 The State Government of Andhra Pradesh (GOAP) through the Government
of India (GOI) has applied for a loan from the International Bank for Re-
construction and Development (IBRD)
 As per the GOAP’s strategic vision, the state has identified the need to
upgrade and operate the high traffic roads in the State through Public
Private Partnership(PPP) arrangements and has entrusted the responsibility
to Andhra Pradesh Road Development Corporation (APRDC).
 A set of eight State Highways have been selected for four laning under
phase-wise programme.
 The project road Hyderabad –
Karimnagar – Ramagundam
Road (State Highway-1) is
207.400 Km long and starts
from Km. 28.200 in Rangareddy
District and ends near
Mancherial (NH-16 Joining
point) at Km. 235.600.
 The project districts comprises of
Rangareddy, Medak,
Karimnagar.
‘Rajiv Rahadhari’ or State Highway-1 is the lifeline of Karimnagar
district as it is not connected to a railway network to Hyderabad.
Once it was converted into a double-lane
and became ‘Rajiv Rahadari’, the accidents
have increased steadily.
 Reasons were many as it could be due to
the high density of vehicular movement,
rapid urbanization and industrial activity in
the coal belt region.
 Following the high accident rates, there
was a clamor for converting the road into
four lane by public representatives, and
accordingly, the foundation stone was laid
in 2008.
LOCATION OF PROJECT
ROAD
 Total cost of the expansion process is Rs1,358.19crore
including LA, utility shifting and environmental cost under
BOT (Built, Operate and Transfer) process and Concession
Period of 15 years.
Existing Road Features
Existing Traffic
Mixed traffic flow is
observed along the
highway. The average
daily traffic along HKR
Road ranges from the
maximum of 20643 PCUs
to as low as 16237 PCUs
in different sections.
Proposed Road Features
Alignment proposal
Pavement
Geometric Design Aspects
Service Roads
Underpasses
Cross Drainage Structures
Design of Intersections
Traffic Control and Road
safety Features
PAVEMENT
 Flexible pavements are proposed for all
through out the road except at the toll plazas
where rigid pavement is proposed. This is
due to the high cost of construction involved
for rigid pavements.
Geometric Design aspects
 The design speed has been kept quite consistent, and speed
difference between two consecutive curves is not exceeded.
All horizontal curves are designed for 100kmph or 80kmph
and the lowest one is 15-35 kmph,
 All geometric design aspects have been carried out as per the
IRC standards and specifications.
Underpasses
 10 cattle, 6 pedestrian and 5 cattle cum pedestrian
underpasses have been proposed to ease access of local traffic
and population
 The project road has 7 major bridges and 32 minor
bridges. These bridges shall be retained as two lanes
and parallel new bridges shall be provided on the new
3-lane portion.
 Traffic control devices and road safety features, including
Traffic Signs, Road Markings, Road lighting & Crash Barriers are
proposed and designed as per relevant IRC codes and standards.
Cross Drainage Structures
Traffic Control and Road safety features
• Apart from widening to four lanes from the
existing 2 lane carriageway, the project have
also proposed several other enhancements
such as bus-bays, truck lay-byes, toll plazas
and Rest areas with Restaurant, toilet facilities,
ATM facility, Emergency First Aid, Repair /
Maintenance facility, Parking provisions for
trucks and cars, PCO and Police outposts.
Organization chart
o Foundation Stone was laid on : October 25th,2008
o Pre-Construction Stage : June 26th 2009
o Construction Stage : March 12th,2010
o Operation Stage :November 27th 2011
o Completion of the project : August 21st 2013.
Feasibility tests
 Feasibility tests are to be made so as to confirm the project
is to be processed or not, some of them are
 Operational tests.
 Technical tests.
 Economic and cost benefit analysis
0.1Area details and Land Acquisition
0.2 Financial details
0.3 Payback Period
0.4 Break Even Analysis
0.5 Net present value
0.6 Benefit Cost Analysis
0.7 Depreciation
Technical Feasibility
 The EIA has been included in project preparation to
streamline environmental issues in project design,
constructional and operational stages. The scope of
the Environmental Assessment (EA) as envisaged in
the Terms of Reference (ToR) includes the delivery
of a Technical Feasibility Report, which shall
contain Environmental Screening and Preliminary
Environmental Assessment of the project.
 Preliminary Environmental Screening :
 A Rapid Assessment Survey
(RAS) was undertaken to identify the Valued
Ecosystem Components (VECs) during the
feasibility stage and were categorised into various
environmental components for screening and to
assess their subsequent impacts due to the project.
0.1 Area Details and Land acquisition
Total land required for widening and upgrading the project
corridor is” 41.137 ha “of which only 0.955 shall be diverted
from forest lands. The rest are to be acquired from private
and other government land holdings. The bulk of the land is
required for widening and up gradation of the existing road
while 4.913 ha of land shall be required for building toll
plaza.
Financial details
Cash outflow :
 Total Budget of the project is
estimated to be 1358.19crores.
 The cash will be given at different
phases of the project.
 The budget allocated will be strictly
considered.
 The projected cash outflow may be
considered as single payment.
0
50
100
150
200
250
300
350
400
2014 2015 2016 2017
cash inflow chart
cash inflow chart
Amountincrores
Years
Payback Period
 Payback period in capital
budgeting refers to the period of time
required for the return on an
investment to "repay" the sum of the
original investment.
 Since the project is done under
BOT Process, From the cash inflow,
Invested capital is going to be recovered
in 4years 2months 15days.
 Inflow cash per year : 323.0688
crores
Net Present Value
 NPV can be describes as
“difference amounts” between the
sums of discounted: cash inflows
and cash outflows. It compares the
present value of money today to the
present value of money in the
future, taking inflation and returns
into account.
State highway which is going to be constructed is
expected to have a life time of 15 years without any
expansion being required in between.
 Net present Value =2,458.55crores
As the net present value is greater than the total
investment project seems to be feasible.
Benefit- Cost analysis
 Just as income and expenses are used in private
sector, so cost benefits are used in public sector to signify
the economic consequences of economic decisions.
 Net-Benefit cost Ratio = PVB-I/I
 IF, BCR >1 : Accepted
BCR<1 : Rejected
 Calculated value of BCR for the project = 1402.8 /1358.19
=1.033
Benefit-cost ratio (BCR) = Present value of Benefit
(PVB)/Investment
BCR>1, SO ACCEPTED 
Conclusion
 Traffic between Hyderabad and karimnagar is heavy, due to
lack of train facility between secunderabad and karimnagar.
 So conversion of state highway-1 to 4-lane toll pay road is
necessary.
 Lot of villages are being connected by this road expansion and
it is not access controlled as high speed vehicular movement is
not possible due to access everywhere.
References
THANK YOU

