IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 5 Ver. IV (Sep. - Oct. 2015), PP 47-51
www.iosrjournals.org
DOI: 10.9790/1684-12544751 www.iosrjournals.org 47 | Page
A Critical Review on Factors Influencing Labour Productivity in
Construction
T .G. Shree Raja Gopal1
, Dr. K. Murali2
1
(Student M.E. (CEM), Sri Ramakrishna Institute of Technology, Tamil Nadu, India)
2
(Professor, Sri Ramakrishna Institute of Technology, Tamil Nadu, India)
Abstract: Worldwide labour productivity is at the forefront of concern facing professionals in the construction
industry. Productivity helps construction industries to be competitive, to achieve the goals and to meet
stakeholder’s expectation. The main objective of the paper is to critically review the factors affecting labour
productivity, grouping of factors and methods to evaluate it. The study on productivity of labour is important in
developing country like India, where most of the building construction is in manual basis. Based on review it
was observed that supervision, skill of labour, tools and equipment, absenteeism and financial constraints were
the most significant factors affecting labour productivity, however in case of grouping of factors it was noted
that human group, management group, material and tool group, environmental group and technological group
are relatively important groups. In case of analysis of labour productivity, factor analysis plays a vital role in
identifying the independent and group factors which can be used to improve the factors affecting.
Keywords: Construction, Labour, Manpower, Machine, Material, Productivity
I. Introduction
Productivity is one of the most important factors which affect the overall performance of any
organization, either large or small. The construction sector has strategic role in developed and developing
countries, employing more than 7% of European work force, the sector is the largest industrial employer in
continent (Rateb et al 2009 and Proverbs et al 1999). The construction industry in India contributes to over 5%
of Nations gross domestic product and employs over 30 million people (Planning Commission 2008).
According to Make in India project it was estimated that the construction industry contribute more than 10% of
India’s gross domestic product. In most countries, labour cost comprises 30-50 percent of total project cost
(Shashank et al 2015, McTague and Jergeas 2002) and the reduction of these costs can be carried out by
effective utilization of manpower in construction industry. Construction productivity and labour productivity are
two important words that determine the profit and loss of construction business. Labour productivity is a sub
domain of the overall construction productivity at the same time construction productivity is highly dependent
on labour productivity (Prakash Rao et al 2015). There are number of factors that directly affect the productivity
of labour, thus it is important for any organization to study and identify those factors at micro level to improve
the labour productivity. The main objective of the paper is to critically review the factors affecting labour
productivity and methods to evaluate labour productivity.
II. Review Of Literature
2.1 Definitions
The origin of the term productivity can be traced back to 1766 when it was first mentioned in article by
Quesnay (Vaggi 1987, Abdulaziz and Camille 2012). In 1883, Littre defined productivity as the faculty to
produce (Jarkas 2005). In 1950, the organization for European Economic Co-operation (OEEC) introduced a
formal definition of productivity as quotient obtained by dividing output by one of the production factors
(Sumanth 1984). Two measures of productivity namely total factor productivity (TFP) and partial factor
productivity (PFP) are commonly used in construction industry (Vaishant and Kansal 2014). The first measure
of productivity total factor productivity is defined as the ratio of total output to total input. Total factor
productivity is expressed as shown in the equation (1).
TFP = ……….1
The second measure partial factor productivity it is defined as the ratio of the output to a single or
selected set of input. Equation (2), (3), (4) gives partial factor productivity for selected set of inputs.
Labour productivity = ……….2
A Critical Review on Factors Influencing Labour Productivity in Construction
DOI: 10.9790/1684-12544751 www.iosrjournals.org 48 | Page
Capital productivity = ……….3
Equipment productivity = ……….4
2.2 Factors Affecting LabourProductivity
Construction labour productivity has been the subject of numerous research studies. Horner et al (1989)
investigated the factors affecting productivity and improving productivity in construction in UK through a
questionnaire survey to a wide range of British constructors. The 13 significant factors which influence labour
productivity were; 1. Skill of labour, 2. Build ability, 3. Quality of supervision, 4. Method of working, 5.
Incentive scheme, 6. Site layout, 7. Complexity of construction information, 8. Crew size and composition, 9.
Length of working day, 10. Availability of power tools, 11. Absenteeism, 12. Total number of operations on site
and 13. Proportion of work sub contracted.
Lim and Alum (1995) classified various factors impacting the construction productivity in Singapore
and shortlisted the following as most significant; 1. Lack of qualified supervision, 2. Shortage of skilled labours,
3. High rate of labour turn over, 4. Labour absenteeism and 5. Communication with foreign labours.
Makulsawatudom et al (2004) researched the influence of 23 factors on the productivity of the
construction industry in Thailand and deducted that lack of material, incomplete drawings, incompetent
supervisors, lack of tools and equipment, labour absenteeism, poor communication, instruction time, poor site
layout, inspection delay and rework, are the most critical.
AynurKazaz et al (2008), moreover surveyed 82 firms on factors affecting labour productivity in
Turkey and identified the following nine factors as most important to labour efficiency; 1. Quality of site
management, 2. Material management, 3. Amount and on payment, 4. Planning, 5. Supervision, 6. Site layout,
7. Work discipline, 8. Occupational education and training, 9. Working at similar activities, based on relative
importance index method.
Soekiman et al (2011) explored various factors affecting labour productivity in Indonesia and
shortlisted the following as most significant: Lag of materials, Delay in arrival of material, Unclear instruction
to labour, Labour strikes, Financial difficulties, Higher absenteeism of labour, No supervision method,
Supervisors absenteeism, Lag of equipment and design change. In another study by Attar et al on various factors
affecting labour productivity and methods to improve it at Sangli, Kolhapur and Pune district concludes with the
same parameters given by Soekiman et al (2011) as most significant factors affecting labour productivity.
Vaishant and Kansal (2014), based on relative importance index identified the top ten following factors
affecting labour productivity in Chambal region, India were: (1) Classification in technical specification, (2)
Labour supervision, (3) Method of construction, (4) Delay in payment, (5) Labour fatigue, (6) Lack of
construction managers leadership, (7) Extents of variations/change order during execution, (8) Late arrival, early
quit and frequent unscheduled break, (9) Labour skill and (10) Availability of experienced labours.
In a survey geared towards identifying the constraints on Iranian construction productivity, Zakari et al
(1996), using the relative index ranking technique, ranked the five following factors as major impacts: (1)
