MODULE III : Levelling
1. Define levelling?
It is a branch of surveying the object
(i) To find the elevations of points
(ii) To establish points based on assumed datum
or is defined as art/science of determining relative heights of different points on,
above, or below earth surface.
2. Define the following terms used in levelling:
(i) Datum (ii) Mean sea level (iii) Bench mark
(iv) Level surface (v) Level line
Datum: It is any surface to which elevations (heights) are referred. or the imaginary
surface with reference to which vertical distances of points (on, above, or below) are
measured. eg: MSL
Mean Sea Level (MSL): It is the datum adopted by GTS department of India
Bench mark:It is fixed reference point of known elevation w.r.t any datum
Level Surface: It is a curved surface which at each point is perpendicular to the
direction of gravity at that point.
 It is perpendicular to the plumb line
 It is parallel to the earth surface
Level line:
 It is a line lying on level surface
 It is perpendicular to the plumb line (direction of gravity)
3. Write a note on levelling instruments? Explain.
Which is the smallest division of the levelling staff?
Differentiate between telescopic levelling staff and target staff?
Orphanage Polytechnic College, Edavanna
REVISION PACKAGE
Surveying - I ( Revision 2015)
OPTC Edavanna Page 2
LEVEL: Instrument used to furnish horizontal line of sight for observing staff
readings and determining reduced levels
1. Dumpy level:
 Simple, compact and stable instrument
 Telescope rigidly fixed to its supports
 It cannot be rotated about horizontal axis
2. Wye (Y) level: Telescope is carried by two vertical wye supports
3. Tilting level: Telescope tilt about its horizontal axis. It is also called as IOP
(Indian Office Pattern) level
4. Automatic level: Telescope tilt about its horizontal axis
It is also called as IOP (Indian Office Pattern) level
LEVELLING STAFF:
 Levelling staffs are scales on which the distances are measured
 Straight rectangular rod having graduations
 Bottom of levelling staff represents zero reading
 The smallest division of a levelling staff is 5 mm
A. Self-reading staff: A staff on which readings are directly read by the observer
through the telescope. They are three types
1. Solid staff
2. Folding staff
3. Telescopic staff
1. Solid staff:
 Made of well-seasoned wood
 3 m length
 Greater accuracy in reading, so used in precise levelling
 No Hinge joints
 Difficult to carry to field
2. Folding staff
 Also called as Hinged staff
 Hinge joints present
 Less accuracy
 4 m length
 Can be folded into 2 m length
OPTC Edavanna Page 3
 Thickness of graduations = 5 mm
3. Telescopic staff
 Three lengths placed one into the other
 Extended to full length by pulling
 Smallest division is 5 mm
 4 m length
 Values in meter (Red - left side) and decimeter (Black - right side) are
marked on it.
B. Target Staff:
 A staff which contains a target is called target staff
 For taking readings, the level man directs the staff
man to raise or lower the target till it is bisected
by line of sight.
 The staff man clamps the target and takes reading.
4. What are the advantage sof dumpy level over wye level?
 Simpler construction with few movable parts
 Fewer adjustments to be made
 Longer life of the adjustments
5. What are the merits and demerits of self-reading staff?
Merits:
 Easier and Quicker to read a self-reading staff
 The reading on a self-reading staff are taken by the leveler himself
 For holding the staff, no experience required, no knowledge required
Demerits:
 Accuracy is less than that of target staff.
 The leveler have all responsibilities in taking reading
6. What are the merits and demerits of target staff?
Merits:
 The reading with target staff can be taken with greater fineness (more
accurate)
 The leveller and staff man have the responsibility in taking the reading
 Vernier is provided on target staff for accurate reading
Demerits:
 It is difficult to adjust the target, so that the line of sight bisects the target
 The staff man is responsible in marking the reading
 So, for holding the staff, an experienced staff man is required
OPTC Edavanna Page 4
7. What is mean by curvature and refraction correction?
For long sights and accurate levelling work, the effects of the line of sight shall have
to be taken into consideration. Due to curvature of earth, the points appear to be
lower than they actually are. While due to refraction, they appear to be higher than
they actually are. The effects of curvature being greater than that of refraction, the
combined effect causes the points to appear to be lower than they actually are.
Curvature correction:
PC = apparent staff reading