More Related Content

What's hot

Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
Eddy Ankit Gangani
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
waiseee
 
Traffic stream models
Traffic stream models Traffic stream models
Traffic stream models
Faris Thyab
 
road construction project
road construction projectroad construction project
road construction project
nishant singh
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
Manjurali Balya
 
Level of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodLevel of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation Method
Md. Abdul Kader
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
Ankit Patel
 
project final year civil
project final year civilproject final year civil
project final year civil
Alankar jaiswal
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
Rashed Alam
 
O & d survey
O & d survey O & d survey
O & d survey
KACHHOT BHAVESH
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
Zawad khalil
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
NAVNEET KUMAR JHA
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
Sumit Singh
 
Traffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTraffic Intersection Points Of Conflict
Traffic Intersection Points Of Conflict
THECITYALLIANCE
 
Road construction report
Road construction reportRoad construction report
Road construction report
mohammad danish anwar
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
Ghanashyam Prajapati
 
Embankment
EmbankmentEmbankment
Embankment
civilguna
 
Intermediate public transport (ipt)
Intermediate public transport (ipt)Intermediate public transport (ipt)
Intermediate public transport (ipt)
abdul fattah barakzai
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNINGintan fatihah
 
Traffic surveys seminar
Traffic surveys seminar Traffic surveys seminar
Traffic surveys seminar
DP NITHIN
 

What's hot (20)

Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
 
Traffic stream models
Traffic stream models Traffic stream models
Traffic stream models
 
road construction project
road construction projectroad construction project
road construction project
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
 
Level of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodLevel of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation Method
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
O & d survey
O & d survey O & d survey
O & d survey
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Traffic Intersection Points Of Conflict
Traffic Intersection Points Of ConflictTraffic Intersection Points Of Conflict
Traffic Intersection Points Of Conflict
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
 