Material shortage, (2) Weather and site condition, (3) Equipment breakdown, (4) Drawing efficiency/change
orders and (5) Lack of proper tools and equipment. Alinaitwe et al (2007) studied the impacts on the
productivity of craftsman in Uganda and concluded that, (1) Incompetent supervisors, (2) Lack of skill, (3)
Rework, (4) Lack of tools/equipment and (5) Poor construction method, are among the most influential.
2.3 Grouping of the Factors Affecting Labour Productivity
Talhouni (1990) classified four categories responsible for affecting productivity on construction sites:
(1) Management, (2) Site, (3) Design, (4) Weather, whereas Herbsman and Ellis (1990) reported two-group
main divisions of influencing factors: (1) Technological and (2) Administrative.
Enshassi et al (2007), surveyed 45 factors affecting labour productivity in building projects in gaze
strip and distributed such factors under the following ten major groups: (1) Manpower, (2) Leadership, (3)
Motivational, (4) Time, (5) Material/Tools, (6) Supervision, (7) Project, (8) Safety, (9) Quality, (10) External.
Brent and Ellis (2014) sorted productivity factors into four major groups: (1) Management, (2)
Human/Labour, (3) Technological and (4) External. Nearly 24 factors were accounted in management factors,
the most significant factors based on relative importance index were lack of labour supervision, unrealistic
scheduling and expectation of labour performance, lack leadership, payment delay and communication. Human
and labour factors include, shortage of experienced labour, skill of labour, motivation of labour and physical
fatigue. 12 factors were included in technological group and ranked on RII, the five most significant factors
were; delay in responding to request for information, rework, extent of variation/change order during execution,
A Critical Review on Factors Influencing Labour Productivity in Construction
DOI: 10.9790/1684-12544751 www.iosrjournals.org 49 | Page
clarity of technical specification and co-ordination level among design disciplines. Rain and high temperature
were grouped under external factors.
Robles et al (2014), selected set of 35 factors to identify factors affecting labour productivity in Spain
with respect to their relative importance. Factor explored were grouped in five different categories according to
the nature of each factor namely, (1) Project, (2) Human, (3) Management, (4) Material and tools, (5)
Environmental. Based on RII the five categories were ranked as, 1. Material and tools, 2. Management, 3.
Human, 4. Project, 5. Environmental.
2.4 Analysis of Labour Productivity
Unanticipated conditions on a construction project leads to significant loss of productivity. A model for
analyzing the complex cause and effect relationships were needed to measure the loss of productivity. Daniel et
al (1994), suggested the action-response model. The action response model provides a new approach to evaluate
specific occurrences of loss of productivity. The cause of loss of productivity was identified through this model
by addressing six issues such as, importance of focusing on crew in any discussion of productivity, extent to
which productivity loss at crew level may be removed, relationships that exists in productivity, contractor’s
active role in influencing productivity, awareness of contractor on need for management decisions and
constraints resulting from external conditions. The action-response model provides a frame work for evaluating
the cause of productivity loss on individual projects.
Improved measured mile analysis technique for quantifying lost labour productivity suggested by
William and Liu (2005), a widely accepted way to quantify losses in the measured mile approach. This approach
compares periods of a project that have been impacted by the change to those that have not been impacted.
Measured mile concept allows specific impacts to be isolated while accounting for other inefficiencies
inherent in the work being performed. It was noted that the measured mile method is the best choice for
productivity loss calculation because it calculates base line productivity and disruption effects in a much more
objective manner. Rateb et al (2009), studied the variability of labour productivity in masonry construction
through measured mile model (ie., base line productivity) and quantified comparable measures of productivity.
Randolph (2010), used measured mile approach in quantification of losses of labour efficiencies. It was
observed that the measured mile is not a rigorous procedure, but rather a concept. Therefore, each analyst is left
to develop procedures as required, which will lead procedure that undermine the validity of analysis.
Shashank et al (2014), analyzed the key factor affecting the variation of labour productivity in India. A
total of 34 factors, grouped into 8 groups according to their characteristics, namely: Manpower, Managerial,
Environmental, Safety, Material/Equipment, Schedule, Motivation and Quality. The result of reliability analysis
and factor analysis showed that three independent factors and one independent group were reflected due to low
corrected item based on total coefficient and loading score. Multiple regression analysis showed that six groups,
namely: Motivational group, Manpower group, Material/Equipment group, Safety group, Managerial group and
Quality group had a positive impact on labour productivity variations.
III. Summary
Construction sector mainly concentrate on 3-M principle for a substantial yield in terms of time and
cost. The 3-M concept includes manpower, machine and material. In recent years many researches concentrate
on improving the labour productivity witnessed the importance of labour productivity. From the review it was
observed that the ordinal measurement scale 1 to 5 was used to determine the effect level and relative
importance index for all factors were calculated. Few researches calculated relative importance index at 1 to 4
ordinal measurement scale. The factors affecting labour productivity in various countries presented in the review
were ranked based on the relative importance index. The major five factors that affect the labour productivity
were; supervision, skill of labour, absenteeism, tools and equipment and financial constraints. These are the
most significant factors that are accounted in US, India, Singapore, Indonesia, Thailand, Turkey and Iran. Few
factors relating to construction methods, site condition, change of order and communication also contribute to
low productivity. Communication plays a vital role in India and in some parts of the European nation due to the
migration of labours. Other factors such as weather and complexity of construction also contribute to low
productivity in countries like Iran and UK.
The review on grouping of the factors affecting labour productivity clearly states that when more
number of factors are considered in the study the importance of many significant factors were ranked below.
Therefore grouping makes it easier for one to identify the similarities and differences between them. From the
review it was noted that in earlier studies there were only two main groups influencing productivity namely
technological group and administrative group later due to the evolving nature and characteristics of factors
affecting productivity, the number of groups increased in order to identify the significant factor relating to
manpower, leadership, motivational, material/tool, supervision, project, safety, quality and external factors.
Based on the relative ranking it was observed that human group and management group have high impact on
A Critical Review on Factors Influencing Labour Productivity in Construction