PB = True staff reading
BC = correction for curvature
R = Radius of earth = 6370 km
 Error due to curvature of earth
is considered when the disyance
is large
 The line of sight is horizontal, but the level line is curved and parallel to the
earth surface
 The vertical distance b/w the line of sight and level line at a particular point is
called curvature correction
 Effect of curvature is to cause the object sighted to appear lower than they
actually are
 curvature correction is always negative
OC2
= OA2
+ AC2
(R+CC)2
= R2
+ d2
R2
+ 2.R.CC +CC
2
= R2
+ d2
2.R.CC = d2
CC = =
Refraction correction:
 Ray of light passes through air layers of different densities. They donot
remain straight, but are refracted and bend downward towards denser medium.
 Refraction correction is assumed as 1/7 times the curvature correction.
 Curvature correction, CC = (subtractive) = 0.0784 d2
 Cr = = 0.01121d2
OPTC Edavanna Page 5
Combined correction:
 Combined correction = Curvature correction (-ve) + Refraction correction
 Cr = + = (subtractive) = 0.06728d2
 Combined correction is subtractive
8. An observer standing on the deck of a ship just sees the top of a light house. The
top of the light house is 30 m above sea level and the height of the observer’s
eye is 5 m above the sea level. Find the distance of the sailor from the light
house?
d = d1 + d2
= √ + √
=√ + √
= 29.60 m
9. Explain errors in levelling?
The errors in levelling are mainly 3 types,
(i) Instrumental error
(ii) Personal error
(iii)Natural error
Instrumental error Personal error Natural error
Error due to imperfect
adjustment
Mistakes in manipulation Earth’s curvature
Error due to sluggish
bubble
Mistake in rod handling Atmospheric refraction
Error due to movement of
objective slide
Mistakes in reading the rod Variations in temperature
Rod not of standard length Errors in sighting Settlement of tripod or
turning points
Error due to defective joint Mistakes in recording Wind vibrations
10.Define sensitivity of bubble tube. How the sensitiveness of bubble tube can be
increased?
 It is the capacity of a level tube to exhibit small deviation from the horizontal
 Also defined as the angular value of one division of the bubble tube.
 The sensitivity of a bubble tube can be increase by
o Increasing the internal radius of the tube
o Increasing the diameter of the tube
o Increasing the length of the bubble
o Decreasing the roughness of the wall
o Decreasing the viscosity of the liquid
OPTC Edavanna Page 6
11.The following readings were observed with a level 1.150 (BM 37.430), 1.930,
2.810, 4.000, CP 1.520, 2.440, 0.730, 0.490, CP 4.000, 3.160, 1.800, 0.7000.
Reduce the levels by height of collimation method. Apply check.
Method I: Rise and Fall method
Check:
Last RL – First RL = 38.91 – 37.430 =1.48
BS - FS = 6.67 – 5.19 = 1.48
Rise - Fall = 5.25 – 3.77 = 1.48
Method II: Height of Instrument method (HI or HC method)
OPTC Edavanna Page 7
Check:
Last RL – First RL = 38.91 – 37.430 =1.48
BS - FS = 6.67 – 5.19 = 1.48
12.Following series of readings of BS and FS was taken in a fly levelling. The first
reading was taken on a point of RL 100.000 m. Draw a page of levelling field-
book and enter readings in it. Find the RLs of all points. Apply check.
1.235, 1.396, 2.345, 1.986, 2.148, 3.755, 0.325, 2.568, 1.465, 2.435, 1.356, 0.768,
1.985, 2.655
Last RL – First RL =
BS - FS =
Rise - Fall =
13.The following staff readings were taken with a level. The instrument was moved
after the fourth and the seventh readings. Calculate the reduced levels of the
points and find level difference between the first and last points. The first
reading was taken on a BM of +100.000 m. Use HC method.
0.875, 2.625, 1.050, 2.185, 1.850, 0.885, 1.375, 2.180, 0.855, 2.200 [refer note]
14.The following staff readings were recorded for a certain work of levelling 1.810,
2.110, 1.225, 1.455, 0.905, 2.435, 2.810, 2.675, and 1.765. The level was shifted
after 4th
and 7th
readings. The first reading was taken on a BM of RL 50.000 m.
Rule out a page of level book and enter the readings
(i) Work out the RL of all stations
(ii) If the staff were held inverted and readings on a ceiling from last instrument
position was 3.500 m, Find the RL of ceiling. [refer note]
OPTC Edavanna Page 8
15.During a construction work, the bottom of an RC sunshade A was taken as a
temporary BM (RL 63.120). The following notes were recorded.
Reading of inverted staff on BM No.A = 2.232
Reading on peg P on ground = 1.034
Change of instrument
Reading of peg P on ground = 1.328
Reading an inverted staff on bottom of cornice B = 4.124
Enter the readings in a level book page and calculate the RL of cornice B.
16.What is a bench mark? What are the different types of BM?
