Route surveying
Route Survey―a survey for determining the
route of a proposed pipeline, power line, cable,
road or other linear facilities in order to
acquire a right-of-way, servitude or easement
from the property owner being crossed.
- Prakash Kumar SekarPrakash Kumar Sekar
Reconnaissance Survey
Gather sufficient information to select
one or more possible route
• Assemble basic information
– Topographic maps
– Cadastral maps / GIS
– Aerial photos
Prakash Kumar Sekar
Reconnaissance Survey
• Evaluate
– General topography
– Geology
– Meteorological statistics
– Flood records
– Unsuitable terrain
– Land use and ownership / Local Authority’s
GIS
– Existing services
– Existing communicationsPrakash Kumar Sekar
Reconnaissance Survey
• Field reconnaissance to confirm
assembled data
• Choose possible routes
• NOTIFY RELEVANT AUTHORITIES
Prakash Kumar Sekar
Preliminary Surveying
• Collect sufficient information to design
the horizontal and vertical alignment
and thus:
– Likely earthwork quantities
– Intersection details
– Bridge and culvert sites
– Stream diversions
– Land resumptions
– Water catchments
– Flood levels
– Road building material
– Total cost Prakash Kumar Sekar
culvert
Prakash Kumar Sekar
Preliminary Survey
• Survey methodology
– Place traverse stations along proposed
route
– Establish basic horizontal and vertical
control
– Control traverse between traverse
stations for horizontal coordinates
– Spirit level vertical control (if necessary)
– Draw paper location for minimum gradient
and curvature, earthwork, suitable cross
section
Prakash Kumar Sekar
Preliminary Survey
It is taken by three party
• The transit party
– Consists of four to seven person conducts
traverse and measure azimith
– Records topographical details, property lines,
drainage structures pipe lines, road and
railways
Prakash Kumar Sekar
• The level party (3 person)
– Establish bench marks
– Conducts l-S and C-S surveying
• Topography or cross section party
• Detail topography survey
Prakash Kumar Sekar
Working Survey
• A working survey must provide data of
sufficient accuracy and extent for the
satisfactory detailed design of the road
and the later setting-out for
construction.
Prakash Kumar Sekar
Working Survey
• Survey Marks
– Pegs (75mm * 50mm) are placed along the
centre line (straight and curves) at 20 / 50
metre intervals
– Offsets (75mm * 50mm pegs, short star
pickets driven flush) placed left and right of
centre line
• 200 metre intervals
• beginning, centre and end of curves
– level and check level all centre line and
offset pegs Prakash Kumar Sekar
Working Survey
• Survey Marks, cont
– establish benchmarks
• at 1km intervals
• at bridge and culvert sites
Prakash Kumar Sekar
CONSTRUCTION SURVEY
urban equivalent to the Working Survey
• route is pre-determined by the presence
of existing road reserves
• general survey requirements are the
same as for Working Surveys
• density of detail is such that the
procedures of observation and
recording may have to be varied
Prakash Kumar Sekar
Route Surveying for highway
• Recinnaisance Survey
– Alignment should avoid cutting and banking
– No obstruction
– Gradient
– Avoid cross drainage works
– Type of soil, flood level
– Source of construction material
– Type of terrain
Prakash Kumar Sekar
Preliminary survey for highway
• Primary traverse
• Topographical survey
• Leveling work
• Hydrological data
• Soil survey
• Establishing bench marks
• Intersection of canals rivers and property
Prakash Kumar Sekar
Location survey for Highway
• Centerline line is marked at 30m interval
• Benchmark for every 300m
• Cross section for every 30m
• All detail of cross drainage work
• Topographical detail
• Soil survey
• Total land width of highway
• Tangent points and intersection pointsPrakash Kumar Sekar
Route Survey for water ways
• Have both historical and modern
importance
• ocean water transportation
– 75% of world trade
– Also passenger transportation
– Military purposes
Prakash Kumar Sekar
Route Survey for water ways
• Inland water transportation
– Oldest form of transportation
– Uses canal or river
– Factors affecting inland transportation
• Diversion of rivers
• Deforestation
• Less importance
Prakash Kumar Sekar
Route Survey for water ways
• Topographical survey, hydrographic survey
and soil investigation
• Regular dredge to avoid silt formation
– Bucket or ladder dredger
– Hydraulics or cutter dredger
– Grab dredger
– Dipper dredger
– Rock dredger
Prakash Kumar Sekar