DOI: 10.9790/1684-12544751 www.iosrjournals.org 50 | Page
affecting labour productivity in major countries like UK, India and Spain. In India and Gaza the group such as
project, technology, motivational, quality and safety have adverse impact on labour productivity. Due to the
grouping of factors, the relative importance on most significant factors in eachgroup can be individually
analyzed and overall ranking of groups through relative importance index can be determined.
The prediction models are very important to identify the problems and suggest a suitable solution for
improving the productivity. From the review it was observed that the three important methods used to develop a
model were action response model, measured mile concept and factor analysis. The action response model is a
plot of productivity overtime for analyzing the complex cause and effect relationship that may lead to loss of
productivity in construction. The model graphically depicts how variety of factors may interact to cause a loss of
productivity, how the crew is influenced by these factors and how management of crew can mitigate, eliminate
and initiate any particular loss of productivity. The action response model provides a framework for evaluating
the cause of productivity loss on individual projects. The measured mile technique is used to quantify the losses
in measured mile approach. The measured mile concept involves comparison of actual labour performance
between two periods. Measured mile is the best choice for productivity loss calculation because it calculates
baseline productivity and disruption effects in objective manner. However the measured mile concept may be
unsuitable for unique and complex work or where work disruption are so pervasive that no measured mile
period exists. An important point to remember is that loss of efficiency can be subjective and experts need time
to develop a report. Factor analysis is a multivariate statistical technique that can be utilized to examine the
underlying patterns or relationships for large number of variables and summarize information in smaller set of
factors or component for prediction purpose. Principal component analysis is the most frequently employed
factor analytic approach. By carrying out the factor analysis one can judge the independent factors and group
factors which show a high correlation with each other and least correlation can be rejected.
IV. Conclusion
The construction sector has strategic role in all developed and developing countries. In the view of the
substantial share of construction sector in the whole economy, the stakeholder attention is focused on improved
resource utilization and productivity. From the review it was observed that, inefficient management of
construction resources can result in low productivity. Proper management of resources in construction project
can yield substantial saving in cost and time.
References
[1]. Rateb J. Sweis, Ghaled J. Sweis, Ayman A. Abu Hammad and Malek Abu Rumman,, Modelling the Variability of Labour
Productivity in Masonry Construction. Jordan Journal of Civil Engineering,3(2), 2009,197-212
[2]. Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O.,The Management of Labour on High Rise Construction Projects: An International
Investigation. International Journal of Project Management, 17, 1999, 195-204.
[3]. Planning Commission, Government of India. , Eleventh Five Year Plan (2007–2012). Planning Commission, Government of India,
3, 2008.
[4]. Shashank K, Dr. Sutapa Hazra, Kabindra Nath Pal, Analysis of Key Factors Affecting the Variations of Labour Productivity in
Construction Projects. International Journal of Emerging Technology and Advanced Engineering, 4(5), 2014, 152-160.
[5]. McTague, B., and Jergeas, G., Productivity Improvement on Alberta Major Construction Projects, Construction Productivity
Improvement Report / Project evaluation tool, Alberta economic development, Alberta, Canada, 2002.
[6]. B. Prakash Rao, AmbikaSreenivasan, Prasad Babu NV, Labour Productivity-Analysis and Ranking. International Research Journal
of Engineering and Technology, 2(3), 2015, 151-155.
[7]. Vaggi, G., The economics of France Quesnay, Duke University Press, Durham, NC, 1987.
[8]. Abdulaziz M. Jarkas, P. Eng and Camille G. Bitar, Factors Affecting Construction Labour Productivity in Kuwait., Journal of
Construction Engineering and Management, 138(7),2011 ,811-820.
[9]. Sumanth, D. J., Productivity engineering and management, McGraw-Hill, New York, 1984.
[10]. Vaishant Gupta, R. Kansal, Improvement of Construction Labour Productivity in Chambal Region. International Journal of
Research in Engineering and Technology, 3(10), 2014, 34-37.
[11]. Horner, R. M. W., Talhouni, B. T and Thomas H. R., Preliminary Results of Major Labour Productivity Monitoring Program.
Proc.of the 3rd Yugoslavian Symposium on Construction Management, Cavtat, 1989, 18-28.
[12]. E C Lim and Jahidul Alum, Construction Productivity: Issues Encountered by Contractors in Singapore. International Journal of
Project Management, 13(1), 1995, 51-58.
[13]. A.Soekiman, K.S.Pribadi, B.W.Soemardi, R.D.Wirahadikusumah, Factors Relating to Labour Productivity Affecting the Project
Schedule Performance in Indonesia. Procedia Engineering, 14, 2011, 865-873.
[14]. A.A. Attar, A.K. Gupta, D.B. Desai, A Study of Various Factors Affecting Labour Productivity and Methods to Improve It.
Proceedings of International Conference on Emerging Trends in Engineering, ISSN 2278-1684, 11-14..
[15]. Aynur Kazaz, Ekrem Manisali, Serdar Ulubeyli, Effect of Basic Motivational Factors on Construction Workforce Productivity in
Turkey, Journal of Construction Engineering and Management, 14(2), 2008, 95-106.
[16]. Makulsawatudom, A., Emsley, M.and Sinthawanarong, K., Critical Factors Influencing Construction Productivity in Thailand. J.
King Mongkut’s Institute of Technology North Bangkok, 14(3), 2004, 1–6.
[17]. Zakari, M., Olomolaiye, P. O., Holt, G. D., and Harris, F. C., A Survey of Constraints on Iranian Construction Operatives
Productivity. Constr. Manage. Economics, 14(5), 1996, 417–426.
[18]. Talhouni, B. T, Measurement and Analysis of Construction Labour Productivity. Doctrol diss., Univ. of Dundee, UK, 1999.
[19]. Adan Enshassi, Sherif Mohammed, ZiadAbu Mustafa and Peter Eduard Mayer, Factors Affecting Labour Productivity in Building
Projects in the Gaza Strip. Journal of Civil Engineering and Management, 8(4), 2007, 245-254.
A Critical Review on Factors Influencing Labour Productivity in Construction
DOI: 10.9790/1684-12544751 www.iosrjournals.org 51 | Page
[20]. Brent G. Hickson and Leighton A. Ellis, Factors Affecting Construction Labour Productivity in Trinidad and Tobago. The Journal
of the Association of Professional Engineers of Trinidad and Tobago, 2(1), 2014, 4-11.
[21]. Alinaitwe, H. M., Mwakali, J. A., and Hanson, B., Factors Affecting the Productivity of Building Craftsmen—Studies of Uganda. J.
Civil Eng. Manage, 13(3), 2007, 169–176.
[22]. G. Robels, Labour Productivity in the Construction Industry-Factors Influencing the Spanish Construction Labour Productivity.
International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering, 8(10), 2014, 1021-1030.
[23]. David W. Halligan, Action Response Model and Loss Productivity in Construction, Journal of Construction Engineering and
Management, 120(1), 1994, 47-64
[24]. William Ibbs and Min Liu, Improved Measured Mile Analysis Technique. Journal of Construction Engineering and Management,
131(12), 2005, 1249-1256.
[25]. H. Randolph Thomas, Quantification of Losses of Labour Efficiencies: Innovations in and Improvement to the Measured Mile,
Journal of Legal Affairs and Disputes Resolution in Engineering and Construction, 2(2), 2010, 106-112.