Bench mark: It is fixed reference point of known elevation w.r.t any datum. There
are four types of bench marks.
1. GTS (Great Trignometrical Survey) BM
2. Permanent BM
3. Arbitrary BM
4. Temperory BM
GTS (Great Trignometrical Survey) BM
 Established by Survey of India
 Established with higher accuracy
 Based on MSL at Bomabay High
Permanent BM
 Fixed in b/w GTS bench marks
 By govt. agencies like railways, PWD
 Written on permanent objects like milestones, railways, bridges, etc.
 Value clearly written
Arbitrary BM
 These are reference points whose RL’s are arbitrarily assumed
 Used for small works
Temperory BM
 Reference points established temporarily whenever required
 Generally chosen to close days work and to start next days.
 Also if there is a break in work
 Marked on objects like stone, trees,..
OPTC Edavanna Page 9
17.The following staff readings were taken with a level. The instrument was moved
after third, sixth, and eighth readings. Calculate the RL of points, if the first
reading was taken by a staff held on a BM 75.000 m. Use HC method.
0.765, 1.825, 1.050, 1.885, 1.850, 0.995, 1.375, 2.250, 0.765, 2.200
18.The staff readings recorded for a work are 1.205, 1.710, 2.500, 0.230, 0.910,
2.100, 2.800, 0.310, 1.820, 2.915. The first reading was taken at BM 140.000.
Rule out a page of field book in rise and fall method and find the average slope
between the points. The instrument was shifted after the fourth and eighth
reading. The distance between first and last station is 1500 m.
19.What are the adjustments done at every set-up of levelling instruments?
20.What are the temporary adjustments in levelling?
21.What are the points should be observed while conducting levelling work?
Adjustments done at every setting of levelling instrument are called temperory
adjustments. They are
(i) Setting out: Fixing the instrument on tripod and levelling it approx by tripod
(ii) Levelling up: Accurate levelling using foot screws and to make the vertical axis
truly vertical. It is done as below,
 Loose the clamp and turn the instrument such that telescope is
parallel to two of the foot screws. Turn level screws and level it.
 Turn the telescope 900
so that telescope is parallel to the third
screw. Turn the level screw until the bubble comes in the center of
level tube.
(iii) Elimination of parallax: Parallax is a condition arising when the image formed
by the objective is not in the plane of cross hairs. It is eliminated by focusing
the objective and eyepiece.
22.What is balancing of sights? What is its importance in the field?
OPTC Edavanna Page 10
In the above fig, let the observations be made with a level in which the line of
collimation is inclined upward by an amount ‘ ’ from horizontal. When the bubble is
in the centre of its run, the level being kept exactly mid-way b/w the two points A &
B. The observed back sight and fore sight are x1 and x2. The correct BS on A will be
equal to x1 – y1, where y1 = D1tan . The correct fore sight on B will be equal to
x2 – y2, where y2 = D2tan . Hence the correct difference b/w A & B is
= (x1 – y1) – (x2 – y2)
= (x1 – y1 ) + (y2 – y1)
= (x1 – x2) + ( D2tan - D1tan )
= (x1 – x2), if D1 =D2
Errors eliminated by balancing:
 The error due to non-parallelism of line of collimation and axis of bubble tube
 The error due to curvature and refraction may be eliminated if the length of two
sights can be made equal.
23.Distinguish between two methods of booking and reducing the elevation of
points from the observed staff readings.
24.Describe the HI method and rise and fall method of computing the levels.
Discuss the merits and demerits of each.
25.What are the two systems of reduction of levels? Explain.
The observed staff readings as noted in a level book are further required to be
manipulated to find out the elevation of points. The operation is known as reduction
of level. There are two methods for reduction of levels:
• HI = BM + BS
• RL of A = HI - FS (or IS)
OPTC Edavanna Page 11
26.Draw a neat diagram of component parts of a levelling instrument? Describe
the function of its salient parts?
Telescope : Used to sight and read staff readings
Diaphragm : Holds the cross hairs (fitted with telescope)
Focussing screws : Separate focussing screws for eye piece and objective.
Eye piece : Magnifies the image formed in the plane of the diaphragm and thus to
read staff during leveling.
Level Tube : Used to make the axis of the telescope horizontal and thus the
line of sight.
Levelling screws : To adjust instrument (level) so that the line of sight is horizontal
for any orientation of the telescope.
Tripod stand : To fix the instrument (level) at a convenient height of an observer.

