1. The document describes the PVNR Elevated Expressway project in Hyderabad connecting the Hyderabad International Airport to Mehdipatnam. 2. The 11.6 km four-lane elevated expressway was opened in 2009 and reduced travel time between the airport and the city by 30-40 minutes. 3. The project cost Rs. 480 crore and was funded through loans taken by the Hyderabad Metropolitan Development Authority from nationalized banks.