matrix concept evaluation in Design
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for Construction
 
Pci journal 2005
Pci journal 2005Pci journal 2005
Pci journal 2005
 

Similar to IRJET- S.W.O.T Analysis: Current Status of Construction

IRJET- S.W.O.T Analysis: A Progressive Strength for Construction Firm
IRJET-  	  S.W.O.T Analysis: A Progressive Strength for Construction FirmIRJET-  	  S.W.O.T Analysis: A Progressive Strength for Construction Firm
IRJET- S.W.O.T Analysis: A Progressive Strength for Construction FirmIRJET Journal
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryIRJET Journal
 
SWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDY
SWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDYSWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDY
SWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDYIRJET Journal
 
Business Analysis using Machine Learning
Business Analysis using Machine LearningBusiness Analysis using Machine Learning
Business Analysis using Machine LearningIRJET Journal
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET Journal
 
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...Dereck Downing
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...IRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...IRJET Journal
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET Journal
 
IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...
IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...
IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...IRJET Journal
 
A Review on Software Process Enhancements of Product Development in Worldwide...
A Review on Software Process Enhancements of Product Development in Worldwide...A Review on Software Process Enhancements of Product Development in Worldwide...
A Review on Software Process Enhancements of Product Development in Worldwide...IRJET Journal
 
IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...
IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...
IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...IRJET Journal
 
Interpretive Structural Modeling based analysis for Critical Failure Factors ...
Interpretive Structural Modeling based analysis for Critical Failure Factors ...Interpretive Structural Modeling based analysis for Critical Failure Factors ...
Interpretive Structural Modeling based analysis for Critical Failure Factors ...IRJET Journal
 
G0363052058
G0363052058G0363052058
G0363052058theijes
 
A Comparative Study of Different types of Models in Software Development Life...
A Comparative Study of Different types of Models in Software Development Life...A Comparative Study of Different types of Models in Software Development Life...
A Comparative Study of Different types of Models in Software Development Life...IRJET Journal
 

Similar to IRJET- S.W.O.T Analysis: Current Status of Construction (20)

IRJET- S.W.O.T Analysis: A Progressive Strength for Construction Firm
IRJET-  	  S.W.O.T Analysis: A Progressive Strength for Construction FirmIRJET-  	  S.W.O.T Analysis: A Progressive Strength for Construction Firm
IRJET- S.W.O.T Analysis: A Progressive Strength for Construction Firm
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction Industry
 
SWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDY
SWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDYSWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDY
SWOT ANALYSIS OF A MULTI PRODUCT DETERGENT MANUFACTURING INDUSTRY- A CASE STUDY
 
Business Analysis using Machine Learning
Business Analysis using Machine LearningBusiness Analysis using Machine Learning
Business Analysis using Machine Learning
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time Overrun
 
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...
IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...
IRJET- Evaluation of Critical Factors of Production System Life Cycle (PSLC):...
 
A Review on Software Process Enhancements of Product Development in Worldwide...
A Review on Software Process Enhancements of Product Development in Worldwide...A Review on Software Process Enhancements of Product Development in Worldwide...
A Review on Software Process Enhancements of Product Development in Worldwide...
 
IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...
IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...
IDENTIFYING VIABILITY PARAMETERS OF ERP SOFTWARE FOR CONSTRUCTION COMPANIES I...
 
Interpretive Structural Modeling based analysis for Critical Failure Factors ...
Interpretive Structural Modeling based analysis for Critical Failure Factors ...Interpretive Structural Modeling based analysis for Critical Failure Factors ...
Interpretive Structural Modeling based analysis for Critical Failure Factors ...
 
