Course Contents:
Introduction; Linear measurements; Analysis and adjustment of measurements, Survey methods: coordinate systems, bearings, horizontal control, traversing, triangulation, detail surveying; Orientation and position; Areas and volumes; Setting out; Curve ranging; Global Positioning system (GPS); Photogrammetry.
Metric Chain : It Consists of galvanized mild steel wire of 4mm diameter known as link.
It is available in 20m, 30m, 50m length which consists of 100 links.
Gunter’s Chain : A 66 feet long chain consists of 100 links, each of 0.66 feet, it is known as Gunter’s chain.
This chain is suitable for taking length in miles.
Engineer’s Chain : A 100 feet long chain consisting of 100 links each of 1 feet is known as engineer’s chain.
This chain is used to measure length in feet and area in sq.yard.
Revenue Chain : it is 33 feet long chain consisting of 16 links.
This chain is used for distance measurements in feet & inches for smaller areas.
Course Contents:
Introduction; Linear measurements; Analysis and adjustment of measurements, Survey methods: coordinate systems, bearings, horizontal control, traversing, triangulation, detail surveying; Orientation and position; Areas and volumes; Setting out; Curve ranging; Global Positioning system (GPS); Photogrammetry.
Metric Chain : It Consists of galvanized mild steel wire of 4mm diameter known as link.
It is available in 20m, 30m, 50m length which consists of 100 links.
Gunter’s Chain : A 66 feet long chain consists of 100 links, each of 0.66 feet, it is known as Gunter’s chain.
This chain is suitable for taking length in miles.
Engineer’s Chain : A 100 feet long chain consisting of 100 links each of 1 feet is known as engineer’s chain.
This chain is used to measure length in feet and area in sq.yard.
Revenue Chain : it is 33 feet long chain consisting of 16 links.
This chain is used for distance measurements in feet & inches for smaller areas.
The act of data collection using surveying devices such as GPS & others is very vital for a successful project implementation of Outside plant fiber Project
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
The Presentation Covers the General Technical Features of Tunnel T 80 across Pir Panjal Mountain Range, for Kashmir Rail Link. This presentation was made at Civil Engineering Society, IIT Kanpur on 30th September 2013.
Introduction of surveying_Surveying, Civil EngineeringA Makwana
Surveying is the art of determining the relative positions of points on, above or beneath the surface of the earth.
The relative positions are determined by measuring horizontal distances, vertical distances, horizontal angles and vertical angles accurately using various surveying instruments.
Levelling is a branch of surveying dealing with determination of relative heights of the point on the surface of the earth in a vertical plane.
Urban Design-Literature study St. Marks Road, BangaloreAnsh Agarwal
Urban Planning
Literature study of St. Marks Road, Bangalore.
Includes:
1. Road Details
2. Survey Details & Analysis
3. Action Needed
4. Proposals
5. Action Made
6. Before & After Scenerio
7. Anatomy of Changes
Types of pipes and types of joints. Different types of pipes used for transporting water from reservoir or treatment plant for water supply in environmental engineering
Introduction- Classification of cements - Portland Cement
Raw materials of Portland cement - Cement Manufacturing Process - Flow chart of Portland Cement manufacturing process - Cement Manufacturing Video - Mixing and Crushing
Dry Process - Wet Process - Burning Process - View of complete setup - Rotary Klin zones - Chemical Reactions -
Grinding and Packaging - Setting and hardening - Flow chart
Sequence - Chemical Reactions - Special Cement -
Design principles in prefabricated structures unit iii ce6016 pfsPrakash Kumar Sekar
CE6016 PREFABRICATED STRUCTURES - Design principles in prefabricated structures unit iii ce6016 pfs - Disuniting of structures- Design of cross section based on the efficiency of material used – Problems in design because of joint flexibility ---- Allowance for joint deformation
Brilliant Lecture delivered to me in Alagappa Engineering college Workshop.
The Global Positioning System (GPS) is a satellite
based radio navigation system provided by the
United States Department of Defence. It gives
unequaled accuracy and flexibility in positioning
for navigation, surveying and GIS data collection.