More Related Content

What's hot

ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSIAEME Publication
 
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRYSTUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRYIAEME Publication
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET Journal
 
A Review on Application of Ergonomic Principles for Work related Injuries in ...
A Review on Application of Ergonomic Principles for Work related Injuries in ...A Review on Application of Ergonomic Principles for Work related Injuries in ...
A Review on Application of Ergonomic Principles for Work related Injuries in ...IRJET Journal
 
A Review on Efficiency of Migrated Labours in Construction Industry
A Review on Efficiency of Migrated Labours in Construction IndustryA Review on Efficiency of Migrated Labours in Construction Industry
A Review on Efficiency of Migrated Labours in Construction IndustryIRJET Journal
 
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...IRJET Journal
 
Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...
Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...
Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...IJERA Editor
 
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...Dr. Amarjeet Singh
 
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryIRJET Journal
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodIRJET Journal
 
The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...JosephineSurya2
 
140080714002 paper-1
140080714002 paper-1140080714002 paper-1
140080714002 paper-1pitroda24977
 
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY IAEME Publication
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET Journal
 
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...IAEME Publication
 

What's hot (19)

ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTSASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
ASSESEMENT ON FACTORS DECLINING LABOUR PRODUCTIVTY IN CONSTRUCTION PROJECTS
 
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRYSTUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
STUDY ON ENHANCEMENT OF HUMAN SAFETY PROTECTION FACTORS IN CONSTRUCTION INDUSTRY
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
A Review on Application of Ergonomic Principles for Work related Injuries in ...
A Review on Application of Ergonomic Principles for Work related Injuries in ...A Review on Application of Ergonomic Principles for Work related Injuries in ...
A Review on Application of Ergonomic Principles for Work related Injuries in ...
 
A Review on Efficiency of Migrated Labours in Construction Industry
A Review on Efficiency of Migrated Labours in Construction IndustryA Review on Efficiency of Migrated Labours in Construction Industry
A Review on Efficiency of Migrated Labours in Construction Industry
 
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
 
[IJET V2I4P4] Authors: Miss. Smita .A. Bhole
[IJET V2I4P4] Authors: Miss. Smita .A. Bhole[IJET V2I4P4] Authors: Miss. Smita .A. Bhole
[IJET V2I4P4] Authors: Miss. Smita .A. Bhole
 
Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...
Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...
Discrete Event Simulation Analysis of the Effect of Labor Absenteeism on the ...
 
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
 
Ijciet 08 04_218
Ijciet 08 04_218Ijciet 08 04_218
Ijciet 08 04_218
 
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
 
30420140501003
3042014050100330420140501003
30420140501003
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index Method
 
The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...
 
140080714002 paper-1
140080714002 paper-1140080714002 paper-1
140080714002 paper-1
 
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
 
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
FACTORS RELATED TO HUMAN RESOURCES AFFECTING THE MAINTENANCE EFFECTIVENESS IN...
 

Viewers also liked

Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...
Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...
Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...IOSR Journals
 
P010439497.jeee [zsep02]
P010439497.jeee [zsep02]P010439497.jeee [zsep02]
P010439497.jeee [zsep02]IOSR Journals
 

Viewers also liked (20)

J017335863
J017335863J017335863
J017335863
 
Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...
Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...
Performance and Emission Characteristics of Twin Cylinder CI Engine Using Cot...
 