Embankment
EmbankmentEmbankment
Embankment
 
Intermediate public transport (ipt)
Intermediate public transport (ipt)Intermediate public transport (ipt)
Intermediate public transport (ipt)
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNING
 
Traffic surveys seminar
Traffic surveys seminar Traffic surveys seminar
Traffic surveys seminar
 

Similar to Feasibility study on expansion of state highway

hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring roadAkhil Padiga
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Life of A Public Auditor
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
Arnaud Renard
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
Axay Sharma
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
FICCINorthEast
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
Kunal Bhadane
 
Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavya
Bhavya Patel
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
Shabaz Khan
 
Hmis newsetter 22
Hmis newsetter 22Hmis newsetter 22
Hmis newsetter 22
DebendraDevKhanal1
 
Errp ia report dec 2012
Errp ia report dec 2012Errp ia report dec 2012
Errp ia report dec 2012
zubeditufail
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
IRJET Journal
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
Sok-Tharath CHREUNG
 
GDRPL Company Profile - .pptx
GDRPL Company Profile - .pptxGDRPL Company Profile - .pptx
GDRPL Company Profile - .pptx
NilayGandhi14
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET Journal
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road network
Gokul K Prasad
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...
IRJET Journal
 

Similar to Feasibility study on expansion of state highway (20)

hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
 
ToR
ToRToR
ToR
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavya
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
Hmis newsetter 22
Hmis newsetter 22Hmis newsetter 22
Hmis newsetter 22
 
Errp ia report dec 2012
Errp ia report dec 2012Errp ia report dec 2012
Errp ia report dec 2012
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
 
GDRPL Company Profile - .pptx
GDRPL Company Profile - .pptxGDRPL Company Profile - .pptx
GDRPL Company Profile - .pptx
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road network
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...
 

Recently uploaded

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Kumar Satyam
 

Recently uploaded (20)

