E Sreedharan
• He served as the Managing Director of Delhi Metro between
1995-2012.
• He is also known as a person who completes scheduled sections
before their target date and within their respective budgets.
• It was due to his efforts, the Delhi Metro is fully operational
before its schedule time.
• Being a Civil Engineer he joined Indian Railways Service of
Engineers
Early Career
• Given a Charge to construct a bridge washed away by a cyclone
• The Railways set a target of six months for the bridge to be repaired
• Sreedharan's boss, under whose jurisdiction the bridge came, reduced
it to three months
• Sreedharan was put in-charge of the execution and he restored the
bridge in just 46 days
Challenges
• Kolkata Metro
In 1970, as the Deputy Chief Engineer, he was put in charge for
implementation, planning and design of Kolkata metro, the first
ever metro in India.
• Konkan Railway
He retired from Indian Railways as Member Engineering in 1990 the
Government needed his services and he was appointed the CMD
of Konkan Railway.
The project was unique in many respects. As was first such
project undertaken by Indian Railways as it involves 93 tunnels
and 150 bridges cutting through mountains on soft soil over a stretch
of 720 Km
Delhi
Metro
Project
Delhi Metro
The need for a reliable public transportation was felt in Delhi
for a long time. A comprehensive traffic and transportation
study completed in 1990 highlighted the urgent need for a rail-
based transit system comprising a network of underground
elevated and surface corridors to meet the traffic demand
projected for 2021. To make this dream a reality , the Delhi
Metro Rail Corporation Limited (DMRC) was registered on 3rd
May 1995 and it is solely responsible for the construction and
operation.
Reason
• Population of over 1 million.
• More registered vehicles than Mumbai, Kolkata & Chennai
put together.
• Automobiles contributing to more than two – thirds of the
total atmospheric pollution.
• High rate of road accidents
Challenges
• DMP is the biggest urban invention in India since independence
in 1947
• Project has to be executed in very difficult urban environment
• Being the capital city, all actions under close scrutiny of VIPs
• Project implementation period compressed from 10 years to 7
years
• Metro being constructed to world class standards with frontline
technologies
• Expertise and technology not available in the country.
The Delhi Metro Project
• Second project in country after Kolkata Metro:1984.
• A 50:50 joint venture of GoI and GNCTD
• DMRC incorporated under Companies Act 1995
• Duration of completion of Phase I – 10 years by the end of
2005
• P-I to connect Delhi’s business, education and shopping
districts.
Funding & Cost Structure
• GoI and GNCTD arranged the all capital required.
• Initial estimation of cost in 1996 Rs 60 billion
• Revised estimation cost in 2002 was Rs 89.27 billion
• Final cost of project approx Rs 99 billion 2.2 million
passenger/day to become the project viable later revised to 1.5
million passenger/day
• Economic IRR 21.4% & Financial IRR 3%
• This project was exempted from custom and excise duties.
• Repayment period 30 years including 10 years grace period.
The Project Team
• Mr. E. Sreedharan was appointed as project manager and
managing director in Nov 1997.
• A technocrat retired from IR in 1990.
• Earned reputation for completing the project on time and
within budget.
• 70% of senior staff hired on deputation from IR
• DMRC opted lean structure.
• Effective contract awarding and procurement process (to
tackle with time, cost and corruption)
• Contract awarding process transparent and simple & fair and
just
• Removed subjectivity from tender evaluation.
Continued…
• Had two departments: project organization and operation &
maintenance
• Experts required from: Civil, electrical and communications
area etc.
• Young 18-30 years motivated team of professionals personally
interviewed by MD.
• Faced skill shortage problem everyone was new to metro
project
• No technical institute of such kind in the country.
• Suitable candidates sent Hong Kong MTRC for training.
• Metro Training School at Shastri Park
• Unique work culture: hard working, dedicated and
professionally competent
The Project Plan
• Individual accountability.
• Daily monitoring of progress.
• Weekly reviews and targets.
• Delhi Metro Act, 2002
Superseded Delhi Municipal Laws.
Lower courts barred from issuing stay orders.
Dedicated team of lawyers to prevent property disputes.
• Cost centers
Manpower.
Energy.
Material & maintenance.
Road Blocks
• Low Financial IRR prompted second thoughts on the project
• Criticism due to inability to recruit, 70% were deputed from
Indian Railways
• Lack of experience & specialized experts in Civil, Electrical &
Communication Engineering
• Loss of Rs 5 million if one day lost
• Difference of opinion on gauge to be adopted
Critical Success Factors
• ‘We mean business’ attitudes.
• Efficiency, courtesy & integrity in corporate culture.
• Corruption free Contract Awarding System & Procurement
Process.
• Autonomy in decision making.
• Advance planning in utility diversion, minimizing public
inconvenience.
What exactly Sreedharan
does as a Project Manager ?
His Beliefs as Project Manger
• Punctuality
• Professional Competence
• Fast Decision Making
• Ethical in behavior
• Courage to stand and take decisions
• Trade offs between the project goals of cost, time and
performance
Learning's from him
• Lets deadline motivate rather than pressurize you
• Work with honesty, others will co-operate
• Believe in yourself, believe in impossible
• Criticism not deter you
His Achievements
• Railway Minister's Award (1963)
• Padma Shri by the Government of India (2001)
• Man of the Year by The Times of India (2002)
• CNN-IBN Indian Of the Year 2007: Public Service (2008)
• Padma Vibhushan by the Government of India (2008)
Thank you for viewing
Yogesh Vijay
JIIT, Noida