More Related Content

What's hot

Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
Vilas Nikam
 
Hydrographics surveying
Hydrographics surveyingHydrographics surveying
Hydrographics surveying
Mir Zafarullah
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Rakesh Verma
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
Umarfarook Momin
 
Traversing
TraversingTraversing
Traversing
Arissa Loh
 
Control surveying
Control surveyingControl surveying
Control surveying
Prakash Kumar Sekar
 
Perpendicular Offset
Perpendicular Offset Perpendicular Offset
Perpendicular Offset
Mujeeb Muji
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
Rakesh Verma
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
Self-employed
 
Levelling
LevellingLevelling
Levelling
AratiSavant
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work book
Talha Hussain
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
Krish Bhavsar
 
Levelling
LevellingLevelling
Levelling
KHUSHBU SHAH
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manualsavineshgautam
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
Mujeeb Muji
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
JNTUK
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
Naufil Sayyad
 
Hydrographic Survey
Hydrographic SurveyHydrographic Survey
Hydrographic Survey
Shubham Bathwal
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
Sunil Kumar Meena
 

What's hot (20)

Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Hydrographics surveying
Hydrographics surveyingHydrographics surveying
Hydrographics surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Traversing
TraversingTraversing
Traversing
 
Control surveying
Control surveyingControl surveying
Control surveying
 
Perpendicular Offset
Perpendicular Offset Perpendicular Offset
Perpendicular Offset
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Levelling
LevellingLevelling
Levelling
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work book
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Levelling
LevellingLevelling
Levelling
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manuals
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Hydrographic Survey
Hydrographic SurveyHydrographic Survey
Hydrographic Survey
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
 

Viewers also liked

(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau
(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau
(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau
Marit Alke
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
SHAMJITH KM
 
Construcción del hotel burj al arab, una superestructura de 7 estrellas
Construcción del hotel burj al arab, una superestructura de 7 estrellasConstrucción del hotel burj al arab, una superestructura de 7 estrellas
Construcción del hotel burj al arab, una superestructura de 7 estrellas
edwin huaman apaza
 
the generation of panning laws for irregular speaker arrays using heuristic m...
the generation of panning laws for irregular speaker arrays using heuristic m...the generation of panning laws for irregular speaker arrays using heuristic m...
the generation of panning laws for irregular speaker arrays using heuristic m...
Bruce Wiggins
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
RAHUL SINHA
 
Levelling
LevellingLevelling
Paradigma laminas
Paradigma  laminas Paradigma  laminas
Paradigma laminas Jose Azuaje
 
Plantilla fase1 Ensamble y Mant Computadores
Plantilla fase1 Ensamble y Mant ComputadoresPlantilla fase1 Ensamble y Mant Computadores
Plantilla fase1 Ensamble y Mant Computadores
Jeffer O
 
Ante3A Schelotto 2015 Aramburu-Cáceres
Ante3A Schelotto 2015 Aramburu-CáceresAnte3A Schelotto 2015 Aramburu-Cáceres
Ante3A Schelotto 2015 Aramburu-Cáceres
Andi Arka
 
Web 2.0
Web 2.0Web 2.0
Web 2.0
2331102431
 
Conducta vial de los peatones
Conducta vial de los peatonesConducta vial de los peatones
Conducta vial de los peatones
Iaracamila
 
Administracion por objetivo
Administracion por objetivoAdministracion por objetivo
Administracion por objetivo
jasonjasnot
 
Planeación didáctica
Planeación didácticaPlaneación didáctica
Planeación didáctica
Flores80Eric
 
Entregable 2 tabla comparativa
Entregable 2 tabla comparativaEntregable 2 tabla comparativa
Entregable 2 tabla comparativa
Leticia Cortés Mora
 

Viewers also liked (20)

Encuentro educadores por la paz
Encuentro educadores por la pazEncuentro educadores por la paz
Encuentro educadores por la paz
 
(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau
(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau
(Mein erster Onlinekurs) Überblick über die 10 Module / Aufbau
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
 
Construcción del hotel burj al arab, una superestructura de 7 estrellas
Construcción del hotel burj al arab, una superestructura de 7 estrellasConstrucción del hotel burj al arab, una superestructura de 7 estrellas
Construcción del hotel burj al arab, una superestructura de 7 estrellas
 
the generation of panning laws for irregular speaker arrays using heuristic m...
the generation of panning laws for irregular speaker arrays using heuristic m...the generation of panning laws for irregular speaker arrays using heuristic m...
the generation of panning laws for irregular speaker arrays using heuristic m...
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Levelling
LevellingLevelling
Levelling
 
Practica 2
Practica 2Practica 2
Practica 2
 
Boliche
BolicheBoliche
Boliche
 
1 0 1025
1 0 10251 0 1025
1 0 1025
 
Paradigma laminas
Paradigma  laminas Paradigma  laminas
Paradigma laminas
 
Presentación ampa final
Presentación ampa finalPresentación ampa final
Presentación ampa final
 
Plantilla fase1 Ensamble y Mant Computadores
Plantilla fase1 Ensamble y Mant ComputadoresPlantilla fase1 Ensamble y Mant Computadores
Plantilla fase1 Ensamble y Mant Computadores
 
Ante3A Schelotto 2015 Aramburu-Cáceres
Ante3A Schelotto 2015 Aramburu-CáceresAnte3A Schelotto 2015 Aramburu-Cáceres
Ante3A Schelotto 2015 Aramburu-Cáceres
 
Las zonas francas en colombia
Las zonas francas en colombiaLas zonas francas en colombia
Las zonas francas en colombia
 