More Related Content

What's hot

Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
Phurba Tamang
 
Traverse Survey Part 2/2
Traverse Survey Part 2/2Traverse Survey Part 2/2
Traverse Survey Part 2/2
Muhammad Zubair
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
Latif Hyder Wadho
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
Rana Ibrahim
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
Lord1911
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
Rajendra Prasad
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
musadoto
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
Muhammad Zubair
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
riyasood003
 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil Engineering
A Makwana
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
Riezat Zainal
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
Noorhazlinda Rahman
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volumekmasz kamal
 
Levelling
LevellingLevelling
Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016
Mitiku Chachu
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
RAHUL SINHA
 
Aerial photogrammetry ppt 2
Aerial photogrammetry ppt 2Aerial photogrammetry ppt 2
Aerial photogrammetry ppt 2
Mr Amol Ghogare
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
Student
 

What's hot (20)

Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
Traverse Survey Part 2/2
Traverse Survey Part 2/2Traverse Survey Part 2/2
Traverse Survey Part 2/2
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Route Survey
Route SurveyRoute Survey
Route Survey
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil Engineering
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
 
Levelling
LevellingLevelling
Levelling
 
Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Aerial photogrammetry ppt 2
Aerial photogrammetry ppt 2Aerial photogrammetry ppt 2
Aerial photogrammetry ppt 2
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 

Viewers also liked

Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
Bhavik Patel
 
Highway route location
Highway route locationHighway route location
Highway route locationwrya hade
 
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
HOW TO CARRY OUT  ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATIONHOW TO CARRY OUT  ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
JOHNSON ADEJOLA ( Msc, CCNA,CFOT, CFOS/D/H/I/O/L
 
Compound and Reserve Curves
Compound and Reserve CurvesCompound and Reserve Curves
Compound and Reserve Curvesharoldtaylor1113
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdfKaila Turla
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )
mohit kumar panchal
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveyingShaker Ullah
 
Hydrographic surveying
Hydrographic surveyingHydrographic surveying
Hydrographic surveying
Prakash Kumar Sekar
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
Gaurav Baviskar
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveyingstooty s
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric designkhaledalshami93
 
Topic 4 curve lesson 2
Topic 4   curve lesson 2Topic 4   curve lesson 2
Topic 4 curve lesson 2kmasz kamal
 
Gps surveying
Gps surveyingGps surveying
Gps surveying
Prakash Kumar Sekar
 
Unit conversion for Civil Engineers
Unit conversion for Civil EngineersUnit conversion for Civil Engineers
Unit conversion for Civil Engineers
Prakash Kumar Sekar
 
Modern surveying techniques
Modern surveying techniquesModern surveying techniques
Modern surveying techniques
Sunny Jaiswal
 

Viewers also liked (20)

Route Surveys
Route SurveysRoute Surveys
Route Surveys
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
 
Highway route location
Highway route locationHighway route location
Highway route location
 
Spiral Curves
Spiral CurvesSpiral Curves
Spiral Curves
 
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
HOW TO CARRY OUT  ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATIONHOW TO CARRY OUT  ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
 
Compound and Reserve Curves
Compound and Reserve CurvesCompound and Reserve Curves
Compound and Reserve Curves
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdf
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )
 
Topic 4 - Curve
Topic 4 - CurveTopic 4 - Curve
Topic 4 - Curve
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveying
 