J017216164
J017216164J017216164
J017216164
 
U180203134138
U180203134138U180203134138
U180203134138
 
I010616064
I010616064I010616064
I010616064
 
E1802023741
E1802023741E1802023741
E1802023741
 
A017650104
A017650104A017650104
A017650104
 
J1803015357
J1803015357J1803015357
J1803015357
 
M1803028995
M1803028995M1803028995
M1803028995
 
K010326568
K010326568K010326568
K010326568
 
I017245865
I017245865I017245865
I017245865
 
P010439497.jeee [zsep02]
P010439497.jeee [zsep02]P010439497.jeee [zsep02]
P010439497.jeee [zsep02]
 
K012247277
K012247277K012247277
K012247277
 
B010630409
B010630409B010630409
B010630409
 
Z01226158164
Z01226158164Z01226158164
Z01226158164
 
C017611624
C017611624C017611624
C017611624
 
L010636772
L010636772L010636772
L010636772
 
B017622430
B017622430B017622430
B017622430
 
A012650114
A012650114A012650114
A012650114
 
J010516267
J010516267J010516267
J010516267
 

Similar to H012544751

Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Journals
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...IRJET Journal
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET Journal
 
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...inventionjournals
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...
Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...
Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...drboon
 
Productivity improvement in construction
Productivity  improvement in constructionProductivity  improvement in construction
Productivity improvement in constructionKabilanP1
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurementSiddharth Mantri
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxKaushalKumar522651
 
IJEBEA14-419
IJEBEA14-419IJEBEA14-419
IJEBEA14-419Ajin Thomas
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayIRJET Journal
 
Time delay and cost escalation in construction works
Time delay and cost escalation in construction worksTime delay and cost escalation in construction works
Time delay and cost escalation in construction worksvivatechijri
 

Similar to H012544751 (20)

Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- Review
 
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
D012261521
D012261521D012261521
D012261521
 
Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...
Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...
Using DEMATEL Method to Analyze the Causal Relations on Technological Innovat...
 
Productivity improvement in construction
Productivity  improvement in constructionProductivity  improvement in construction
Productivity improvement in construction
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurement
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Ijciet 08 04_220
Ijciet 08 04_220Ijciet 08 04_220
Ijciet 08 04_220
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
 
H0341034041
H0341034041H0341034041
H0341034041
 
IJEBEA14-419
IJEBEA14-419IJEBEA14-419
IJEBEA14-419
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction Delay
 
Time delay and cost escalation in construction works
Time delay and cost escalation in construction worksTime delay and cost escalation in construction works
Time delay and cost escalation in construction works
 
Ijciet 10 01_054
Ijciet 10 01_054Ijciet 10 01_054
Ijciet 10 01_054
 

More from IOSR Journals (20)

A011140104
A011140104A011140104
A011140104
 
M0111397100
M0111397100M0111397100
M0111397100
 
L011138596
L011138596L011138596
L011138596
 
K011138084
K011138084K011138084
K011138084
 
J011137479
J011137479J011137479
J011137479
 
I011136673
I011136673I011136673
I011136673
 
G011134454
G011134454G011134454
G011134454
 
H011135565
H011135565H011135565
H011135565
 
F011134043
F011134043F011134043
F011134043
 
E011133639
E011133639E011133639
E011133639
 
D011132635
D011132635D011132635
D011132635
 
C011131925
C011131925C011131925
C011131925
 
B011130918
B011130918B011130918
B011130918
 
A011130108
A011130108A011130108
A011130108
 
I011125160
I011125160I011125160
I011125160
 
H011124050
H011124050H011124050
H011124050
 
G011123539
G011123539G011123539
G011123539
 
F011123134
F011123134F011123134
F011123134
 
E011122530
E011122530E011122530
E011122530
 
D011121524
D011121524D011121524
D011121524
 

Recently uploaded

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 

Recently uploaded (20)