Web 2.0
Web 2.0Web 2.0
Web 2.0
 
Conducta vial de los peatones
Conducta vial de los peatonesConducta vial de los peatones
Conducta vial de los peatones
 
Administracion por objetivo
Administracion por objetivoAdministracion por objetivo
Administracion por objetivo
 
Planeación didáctica
Planeación didácticaPlaneación didáctica
Planeación didáctica
 
Entregable 2 tabla comparativa
Entregable 2 tabla comparativaEntregable 2 tabla comparativa
Entregable 2 tabla comparativa
 

Similar to Surveying - Module iii-levelling only note

Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveyingstooty s
 
Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01Sunilkumar Mandal
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
Doreen Yeo
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
ashleyyeap
 
Levelling
LevellingLevelling
Levelling
Arissa Loh
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
LeulDamtew
 
UNIT FOUR.pptx
UNIT FOUR.pptxUNIT FOUR.pptx
UNIT FOUR.pptx
warkisafile1
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
AlwandBarzani
 
Real life application of angle of elevation and depression.pptx
Real life application of angle of elevation and depression.pptxReal life application of angle of elevation and depression.pptx
Real life application of angle of elevation and depression.pptx
LiciaMc
 
Surveying short question answers
Surveying short question answersSurveying short question answers
Surveying short question answers
Saurabh Pare
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
Doreen Yeo
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
Phurba Tamang
 
1 st report
1 st report1 st report
1 st report
fareezsham
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
Farah Sham
 
surveying.levelling ppt.ppt
surveying.levelling ppt.pptsurveying.levelling ppt.ppt
surveying.levelling ppt.ppt
ivargarud
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
Bahzad5
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
Est
 
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Kaushal Mehta
 

Similar to Surveying - Module iii-levelling only note (20)

Types of level
Types of levelTypes of level
Types of level
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
Levelling
LevellingLevelling
Levelling
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
 
UNIT FOUR.pptx
UNIT FOUR.pptxUNIT FOUR.pptx
UNIT FOUR.pptx
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
 
Real life application of angle of elevation and depression.pptx
Real life application of angle of elevation and depression.pptxReal life application of angle of elevation and depression.pptx
Real life application of angle of elevation and depression.pptx
 
Surveying short question answers
Surveying short question answersSurveying short question answers
Surveying short question answers
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Levelling
LevellingLevelling
Levelling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
1 st report
1 st report1 st report
1 st report
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
surveying.levelling ppt.ppt
surveying.levelling ppt.pptsurveying.levelling ppt.ppt
surveying.levelling ppt.ppt
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
 

More from SHAMJITH KM

Salah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdfSalah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdf
SHAMJITH KM
 
Construction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture NotesConstruction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture Notes
SHAMJITH KM
 
Construction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture NotesConstruction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture Notes
SHAMJITH KM
 
Construction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture NotesConstruction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture Notes
SHAMJITH KM
 
Construction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture NotesConstruction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture Notes
SHAMJITH KM
 
Computing fundamentals lab record - Polytechnics
Computing fundamentals lab record - PolytechnicsComputing fundamentals lab record - Polytechnics
Computing fundamentals lab record - Polytechnics
SHAMJITH KM
 
Concrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsConcrete lab manual - Polytechnics
Concrete lab manual - Polytechnics
SHAMJITH KM
 
Concrete Technology Study Notes
Concrete Technology Study NotesConcrete Technology Study Notes
Concrete Technology Study Notes
SHAMJITH KM
 
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളുംനബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
SHAMJITH KM
 
Design of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc fileDesign of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc file
SHAMJITH KM
 
Design of simple beam using staad pro
Design of simple beam using staad proDesign of simple beam using staad pro
Design of simple beam using staad pro
SHAMJITH KM
 
Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)
SHAMJITH KM
 
Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)
SHAMJITH KM
 
Python programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - KalamasseryPython programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - Kalamassery
SHAMJITH KM
 
Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)
SHAMJITH KM
 
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
SHAMJITH KM
 
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
SHAMJITH KM
 
CAD Lab model viva questions
CAD Lab model viva questions CAD Lab model viva questions
CAD Lab model viva questions
SHAMJITH KM
 
Brain Computer Interface (BCI) - seminar PPT
Brain Computer Interface (BCI) -  seminar PPTBrain Computer Interface (BCI) -  seminar PPT
Brain Computer Interface (BCI) - seminar PPT
SHAMJITH KM
 
A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍
A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍
A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍
SHAMJITH KM
 

More from SHAMJITH KM (20)

Salah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdfSalah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdf
 
Construction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture NotesConstruction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture Notes
 
Construction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture NotesConstruction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture Notes
 
Construction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture NotesConstruction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture Notes
 
Construction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture NotesConstruction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture Notes
 