More Related Content

What's hot

Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluationgouravranjan27
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metrojerry christo
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisPiyusha Rustagi
 
Public Private Partnership - in Road Sector
Public Private Partnership - in Road SectorPublic Private Partnership - in Road Sector
Public Private Partnership - in Road SectorBathla Tuition Centre
 
Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxSaurabh Patil
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study Soumya Bhadani
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
Delhi metro case solution by nitin bana
Delhi metro case solution by nitin banaDelhi metro case solution by nitin bana
Delhi metro case solution by nitin banaNitin Bana
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesAmit Trivedi
 
Rohan organiations study at cochin port trust
Rohan organiations study at cochin port trustRohan organiations study at cochin port trust
Rohan organiations study at cochin port trustLibu Thomas
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro projectSAKSHI AGHI
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and EconomicsKunal Bhadane
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)Sourabh Jain
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka CityZunayet Shibly
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchSunil Dayma
 

What's hot (20)

Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
 
L&t
L&tL&t
L&t
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
Public Private Partnership - in Road Sector
Public Private Partnership - in Road SectorPublic Private Partnership - in Road Sector
Public Private Partnership - in Road Sector
 
Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptx
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
delhi metro
delhi metrodelhi metro
delhi metro
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Delhi metro case solution by nitin bana
Delhi metro case solution by nitin banaDelhi metro case solution by nitin bana
Delhi metro case solution by nitin bana
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
 
Airport express line
Airport express lineAirport express line
Airport express line
 
Rohan organiations study at cochin port trust
Rohan organiations study at cochin port trustRohan organiations study at cochin port trust
Rohan organiations study at cochin port trust
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro project
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary research
 

Viewers also liked

Leadership Dr. E Sreedharan Arun.Vi
Leadership Dr. E Sreedharan   Arun.ViLeadership Dr. E Sreedharan   Arun.Vi
Leadership Dr. E Sreedharan Arun.ViArun VI
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro railkarthik1923
 
Cadbury India : A fight to worm rumour
Cadbury India : A fight to worm rumourCadbury India : A fight to worm rumour
Cadbury India : A fight to worm rumourMustahid Ali
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 

Viewers also liked (10)

Leadership Dr. E Sreedharan Arun.Vi
Leadership Dr. E Sreedharan   Arun.ViLeadership Dr. E Sreedharan   Arun.Vi
Leadership Dr. E Sreedharan Arun.Vi
 