G0363052058
G0363052058G0363052058
G0363052058
 
A Comparative Study of Different types of Models in Software Development Life...
A Comparative Study of Different types of Models in Software Development Life...A Comparative Study of Different types of Models in Software Development Life...
A Comparative Study of Different types of Models in Software Development Life...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

IRJET- S.W.O.T Analysis: Current Status of Construction

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3543 S.W.O.T ANALYSIS: CURRENT STATUS OF CONSTRUCTION Viklesh S. Ingle1, Hemant H. Salunkhe2 1Secound Year M.E Construction and Management D.Y.Patil Institute of Engineering and Technology, Ambi, Pune, Maharashtra, India 2Professor Department of Civil Engineering Management D Y Patil Institute of Engineering and Technology, Ami, Pune, Maharastra, India ----------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - This paper contains SWOT Analysis for a construction firm. Different constructions firms are taken into consideration and their working conditions are analyzed. Learning the current situation of strength, Weakness, opportunity and Threats, will contribute in explaining the in general condition of construction firm which will help to make decision and progressively help for making strategy planning. SWOT Analysis provide an easier and quicker solution for determine the potential strength of thefirm. On the basis of analysis Analytical Hierarchy Process (AHP) is being taken in initial stage for planning and the remaining work is integrated in the form of flowchart. Integrating the work in smaller sections will make easier to perform the task and help in determining the objectives of the paper. Comparison betweendifferentfirmandtheir workingscenariois doneon whichstabilityof the firm is decided. Multiple criteria decision making Analysis process is also included for various decisions taken during of the project. Over viewing of the project is done in a systematic manner in stage wise process which includes Analysisofstrategy, Delay Analysis, Market Analysis, Environment Sustainable Design, Risk Management, Cost Comparison, Life Cycle Cost Analysis, and Competitors Analysis. All these are analyzed by using Super decision software for analysis in various stages. I foundsuperdecision making software for SWOT Analysis and obtain the required output. Key Words: SWOT Analysis, AHP, MCDA I. INTRODUCTION SWOT Analysis:-  Strength:-In build capacities of a construction firm to compete and grow strongly. One type of source for a construction firm which will useful for obtaining their desired objectives and goals.  Weakness: - In build deficiencies which will affect the growth of a construction firm and its survival. Some short of deficiencies, limitations or defects which will affect the constructionfirmtokeepaway fromachievingtheirobjectives and goals.  Opportunity: - The chances and opening towards growth of that particular firm and are created during analysis of strength and weakness.  Threats:-These are being challenges which arise during swot analysis. They are sometimes considering at the initial stages of planning or they are obtaining during working condition and alternating solution has to be giventothefirm. An undesirable condition which is being created while dealing with strength and weakness of the construction firm which will contribute towards damaging the strategic planning of the construction firm. II. Literature Review 1. “A RULE BASED SWOT ANALYSIS APPLICATION: A CASE STUDY FOR INDONESIAN HIGHER EDUCATION INSTITUTION” BY HusniThamrinaEndang , WahyuPamungkasb SWOT Analysis was first introduced by Albert Humphery during 1960-1970 when he used to work at Stanford University to develop methods which will contribute in companies in the United States in planning changes form. In the particular study firstly SWOT has being introduced. SWOT Analysis is an attempt to determine the strength and the weakness of the firm. Identification of opportunities for improvement and to find out the possible external difficulties that needs to be overcome. Description of SWOT Analysis will help for making strategic planning for long term and short term. HOUBEN is belonging to the first team that attempted to automation of SWOT Analysis.Provisionofknowledgebasedsystems has been used. This includes a knowledge Engineer who has list of Questioner in his build system (automated). This was an initial study which needs more improvement. Kurtilla