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 

H012544751

  • 1. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 5 Ver. IV (Sep. - Oct. 2015), PP 47-51 www.iosrjournals.org DOI: 10.9790/1684-12544751 www.iosrjournals.org 47 | Page A Critical Review on Factors Influencing Labour Productivity in Construction T .G. Shree Raja Gopal1 , Dr. K. Murali2 1 (Student M.E. (CEM), Sri Ramakrishna Institute of Technology, Tamil Nadu, India) 2 (Professor, Sri Ramakrishna Institute of Technology, Tamil Nadu, India) Abstract: Worldwide labour productivity is at the forefront of concern facing professionals in the construction industry. Productivity helps construction industries to be competitive, to achieve the goals and to meet stakeholder’s expectation. The main objective of the paper is to critically review the factors affecting labour productivity, grouping of factors and methods to evaluate it. The study on productivity of labour is important in developing country like India, where most of the building construction is in manual basis. Based on review it was observed that supervision, skill of labour, tools and equipment, absenteeism and financial constraints were the most significant factors affecting labour productivity, however in case of grouping of factors it was noted that human group, management group, material and tool group, environmental group and technological group are relatively important groups. In case of analysis of labour productivity, factor analysis plays a vital role in identifying the independent and group factors which can be used to improve the factors affecting. Keywords: Construction, Labour, Manpower, Machine, Material, Productivity I. Introduction Productivity is one of the most important factors which affect the overall performance of any organization, either large or small. The construction sector has strategic role in developed and developing countries, employing more than 7% of European work force, the sector is the largest industrial employer in continent (Rateb et al 2009 and Proverbs et al 1999). The construction industry in India contributes to over 5% of Nations gross domestic product and employs over 30 million people (Planning Commission 2008). According to Make in India project it was estimated that the construction industry contribute more than 10% of India’s gross domestic product. In most countries, labour cost comprises 30-50 percent of total project cost (Shashank et al 2015, McTague and Jergeas 2002) and the reduction of these costs can be carried out by effective utilization of manpower in construction industry. Construction productivity and labour productivity are two important words that determine the profit and loss of construction business. Labour productivity is a sub domain of the overall construction productivity at the same time construction productivity is highly dependent on labour productivity (Prakash Rao et al 2015). There are number of factors that directly affect the productivity of labour, thus it is important for any organization to study and identify those factors at micro level to improve the labour productivity. The main objective of the paper is to critically review the factors affecting labour productivity and methods to evaluate labour productivity. II. Review Of Literature 2.1 Definitions The origin of the term productivity can be traced back to 1766 when it was first mentioned in article by Quesnay (Vaggi 1987, Abdulaziz and Camille 2012). In 1883, Littre defined productivity as the faculty to produce (Jarkas 2005). In 1950, the organization for European Economic Co-operation (OEEC) introduced a formal definition of productivity as quotient obtained by dividing output by one of the production factors (Sumanth 1984). Two measures of productivity namely total factor productivity (TFP) and partial factor productivity (PFP) are commonly used in construction industry (Vaishant and Kansal 2014). The first measure of productivity total factor productivity is defined as the ratio of total output to total input. Total factor productivity is expressed as shown in the equation (1). TFP = ……….1 The second measure partial factor productivity it is defined as the ratio of the output to a single or selected set of input. Equation (2), (3), (4) gives partial factor productivity for selected set of inputs. Labour productivity = ……….2
  • 2. A Critical Review on Factors Influencing Labour Productivity in Construction DOI: 10.9790/1684-12544751 www.iosrjournals.org 48 | Page Capital productivity = ……….3 Equipment productivity = ……….4 2.2 Factors Affecting LabourProductivity Construction labour productivity has been the subject of numerous research studies. Horner et al (1989) investigated the factors affecting productivity and improving productivity in construction in UK through a questionnaire survey to a wide range of British constructors. The 13 significant factors which influence labour productivity were; 1. Skill of labour, 2. Build ability, 3. Quality of supervision, 4. Method of working, 5. Incentive scheme, 6. Site layout, 7. Complexity of construction information, 8. Crew size and composition, 9. Length of working day, 10. Availability of power tools, 11. Absenteeism, 12. Total number of operations on site and 13. Proportion of work sub contracted. Lim and Alum (1995) classified various factors impacting the construction productivity in Singapore and shortlisted the following as most significant; 1. Lack of qualified supervision, 2. Shortage of skilled labours, 3. High rate of labour turn over, 4. Labour absenteeism and 5. Communication with foreign labours. Makulsawatudom et al (2004) researched the influence of 23 factors on the productivity of the construction industry in Thailand and deducted that lack of material, incomplete drawings, incompetent supervisors, lack of tools and equipment, labour absenteeism, poor communication, instruction time, poor site layout, inspection delay and rework, are the most critical. AynurKazaz et al (2008), moreover surveyed 82 firms on factors affecting labour productivity in Turkey and identified the following nine factors as most important to labour efficiency; 1. Quality of site management, 2. Material management, 3. Amount and on payment, 4. Planning, 5. Supervision, 6. Site layout, 7. Work discipline, 8. Occupational education and training, 9. Working at similar activities, based on relative importance index method. Soekiman et al (2011) explored various factors affecting labour productivity in Indonesia and shortlisted the following as most significant: Lag of materials, Delay in arrival of material, Unclear instruction to labour, Labour strikes, Financial difficulties, Higher absenteeism of labour, No supervision method, Supervisors absenteeism, Lag of equipment and design change. In another study by Attar et al on various factors affecting labour productivity and methods to improve it at Sangli, Kolhapur and Pune district concludes with the same parameters given by Soekiman et al (2011) as most significant factors affecting labour productivity. Vaishant and Kansal (2014), based on relative importance index identified the top ten following factors affecting labour productivity in Chambal region, India were: (1) Classification in technical specification, (2) Labour supervision, (3) Method of construction, (4) Delay in payment, (5) Labour fatigue, (6) Lack of construction managers leadership, (7) Extents of variations/change order during execution, (8) Late arrival, early quit and frequent unscheduled break, (9) Labour skill and (10) Availability of experienced labours. In a survey geared towards identifying the constraints on Iranian construction productivity, Zakari et al (1996), using the relative index ranking technique, ranked the five following factors as major impacts: (1) Material shortage, (2) Weather and site condition, (3) Equipment breakdown, (4) Drawing efficiency/change orders and (5) Lack of proper tools and equipment. Alinaitwe et al (2007) studied the impacts on the productivity of craftsman in Uganda and concluded that, (1) Incompetent supervisors, (2) Lack of skill, (3) Rework, (4) Lack of tools/equipment and (5) Poor construction method, are among the most influential. 