1 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
10TH UMI Conference cum Exhibition and
CODATU XVII Conference
Intelligent, Inclusive & Sustainable Mobility
4th to 6th November 2017
Plenary session, Day 3, 06-11-2017
Presented by
Dr. Brijesh Dixit , Managing Director, Maharashtra Metro Rail Corporation
Limited
2 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Benefits of Digitalizing
Metro Project from
Concept to Commissioning
5D BIM & ERP - Digital project
management for Nagpur Metro &
Pune Metro
3 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Agenda
• Project management overview in India
• Nagpur metro overview
• Digital Project Management for Project Lifecycle
• Components & Benefits of 5D BIM & ERP
• Summary
4 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Project Management Overview in India: Headlines
5 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Project Management Scenario in India
Sector Mean %
Cost Overrun
Mean %
Time Overrun
Urban Development 12% 66%
Railways 95% 118%
Road Transport &
Highways
16% 50%
Shipping & Ports -1% 119%
Atomic Energy 15 % 301 %
Civil Aviation -2% 69%
Petrochemicals -12% 74%
Power 52% 34%
Source: Ministry of Statistics & Program Implementation, Government of India
Time and Cost Overruns in
Infrastructure Projects
6 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Project Management Scenario in India
Major Reasons :
• Land/site handover
• Delay in regulatory
approvals
• Contractual Disputes
• Design/scope change
• Coordination issues
within stakeholders
Reasons for time overrun
across all sectors
7 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Project Management Scenario in India
Major Reasons :
• Scope creep
• Design change/iterations
• Material price escalations
beyond projections
• Location and connectivity of
project site
Reasons for cost overrun
across all sectors
8 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Plan and
Design
1-3 years
Construct and Commission
3-6 years
Operate, Maintain and Renewal
6-50 years
Disposal
1-5 years
Cost
Time, Disciplines, Information
Lifecycle : Concept to Operations (Common / Connected
Data Environment) BIM
Typical
15-20% 80-85%
9 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
10 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Nagpur Metro Network Details
38.215 Km in length; 40 Stations
~ 48 months of construction phase
~ USD 1.4 Billion
~ USD 18 Million (1.3%) spent on digitization
with nearly 50+ major consultants/
contractors on board
31.254 Km in length; 30 Stations
~ 5 years of construction phase
~ USD 1.73 Billion
Pune Metro Network Details
11 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
AFC
Viaduct
Structures
Depot Plant
EquipmentDrainage
Track
Signaling
Architectural
Electrical
Fire
Systems
Mechanical
Systems
Air
Conditioning
Geotech
nical
Lifts &
Escalators
Quantity
Surveying
Fencing &
Environment
Design
Management
Contract
Administration
Asset
Manag
ement
Telecom
Project
Monitoring
Interface
Management
Utilities
Land Use &
PropertySpecifications
Quality
Control
Document
Control
Rolling
Stock
Traffic
Mgmt
Complexity…Disciplines…
12 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
5D BIM + ERP – One project one platform
Time & Progress
Management
Multiple Contracts
Management
Integrated Asset
Management
Design
Management
Cost & Revenue
Management
2D
3D
4D TIME 5D COST 5D BIM
13 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Nagpur Metro: First metro on 5D BIM integrated with ERP
2 Corr.1 - North South: 19.7 km; 20 Stations
Corr.2 - East West: 18.6 km; 20 Stations
20+
30+
Major contractors (> 200 Cr)
DDCs & 3D Modeling teams
53 Major contract packages worth 8680 Cr
1000 Combined Users of 4 Softwares
50+ Construction project schedules
14 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Digital Project Management : Uniqueness @ Maha Metro
Cost
Overrun
Time
Overrun
Weak
documentation
Cross Rail – London, UK
Network Rail - UK
Transport for London
Sydney Rail Expansion
Program
MRT Corp. Sdn.Bhd.
London Underground
Disputes &
Litigations
O&M
Challenges
• 3D BIM (Building
‘Verb’ Information
Modelling)
• 4th Dimension : Time
• 5th Dimension : Cost
• Enterprise Resource
Planning
• Integrated Asset
Management
• Driving O&M through
digital platform
• Owner’s Support
Office with Digital
Project Management
15 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Common Data
Environment
NMRCL / GC:
1. Model based analysis
2. Schedule & progress updates
3. Cost monitoring
4. 5D Simulation & Visualization
GC &
NMRCL
Approval
Helpdesk
Detailed Design
Consultants Across
Globe
DDC 1
DDC 2
DDC 3
Execution Contracts
Awarded
CONTRACTORS
Schedule Submission &
progress updates by
Contractors
3D Model Collaboration & Final
Preparation
NMRCL DATA CENTER
GC
NMRCL
Review &
Approvals
Contractors, GC, NMRCL
1. Monthly Billing Processes
2. Approval of Bills & Payments
3. Payroll Processing
4. Safety, Quality & other
processes
How NMRCL Ecosystem Works
16 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Managing design-documentation with common data
environment (CDE)