Computing fundamentals lab record - Polytechnics
Computing fundamentals lab record - PolytechnicsComputing fundamentals lab record - Polytechnics
Computing fundamentals lab record - Polytechnics
 
Concrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsConcrete lab manual - Polytechnics
Concrete lab manual - Polytechnics
 
Concrete Technology Study Notes
Concrete Technology Study NotesConcrete Technology Study Notes
Concrete Technology Study Notes
 
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളുംനബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
 
Design of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc fileDesign of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc file
 
Design of simple beam using staad pro
Design of simple beam using staad proDesign of simple beam using staad pro
Design of simple beam using staad pro
 
Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)
 
Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)
 
Python programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - KalamasseryPython programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - Kalamassery
 
Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)
 
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
 
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
 
CAD Lab model viva questions
CAD Lab model viva questions CAD Lab model viva questions
CAD Lab model viva questions
 
Brain Computer Interface (BCI) - seminar PPT
Brain Computer Interface (BCI) -  seminar PPTBrain Computer Interface (BCI) -  seminar PPT
Brain Computer Interface (BCI) - seminar PPT
 
A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍
A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍
A home in heaven - സ്വര്‍ഗത്തില്‍ ഒരു വീട് ലഭിക്കാന്‍
 

Recently uploaded

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 

Recently uploaded (20)

