CHAPTER THREE
VERTICAL DISTANCEMEASUREMENT( LEVELING)
1
Content :-
Introduction
Definitions of Basic Terms
Principle of leveling
The Leveling Instrument
Booking Methods of Leveling and Reduction of
Levels
Types of Leveling
Errors in leveling
Engineering application of leveling
3.1 Introduction
 Leveling is a method of surveying used for determination
of the difference of elevations or
 Levels of various points on the surface of the earth.
The elevation of a point is its vertical distance above or
below a reference level, called datum.
The most commonly used datum is the mean sea Level
(M.S.L)
2
Leveling is an important
 for many engineering works and
construction projects.
 Leveling is needed for the design of highways,
railways, and canals e.t.c and for locating the gradient
lines.
3
Definitions of Basic Terms
Vertical line: is a line from the surface of the
earth to the earth's center.
Horizontal line: is a straight line perpendicular to
a vertical line.
Mean sea level (MSL): The average height of the
sea's surface for all stages of the tide over a
specified
Vertical control: A series of benchmarks or other
points of known elevation established throughout
an area,
Reduced level (RL): The RL of a point is its
height above or below a reference datum.
4
5
3.2 Definitions of Basic Terms
1.Station.The station is the point where the staff is held for taking reading
(observation) from a leveling instrument.
2. Bench mark (BM): -is a permanent or semi permanent point of known
elevation that provides beginning point for determining the elevation of
other points.
3.Height of the instrument. (H.I). It is the elevation of the line of sight
with respect to the datum.
The elevation of the line of sight of the telescope
6
4.Backsight (BS) - It is the reading taken
on a staff held at point of known elevation or
 at the point whose elevation has already been determined.
The reading taken after setting the instrument set up(the first reading)
5.Foresight (FS) - The last sight taken before the instrument is moved
7
Definitions of Basic Terms …
6.Intermediate sight (IS) - It is the reading taken on a staff held
at point whose elevations is required,
Any sighting that is not a back sight or fore sight
7. Line of Collimation – Imaginary line that passes through
leveling instrument at Cross-Hairs .
8.Turning point. (T.P.) :-For leveling over a long distance, the
instrument has to be set up a number of times.
• A turning point is the point selected on the route before
shifting the instrument.
8
Definitions of Basic Terms …
9
9. Balancing of sight. To reduce the effect of
instrumental and other errors, the distance of the point
where a back sight is taken and the distance of the point
where a fore sight is taken, as measured from the
instrument station, should be approximately equal.
10
2.Steps in leveling
1. When the leveling instrument has been properly
leveled, the bubble tube axis and the line of sight are
horizontal and the vertical axis of the instrument is
truly vertical.
2. In practice, the leveling instrument is set up at a
convenient position, and the one staff is kept at a
point of known elevation.
3. The reading is taken on the staff and the level of the
line of sight is determined.
11
4. Now the 2nd staff is kept on the point of the
unknown elevation and a reading is taken.
5. The level of the point is determined from the level
of the line of sight already computed and from the
2nd staff reading.
12
2.Principle of direct leveling
13
The Leveling Instrument
The Level
 dumpy levels, tilting levels, and automatic levels
Has a set of cross-hairs
 Can be turned through 360° horizontally
 Consist of a high-powered telescope
 Attached to a spirit or bubble level that keeps the line of sight of the
telescope horizontal
14
 The Tripod:- A fully adjustable 3-legged stand on which
the level sits.
15
The Staff
 A measuring stick, usually 4m tall, and clearly marked in
divisions of 10mm.
16
Reading the E Staff
• Each “E” is 50mm
• Each Part of the E is 10mm
• Millimeters are interpolated
• Staff is read to the millimeter
17
Bubble
 Keep the staff upright
 Any tilt will disturb your readings
18
 Methods of booking and reduction of Levels
(1)Height of Instrument (HI) method :-
The desired elevation of a point is found by:-
I. adding BS in to given benchmark to find height of
instrument
II. subtracting FS from height of instrument Or
RL of a point = ( RLBM +BS) – FS) = HI – FS
19
Computation of Elevations
Booking Methods
1.Height of Instrument (HI) method
20
1.Height of Instrument (HI) method
station BS IS FS HI Elevation Remar
k
A EleA
a
b
B T.P
c
C
21
S1
S2
S3
S4
S5
56
S7
H.IA=EleA+S1
Ha=H.IA-S2
Hb=H.IA-S3
HB=H.IA-S4
Hc=H.IB-S7
H.IB=EleB+S5
Hc=H.IB-S6
Σ B.S. Σ F.S.
Check: Σ B.S. – Σ F.S. = Last R.L. – First R.L.
• Let as done the next example
22
Elevation 100.00
BS
12.64
FS
3.11
Stn
BM1
TP1
Elevn/R.L
BS FS HI
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
FS
2.56
TP2
2.56
TP2 117.85
BS
9.72
9.72 127.57
BM2
FS
3.10
BM2 3.10 124.47
100.00
23
1. BS + Elevation = HI
2. HI - FS = New Elev
1.Height of Instrument (HI) method
Change in elevation:
summation of the BS and the FS then subtract
+33.24 -8.77
Change in elevation = 33.24 -8.77 = 24.47
Point
BM1
TP1
Elevation
BS FS HI
12.64 112.64
3.11 109.53
10.88 120.41
2.56
TP2 117.85
9.72 127.57
BM2
3.10 124.47
100.00
ΣΔh = BM2Elev – BM1elev
= ΣBS – ΣFS
24
Computation of Elevations
Example:-by Using The Following Figure
A. Prepare The Field Book
B. Fill The Staff Reading
C. Calculate The Elevations Of Points TP1 And TP2?
BS
1.27
FS
4.91
TP1
BM
BS
2.33
FS
6.17
TP2
Elevation 356.68
25
2.Rise and Fall Method
Rise and fall (RF) method: –
 If 2nd red reading > first rod reading ⇒ fall
 If 2nd rod reading < first rod reading ⇒ rise
 Then RL of 2nd station = RL of first station - fall or
RL of first station + rise
26
Rise and fall method
Station B.S I.S F.S (+)Rise (-)Fall Elev Remarak
A hA
a
b
B
c
C
27
S1
S2
S3
S4
S5
S6
r1=S1 – S2
f2 = S3 – S4
f1=s2-s3
f3 = S5 – S6
r2=S6-S7
ha+=hA + r1
hb = ha – f1
hB = hb – f2
hc = hB – f3
hC = hc + r2
(b) For the rise and fall method
Check:-Σ B.S. – Σ F.S. = Σ Rise – Σ Fall = Last R.L. – First
R.L.
S7
Σ B.S. Σ F.S Σ Rise Σ Fall
RISE AND FALL METHOD
Station B.S I.S F.S Rise(+) Fall(-) Elev(R.L Remarke
1 2.390 31.517 BM
2 1.985
3 1.318
4 0.988 1.612
5 1.502
6 1.415
7 2.420 0.316
8 0.532 TBM
Σ=5.798 Σ=2.46
0
Σ=4.146 Σ=0.808
28
NOTE:- (+) donates rise and (-) fall
RISE AND FALL METHOD
Station B.S I.S F.S Rise(+) Fall(-) Elev(R.L Remarke
1 2.390 31.517 BM
2 1.985 0.405 31.922
3 1.318 0.667 32.589
4 0.988 1.612 0.294 32.295
5 1.502 0.514 31.781
6 1.415 0.087 31.868
7 2.420 0.316 1.099 32.967
8 0.532 1.888 34.855 TBM
Σ=5.798 Σ=2.46
0
Σ=4.146 Σ=0.808
29
NOTE:- (+) donates rise and (-) fall