CDE:
Single source of information for design &
drawings.
Adopted using BS 1192 standards
Benefits:
Design consistency & uniformity in models
& drawings
Online review & approval process
Automated CAD QA checks
Early detection of issues
Detailed analysis using federated 3D
model
3D Model: Clash Detection & conflict resolutionBS 1192 : 3D Model Practice
Single source of drawings & documents Better monitoring & control using dashboards
17 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Adopting the world’s best scheduling engine
Primavera EPPM (Enterprise
Project Portfolio Management):
Single place of work for all contractors
Integrated project schedule management
Benefits:
Dynamic working and progress updates
on all project schedules
Avoid delays by identifying obstacles due
to interdependencies & take proactive
measures
Obtain holistic view by integrating time
with cost information (from ERP)
Various reports for detailed analysis and
prevent time overruns
18 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Enterprise wide accounting through ERP
SAP-ERP:
Integrated process mapping to capture
complete accounting and other key
information
Benefits:
Monitor budget of 8680 Cr INR
Track variation contracts effectively
User-friendly employee self service portal
Better quality checks & control
Land records & registration process
File & Daak management
Monitor Safety & Environment parameters
Capture operations & maintenance process
after commissioning.
Budgeting
Contracts Procurement
Contractor Billing
Quality monitoring
Office Automation
Enterprise Project Structure
Finance & Accounts, Funds
Management
Plant & Maintenance
HR, ESS & MSS
EHS Management
19 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
4th / 5th Dimension: Integrating 3D model with schedule &
cost
Time analysis on 3D model:
Integrate 3D model with schedule for monitoring time.
Benefits:
Timely Rectification of the flaws in construction sequencing by Contractor in schedule with
the help of simulation
Identify interdependencies visually for better & informed decisions.
Model based progress monitoring during execution.
20 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
3D Model Based Delay Analysis
Month 1 Month 2
Integrate 3D model with
actual progress.
Benefits:
 Analyse current delays
 Forecast probable
obstacles & take
precautionary steps.
Work planned in next reporting month
Work completed in current reporting month
Delayed works in current reporting month
Work in progress in current reporting month
Work completed in previous reporting month
Work planned in later periods
Works planned in current reporting month but not
yet executed
Month 3
21 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Achieving 5DBIM integration through RIBiTWO
Provided integrated view of project by linking 3D model (Bentley), schedule (Primavera),
cost (SAP)
Single platform for 3D Model, Scheduling (4D) and Cost (5D)
Integrating schedule & actual cost information from SAP to analyze physical progress and
financial progress
Earned value management through controlling structure
22 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
23 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Digital Platform: Playing significant role in Asset Management
User can see linked documents of door shutter on station platform
24 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Documents are linked to Assets identified through relations (Ex: linked documents to CCTV are
shown above)
Digital Platform: Playing significant role in Asset Management
25 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Digital Project Management in O&M Benefits
• Asset Information
Management System
(AIMS) being developed for
effective handover to O&M
• AIMS along with common
data environment will
support effective O&M
• Complete maintenance
processes through ERP
26 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Owner Support Office through Digital Project Management
OSO (Owner’s Support Office):
• Project Management Service
• Establish & Manage Centre of Excellence
• Business Consulting, IT Strategy & System
Design
• Ensure adoption of digital platform across
ecosystem
OSO Roles &
Responsibility
Project
Management
Service
Business
Consulting, IT
Strategy &
System Design
Establish &
Manage Centre
of Excellence
27 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
War room managed by Owner Support Office
Key activities managed in war room set up by Maha Metro in Nagpur office:
1. Monitor execution of project closely, identify probable bottlenecks and take necessary steps to avoid
2. Gather vital information from various stakeholders in one place
3. Communicate accurate and timely information with key decision makers
28 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Digital Project Management Platform: The Way Ahead
Current Usage Way Forward
29 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
30 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
Nagpur Metro Current Project Status…headlines
31 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation

More Related Content

What's hot

metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
A.U Architecture Alumni Association
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
Avtansh Ghai
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
Axay Sharma
 
Planning for a multimodal transport interchange literature
Planning for a multimodal transport interchange   literaturePlanning for a multimodal transport interchange   literature
Planning for a multimodal transport interchange literature
Gargee Ghosh
 
Traffic survey
Traffic surveyTraffic survey
Traffic survey
niazali15CRP92
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
ASHISH SINGH
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Prashant Inamdar
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
Paromita Roy
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
Mr. Ramesh Nayaka
 
Transit Oriented Development
Transit Oriented DevelopmentTransit Oriented Development
Transit Oriented Development
glogan56
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
Sukhdarshan Singh
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
Karan Shah
 
TOD in India
TOD in IndiaTOD in India
061. Comprehensive Mobility Plan Intro
061. Comprehensive Mobility Plan   Intro061. Comprehensive Mobility Plan   Intro
061. Comprehensive Mobility Plan Intro
Ranjit Gadgil
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
libin paul
 
Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...
Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...
Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...
Shivika Mehrotra
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
Rashed Alam
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
Dhwani Shah
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
harshit315
 
Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad
Ar Vandana Talikoti
 

What's hot (20)

metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
Planning for a multimodal transport interchange literature
Planning for a multimodal transport interchange   literaturePlanning for a multimodal transport interchange   literature
Planning for a multimodal transport interchange literature
 
Traffic survey
Traffic surveyTraffic survey
Traffic survey
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Transit Oriented Development
Transit Oriented DevelopmentTransit Oriented Development
Transit Oriented Development
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
061. Comprehensive Mobility Plan Intro
061. Comprehensive Mobility Plan   Intro061. Comprehensive Mobility Plan   Intro
061. Comprehensive Mobility Plan Intro
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...
Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...
Impact of Interstate Bus terminal on the Builtform of Residential Neighbourho...
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
 
Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad
 

Similar to Nagpur metro

Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
IRJET Journal
 
IRJET- Grab Cab
IRJET-  	  Grab CabIRJET-  	  Grab Cab
IRJET- Grab Cab
IRJET Journal
 
draft_ver3 new.pptx
draft_ver3 new.pptxdraft_ver3 new.pptx
draft_ver3 new.pptx
him123bsp
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
IRJET Journal
 
ROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptx
ROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptxROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptx
ROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptx
SurajKundu8
 
IRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for TransportationIRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET Journal
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
MANNU KUMAR
 
smart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technologysmart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technology
1RN20IS063JNithish
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
Kiran Birdi
 
An Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya Pradesh
An Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya PradeshAn Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya Pradesh
An Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya Pradesh
IRJET Journal
 