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 

Surveying - Module iii-levelling only note

  • 1. OPTC Edavanna Page 1 MODULE III : Levelling 1. Define levelling? It is a branch of surveying the object (i) To find the elevations of points (ii) To establish points based on assumed datum or is defined as art/science of determining relative heights of different points on, above, or below earth surface. 2. Define the following terms used in levelling: (i) Datum (ii) Mean sea level (iii) Bench mark (iv) Level surface (v) Level line Datum: It is any surface to which elevations (heights) are referred. or the imaginary surface with reference to which vertical distances of points (on, above, or below) are measured. eg: MSL Mean Sea Level (MSL): It is the datum adopted by GTS department of India Bench mark:It is fixed reference point of known elevation w.r.t any datum Level Surface: It is a curved surface which at each point is perpendicular to the direction of gravity at that point.  It is perpendicular to the plumb line  It is parallel to the earth surface Level line:  It is a line lying on level surface  It is perpendicular to the plumb line (direction of gravity) 3. Write a note on levelling instruments? Explain. Which is the smallest division of the levelling staff? Differentiate between telescopic levelling staff and target staff? Orphanage Polytechnic College, Edavanna REVISION PACKAGE Surveying - I ( Revision 2015)
  • 2. OPTC Edavanna Page 2 LEVEL: Instrument used to furnish horizontal line of sight for observing staff readings and determining reduced levels 1. Dumpy level:  Simple, compact and stable instrument  Telescope rigidly fixed to its supports  It cannot be rotated about horizontal axis 2. Wye (Y) level: Telescope is carried by two vertical wye supports 3. Tilting level: Telescope tilt about its horizontal axis. It is also called as IOP (Indian Office Pattern) level 4. Automatic level: Telescope tilt about its horizontal axis It is also called as IOP (Indian Office Pattern) level LEVELLING STAFF:  Levelling staffs are scales on which the distances are measured  Straight rectangular rod having graduations  Bottom of levelling staff represents zero reading  The smallest division of a levelling staff is 5 mm A. Self-reading staff: A staff on which readings are directly read by the observer through the telescope. They are three types 1. Solid staff 2. Folding staff 3. Telescopic staff 1. Solid staff:  Made of well-seasoned wood  3 m length  Greater accuracy in reading, so used in precise levelling  No Hinge joints  Difficult to carry to field 2. Folding staff  Also called as Hinged staff  Hinge joints present  Less accuracy  4 m length  Can be folded into 2 m length
  • 3. OPTC Edavanna Page 3  Thickness of graduations = 5 mm 3. Telescopic staff  Three lengths placed one into the other  Extended to full length by pulling  Smallest division is 5 mm  4 m length  Values in meter (Red - left side) and decimeter (Black - right side) are marked on it. B. Target Staff:  A staff which contains a target is called target staff  For taking readings, the level man directs the staff man to raise or lower the target till it is bisected by line of sight.  The staff man clamps the target and takes reading. 4. What are the advantage sof dumpy level over wye level?  Simpler construction with few movable parts  Fewer adjustments to be made  Longer life of the adjustments 5. What are the merits and demerits of self-reading staff? Merits:  Easier and Quicker to read a self-reading staff  The reading on a self-reading staff are taken by the leveler himself  For holding the staff, no experience required, no knowledge required Demerits:  Accuracy is less than that of target staff.  The leveler have all responsibilities in taking reading 6. What are the merits and demerits of target staff? Merits:  The reading with target staff can be taken with greater fineness (more accurate)  The leveller and staff man have the responsibility in taking the reading  Vernier is provided on target staff for accurate reading Demerits:  It is difficult to adjust the target, so that the line of sight bisects the target  The staff man is responsible in marking the reading  So, for holding the staff, an experienced staff man is required
  • 4. OPTC Edavanna Page 4 7. What is mean by curvature and refraction correction? For long sights and accurate levelling work, the effects of the line of sight shall have to be taken into consideration. Due to curvature of earth, the points appear to be lower than they actually are. While due to refraction, they appear to be higher than they actually are. The effects of curvature being greater than that of refraction, the combined effect causes the points to appear to be lower than they actually are. Curvature correction: PC = apparent staff reading PB = True staff reading BC = correction for curvature R = Radius of earth = 6370 km  Error due to curvature of earth is considered when the disyance is large  The line of sight is horizontal, but the level line is curved and parallel to the earth surface  The vertical distance b/w the line of sight and level line at a particular point is called curvature correction  Effect of curvature is to cause the object sighted to appear lower than they actually are  curvature correction is always negative OC2 = OA2 + AC2 (R+CC)2 = R2 + d2 R2 + 2.R.CC +CC 2 = R2 + d2 2.R.CC = d2 CC = = Refraction correction:  Ray of light passes through air layers of different densities. They donot remain straight, but are refracted and bend downward towards denser medium.  Refraction correction is assumed as 1/7 times the curvature correction.  Curvature correction, CC = (subtractive) = 0.0784 d2  Cr = = 0.01121d2
  • 5. OPTC Edavanna Page 5 Combined correction:  Combined correction = Curvature correction (-ve) + Refraction correction  Cr = + = (subtractive) = 0.06728d2  Combined correction is subtractive 8. An observer standing on the deck of a ship just sees the top of a light house. The top of the light house is 30 m above sea level and the height of the observer’s eye is 5 m above the sea level. Find the distance of the sailor from the light house? d = d1 + d2 = √ + √ =√ + √ = 29.60 m 9. Explain errors in levelling? The errors in levelling are mainly 3 types, (i) Instrumental error (ii) Personal error (iii)Natural error Instrumental error Personal error Natural error Error due to imperfect adjustment Mistakes in manipulation Earth’s curvature Error due to sluggish bubble Mistake in rod handling Atmospheric refraction Error due to movement of objective slide Mistakes in reading the rod Variations in temperature Rod not of standard length Errors in sighting Settlement of tripod or turning points Error due to defective joint Mistakes in recording Wind vibrations 10.Define sensitivity of bubble tube. How the sensitiveness of bubble tube can be increased?  It is the capacity of a level tube to exhibit small deviation from the horizontal  Also defined as the angular value of one division of the bubble tube.  The sensitivity of a bubble tube can be increase by o Increasing the internal radius of the tube o Increasing the diameter of the tube o Increasing the length of the bubble o Decreasing the roughness of the wall o Decreasing the viscosity of the liquid
