PROJECT MANAGEMENT SYSTEM

          PVNR
  ELEVATED EXPRESS WAY
        2005-2009
                     BY
         AKHILESH PADIGA GO6155
         VENKATESH PUTTY GO6162
      SASI KIRAN LINGAMPALLI GO6146
HMDA
INTEGRATION OF:
• Hyderabad Urban Development Authority (HUDA),
• Hyderabad Airport Development Authority (HADA),
• Cyberabad Development Authority (CDA)
• Buddha Poornima Project Authority (BPPA).
• the 2nd largest urban development area in India
  WITH 7,100 sq km
PVNR EXPRESSWAY
• 11.6 km,17.2m width Elevated Expressway connecting the
  HYDERABAD INTERNATIONAL AIRPORT with the
  city at MEHDIPATNAM.

• Opened for traffic at the end points on 2009-10-19

• The Hyderabad Metropolitan Development Authority is
  developing the Rs 439-crore PVNR Expressway
PROJECT IDEA!
The project comprises three main components

• 11.46-km four-lane elevated expressway
• 3.9-km long trumpet interchange
• 62-metre underpass.
DETAILS
Three sets of ramps at
• Laxminagar
• Upparpally
• Aramghar

• No of piers: 328
USP ??
 At present, it takes 45 minutes to an
  hour

 Travel time to the airport reduces by
  30 to 40 minutes

 Longest elevated expressway        in
  INDIA
 24 7 CCTV surveillance
JOINT VENTURES
• Span Consultants Pvt. Ltd is the consultant for
  the project
• Simplex Infrastructures Ltd has been
  appointed as the EPC and civil contractor for
  the expressway
• Helps to complete the work in expected time
GOVERNMENT AND LOCAL SUPPORT
• Location of new airport

• Easy to reach airport

• A must needed project to avoid traffic

• Combined support from govt and public
How it differs from other projects?
• Longest ELEVATED expressway in INDIA
• Appropriate use
• Connecting airport to city by cutting the travel
  time
• Connecting through interchanges
BENFITS TO SOCIETY
•   Reduction in Traffic problems
•   Connecting to IRR
•   Less area consumption
•   Fuel efficiency
•   No toll-govt project
BENFITS OF PROJECT
 No two wheeler traffic.
 No traffic jams.
 No bus stops.
 No hard work to chug
  behind an auto rickshaw or
  an RTC bus
 No traffic signals.
ORGANIZING STRUCTURE

                                  ENGINEERING   FINANCE
                         HR
                                     HEAD         HEAD
            SPAN
                        PROJECT      PROJECT
                                                ACCOUNTANT
                        MANAGER      MANAGER
Rajeshwar
  Tiwari                               SITE
                                     ENGINEER
FEASIBILITY STUDIES




PRI is greater than 4, hence feasible for this type of project
FINANCIAL MANAGEMENT
  GOVERNMENT

      HMDA

SPAN COUNSALTANCY

SIMPLEX INFRA LTD
        HMDA has to release Rs 25 crore
TENDRING, BIDDING
• By HMDA
• LUMP SUM CONTACT-
  439Cr
• Selected by closed BID
• SPAN consultancy is
  selected, SIMPLEX is the
  CONTRACTOR
LOANS
• HMDA taken loans from NATIONALISED
  banks for a loan of Rs 100 crore
• mortgage hundred acres of prime lands located
  in Jawahar Nagar and some other places
  belonging to it.
• Interest rates @12%
APPROVAL OF PROJECT

• HMDA approved and developed the project

• The water board was initially provided with
  Rs.3.70 crore and later provided with an
  additional Rs.1.30 crore by the HMDA
LATEST TECHNOLOGY
• EXCAVATORS

• PSC DECK SLABS

• PAVER, READY MIX ASPALT
AWARDS

• It is awarded as the
  INDIAN’S
  LONGEST
  ELEVATED
  EXPRESS WAY till
  date
CONTROVERSIES
• Quality aspects
• GMR-AIRPORT,
  GOVERNMENT-PVNR HW
• Relocation of temple, houses
• Delay in the project by 1 year
  & INCREASE IN COST
• Road accidents
ESTIMATED COST VS ACTUAL
            COST
• ESTIMATED COST: 439 CR (During
  bidding)
• Project cost: 480Cr appox
• Increase in Project cost=40Cr due to delays
  and increased rates of resources.
• Biggest defect of the project
ROLE OF PROJECT MANAGER