2.3 Grouping of the Factors Affecting Labour Productivity Talhouni (1990) classified four categories responsible for affecting productivity on construction sites: (1) Management, (2) Site, (3) Design, (4) Weather, whereas Herbsman and Ellis (1990) reported two-group main divisions of influencing factors: (1) Technological and (2) Administrative. Enshassi et al (2007), surveyed 45 factors affecting labour productivity in building projects in gaze strip and distributed such factors under the following ten major groups: (1) Manpower, (2) Leadership, (3) Motivational, (4) Time, (5) Material/Tools, (6) Supervision, (7) Project, (8) Safety, (9) Quality, (10) External. Brent and Ellis (2014) sorted productivity factors into four major groups: (1) Management, (2) Human/Labour, (3) Technological and (4) External. Nearly 24 factors were accounted in management factors, the most significant factors based on relative importance index were lack of labour supervision, unrealistic scheduling and expectation of labour performance, lack leadership, payment delay and communication. Human and labour factors include, shortage of experienced labour, skill of labour, motivation of labour and physical fatigue. 12 factors were included in technological group and ranked on RII, the five most significant factors were; delay in responding to request for information, rework, extent of variation/change order during execution,
  • 3. A Critical Review on Factors Influencing Labour Productivity in Construction DOI: 10.9790/1684-12544751 www.iosrjournals.org 49 | Page clarity of technical specification and co-ordination level among design disciplines. Rain and high temperature were grouped under external factors. Robles et al (2014), selected set of 35 factors to identify factors affecting labour productivity in Spain with respect to their relative importance. Factor explored were grouped in five different categories according to the nature of each factor namely, (1) Project, (2) Human, (3) Management, (4) Material and tools, (5) Environmental. Based on RII the five categories were ranked as, 1. Material and tools, 2. Management, 3. Human, 4. Project, 5. Environmental. 2.4 Analysis of Labour Productivity Unanticipated conditions on a construction project leads to significant loss of productivity. A model for analyzing the complex cause and effect relationships were needed to measure the loss of productivity. Daniel et al (1994), suggested the action-response model. The action response model provides a new approach to evaluate specific occurrences of loss of productivity. The cause of loss of productivity was identified through this model by addressing six issues such as, importance of focusing on crew in any discussion of productivity, extent to which productivity loss at crew level may be removed, relationships that exists in productivity, contractor’s active role in influencing productivity, awareness of contractor on need for management decisions and constraints resulting from external conditions. The action-response model provides a frame work for evaluating the cause of productivity loss on individual projects. Improved measured mile analysis technique for quantifying lost labour productivity suggested by William and Liu (2005), a widely accepted way to quantify losses in the measured mile approach. This approach compares periods of a project that have been impacted by the change to those that have not been impacted. Measured mile concept allows specific impacts to be isolated while accounting for other inefficiencies inherent in the work being performed. It was noted that the measured mile method is the best choice for productivity loss calculation because it calculates base line productivity and disruption effects in a much more objective manner. Rateb et al (2009), studied the variability of labour productivity in masonry construction through measured mile model (ie., base line productivity) and quantified comparable measures of productivity. Randolph (2010), used measured mile approach in quantification of losses of labour efficiencies. It was observed that the measured mile is not a rigorous procedure, but rather a concept. Therefore, each analyst is left to develop procedures as required, which will lead procedure that undermine the validity of analysis. Shashank et al (2014), analyzed the key factor affecting the variation of labour productivity in India. A total of 34 factors, grouped into 8 groups according to their characteristics, namely: Manpower, Managerial, Environmental, Safety, Material/Equipment, Schedule, Motivation and Quality. The result of reliability analysis and factor analysis showed that three independent factors and one independent group were reflected due to low corrected item based on total coefficient and loading score. Multiple regression analysis showed that six groups, namely: Motivational group, Manpower group, Material/Equipment group, Safety group, Managerial group and Quality group had a positive impact on labour productivity variations. III. Summary Construction sector mainly concentrate on 3-M principle for a substantial yield in terms of time and cost. The 3-M concept includes manpower, machine and material. In recent years many researches concentrate on improving the labour productivity witnessed the importance of labour productivity. From the review it was observed that the ordinal measurement scale 1 to 5 was used to determine the effect level and relative importance index for all factors were calculated. Few researches calculated relative importance index at 1 to 4 ordinal measurement scale. The factors affecting labour productivity in various countries presented in the review were ranked based on the relative importance index. The major five factors that affect the labour productivity were; supervision, skill of labour, absenteeism, tools and equipment and financial constraints. These are the most significant factors that are accounted in US, India, Singapore, Indonesia, Thailand, Turkey and Iran. Few factors relating to construction methods, site condition, change of order and communication also contribute to low productivity. Communication plays a vital role in India and in some parts of the European nation due to the migration of labours. Other factors such as weather and complexity of construction also contribute to low productivity in countries like Iran and UK. The review on grouping of the factors affecting labour productivity clearly states that when more number of factors are considered in the study the importance of many significant factors were ranked below. Therefore grouping makes it easier for one to identify the similarities and differences between them. From the review it was noted that in earlier studies there were only two main groups influencing productivity namely technological group and administrative group later due to the evolving nature and characteristics of factors affecting productivity, the number of groups increased in order to identify the significant factor relating to manpower, leadership, motivational, material/tool, supervision, project, safety, quality and external factors. Based on the relative ranking it was observed that human group and management group have high impact on