More Related Content

What's hot

Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
Darren Lee
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of angles
Rajendra Prasad
 
Earthwork
EarthworkEarthwork
Earthwork
Rajiva Gupta
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
musadoto
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
ashleyyeap
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
neharajpl
 
Conventional and modern surveying instruments
Conventional and modern surveying instrumentsConventional and modern surveying instruments
Conventional and modern surveying instruments
sameedaslam
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
santosh927
 
Levelling
LevellingLevelling
Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01
Rajesh Rajguru
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
Bahzad5
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
KiplimoCalvin
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
Self-employed
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
Naufil Sayyad
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
neharajpl
 
Theodolite and its working mechanism
Theodolite and its working mechanismTheodolite and its working mechanism
Theodolite and its working mechanism
Binabh Devkota
 
Levelling
LevellingLevelling
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
Rajendra Prasad
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
SHAMJITH KM
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
Bahzad5
 

What's hot (20)

Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of angles
 
Earthwork
EarthworkEarthwork
Earthwork
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Conventional and modern surveying instruments
Conventional and modern surveying instrumentsConventional and modern surveying instruments
Conventional and modern surveying instruments
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 
Levelling
LevellingLevelling
Levelling
 
Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Theodolite and its working mechanism
Theodolite and its working mechanismTheodolite and its working mechanism
Theodolite and its working mechanism
 
Levelling
LevellingLevelling
Levelling
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
Surveying - Module II - compass surveying
Surveying - Module  II - compass surveyingSurveying - Module  II - compass surveying
Surveying - Module II - compass surveying
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 

Similar to chapter 3 up to booking method.pdf

Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
XinYee Khoo
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveyingMohammed_82
 
levelling survey
levelling surveylevelling survey
levelling survey
prashantsingham
 
Levelling
LevellingLevelling
Levelling
Arissa Loh
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
Phurba Tamang
 
chapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdfchapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdf
sandipanpaul16
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
Doreen Yeo
 