Hydrographic surveying
Hydrographic surveyingHydrographic surveying
Hydrographic surveying
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Surveying
Surveying Surveying
Surveying
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Topic 4 curve lesson 2
Topic 4   curve lesson 2Topic 4   curve lesson 2
Topic 4 curve lesson 2
 
Gps surveying
Gps surveyingGps surveying
Gps surveying
 
Unit conversion for Civil Engineers
Unit conversion for Civil EngineersUnit conversion for Civil Engineers
Unit conversion for Civil Engineers
 
Designing the highway
Designing the highwayDesigning the highway
Designing the highway
 
Modern surveying techniques
Modern surveying techniquesModern surveying techniques
Modern surveying techniques
 

Similar to Route surveying

L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
Sachin PatiL
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Hitesh Khanna
 
Surveying
SurveyingSurveying
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx
natan82253
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
DhananjayM13
 
Introduction of surveying_Surveying, Civil Engineering
Introduction of surveying_Surveying, Civil EngineeringIntroduction of surveying_Surveying, Civil Engineering
Introduction of surveying_Surveying, Civil Engineering
A Makwana
 
presentation on Proposal for road survey & construction
presentation on Proposal for road survey & constructionpresentation on Proposal for road survey & construction
presentation on Proposal for road survey & construction
Dipendra Bhattarai
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
Saksham Bhutani
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
Dr. Ezzat Elsayed Gomaa
 
Ge6251 bcme notes with question bank
Ge6251   bcme notes with question bankGe6251   bcme notes with question bank
Ge6251 bcme notes with question bank
gokulfea
 
LECT 2 - EARTHWORK.pdf
LECT 2 - EARTHWORK.pdfLECT 2 - EARTHWORK.pdf
LECT 2 - EARTHWORK.pdf
DRJULAIDAKALIWON
 
site analysis and planning
site analysis and planningsite analysis and planning
site analysis and planning
shami udeen
 
module20120PPT.pdf
module20120PPT.pdfmodule20120PPT.pdf
module20120PPT.pdf
RakeshH21
 
Introduction of Surveying and levelling.
Introduction of Surveying and levelling.Introduction of Surveying and levelling.
Introduction of Surveying and levelling.
Janki Patel
 
BCE - MOD 2 - SURVEYING - Copy.pptx
BCE - MOD 2 - SURVEYING - Copy.pptxBCE - MOD 2 - SURVEYING - Copy.pptx
BCE - MOD 2 - SURVEYING - Copy.pptx
TaraLeander
 
A Intro LS PLF.pptx
A Intro LS PLF.pptxA Intro LS PLF.pptx
A Intro LS PLF.pptx
alex15509
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
Ansh Agarwal
 
Selection of Alignment & importance of track drainage
Selection of Alignment & importance of track drainageSelection of Alignment & importance of track drainage
Selection of Alignment & importance of track drainage
RAMPRASAD KUMAWAT
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
KHUSHBU SHAH
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
Mir Zafarullah
 

Similar to Route surveying (20)

L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Surveying
SurveyingSurveying
Surveying
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
Introduction of surveying_Surveying, Civil Engineering
Introduction of surveying_Surveying, Civil EngineeringIntroduction of surveying_Surveying, Civil Engineering
Introduction of surveying_Surveying, Civil Engineering
 
presentation on Proposal for road survey & construction
presentation on Proposal for road survey & constructionpresentation on Proposal for road survey & construction
presentation on Proposal for road survey & construction
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
Introduction to Civil Engineering
Introduction to Civil EngineeringIntroduction to Civil Engineering
Introduction to Civil Engineering
 
Ge6251 bcme notes with question bank
Ge6251   bcme notes with question bankGe6251   bcme notes with question bank
Ge6251 bcme notes with question bank
 
LECT 2 - EARTHWORK.pdf
LECT 2 - EARTHWORK.pdfLECT 2 - EARTHWORK.pdf
LECT 2 - EARTHWORK.pdf
 
site analysis and planning
site analysis and planningsite analysis and planning
site analysis and planning
 
module20120PPT.pdf
module20120PPT.pdfmodule20120PPT.pdf
module20120PPT.pdf
 
Introduction of Surveying and levelling.
Introduction of Surveying and levelling.Introduction of Surveying and levelling.
Introduction of Surveying and levelling.
 