A Review of _Urban Water Networks Management Using GIS
A Review of _Urban Water Networks Management Using GISA Review of _Urban Water Networks Management Using GIS
A Review of _Urban Water Networks Management Using GIS
IRJET Journal
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
FICCINorthEast
 
Estimation of a micro services based estimation application bhawna thakur -...
Estimation of a micro services based estimation application   bhawna thakur -...Estimation of a micro services based estimation application   bhawna thakur -...
Estimation of a micro services based estimation application bhawna thakur -...
Nesma
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station Construction
IRJET Journal
 
Geosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedinGeosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedin
Jean-Baptiste MONNIER, PhD
 
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
Lindsey Sais
 
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
IRJET Journal
 
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Fairfax County
 
King County Information Technology
King County Information TechnologyKing County Information Technology
King County Information Technology
Jamie Holter
 
Introdution to BIM
Introdution to BIMIntrodution to BIM
Introdution to BIM
Syed Qaseem Haider
 

Similar to Nagpur metro (20)

Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
IRJET- Grab Cab
IRJET-  	  Grab CabIRJET-  	  Grab Cab
IRJET- Grab Cab
 
draft_ver3 new.pptx
draft_ver3 new.pptxdraft_ver3 new.pptx
draft_ver3 new.pptx
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
ROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptx
ROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptxROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptx
ROAD CONSTRUCTION AND MANAGAEMENT SYSTEM presentation.pptx
 
IRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for TransportationIRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for Transportation
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
smart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technologysmart parking1 (1) a view of ppt presentation of parking technology
smart parking1 (1) a view of ppt presentation of parking technology
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
An Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya Pradesh
An Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya PradeshAn Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya Pradesh
An Energy Saving Pavement Management (ESPM) for Urban Roads in Madhya Pradesh
 
A Review of _Urban Water Networks Management Using GIS
A Review of _Urban Water Networks Management Using GISA Review of _Urban Water Networks Management Using GIS
A Review of _Urban Water Networks Management Using GIS
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
Estimation of a micro services based estimation application bhawna thakur -...
Estimation of a micro services based estimation application   bhawna thakur -...Estimation of a micro services based estimation application   bhawna thakur -...
Estimation of a micro services based estimation application bhawna thakur -...
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station Construction
 
Geosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedinGeosmart hong kong 2014 v8 for linkedin
Geosmart hong kong 2014 v8 for linkedin
 
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
 
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
COMPARATIVE ANALYSIS OF GEOMETRIC DESIGN OF HIGHWAY USING AUTOCAD CIVIL 3D AN...
 
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
Agenda Item 6: Update Intelligent Transportation Systems (ITS) for Fairfax Co...
 
King County Information Technology
King County Information TechnologyKing County Information Technology
King County Information Technology
 
Introdution to BIM
Introdution to BIMIntrodution to BIM
Introdution to BIM
 

Recently uploaded

在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
yemqpj
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
ajatjamwal123
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 

Recently uploaded (20)

在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
在线办理(ISU毕业证书)爱荷华州立大学毕业证学历证书一模一样
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 