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Kaushal Mehta
 
1 st report
1 st report1 st report
1 st report
fareezsham
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only note
SHAMJITH KM
 
UNIT FOUR.pptx
UNIT FOUR.pptxUNIT FOUR.pptx
UNIT FOUR.pptx
warkisafile1
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
Bahzad5
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
ATHIRA B K
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
ANAND JIBHKATE
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
AlwandBarzani
 
S2 2 leveling
S2 2 levelingS2 2 leveling
S2 2 leveling
Est
 
Site surveying-almost-1
Site surveying-almost-1Site surveying-almost-1
Site surveying-almost-1
Lam Yu
 

Similar to chapter 3 up to booking method.pdf (20)

Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
Mohammed kareem
Mohammed kareemMohammed kareem
Mohammed kareem
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Levelling
LevellingLevelling
Levelling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
chapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdfchapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdf
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
 
1 st report
1 st report1 st report
1 st report
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only note
 
UNIT FOUR.pptx
UNIT FOUR.pptxUNIT FOUR.pptx
UNIT FOUR.pptx
 
Levelling
LevellingLevelling
Levelling
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
 
S2 2 leveling
S2 2 levelingS2 2 leveling
S2 2 leveling
 
Site surveying-almost-1
Site surveying-almost-1Site surveying-almost-1
Site surveying-almost-1
 

Recently uploaded

原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
farazahmadas6
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
Let's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons ShirtLet's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons Shirt
TeeFusion
 

Recently uploaded (20)

原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
Let's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons ShirtLet's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons Shirt
 