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
 

Feasibility study on expansion of state highway

  • 2.  The State Government of Andhra Pradesh (GOAP) through the Government of India (GOI) has applied for a loan from the International Bank for Re- construction and Development (IBRD)  As per the GOAP’s strategic vision, the state has identified the need to upgrade and operate the high traffic roads in the State through Public Private Partnership(PPP) arrangements and has entrusted the responsibility to Andhra Pradesh Road Development Corporation (APRDC).  A set of eight State Highways have been selected for four laning under phase-wise programme.
  • 3.  The project road Hyderabad – Karimnagar – Ramagundam Road (State Highway-1) is 207.400 Km long and starts from Km. 28.200 in Rangareddy District and ends near Mancherial (NH-16 Joining point) at Km. 235.600.  The project districts comprises of Rangareddy, Medak, Karimnagar.
  • 4. ‘Rajiv Rahadhari’ or State Highway-1 is the lifeline of Karimnagar district as it is not connected to a railway network to Hyderabad. Once it was converted into a double-lane and became ‘Rajiv Rahadari’, the accidents have increased steadily.  Reasons were many as it could be due to the high density of vehicular movement, rapid urbanization and industrial activity in the coal belt region.  Following the high accident rates, there was a clamor for converting the road into four lane by public representatives, and accordingly, the foundation stone was laid in 2008.
  • 6.  Total cost of the expansion process is Rs1,358.19crore including LA, utility shifting and environmental cost under BOT (Built, Operate and Transfer) process and Concession Period of 15 years.
  • 8. Existing Traffic Mixed traffic flow is observed along the highway. The average daily traffic along HKR Road ranges from the maximum of 20643 PCUs to as low as 16237 PCUs in different sections.
  • 9. Proposed Road Features Alignment proposal Pavement Geometric Design Aspects Service Roads Underpasses Cross Drainage Structures Design of Intersections Traffic Control and Road safety Features
  • 10. PAVEMENT  Flexible pavements are proposed for all through out the road except at the toll plazas where rigid pavement is proposed. This is due to the high cost of construction involved for rigid pavements.
  • 11. Geometric Design aspects  The design speed has been kept quite consistent, and speed difference between two consecutive curves is not exceeded. All horizontal curves are designed for 100kmph or 80kmph and the lowest one is 15-35 kmph,  All geometric design aspects have been carried out as per the IRC standards and specifications.
  • 12. Underpasses  10 cattle, 6 pedestrian and 5 cattle cum pedestrian underpasses have been proposed to ease access of local traffic and population  The project road has 7 major bridges and 32 minor bridges. These bridges shall be retained as two lanes and parallel new bridges shall be provided on the new 3-lane portion.  Traffic control devices and road safety features, including Traffic Signs, Road Markings, Road lighting & Crash Barriers are proposed and designed as per relevant IRC codes and standards. Cross Drainage Structures Traffic Control and Road safety features
  • 13. • Apart from widening to four lanes from the existing 2 lane carriageway, the project have also proposed several other enhancements such as bus-bays, truck lay-byes, toll plazas and Rest areas with Restaurant, toilet facilities, ATM facility, Emergency First Aid, Repair / Maintenance facility, Parking provisions for trucks and cars, PCO and Police outposts.
  • 14.
  • 15.
  • 17. o Foundation Stone was laid on : October 25th,2008 o Pre-Construction Stage : June 26th 2009 o Construction Stage : March 12th,2010 o Operation Stage :November 27th 2011 o Completion of the project : August 21st 2013.
  • 18. Feasibility tests  Feasibility tests are to be made so as to confirm the project is to be processed or not, some of them are  Operational tests.  Technical tests.  Economic and cost benefit analysis 0.1Area details and Land Acquisition 0.2 Financial details 0.3 Payback Period 0.4 Break Even Analysis 0.5 Net present value 0.6 Benefit Cost Analysis 0.7 Depreciation
  • 19. Technical Feasibility  The EIA has been included in project preparation to streamline environmental issues in project design, constructional and operational stages. The scope of the Environmental Assessment (EA) as envisaged in the Terms of Reference (ToR) includes the delivery of a Technical Feasibility Report, which shall contain Environmental Screening and Preliminary Environmental Assessment of the project.  Preliminary Environmental Screening :  A Rapid Assessment Survey (RAS) was undertaken to identify the Valued Ecosystem Components (VECs) during the feasibility stage and were categorised into various environmental components for screening and to assess their subsequent impacts due to the project.
  • 20. 0.1 Area Details and Land acquisition Total land required for widening and upgrading the project corridor is” 41.137 ha “of which only 0.955 shall be diverted from forest lands. The rest are to be acquired from private and other government land holdings. The bulk of the land is required for widening and up gradation of the existing road while 4.913 ha of land shall be required for building toll plaza.
  • 21. Financial details Cash outflow :  Total Budget of the project is estimated to be 1358.19crores.  The cash will be given at different phases of the project.  The budget allocated will be strictly considered.  The projected cash outflow may be considered as single payment.
  • 22. 0 50 100 150 200 250 300 350 400 2014 2015 2016 2017 cash inflow chart cash inflow chart Amountincrores Years
  • 23. Payback Period  Payback period in capital budgeting refers to the period of time required for the return on an investment to "repay" the sum of the original investment.  Since the project is done under BOT Process, From the cash inflow, Invested capital is going to be recovered in 4years 2months 15days.  Inflow cash per year : 323.0688 crores
  • 24. Net Present Value  NPV can be describes as “difference amounts” between the sums of discounted: cash inflows and cash outflows. It compares the present value of money today to the present value of money in the future, taking inflation and returns into account.
  • 25. State highway which is going to be constructed is expected to have a life time of 15 years without any expansion being required in between.  Net present Value =2,458.55crores As the net present value is greater than the total investment project seems to be feasible.
  • 26. Benefit- Cost analysis  Just as income and expenses are used in private sector, so cost benefits are used in public sector to signify the economic consequences of economic decisions.  Net-Benefit cost Ratio = PVB-I/I  IF, BCR >1 : Accepted BCR<1 : Rejected  Calculated value of BCR for the project = 1402.8 /1358.19 =1.033 Benefit-cost ratio (BCR) = Present value of Benefit (PVB)/Investment BCR>1, SO ACCEPTED 
  • 27. Conclusion  Traffic between Hyderabad and karimnagar is heavy, due to lack of train facility between secunderabad and karimnagar.  So conversion of state highway-1 to 4-lane toll pay road is necessary.  Lot of villages are being connected by this road expansion and it is not access controlled as high speed vehicular movement is not possible due to access everywhere.