Planning
Scheduling
Co ordination IN ORGANIZATION
Prevents over cost
Using of project management systems
Monitoring
Settlement of ISSUES
Delay in project increases the                            Decrease in the expected
cost by nearly 10% of over all                            quality will increase the
project cost                                              maintaining cost




                 Benefits to the society is more reducing traffic
                 problems

    If this project is a PPP with a                      Role of project manager is
    toll it will be a better project                     crucial in schedule, cost,
                                                         performance of project
Elevated express highway pvnr

More Related Content

What's hot

Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAI
Anshuman Jaiswal
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
satish choudhari
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
Vikas Saini
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
Pramod Kumar
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway Engineers
Anil Kumar Gupta
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
NISHCHAY SAXENA
 

What's hot (20)

Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAI
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Appraising kolkata metro rail project case
Appraising kolkata metro rail project caseAppraising kolkata metro rail project case
Appraising kolkata metro rail project case
 
Ahmedabad metro rail project (amrc) deepen
Ahmedabad metro rail project (amrc)   deepenAhmedabad metro rail project (amrc)   deepen
Ahmedabad metro rail project (amrc) deepen
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai Metro
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway Engineers
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
 
Yogyakarta Bus Terminal
Yogyakarta Bus TerminalYogyakarta Bus Terminal
Yogyakarta Bus Terminal
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 

Viewers also liked

1 roads classification
1 roads classification1 roads classification
1 roads classification
Bharath Raj
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERING
Azan Shukor
 

Viewers also liked (9)

PPT On High level bridge
PPT On High level bridgePPT On High level bridge
PPT On High level bridge
 
1 roads classification
1 roads classification1 roads classification
1 roads classification
 
Block making machine - Compacta
Block making machine - CompactaBlock making machine - Compacta
Block making machine - Compacta
 
Road Types and Road Transportation
Road Types and Road TransportationRoad Types and Road Transportation
Road Types and Road Transportation
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
Types of highways
Types of highwaysTypes of highways
Types of highways
 
Types of roads
Types of roadsTypes of roads
Types of roads
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERING
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
 

Similar to Elevated express highway pvnr

Resume - Vikas Datta-v2
Resume - Vikas Datta-v2Resume - Vikas Datta-v2
Resume - Vikas Datta-v2
VIKAS DATTA
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1
Sneha Kaira
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
Basavaraj L N
 

Similar to Elevated express highway pvnr (20)

11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
Ppp
PppPpp
Ppp
 
Feasibility study on expansion of state highway
Feasibility study on expansion of state highwayFeasibility study on expansion of state highway
Feasibility study on expansion of state highway
 
Resume - Vikas Datta-v2
Resume - Vikas Datta-v2Resume - Vikas Datta-v2
Resume - Vikas Datta-v2
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1
 
Nagpur metro
Nagpur metroNagpur metro
Nagpur metro
 
Sheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfSheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdf
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
KHURRAM ASHFAQ KHAN CV updated
KHURRAM ASHFAQ KHAN  CV updatedKHURRAM ASHFAQ KHAN  CV updated
KHURRAM ASHFAQ KHAN CV updated
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project manager
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 

More from Akhil Padiga (8)

How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQM
 
Stress management
Stress managementStress management
Stress management
 
Kaizen
KaizenKaizen
Kaizen
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concrete
 
sales vs marketing
sales vs marketingsales vs marketing
sales vs marketing
 
Earth quake resistant structures
Earth quake resistant structuresEarth quake resistant structures
Earth quake resistant structures
 
rain water harvesting business plan
rain water harvesting business planrain water harvesting business plan
rain water harvesting business plan
 

Recently uploaded

Neurulation and the formation of the neural tube
Neurulation and the formation of the neural tubeNeurulation and the formation of the neural tube
Neurulation and the formation of the neural tube
SaadHumayun7
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
ashishpaul799
 

Recently uploaded (20)

How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
An Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptxAn Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptx
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
NCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdfNCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdf
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
Neurulation and the formation of the neural tube
Neurulation and the formation of the neural tubeNeurulation and the formation of the neural tube
Neurulation and the formation of the neural tube
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
 
