SlideShare a Scribd company logo
MUMBAI METRO ONEPPP session Faisal Khan
Presentation Plan Present Scenario of transport infrastructure in Mumbai Project Description Bidding selection PPP structure of the Project Risk allocation framework
Present Transport Scenario in Mumbai ,[object Object]
Many areas in city and suburbs are not served by rail system
 Suburban rail traffic increased by 6 times while the capacity increased by only 2.3 times
4500 passengers travel per train against the carrying capacity of 1750 resulting in unbearable overcrowding,[object Object]
Phase I – Versova-Andheri-Ghatkopar line with dedicated elevated corridor and of length 11.07 km with 12 stations
 Rail to have maximum speed of 80kmph with average speed of 33kmph
Project will provide East-West rail based connectivity to Central and Western suburbs
Total time for journey from Versova to Ghatkopar would be approximately 21 minutes as against 90 minutes by other modes of transport,[object Object]
Bidding Selection  Detailed feasibility study carried out under the Indo-German technical co-operation to the group of TEWET, DE-Consult and TCS during 97-00  Study recommended mass transit corridor from Andheri to Ghatkopar as potentially bankable and economically viable – Government decided to go on PPP basis  Management of transaction process – Consortium of Louis Berger as technical consultants, PwC, Masons and Economic Laws and Practices was appointed to assisst MMRDA  Bids invited in August 2004 and 150 bidders responded to EoI Bid process: Technical and financial stage
Bidding selection contd..  Technical bids invited in May 05  HCC and RITES  Reliance Energy Limited, Veolia Transport, Connex-France ShaktikumarSacheti Limited and Lingakaran Metro  Siemens, L&T, Gammon, BEML  IL&FS, ITD Thailand and Unity Infraprojects Financial bids invited from qualified bidders in January 06 Reliance Energy Limited and Connex-France IL&FS, ITD Thailand and Unity Infraprojects Bid Won by consortia of Reliance Energy Limited, Veolia Transport, Hong Kong MRT & Connex France

More Related Content

What's hot

Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
WRI Ross Center for Sustainable Cities
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
Gurjit Kaur Kaler
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
Raghavendra Rachamadugu
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
Axay Sharma
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
Kshitij Gupta
 
Encouraging use of FOBs and subway
Encouraging use of FOBs and subwayEncouraging use of FOBs and subway
Encouraging use of FOBs and subway
Rrahul Nawlle (IGBC AP)
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
Kunal Bhadane
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail projectSaravanan rulez
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
Abhishek Kanwar
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
Pankaj Maurya
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
OmkarRasal
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
Nikita James
 
Metro project
Metro project Metro project
Metro project
Vikas Singh
 
Dharwad District profile
Dharwad District profileDharwad District profile
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport Policy
MeenuSajeev
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
Yash Kotgirwar
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
Piyusha Rustagi
 
Case studies ppp
Case studies pppCase studies ppp
Case studies pppamityasum23
 

What's hot (20)

Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Encouraging use of FOBs and subway
Encouraging use of FOBs and subwayEncouraging use of FOBs and subway
Encouraging use of FOBs and subway
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Metro project
Metro project Metro project
Metro project
 
Dharwad District profile
Dharwad District profileDharwad District profile
Dharwad District profile
 
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport Policy
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
Case studies ppp
Case studies pppCase studies ppp
Case studies ppp
 

Similar to PPP in Transport - Mumbai Metro One

High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
Rajesh Prasad
 
Major issues in infrastructure
Major issues in infrastructureMajor issues in infrastructure
Major issues in infrastructure
vinyas87
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationAdam Smith
 
High speed rails in india ppt
High speed rails in india pptHigh speed rails in india ppt
High speed rails in india ppt
Pravin Hadiyal
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata
Rajesh Prasad
 
Seminar dt 28.12.2013 at kolkata
 Seminar dt 28.12.2013 at kolkata  Seminar dt 28.12.2013 at kolkata
Seminar dt 28.12.2013 at kolkata Rajesh Prasad
 
India Logistics Infrastructure
India Logistics InfrastructureIndia Logistics Infrastructure
India Logistics Infrastructure
rajeevchopra
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
Loay Ghazaleh MBA, BSc Civil Eng.
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring roadAkhil Padiga
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluationgouravranjan27
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Reportgiap0083
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
Kritika Garg
 