E sreedharan
E sreedharanE sreedharan
E sreedharan
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Cadbury India : A fight to worm rumour
Cadbury India : A fight to worm rumourCadbury India : A fight to worm rumour
Cadbury India : A fight to worm rumour
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
Cadbury's worm case
Cadbury's worm caseCadbury's worm case
Cadbury's worm case
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
Project management
Project managementProject management
Project management
 

Similar to E. Sreedharan as Project manager

Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor Joseph Jincy
 
KMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptxKMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptxSwaragNP
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyMohit Gaur
 
List of various Projects PPT . To know about the company
List of various Projects PPT . To know about the companyList of various Projects PPT . To know about the company
List of various Projects PPT . To know about the companyrebekahsantineer1
 
Kushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal Vashishth
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1OmkarRasal
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01Akshay Gaikwad
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra Parmar
 
Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Ar Vandana Talikoti
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)Kritika Garg
 
Dmrc and l&t tranning report
Dmrc and l&t tranning reportDmrc and l&t tranning report
Dmrc and l&t tranning reportHemant Singh
 

Similar to E. Sreedharan as Project manager (20)

Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Dmrc
DmrcDmrc
Dmrc
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
KMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptxKMRL_VIVA_PPT.pptx
KMRL_VIVA_PPT.pptx
 
Rageet bundela
Rageet bundelaRageet bundela
Rageet bundela
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
List of various Projects PPT . To know about the company
List of various Projects PPT . To know about the companyList of various Projects PPT . To know about the company
List of various Projects PPT . To know about the company
 
Kushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analytics
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
resume_AK2
resume_AK2resume_AK2
resume_AK2
 
Project LlifeCycle
Project LlifeCycleProject LlifeCycle
Project LlifeCycle
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
Konkan railways
Konkan railwaysKonkan railways
Konkan railways
 
659193
659193659193
659193
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)
 
Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad Infrastructure project ring road, Ahmadabad
Infrastructure project ring road, Ahmadabad
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
Dmrc and l&t tranning report
Dmrc and l&t tranning reportDmrc and l&t tranning report
Dmrc and l&t tranning report
 

Recently uploaded

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasiemaillard
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsCol Mukteshwar Prasad
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfTamralipta Mahavidyalaya
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345beazzy04
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfDr. M. Kumaresan Hort.
 
Forest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDFForest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDFVivekanand Anglo Vedic Academy
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxricssacare
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chipsGeoBlogs
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxbennyroshan06
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptSourabh Kumar
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxJenilouCasareno
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportAvinash Rai
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringDenish Jangid
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxCapitolTechU
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxakshayaramakrishnan21
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXMIRIAMSALINAS13
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...Sayali Powar
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptxmansk2
 

Recently uploaded (20)

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdf
 
Forest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDFForest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDF
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 