  • 4. A Critical Review on Factors Influencing Labour Productivity in Construction DOI: 10.9790/1684-12544751 www.iosrjournals.org 50 | Page affecting labour productivity in major countries like UK, India and Spain. In India and Gaza the group such as project, technology, motivational, quality and safety have adverse impact on labour productivity. Due to the grouping of factors, the relative importance on most significant factors in eachgroup can be individually analyzed and overall ranking of groups through relative importance index can be determined. The prediction models are very important to identify the problems and suggest a suitable solution for improving the productivity. From the review it was observed that the three important methods used to develop a model were action response model, measured mile concept and factor analysis. The action response model is a plot of productivity overtime for analyzing the complex cause and effect relationship that may lead to loss of productivity in construction. The model graphically depicts how variety of factors may interact to cause a loss of productivity, how the crew is influenced by these factors and how management of crew can mitigate, eliminate and initiate any particular loss of productivity. The action response model provides a framework for evaluating the cause of productivity loss on individual projects. The measured mile technique is used to quantify the losses in measured mile approach. The measured mile concept involves comparison of actual labour performance between two periods. Measured mile is the best choice for productivity loss calculation because it calculates baseline productivity and disruption effects in objective manner. However the measured mile concept may be unsuitable for unique and complex work or where work disruption are so pervasive that no measured mile period exists. An important point to remember is that loss of efficiency can be subjective and experts need time to develop a report. Factor analysis is a multivariate statistical technique that can be utilized to examine the underlying patterns or relationships for large number of variables and summarize information in smaller set of factors or component for prediction purpose. Principal component analysis is the most frequently employed factor analytic approach. By carrying out the factor analysis one can judge the independent factors and group factors which show a high correlation with each other and least correlation can be rejected. IV. Conclusion The construction sector has strategic role in all developed and developing countries. In the view of the substantial share of construction sector in the whole economy, the stakeholder attention is focused on improved resource utilization and productivity. From the review it was observed that, inefficient management of construction resources can result in low productivity. Proper management of resources in construction project can yield substantial saving in cost and time. References [1]. Rateb J. Sweis, Ghaled J. Sweis, Ayman A. Abu Hammad and Malek Abu Rumman,, Modelling the Variability of Labour Productivity in Masonry Construction. Jordan Journal of Civil Engineering,3(2), 2009,197-212 [2]. Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O.,The Management of Labour on High Rise Construction Projects: An International Investigation. International Journal of Project Management, 17, 1999, 195-204. [3]. Planning Commission, Government of India. , Eleventh Five Year Plan (2007–2012). Planning Commission, Government of India, 3, 2008. [4]. Shashank K, Dr. Sutapa Hazra, Kabindra Nath Pal, Analysis of Key Factors Affecting the Variations of Labour Productivity in Construction Projects. International Journal of Emerging Technology and Advanced Engineering, 4(5), 2014, 152-160. [5]. McTague, B., and Jergeas, G., Productivity Improvement on Alberta Major Construction Projects, Construction Productivity Improvement Report / Project evaluation tool, Alberta economic development, Alberta, Canada, 2002. [6]. B. Prakash Rao, AmbikaSreenivasan, Prasad Babu NV, Labour Productivity-Analysis and Ranking. International Research Journal of Engineering and Technology, 2(3), 2015, 151-155. [7]. Vaggi, G., The economics of France Quesnay, Duke University Press, Durham, NC, 1987. [8]. Abdulaziz M. Jarkas, P. Eng and Camille G. Bitar, Factors Affecting Construction Labour Productivity in Kuwait., Journal of Construction Engineering and Management, 138(7),2011 ,811-820. [9]. Sumanth, D. J., Productivity engineering and management, McGraw-Hill, New York, 1984. [10]. Vaishant Gupta, R. Kansal, Improvement of Construction Labour Productivity in Chambal Region. International Journal of Research in Engineering and Technology, 3(10), 2014, 34-37. [11]. Horner, R. M. W., Talhouni, B. T and Thomas H. R., Preliminary Results of Major Labour Productivity Monitoring Program. Proc.of the 3rd Yugoslavian Symposium on Construction Management, Cavtat, 1989, 18-28. [12]. E C Lim and Jahidul Alum, Construction Productivity: Issues Encountered by Contractors in Singapore. International Journal of Project Management, 13(1), 1995, 51-58. [13]. A.Soekiman, K.S.Pribadi, B.W.Soemardi, R.D.Wirahadikusumah, Factors Relating to Labour Productivity Affecting the Project Schedule Performance in Indonesia. Procedia Engineering, 14, 2011, 865-873. [14]. A.A. Attar, A.K. Gupta, D.B. Desai, A Study of Various Factors Affecting Labour Productivity and Methods to Improve It. Proceedings of International Conference on Emerging Trends in Engineering, ISSN 2278-1684, 11-14.. [15]. Aynur Kazaz, Ekrem Manisali, Serdar Ulubeyli, Effect of Basic Motivational Factors on Construction Workforce Productivity in Turkey, Journal of Construction Engineering and Management, 14(2), 2008, 95-106. [16]. Makulsawatudom, A., Emsley, M.and Sinthawanarong, K., Critical Factors Influencing Construction Productivity in Thailand. J. King Mongkut’s Institute of Technology North Bangkok, 14(3), 2004, 1–6. [17]. Zakari, M., Olomolaiye, P. O., Holt, G. D., and Harris, F. C., A Survey of Constraints on Iranian Construction Operatives Productivity. Constr. Manage. Economics, 14(5), 1996, 417–426. [18]. Talhouni, B. T, Measurement and Analysis of Construction Labour Productivity. Doctrol diss., Univ. of Dundee, UK, 1999. [19]. Adan Enshassi, Sherif Mohammed, ZiadAbu Mustafa and Peter Eduard Mayer, Factors Affecting Labour Productivity in Building Projects in the Gaza Strip. Journal of Civil Engineering and Management, 8(4), 2007, 245-254.
  • 5. A Critical Review on Factors Influencing Labour Productivity in Construction DOI: 10.9790/1684-12544751 www.iosrjournals.org 51 | Page [20]. Brent G. Hickson and Leighton A. Ellis, Factors Affecting Construction Labour Productivity in Trinidad and Tobago. The Journal of the Association of Professional Engineers of Trinidad and Tobago, 2(1), 2014, 4-11. [21]. Alinaitwe, H. M., Mwakali, J. A., and Hanson, B., Factors Affecting the Productivity of Building Craftsmen—Studies of Uganda. J. Civil Eng. Manage, 13(3), 2007, 169–176. [22]. G. Robels, Labour Productivity in the Construction Industry-Factors Influencing the Spanish Construction Labour Productivity. International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering, 8(10), 2014, 1021-1030. [23]. David W. Halligan, Action Response Model and Loss Productivity in Construction, Journal of Construction Engineering and Management, 120(1), 1994, 47-64 [24]. William Ibbs and Min Liu, Improved Measured Mile Analysis Technique. Journal of Construction Engineering and Management, 131(12), 2005, 1249-1256. [25]. H. Randolph Thomas, Quantification of Losses of Labour Efficiencies: Innovations in and Improvement to the Measured Mile, Journal of Legal Affairs and Disputes Resolution in Engineering and Construction, 2(2), 2010, 106-112.