Nagpur metro

  • 1. 1 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation 10TH UMI Conference cum Exhibition and CODATU XVII Conference Intelligent, Inclusive & Sustainable Mobility 4th to 6th November 2017 Plenary session, Day 3, 06-11-2017 Presented by Dr. Brijesh Dixit , Managing Director, Maharashtra Metro Rail Corporation Limited
  • 2. 2 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Benefits of Digitalizing Metro Project from Concept to Commissioning 5D BIM & ERP - Digital project management for Nagpur Metro & Pune Metro
  • 3. 3 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Agenda • Project management overview in India • Nagpur metro overview • Digital Project Management for Project Lifecycle • Components & Benefits of 5D BIM & ERP • Summary
  • 4. 4 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Project Management Overview in India: Headlines
  • 5. 5 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Project Management Scenario in India Sector Mean % Cost Overrun Mean % Time Overrun Urban Development 12% 66% Railways 95% 118% Road Transport & Highways 16% 50% Shipping & Ports -1% 119% Atomic Energy 15 % 301 % Civil Aviation -2% 69% Petrochemicals -12% 74% Power 52% 34% Source: Ministry of Statistics & Program Implementation, Government of India Time and Cost Overruns in Infrastructure Projects
  • 6. 6 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Project Management Scenario in India Major Reasons : • Land/site handover • Delay in regulatory approvals • Contractual Disputes • Design/scope change • Coordination issues within stakeholders Reasons for time overrun across all sectors
  • 7. 7 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Project Management Scenario in India Major Reasons : • Scope creep • Design change/iterations • Material price escalations beyond projections • Location and connectivity of project site Reasons for cost overrun across all sectors
  • 8. 8 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Plan and Design 1-3 years Construct and Commission 3-6 years Operate, Maintain and Renewal 6-50 years Disposal 1-5 years Cost Time, Disciplines, Information Lifecycle : Concept to Operations (Common / Connected Data Environment) BIM Typical 15-20% 80-85%
  • 9. 9 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
  • 10. 10 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Nagpur Metro Network Details 38.215 Km in length; 40 Stations ~ 48 months of construction phase ~ USD 1.4 Billion ~ USD 18 Million (1.3%) spent on digitization with nearly 50+ major consultants/ contractors on board 31.254 Km in length; 30 Stations ~ 5 years of construction phase ~ USD 1.73 Billion Pune Metro Network Details
  • 11. 11 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation AFC Viaduct Structures Depot Plant EquipmentDrainage Track Signaling Architectural Electrical Fire Systems Mechanical Systems Air Conditioning Geotech nical Lifts & Escalators Quantity Surveying Fencing & Environment Design Management Contract Administration Asset Manag ement Telecom Project Monitoring Interface Management Utilities Land Use & PropertySpecifications Quality Control Document Control Rolling Stock Traffic Mgmt Complexity…Disciplines…
  • 12. 12 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation 5D BIM + ERP – One project one platform Time & Progress Management Multiple Contracts Management Integrated Asset Management Design Management Cost & Revenue Management 2D 3D 4D TIME 5D COST 5D BIM
  • 13. 13 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Nagpur Metro: First metro on 5D BIM integrated with ERP 2 Corr.1 - North South: 19.7 km; 20 Stations Corr.2 - East West: 18.6 km; 20 Stations 20+ 30+ Major contractors (> 200 Cr) DDCs & 3D Modeling teams 53 Major contract packages worth 8680 Cr 1000 Combined Users of 4 Softwares 50+ Construction project schedules
  • 14. 14 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Digital Project Management : Uniqueness @ Maha Metro Cost Overrun Time Overrun Weak documentation Cross Rail – London, UK Network Rail - UK Transport for London Sydney Rail Expansion Program MRT Corp. Sdn.Bhd. London Underground Disputes & Litigations O&M Challenges • 3D BIM (Building ‘Verb’ Information Modelling) • 4th Dimension : Time • 5th Dimension : Cost • Enterprise Resource Planning • Integrated Asset Management • Driving O&M through digital platform • Owner’s Support Office with Digital Project Management
  • 15. 15 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Common Data Environment NMRCL / GC: 1. Model based analysis 2. Schedule & progress updates 3. Cost monitoring 4. 5D Simulation & Visualization GC & NMRCL Approval Helpdesk Detailed Design Consultants Across Globe DDC 1 DDC 2 DDC 3 Execution Contracts Awarded CONTRACTORS Schedule Submission & progress updates by Contractors 3D Model Collaboration & Final Preparation NMRCL DATA CENTER GC NMRCL Review & Approvals Contractors, GC, NMRCL 1. Monthly Billing Processes 2. Approval of Bills & Payments 3. Payroll Processing 4. Safety, Quality & other processes How NMRCL Ecosystem Works