BCE - MOD 2 - SURVEYING - Copy.pptx
BCE - MOD 2 - SURVEYING - Copy.pptxBCE - MOD 2 - SURVEYING - Copy.pptx
BCE - MOD 2 - SURVEYING - Copy.pptx
 
A Intro LS PLF.pptx
A Intro LS PLF.pptxA Intro LS PLF.pptx
A Intro LS PLF.pptx
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
 
Selection of Alignment & importance of track drainage
Selection of Alignment & importance of track drainageSelection of Alignment & importance of track drainage
Selection of Alignment & importance of track drainage
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 

More from Prakash Kumar Sekar

Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]
Prakash Kumar Sekar
 
Manufacture of cement - Classification and hydration
Manufacture of cement - Classification and hydrationManufacture of cement - Classification and hydration
Manufacture of cement - Classification and hydration
Prakash Kumar Sekar
 
Design principles in prefabricated structures unit iii ce6016 pfs
Design principles in prefabricated structures unit iii   ce6016 pfsDesign principles in prefabricated structures unit iii   ce6016 pfs
Design principles in prefabricated structures unit iii ce6016 pfs
Prakash Kumar Sekar
 
Global Positioning system GPS - Dr. S. Balamurugan
Global Positioning system GPS - Dr. S. BalamuruganGlobal Positioning system GPS - Dr. S. Balamurugan
Global Positioning system GPS - Dr. S. Balamurugan
Prakash Kumar Sekar
 
Economical eco friendly light-weight building blocks using waste paper - pape...
Economical eco friendly light-weight building blocks using waste paper - pape...Economical eco friendly light-weight building blocks using waste paper - pape...
Economical eco friendly light-weight building blocks using waste paper - pape...
Prakash Kumar Sekar
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
Prakash Kumar Sekar
 
Design of steel structures Introduction
Design of steel structures IntroductionDesign of steel structures Introduction
Design of steel structures Introduction
Prakash Kumar Sekar
 
Angles and triangles
Angles and trianglesAngles and triangles
Angles and triangles
Prakash Kumar Sekar
 

More from Prakash Kumar Sekar (8)

Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]
 
Manufacture of cement - Classification and hydration
Manufacture of cement - Classification and hydrationManufacture of cement - Classification and hydration
Manufacture of cement - Classification and hydration
 
Design principles in prefabricated structures unit iii ce6016 pfs
Design principles in prefabricated structures unit iii   ce6016 pfsDesign principles in prefabricated structures unit iii   ce6016 pfs
Design principles in prefabricated structures unit iii ce6016 pfs
 
Global Positioning system GPS - Dr. S. Balamurugan
Global Positioning system GPS - Dr. S. BalamuruganGlobal Positioning system GPS - Dr. S. Balamurugan
Global Positioning system GPS - Dr. S. Balamurugan
 
Economical eco friendly light-weight building blocks using waste paper - pape...
Economical eco friendly light-weight building blocks using waste paper - pape...Economical eco friendly light-weight building blocks using waste paper - pape...
Economical eco friendly light-weight building blocks using waste paper - pape...
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
 
Design of steel structures Introduction
Design of steel structures IntroductionDesign of steel structures Introduction
Design of steel structures Introduction
 
Angles and triangles
Angles and trianglesAngles and triangles
Angles and triangles
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