Dfc
DfcDfc
Airport express line
Airport express lineAirport express line
Airport express line
Bhaskar Bhattacharya
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
DBTGrupoIndia
 
Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Jayesh Kambli
 
Group 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptxGroup 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptx
PMUHaryanaTourism
 

Similar to PPP in Transport - Mumbai Metro One (20)

High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
Qatar rail - Geoff Mee presentation
Qatar rail - Geoff Mee presentationQatar rail - Geoff Mee presentation
Qatar rail - Geoff Mee presentation
 
Major issues in infrastructure
Major issues in infrastructureMajor issues in infrastructure
Major issues in infrastructure
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint Presentation
 
High speed rails in india ppt
High speed rails in india pptHigh speed rails in india ppt
High speed rails in india ppt
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata
 
Seminar dt 28.12.2013 at kolkata
 Seminar dt 28.12.2013 at kolkata  Seminar dt 28.12.2013 at kolkata
Seminar dt 28.12.2013 at kolkata
 
India Logistics Infrastructure
India Logistics InfrastructureIndia Logistics Infrastructure
India Logistics Infrastructure
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
 
M9-EIA-Draft Final Report
M9-EIA-Draft Final ReportM9-EIA-Draft Final Report
M9-EIA-Draft Final Report
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
TeamVision
TeamVisionTeamVision
TeamVision
 
Dfc
DfcDfc
Dfc
 
Airport express line
Airport express lineAirport express line
Airport express line
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
 
Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)
 
BRIEF_ON_LAPSSET
BRIEF_ON_LAPSSETBRIEF_ON_LAPSSET
BRIEF_ON_LAPSSET
 
Group 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptxGroup 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptx
 

Recently uploaded

Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 

Recently uploaded (20)

Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 

PPP in Transport - Mumbai Metro One

  • 1. MUMBAI METRO ONEPPP session Faisal Khan
  • 2. Presentation Plan Present Scenario of transport infrastructure in Mumbai Project Description Bidding selection PPP structure of the Project Risk allocation framework
  • 3.
  • 4. Many areas in city and suburbs are not served by rail system
  • 5. Suburban rail traffic increased by 6 times while the capacity increased by only 2.3 times
  • 6.
  • 7. Phase I – Versova-Andheri-Ghatkopar line with dedicated elevated corridor and of length 11.07 km with 12 stations
  • 8. Rail to have maximum speed of 80kmph with average speed of 33kmph
  • 9. Project will provide East-West rail based connectivity to Central and Western suburbs
  • 10.
  • 11. Bidding Selection Detailed feasibility study carried out under the Indo-German technical co-operation to the group of TEWET, DE-Consult and TCS during 97-00 Study recommended mass transit corridor from Andheri to Ghatkopar as potentially bankable and economically viable – Government decided to go on PPP basis Management of transaction process – Consortium of Louis Berger as technical consultants, PwC, Masons and Economic Laws and Practices was appointed to assisst MMRDA Bids invited in August 2004 and 150 bidders responded to EoI Bid process: Technical and financial stage
  • 12. Bidding selection contd.. Technical bids invited in May 05 HCC and RITES Reliance Energy Limited, Veolia Transport, Connex-France ShaktikumarSacheti Limited and Lingakaran Metro Siemens, L&T, Gammon, BEML IL&FS, ITD Thailand and Unity Infraprojects Financial bids invited from qualified bidders in January 06 Reliance Energy Limited and Connex-France IL&FS, ITD Thailand and Unity Infraprojects Bid Won by consortia of Reliance Energy Limited, Veolia Transport, Hong Kong MRT & Connex France
  • 13. Bidding Selection contd.. Expected IRR of 26% by REL-led consortium but government negotiated and the consortium agreed to an equity IRR of 15% Project faced delay in obtaining approval for VGF as its concession agreement was based on MCA of NHAI and only tentative guidelines were in place for PPP agreements Government gave special grant of 20% and GoM approved grant of 7.5% of project cost SPV incorporated in December 2006 by the name ‘Mumbai Metro One Private Limited’
  • 15. PPP structure of project Connex-France & others EPC Contractors 5% Reliance Energy Ltd MMRDA MMOPL 69% 26% Indian Bank, Oriental Bank of Commerce Canara Bank, KarurVysya Bank IDBI, Corporation Bank
  • 17. Thank You for Listening