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3544 Introduction and use of decision making techniqueswasdoneinconstructionofbuildingSWOTAnalysis.InitiallySWOTfactors are arranged in a systematic manner. On the basis of importance they are categorized in various part and priority based data has been developed. 1. “APPLICATION OF THE AHP IN PROJECT MANAGEMENT” BY Kamal M. Al- Harbi  MCDA( Multiple Criteria Decision Making):- Various decisions have to taken by project owners for their benefits. Various elements are considered and factors occurring during the working process are determined. These factors are categorized in a systematic manner. Relationship of these factors is determined. Changes have to be made at the time of requirement. Activities of construction firm are show in an integrated process which contains hierarchal stages. Skill of determining these threats and solving them in initial stages will make ease to perform various task without any troubles and smooth working of the project can be achieve for success of the project. Schuyler The capability of making a sound decision important is an essential condition for the success of a construction firm. Multi criteria decision making problems focus on determining the problems.  Multi Criteria Decision Making: - Situations which contains necessary conditions for different courses of action, which cannot be solved by any of the simple methods is termed as Multi Criteria Decision Making. It is a skill of any particular person to determine and provide a perfect solution for any type of situation which affects the working condition.  Analytical Hierarchy Process(AHP):- It is a process which deals with organizing the data in an integrating process and successively helps for analyzing the problem in detail. This process is representing in the form of a flowchart which describe the problem in a stage wise process. This makes the problem Easy to understand and deal with it. This process is simple, easy and quick to perform for any type of problem. It is useful in any type of field. S = Strength W = Weakness O = Opportunity T = Threats Figure 1 SWOT ANALYSIS STRUCTURE III. METHODS AND DATA COLLECTION:- Stepwise procedure has being followed which is in the form of flowchart. 1) SWOT ANALYSIS is carried out on Internal and external Environment of construction firm and analytical hierarchal method are followed by it. 2) These AHP methods integrate the whole process in a flowchart form which describestheactivitiesoftheconstruction firm. 3) Here I have done site visit on construction firm and on meeting of meeting and description questions are prepared and rating has being given to that particular firm to determine the stability of the construction firm. 4) Comparative analysis is done and data is prepared.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3545 While dealing with AHP models they provide priority factors along with their importance with respect to otherclassifications. Prioritization mechanism can be obtain by using comparison matrix and by assigning comparison scale developed by Saaty (1980) to provide the relative importance to the describing classes. Table 1 Classification of factors for comparison Importance Explanation 1 Equal Important 3 Moderate Important 5 Highly Important  Procedure to determine the Priority and comparison of different classes 1. Number of comparison (n) = n 2. Comparison matrix = (n X n) 3. Eigen value = ….. ….. …… This will provide Priority Vector and importance of that factor with respect to other factor. Relationship between priority vector with respect to their weight or importance can be explained by using: A = X w Where w= Importance of the factor 4. Consistency Index (C.I) = 5. Consistency Ratio (C.R) = Table2. Random index n 1 2 3 4 5 6 7 8 9 RI 0.00 0.00 0.58 0.90 1.12 1.24 1.32 1.41 1.45 Figure 2 Methodology of SWOT Analysis Goal of construction firm
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3546 Table 3 General factor used to determine SWOT Analysis Strength(S) Weakness(W) 1. Staff Structure (S1) 2. Acceptability (S2) 3. Profitability (S3) 4. Specialty of project (S4) 5. SurroundingEnvironment(S5) 1. Working Condition (W1) 2. Budget (W2) 3. Reliability of Data (W3) 4. Record Maintenance (W4) 5. Schedule of Work (W5) Opportunity(O) Threats(T) 1. Maintenancemanagement(O1) 2. Business strategy (O2) 3. Market Analysis (O3) 4. New methods of Working (O4) 5. Future Thinking (O5) 1. Conflicts (T1) 2. Disputes (T2) 3. Variable policy (T3) 4. Creditors (T4) 5. Competitors Analysis (T5) 1. SWOT Matrix of Gagan Nulife  Eigen value : 5.52 Consistency Index :0.5075 