E. Sreedharan as Project manager

  • 1.
  • 3. E Sreedharan • He served as the Managing Director of Delhi Metro between 1995-2012. • He is also known as a person who completes scheduled sections before their target date and within their respective budgets. • It was due to his efforts, the Delhi Metro is fully operational before its schedule time. • Being a Civil Engineer he joined Indian Railways Service of Engineers
  • 4. Early Career • Given a Charge to construct a bridge washed away by a cyclone • The Railways set a target of six months for the bridge to be repaired • Sreedharan's boss, under whose jurisdiction the bridge came, reduced it to three months • Sreedharan was put in-charge of the execution and he restored the bridge in just 46 days
  • 5. Challenges • Kolkata Metro In 1970, as the Deputy Chief Engineer, he was put in charge for implementation, planning and design of Kolkata metro, the first ever metro in India. • Konkan Railway He retired from Indian Railways as Member Engineering in 1990 the Government needed his services and he was appointed the CMD of Konkan Railway. The project was unique in many respects. As was first such project undertaken by Indian Railways as it involves 93 tunnels and 150 bridges cutting through mountains on soft soil over a stretch of 720 Km
  • 7. Delhi Metro The need for a reliable public transportation was felt in Delhi for a long time. A comprehensive traffic and transportation study completed in 1990 highlighted the urgent need for a rail- based transit system comprising a network of underground elevated and surface corridors to meet the traffic demand projected for 2021. To make this dream a reality , the Delhi Metro Rail Corporation Limited (DMRC) was registered on 3rd May 1995 and it is solely responsible for the construction and operation.
  • 8. Reason • Population of over 1 million. • More registered vehicles than Mumbai, Kolkata & Chennai put together. • Automobiles contributing to more than two – thirds of the total atmospheric pollution. • High rate of road accidents
  • 9. Challenges • DMP is the biggest urban invention in India since independence in 1947 • Project has to be executed in very difficult urban environment • Being the capital city, all actions under close scrutiny of VIPs • Project implementation period compressed from 10 years to 7 years • Metro being constructed to world class standards with frontline technologies • Expertise and technology not available in the country.
  • 10. The Delhi Metro Project • Second project in country after Kolkata Metro:1984. • A 50:50 joint venture of GoI and GNCTD • DMRC incorporated under Companies Act 1995 • Duration of completion of Phase I – 10 years by the end of 2005 • P-I to connect Delhi’s business, education and shopping districts.
  • 11. Funding & Cost Structure • GoI and GNCTD arranged the all capital required. • Initial estimation of cost in 1996 Rs 60 billion • Revised estimation cost in 2002 was Rs 89.27 billion • Final cost of project approx Rs 99 billion 2.2 million passenger/day to become the project viable later revised to 1.5 million passenger/day • Economic IRR 21.4% & Financial IRR 3% • This project was exempted from custom and excise duties. • Repayment period 30 years including 10 years grace period.
  • 12. The Project Team • Mr. E. Sreedharan was appointed as project manager and managing director in Nov 1997. • A technocrat retired from IR in 1990. • Earned reputation for completing the project on time and within budget. • 70% of senior staff hired on deputation from IR • DMRC opted lean structure. • Effective contract awarding and procurement process (to tackle with time, cost and corruption) • Contract awarding process transparent and simple & fair and just • Removed subjectivity from tender evaluation.
  • 13. Continued… • Had two departments: project organization and operation & maintenance • Experts required from: Civil, electrical and communications area etc. • Young 18-30 years motivated team of professionals personally interviewed by MD. • Faced skill shortage problem everyone was new to metro project • No technical institute of such kind in the country. • Suitable candidates sent Hong Kong MTRC for training. • Metro Training School at Shastri Park • Unique work culture: hard working, dedicated and professionally competent
  • 14. The Project Plan • Individual accountability. • Daily monitoring of progress. • Weekly reviews and targets. • Delhi Metro Act, 2002 Superseded Delhi Municipal Laws. Lower courts barred from issuing stay orders. Dedicated team of lawyers to prevent property disputes. • Cost centers Manpower. Energy. Material & maintenance.
  • 15. Road Blocks • Low Financial IRR prompted second thoughts on the project • Criticism due to inability to recruit, 70% were deputed from Indian Railways • Lack of experience & specialized experts in Civil, Electrical & Communication Engineering • Loss of Rs 5 million if one day lost • Difference of opinion on gauge to be adopted
  • 16. Critical Success Factors • ‘We mean business’ attitudes. • Efficiency, courtesy & integrity in corporate culture. • Corruption free Contract Awarding System & Procurement Process. • Autonomy in decision making. • Advance planning in utility diversion, minimizing public inconvenience.
  • 17. What exactly Sreedharan does as a Project Manager ?
  • 18. His Beliefs as Project Manger • Punctuality • Professional Competence • Fast Decision Making • Ethical in behavior • Courage to stand and take decisions • Trade offs between the project goals of cost, time and performance
  • 19. Learning's from him • Lets deadline motivate rather than pressurize you • Work with honesty, others will co-operate • Believe in yourself, believe in impossible • Criticism not deter you
  • 20. His Achievements • Railway Minister's Award (1963) • Padma Shri by the Government of India (2001) • Man of the Year by The Times of India (2002) • CNN-IBN Indian Of the Year 2007: Public Service (2008) • Padma Vibhushan by the Government of India (2008)