  • 16. 16 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Managing design-documentation with common data environment (CDE) CDE: Single source of information for design & drawings. Adopted using BS 1192 standards Benefits: Design consistency & uniformity in models & drawings Online review & approval process Automated CAD QA checks Early detection of issues Detailed analysis using federated 3D model 3D Model: Clash Detection & conflict resolutionBS 1192 : 3D Model Practice Single source of drawings & documents Better monitoring & control using dashboards
  • 17. 17 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Adopting the world’s best scheduling engine Primavera EPPM (Enterprise Project Portfolio Management): Single place of work for all contractors Integrated project schedule management Benefits: Dynamic working and progress updates on all project schedules Avoid delays by identifying obstacles due to interdependencies & take proactive measures Obtain holistic view by integrating time with cost information (from ERP) Various reports for detailed analysis and prevent time overruns
  • 18. 18 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Enterprise wide accounting through ERP SAP-ERP: Integrated process mapping to capture complete accounting and other key information Benefits: Monitor budget of 8680 Cr INR Track variation contracts effectively User-friendly employee self service portal Better quality checks & control Land records & registration process File & Daak management Monitor Safety & Environment parameters Capture operations & maintenance process after commissioning. Budgeting Contracts Procurement Contractor Billing Quality monitoring Office Automation Enterprise Project Structure Finance & Accounts, Funds Management Plant & Maintenance HR, ESS & MSS EHS Management
  • 19. 19 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation 4th / 5th Dimension: Integrating 3D model with schedule & cost Time analysis on 3D model: Integrate 3D model with schedule for monitoring time. Benefits: Timely Rectification of the flaws in construction sequencing by Contractor in schedule with the help of simulation Identify interdependencies visually for better & informed decisions. Model based progress monitoring during execution.
  • 20. 20 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation 3D Model Based Delay Analysis Month 1 Month 2 Integrate 3D model with actual progress. Benefits:  Analyse current delays  Forecast probable obstacles & take precautionary steps. Work planned in next reporting month Work completed in current reporting month Delayed works in current reporting month Work in progress in current reporting month Work completed in previous reporting month Work planned in later periods Works planned in current reporting month but not yet executed Month 3
  • 21. 21 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Achieving 5DBIM integration through RIBiTWO Provided integrated view of project by linking 3D model (Bentley), schedule (Primavera), cost (SAP) Single platform for 3D Model, Scheduling (4D) and Cost (5D) Integrating schedule & actual cost information from SAP to analyze physical progress and financial progress Earned value management through controlling structure
  • 22. 22 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
  • 23. 23 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Digital Platform: Playing significant role in Asset Management User can see linked documents of door shutter on station platform
  • 24. 24 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Documents are linked to Assets identified through relations (Ex: linked documents to CCTV are shown above) Digital Platform: Playing significant role in Asset Management
  • 25. 25 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Digital Project Management in O&M Benefits • Asset Information Management System (AIMS) being developed for effective handover to O&M • AIMS along with common data environment will support effective O&M • Complete maintenance processes through ERP
  • 26. 26 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Owner Support Office through Digital Project Management OSO (Owner’s Support Office): • Project Management Service • Establish & Manage Centre of Excellence • Business Consulting, IT Strategy & System Design • Ensure adoption of digital platform across ecosystem OSO Roles & Responsibility Project Management Service Business Consulting, IT Strategy & System Design Establish & Manage Centre of Excellence
  • 27. 27 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation War room managed by Owner Support Office Key activities managed in war room set up by Maha Metro in Nagpur office: 1. Monitor execution of project closely, identify probable bottlenecks and take necessary steps to avoid 2. Gather vital information from various stakeholders in one place 3. Communicate accurate and timely information with key decision makers
  • 28. 28 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Digital Project Management Platform: The Way Ahead Current Usage Way Forward
  • 29. 29 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation
  • 30. 30 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation Nagpur Metro Current Project Status…headlines
  • 31. 31 | WWW. http://www.metrorailnagpur.com/| © 2017 Maha Metro Rail Corporation