Route surveying

  • 1. Route surveying Route Survey―a survey for determining the route of a proposed pipeline, power line, cable, road or other linear facilities in order to acquire a right-of-way, servitude or easement from the property owner being crossed. - Prakash Kumar SekarPrakash Kumar Sekar
  • 2. Reconnaissance Survey Gather sufficient information to select one or more possible route • Assemble basic information – Topographic maps – Cadastral maps / GIS – Aerial photos Prakash Kumar Sekar
  • 3. Reconnaissance Survey • Evaluate – General topography – Geology – Meteorological statistics – Flood records – Unsuitable terrain – Land use and ownership / Local Authority’s GIS – Existing services – Existing communicationsPrakash Kumar Sekar
  • 4. Reconnaissance Survey • Field reconnaissance to confirm assembled data • Choose possible routes • NOTIFY RELEVANT AUTHORITIES Prakash Kumar Sekar
  • 5. Preliminary Surveying • Collect sufficient information to design the horizontal and vertical alignment and thus: – Likely earthwork quantities – Intersection details – Bridge and culvert sites – Stream diversions – Land resumptions – Water catchments – Flood levels – Road building material – Total cost Prakash Kumar Sekar
  • 7. Preliminary Survey • Survey methodology – Place traverse stations along proposed route – Establish basic horizontal and vertical control – Control traverse between traverse stations for horizontal coordinates – Spirit level vertical control (if necessary) – Draw paper location for minimum gradient and curvature, earthwork, suitable cross section Prakash Kumar Sekar
  • 8. Preliminary Survey It is taken by three party • The transit party – Consists of four to seven person conducts traverse and measure azimith – Records topographical details, property lines, drainage structures pipe lines, road and railways Prakash Kumar Sekar
  • 9. • The level party (3 person) – Establish bench marks – Conducts l-S and C-S surveying • Topography or cross section party • Detail topography survey Prakash Kumar Sekar
  • 10. Working Survey • A working survey must provide data of sufficient accuracy and extent for the satisfactory detailed design of the road and the later setting-out for construction. Prakash Kumar Sekar
  • 11. Working Survey • Survey Marks – Pegs (75mm * 50mm) are placed along the centre line (straight and curves) at 20 / 50 metre intervals – Offsets (75mm * 50mm pegs, short star pickets driven flush) placed left and right of centre line • 200 metre intervals • beginning, centre and end of curves – level and check level all centre line and offset pegs Prakash Kumar Sekar
  • 12. Working Survey • Survey Marks, cont – establish benchmarks • at 1km intervals • at bridge and culvert sites Prakash Kumar Sekar
  • 13. CONSTRUCTION SURVEY urban equivalent to the Working Survey • route is pre-determined by the presence of existing road reserves • general survey requirements are the same as for Working Surveys • density of detail is such that the procedures of observation and recording may have to be varied Prakash Kumar Sekar
  • 14. Route Surveying for highway • Recinnaisance Survey – Alignment should avoid cutting and banking – No obstruction – Gradient – Avoid cross drainage works – Type of soil, flood level – Source of construction material – Type of terrain Prakash Kumar Sekar
  • 15. Preliminary survey for highway • Primary traverse • Topographical survey • Leveling work • Hydrological data • Soil survey • Establishing bench marks • Intersection of canals rivers and property Prakash Kumar Sekar
  • 16. Location survey for Highway • Centerline line is marked at 30m interval • Benchmark for every 300m • Cross section for every 30m • All detail of cross drainage work • Topographical detail • Soil survey • Total land width of highway • Tangent points and intersection pointsPrakash Kumar Sekar
  • 17. Route Survey for water ways • Have both historical and modern importance • ocean water transportation – 75% of world trade – Also passenger transportation – Military purposes Prakash Kumar Sekar
  • 18. Route Survey for water ways • Inland water transportation – Oldest form of transportation – Uses canal or river – Factors affecting inland transportation • Diversion of rivers • Deforestation • Less importance Prakash Kumar Sekar
  • 19. Route Survey for water ways • Topographical survey, hydrographic survey and soil investigation • Regular dredge to avoid silt formation – Bucket or ladder dredger – Hydraulics or cutter dredger – Grab dredger – Dipper dredger – Rock dredger Prakash Kumar Sekar