How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 

Elevated express highway pvnr

  • 1. PROJECT MANAGEMENT SYSTEM PVNR ELEVATED EXPRESS WAY 2005-2009 BY AKHILESH PADIGA GO6155 VENKATESH PUTTY GO6162 SASI KIRAN LINGAMPALLI GO6146
  • 2. HMDA INTEGRATION OF: • Hyderabad Urban Development Authority (HUDA), • Hyderabad Airport Development Authority (HADA), • Cyberabad Development Authority (CDA) • Buddha Poornima Project Authority (BPPA). • the 2nd largest urban development area in India WITH 7,100 sq km
  • 3. PVNR EXPRESSWAY • 11.6 km,17.2m width Elevated Expressway connecting the HYDERABAD INTERNATIONAL AIRPORT with the city at MEHDIPATNAM. • Opened for traffic at the end points on 2009-10-19 • The Hyderabad Metropolitan Development Authority is developing the Rs 439-crore PVNR Expressway
  • 4. PROJECT IDEA! The project comprises three main components • 11.46-km four-lane elevated expressway • 3.9-km long trumpet interchange • 62-metre underpass.
  • 5. DETAILS Three sets of ramps at • Laxminagar • Upparpally • Aramghar • No of piers: 328
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. USP ??  At present, it takes 45 minutes to an hour  Travel time to the airport reduces by 30 to 40 minutes  Longest elevated expressway in INDIA  24 7 CCTV surveillance
  • 11. JOINT VENTURES • Span Consultants Pvt. Ltd is the consultant for the project • Simplex Infrastructures Ltd has been appointed as the EPC and civil contractor for the expressway • Helps to complete the work in expected time
  • 12. GOVERNMENT AND LOCAL SUPPORT • Location of new airport • Easy to reach airport • A must needed project to avoid traffic • Combined support from govt and public
  • 13. How it differs from other projects? • Longest ELEVATED expressway in INDIA • Appropriate use • Connecting airport to city by cutting the travel time • Connecting through interchanges
  • 14. BENFITS TO SOCIETY • Reduction in Traffic problems • Connecting to IRR • Less area consumption • Fuel efficiency • No toll-govt project
  • 15. BENFITS OF PROJECT  No two wheeler traffic.  No traffic jams.  No bus stops.  No hard work to chug behind an auto rickshaw or an RTC bus  No traffic signals.
  • 16. ORGANIZING STRUCTURE ENGINEERING FINANCE HR HEAD HEAD SPAN PROJECT PROJECT ACCOUNTANT MANAGER MANAGER Rajeshwar Tiwari SITE ENGINEER
  • 17. FEASIBILITY STUDIES PRI is greater than 4, hence feasible for this type of project
  • 18. FINANCIAL MANAGEMENT GOVERNMENT HMDA SPAN COUNSALTANCY SIMPLEX INFRA LTD HMDA has to release Rs 25 crore
  • 19. TENDRING, BIDDING • By HMDA • LUMP SUM CONTACT- 439Cr • Selected by closed BID • SPAN consultancy is selected, SIMPLEX is the CONTRACTOR
  • 20. LOANS • HMDA taken loans from NATIONALISED banks for a loan of Rs 100 crore • mortgage hundred acres of prime lands located in Jawahar Nagar and some other places belonging to it. • Interest rates @12%
  • 21. APPROVAL OF PROJECT • HMDA approved and developed the project • The water board was initially provided with Rs.3.70 crore and later provided with an additional Rs.1.30 crore by the HMDA
  • 22. LATEST TECHNOLOGY • EXCAVATORS • PSC DECK SLABS • PAVER, READY MIX ASPALT
  • 23. AWARDS • It is awarded as the INDIAN’S LONGEST ELEVATED EXPRESS WAY till date
  • 24. CONTROVERSIES • Quality aspects • GMR-AIRPORT, GOVERNMENT-PVNR HW • Relocation of temple, houses • Delay in the project by 1 year & INCREASE IN COST • Road accidents
  • 25. ESTIMATED COST VS ACTUAL COST • ESTIMATED COST: 439 CR (During bidding) • Project cost: 480Cr appox • Increase in Project cost=40Cr due to delays and increased rates of resources. • Biggest defect of the project
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. ROLE OF PROJECT MANAGER Planning Scheduling Co ordination IN ORGANIZATION Prevents over cost Using of project management systems Monitoring Settlement of ISSUES
  • 44. Delay in project increases the Decrease in the expected cost by nearly 10% of over all quality will increase the project cost maintaining cost Benefits to the society is more reducing traffic problems If this project is a PPP with a Role of project manager is toll it will be a better project crucial in schedule, cost, performance of project