Consistency Ratio : 0.875 2. Matrix of Strength of Gagan Nulife Strength S1 S2 S3 S1 S2 S3 SUM AVERAGE Staff structure S1 1 3 5 0.65 0.71 0.45 1.82 0.61 Acceptability S2 0.33 1 5 0.22 0.24 0.45 0.91 0.30 Profitability S3 0.2 0.2 1 0.13 0.05 0.09 0.27 0.09 1.53 4.2 11  Eigen value : 5.29 Consistency Index :0.5075 Consistency Ratio : 0.875 3. Matrix for Weakness of Gagan Nulife Weakness W1 W2 W3 W1 W2 W3 SUM AVERAGE Reliability of data W1 1 3 5 0.65 0.69 0.56 1.90 0.63 Record Maintenance W2 0.33 1 3 0.22 0.23 0.33 0.78 0.26 Schedule of work W3 0.2 0.3 1 0.13 0.08 0.11 0.32 0.11 1.53 4.3 9  Eigen value : 3.26 Consistency Index :0.13 Consistency Ratio : 0.22 S W O T S W O T SUM AVERAGE Strength S 1 3 3 5 0.54 0.56 0.58 0.36 2.03 0.54 Weakness W 0.33 1 1 3 0.18 0.19 0.19 0.21 0.77 0.18 Opportunity O 0.33 1 1 5 0.18 0.19 0.19 0.36 0.92 0.18 Threats T 0.2 0.33 0.2 1 0.11 0.06 0.04 0.07 0.28 0.11 1.87 5.33 5.20 14.00
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3547 4. Matrix for Opportunity of Gagan Nulife Opportunity O1 O2 O3 O1 O2 O3 SUM AVERAGE Maintenance Management O1 1 0.33 0.2 0.11 0.14 0.09 0.34 0.11 Business Strategy O2 3 1 1 0.33 0.43 0.45 1.22 0.41 Market Analysis O3 5 1 1 0.56 0.43 0.45 1.44 0.48 9 2.33 2.2  Eigen value : 3.02 Consistency Index : 0.1 Consistency Ratio : 0.17 5. Matrix for Threats of Gagan Nulife Threats T1 T2 T3 T1 T2 T3 SUM AVERAGE Conflits T1 1 0.2 0.33 0.11 0.13 0.08 0.32 0.11 Creditors T2 5 1 3 0.56 0.65 0.69 1.90 0.63 Competitors Analysis T3 3 0.33 1 0.33 0.22 0.23 0.78 0.26 9 1.53 4.33  Eigen value : 3.03 Consistency Index : 0.15 Consistency Ratio : 0.25 IV. Result Overall synthesis of the report Group Priority Factors Importance with respect to Group Overall Priority Strength 0.54 Staff Structure 0.61 0.3294 Acceptability 0.3 0.162 Profitability 0.09 0.0486 Weakness 0.18 Reliability of Data 0.63 0.1134 Record Maintenance 0.26 0.0468 Schedule of Work 0.11 0.0198 Opportunity 0.18 Maintenance Management 0.11 0.0198 Business Strategy 0.41 0.0738 Market Analysis 0.48 0.0864 Threats 0.11 Conflicts 0.11 0.0121 Creditors 0.63 0.0693 Competitors Analysis 0.26 0.0286
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3548 Overall Status of Gagan Nulife Strength Weakness Opportunity Threats Figure 3 Synthesis of overall status of construction firm On the basis of all above analysis we have evaluate strategic factors for a construction firm by using SWOT Analysis and AHP Methods. It has been concluded that Group Importance Strength 54% Weakness 18% Opportunity 18% Threats 11% V. CONCLUSIONS  SWOT Analysis deals with the current status and provide a satisfactory result which is the basic need of the construction firm.  Converting the problem in an AHP and dealing it is quite simple and beneficial. SWOT analysis could be helpful for a construction firm in at any stage of the construction firm.  Consistency level for a construction firm is in essential condition. This provides stability for the construction firm.  Integrating the problem in a systematic manner could be helpful for understanding the problem in deal.  Multi Criteria Decision Analysis provides support to SWOT Analysis and converts the complex problem into easy.  Combination of SWOT Analysis and AHP help to decide the drawbacks of the construction firm. REFERENCES [1] Selection of the information systems’ development in enterprises by multi criteria decision making by Vensa Cancer. [2] A combined application of SWOT Analysis and the analytical network method by Liaoji Zheng and HuiQing Liu. [3] Safety risk assessment using Analytic Hierarchyprocess(AHP)duringplanningand budgetingofconstructionprojects by Saman Aminbakhsh, Murat Gunduz, Rifat Sonmez [4] Decision support system for selecting the proper project delivery methodusinganalytical hierarchyprocess(AHP) by Ibrahim M. Mahdi, Khaled Alreshaid. [5] Decision making – The Analytic Hierarchy and network processes (ANP/AHP) by Thomas L. Saaty. [6] Exploring the potential for silvopasture adoption in south central Florida: an application of SWOT-AHP method by Ram K. Shrestha, Janaki R.R. Alavalapati, Robert S. Kalmbacher [7] Evaluation of project level environment impact assessmentandSWOTanalysisofEIAprocessinIndia byA.K.A.RATHI [8] SWOT analysis for planned maintenance strategy – a case study by Malgorzata Jasiulewicz- kaczmarek [9] Application of combined SWOT and AHP: A case study for a manufacturing Firm by Ali Gorener, Kerem Toker, Korkmaz Ulucay. [10] Application of AHP method in external strategic analysis of the selected organization by Terezie Bartuskova, Ales Kresta