chapter 3 up to booking method.pdf

  • 1. CHAPTER THREE VERTICAL DISTANCEMEASUREMENT( LEVELING) 1 Content :- Introduction Definitions of Basic Terms Principle of leveling The Leveling Instrument Booking Methods of Leveling and Reduction of Levels Types of Leveling Errors in leveling Engineering application of leveling
  • 2. 3.1 Introduction  Leveling is a method of surveying used for determination of the difference of elevations or  Levels of various points on the surface of the earth. The elevation of a point is its vertical distance above or below a reference level, called datum. The most commonly used datum is the mean sea Level (M.S.L) 2
  • 3. Leveling is an important  for many engineering works and construction projects.  Leveling is needed for the design of highways, railways, and canals e.t.c and for locating the gradient lines. 3
  • 4. Definitions of Basic Terms Vertical line: is a line from the surface of the earth to the earth's center. Horizontal line: is a straight line perpendicular to a vertical line. Mean sea level (MSL): The average height of the sea's surface for all stages of the tide over a specified Vertical control: A series of benchmarks or other points of known elevation established throughout an area, Reduced level (RL): The RL of a point is its height above or below a reference datum. 4
  • 5. 5
  • 6. 3.2 Definitions of Basic Terms 1.Station.The station is the point where the staff is held for taking reading (observation) from a leveling instrument. 2. Bench mark (BM): -is a permanent or semi permanent point of known elevation that provides beginning point for determining the elevation of other points. 3.Height of the instrument. (H.I). It is the elevation of the line of sight with respect to the datum. The elevation of the line of sight of the telescope 6
  • 7. 4.Backsight (BS) - It is the reading taken on a staff held at point of known elevation or  at the point whose elevation has already been determined. The reading taken after setting the instrument set up(the first reading) 5.Foresight (FS) - The last sight taken before the instrument is moved 7 Definitions of Basic Terms …
  • 8. 6.Intermediate sight (IS) - It is the reading taken on a staff held at point whose elevations is required, Any sighting that is not a back sight or fore sight 7. Line of Collimation – Imaginary line that passes through leveling instrument at Cross-Hairs . 8.Turning point. (T.P.) :-For leveling over a long distance, the instrument has to be set up a number of times. • A turning point is the point selected on the route before shifting the instrument. 8 Definitions of Basic Terms …
  • 9. 9
  • 10. 9. Balancing of sight. To reduce the effect of instrumental and other errors, the distance of the point where a back sight is taken and the distance of the point where a fore sight is taken, as measured from the instrument station, should be approximately equal. 10
  • 11. 2.Steps in leveling 1. When the leveling instrument has been properly leveled, the bubble tube axis and the line of sight are horizontal and the vertical axis of the instrument is truly vertical. 2. In practice, the leveling instrument is set up at a convenient position, and the one staff is kept at a point of known elevation. 3. The reading is taken on the staff and the level of the line of sight is determined. 11
  • 12. 4. Now the 2nd staff is kept on the point of the unknown elevation and a reading is taken. 5. The level of the point is determined from the level of the line of sight already computed and from the 2nd staff reading. 12
  • 13. 2.Principle of direct leveling 13
  • 14. The Leveling Instrument The Level  dumpy levels, tilting levels, and automatic levels Has a set of cross-hairs  Can be turned through 360° horizontally  Consist of a high-powered telescope  Attached to a spirit or bubble level that keeps the line of sight of the telescope horizontal 14
  • 15.  The Tripod:- A fully adjustable 3-legged stand on which the level sits. 15
  • 16. The Staff  A measuring stick, usually 4m tall, and clearly marked in divisions of 10mm. 16
  • 17. Reading the E Staff • Each “E” is 50mm • Each Part of the E is 10mm • Millimeters are interpolated • Staff is read to the millimeter 17
  • 18. Bubble  Keep the staff upright  Any tilt will disturb your readings 18
  • 19.  Methods of booking and reduction of Levels (1)Height of Instrument (HI) method :- The desired elevation of a point is found by:- I. adding BS in to given benchmark to find height of instrument II. subtracting FS from height of instrument Or RL of a point = ( RLBM +BS) – FS) = HI – FS 19
  • 20. Computation of Elevations Booking Methods 1.Height of Instrument (HI) method 20
  • 21. 1.Height of Instrument (HI) method station BS IS FS HI Elevation Remar k A EleA a b B T.P c C 21 S1 S2 S3 S4 S5 56 S7 H.IA=EleA+S1 Ha=H.IA-S2 Hb=H.IA-S3 HB=H.IA-S4 Hc=H.IB-S7 H.IB=EleB+S5 Hc=H.IB-S6 Σ B.S. Σ F.S. Check: Σ B.S. – Σ F.S. = Last R.L. – First R.L.
  • 22. • Let as done the next example 22
  • 23. Elevation 100.00 BS 12.64 FS 3.11 Stn BM1 TP1 Elevn/R.L BS FS HI TP1 BM1 12.64 112.64 3.11 109.53 BS 10.88 10.88 120.41 FS 2.56 TP2 2.56 TP2 117.85 BS 9.72 9.72 127.57 BM2 FS 3.10 BM2 3.10 124.47 100.00 23 1. BS + Elevation = HI 2. HI - FS = New Elev 1.Height of Instrument (HI) method
  • 24. Change in elevation: summation of the BS and the FS then subtract +33.24 -8.77 Change in elevation = 33.24 -8.77 = 24.47 Point BM1 TP1 Elevation BS FS HI 12.64 112.64 3.11 109.53 10.88 120.41 2.56 TP2 117.85 9.72 127.57 BM2 3.10 124.47 100.00 ΣΔh = BM2Elev – BM1elev = ΣBS – ΣFS 24
  • 25. Computation of Elevations Example:-by Using The Following Figure A. Prepare The Field Book B. Fill The Staff Reading C. Calculate The Elevations Of Points TP1 And TP2? BS 1.27 FS 4.91 TP1 BM BS 2.33 FS 6.17 TP2 Elevation 356.68 25
  • 26. 2.Rise and Fall Method Rise and fall (RF) method: –  If 2nd red reading > first rod reading ⇒ fall  If 2nd rod reading < first rod reading ⇒ rise  Then RL of 2nd station = RL of first station - fall or RL of first station + rise 26
  • 27. Rise and fall method Station B.S I.S F.S (+)Rise (-)Fall Elev Remarak A hA a b B c C 27 S1 S2 S3 S4 S5 S6 r1=S1 – S2 f2 = S3 – S4 f1=s2-s3 f3 = S5 – S6 r2=S6-S7 ha+=hA + r1 hb = ha – f1 hB = hb – f2 hc = hB – f3 hC = hc + r2 (b) For the rise and fall method Check:-Σ B.S. – Σ F.S. = Σ Rise – Σ Fall = Last R.L. – First R.L. S7 Σ B.S. Σ F.S Σ Rise Σ Fall
  • 28. RISE AND FALL METHOD Station B.S I.S F.S Rise(+) Fall(-) Elev(R.L Remarke 1 2.390 31.517 BM 2 1.985 3 1.318 4 0.988 1.612 5 1.502 6 1.415 7 2.420 0.316 8 0.532 TBM Σ=5.798 Σ=2.46 0 Σ=4.146 Σ=0.808 28 NOTE:- (+) donates rise and (-) fall
  • 29. RISE AND FALL METHOD Station B.S I.S F.S Rise(+) Fall(-) Elev(R.L Remarke 1 2.390 31.517 BM 2 1.985 0.405 31.922 3 1.318 0.667 32.589 4 0.988 1.612 0.294 32.295 5 1.502 0.514 31.781 6 1.415 0.087 31.868 7 2.420 0.316 1.099 32.967 8 0.532 1.888 34.855 TBM Σ=5.798 Σ=2.46 0 Σ=4.146 Σ=0.808 29 NOTE:- (+) donates rise and (-) fall