  • 6. OPTC Edavanna Page 6 11.The following readings were observed with a level 1.150 (BM 37.430), 1.930, 2.810, 4.000, CP 1.520, 2.440, 0.730, 0.490, CP 4.000, 3.160, 1.800, 0.7000. Reduce the levels by height of collimation method. Apply check. Method I: Rise and Fall method Check: Last RL – First RL = 38.91 – 37.430 =1.48 BS - FS = 6.67 – 5.19 = 1.48 Rise - Fall = 5.25 – 3.77 = 1.48 Method II: Height of Instrument method (HI or HC method)
  • 7. OPTC Edavanna Page 7 Check: Last RL – First RL = 38.91 – 37.430 =1.48 BS - FS = 6.67 – 5.19 = 1.48 12.Following series of readings of BS and FS was taken in a fly levelling. The first reading was taken on a point of RL 100.000 m. Draw a page of levelling field- book and enter readings in it. Find the RLs of all points. Apply check. 1.235, 1.396, 2.345, 1.986, 2.148, 3.755, 0.325, 2.568, 1.465, 2.435, 1.356, 0.768, 1.985, 2.655 Last RL – First RL = BS - FS = Rise - Fall = 13.The following staff readings were taken with a level. The instrument was moved after the fourth and the seventh readings. Calculate the reduced levels of the points and find level difference between the first and last points. The first reading was taken on a BM of +100.000 m. Use HC method. 0.875, 2.625, 1.050, 2.185, 1.850, 0.885, 1.375, 2.180, 0.855, 2.200 [refer note] 14.The following staff readings were recorded for a certain work of levelling 1.810, 2.110, 1.225, 1.455, 0.905, 2.435, 2.810, 2.675, and 1.765. The level was shifted after 4th and 7th readings. The first reading was taken on a BM of RL 50.000 m. Rule out a page of level book and enter the readings (i) Work out the RL of all stations (ii) If the staff were held inverted and readings on a ceiling from last instrument position was 3.500 m, Find the RL of ceiling. [refer note]
  • 8. OPTC Edavanna Page 8 15.During a construction work, the bottom of an RC sunshade A was taken as a temporary BM (RL 63.120). The following notes were recorded. Reading of inverted staff on BM No.A = 2.232 Reading on peg P on ground = 1.034 Change of instrument Reading of peg P on ground = 1.328 Reading an inverted staff on bottom of cornice B = 4.124 Enter the readings in a level book page and calculate the RL of cornice B. 16.What is a bench mark? What are the different types of BM? Bench mark: It is fixed reference point of known elevation w.r.t any datum. There are four types of bench marks. 1. GTS (Great Trignometrical Survey) BM 2. Permanent BM 3. Arbitrary BM 4. Temperory BM GTS (Great Trignometrical Survey) BM  Established by Survey of India  Established with higher accuracy  Based on MSL at Bomabay High Permanent BM  Fixed in b/w GTS bench marks  By govt. agencies like railways, PWD  Written on permanent objects like milestones, railways, bridges, etc.  Value clearly written Arbitrary BM  These are reference points whose RL’s are arbitrarily assumed  Used for small works Temperory BM  Reference points established temporarily whenever required  Generally chosen to close days work and to start next days.  Also if there is a break in work  Marked on objects like stone, trees,..
  • 9. OPTC Edavanna Page 9 17.The following staff readings were taken with a level. The instrument was moved after third, sixth, and eighth readings. Calculate the RL of points, if the first reading was taken by a staff held on a BM 75.000 m. Use HC method. 0.765, 1.825, 1.050, 1.885, 1.850, 0.995, 1.375, 2.250, 0.765, 2.200 18.The staff readings recorded for a work are 1.205, 1.710, 2.500, 0.230, 0.910, 2.100, 2.800, 0.310, 1.820, 2.915. The first reading was taken at BM 140.000. Rule out a page of field book in rise and fall method and find the average slope between the points. The instrument was shifted after the fourth and eighth reading. The distance between first and last station is 1500 m. 19.What are the adjustments done at every set-up of levelling instruments? 20.What are the temporary adjustments in levelling? 21.What are the points should be observed while conducting levelling work? Adjustments done at every setting of levelling instrument are called temperory adjustments. They are (i) Setting out: Fixing the instrument on tripod and levelling it approx by tripod (ii) Levelling up: Accurate levelling using foot screws and to make the vertical axis truly vertical. It is done as below,  Loose the clamp and turn the instrument such that telescope is parallel to two of the foot screws. Turn level screws and level it.  Turn the telescope 900 so that telescope is parallel to the third screw. Turn the level screw until the bubble comes in the center of level tube. (iii) Elimination of parallax: Parallax is a condition arising when the image formed by the objective is not in the plane of cross hairs. It is eliminated by focusing the objective and eyepiece. 22.What is balancing of sights? What is its importance in the field?
  • 10. OPTC Edavanna Page 10 In the above fig, let the observations be made with a level in which the line of collimation is inclined upward by an amount ‘ ’ from horizontal. When the bubble is in the centre of its run, the level being kept exactly mid-way b/w the two points A & B. The observed back sight and fore sight are x1 and x2. The correct BS on A will be equal to x1 – y1, where y1 = D1tan . The correct fore sight on B will be equal to x2 – y2, where y2 = D2tan . Hence the correct difference b/w A & B is = (x1 – y1) – (x2 – y2) = (x1 – y1 ) + (y2 – y1) = (x1 – x2) + ( D2tan - D1tan ) = (x1 – x2), if D1 =D2 Errors eliminated by balancing:  The error due to non-parallelism of line of collimation and axis of bubble tube  The error due to curvature and refraction may be eliminated if the length of two sights can be made equal. 23.Distinguish between two methods of booking and reducing the elevation of points from the observed staff readings. 24.Describe the HI method and rise and fall method of computing the levels. Discuss the merits and demerits of each. 25.What are the two systems of reduction of levels? Explain. The observed staff readings as noted in a level book are further required to be manipulated to find out the elevation of points. The operation is known as reduction of level. There are two methods for reduction of levels: • HI = BM + BS • RL of A = HI - FS (or IS)
  • 11. OPTC Edavanna Page 11 26.Draw a neat diagram of component parts of a levelling instrument? Describe the function of its salient parts? Telescope : Used to sight and read staff readings Diaphragm : Holds the cross hairs (fitted with telescope) Focussing screws : Separate focussing screws for eye piece and objective. Eye piece : Magnifies the image formed in the plane of the diaphragm and thus to read staff during leveling. Level Tube : Used to make the axis of the telescope horizontal and thus the line of sight. Levelling screws : To adjust instrument (level) so that the line of sight is horizontal for any orientation of the telescope. Tripod stand : To fix the instrument (level) at a convenient height of an observer.