Economical eco friendly light-weight building blocks using waste paper - pape...Prakash Kumar Sekar
The major component in any construction activity is the cost of the material. In developing countries, the untapped or unused resources are needed to be identified for its potential use in the construction sectors. The one such resource is waste paper. Paper pulp added with cement and sand hardens and forms a light weight construction material called Papercrete, which satisfies many of the engineering properties needed for construction. Papercrete has advantages like low-cost, economical and it is eco-friendly. In this research, papercrete blocks are created and their engineering properties are studied. It is to be noted that under compression papercrete fails slowly in a ductile manner but there was no earlier reliable research findings relating compressive stress with compressive strain which is covered in this paper.
It shows the different methods to calculate angles and sides in the different type of triangle. Its one of the basics for understanding doing surveying.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
1. Route surveying
Route Survey―a survey for determining the
route of a proposed pipeline, power line, cable,
road or other linear facilities in order to
acquire a right-of-way, servitude or easement
from the property owner being crossed.
- Prakash Kumar SekarPrakash Kumar Sekar
2. Reconnaissance Survey
Gather sufficient information to select
one or more possible route
• Assemble basic information
– Topographic maps
– Cadastral maps / GIS
– Aerial photos
Prakash Kumar Sekar
3. Reconnaissance Survey
• Evaluate
– General topography
– Geology
– Meteorological statistics
– Flood records
– Unsuitable terrain
– Land use and ownership / Local Authority’s
GIS
– Existing services
– Existing communicationsPrakash Kumar Sekar
4. Reconnaissance Survey
• Field reconnaissance to confirm
assembled data
• Choose possible routes
• NOTIFY RELEVANT AUTHORITIES
Prakash Kumar Sekar
5. Preliminary Surveying
• Collect sufficient information to design
the horizontal and vertical alignment
and thus:
– Likely earthwork quantities
– Intersection details
– Bridge and culvert sites
– Stream diversions
– Land resumptions
– Water catchments
– Flood levels
– Road building material
– Total cost Prakash Kumar Sekar
7. Preliminary Survey
• Survey methodology
– Place traverse stations along proposed
route
– Establish basic horizontal and vertical
control
– Control traverse between traverse
stations for horizontal coordinates
– Spirit level vertical control (if necessary)
– Draw paper location for minimum gradient
and curvature, earthwork, suitable cross
section
Prakash Kumar Sekar
8. Preliminary Survey
It is taken by three party
• The transit party
– Consists of four to seven person conducts
traverse and measure azimith
– Records topographical details, property lines,
drainage structures pipe lines, road and
railways
Prakash Kumar Sekar
9. • The level party (3 person)
– Establish bench marks
– Conducts l-S and C-S surveying
• Topography or cross section party
• Detail topography survey
Prakash Kumar Sekar
10. Working Survey
• A working survey must provide data of
sufficient accuracy and extent for the
satisfactory detailed design of the road
and the later setting-out for
construction.
Prakash Kumar Sekar
11. Working Survey
• Survey Marks
– Pegs (75mm * 50mm) are placed along the
centre line (straight and curves) at 20 / 50
metre intervals
– Offsets (75mm * 50mm pegs, short star
pickets driven flush) placed left and right of
centre line
• 200 metre intervals
• beginning, centre and end of curves
– level and check level all centre line and
offset pegs Prakash Kumar Sekar
12. Working Survey
• Survey Marks, cont
– establish benchmarks
• at 1km intervals
• at bridge and culvert sites
Prakash Kumar Sekar
13. CONSTRUCTION SURVEY
urban equivalent to the Working Survey
• route is pre-determined by the presence
of existing road reserves
• general survey requirements are the
same as for Working Surveys
• density of detail is such that the
procedures of observation and
recording may have to be varied
Prakash Kumar Sekar
14. Route Surveying for highway
• Recinnaisance Survey
– Alignment should avoid cutting and banking
– No obstruction
– Gradient
– Avoid cross drainage works
– Type of soil, flood level
– Source of construction material
– Type of terrain
Prakash Kumar Sekar
15. Preliminary survey for highway
• Primary traverse
• Topographical survey
• Leveling work
• Hydrological data
• Soil survey
• Establishing bench marks
• Intersection of canals rivers and property
Prakash Kumar Sekar
16. Location survey for Highway
• Centerline line is marked at 30m interval
• Benchmark for every 300m
• Cross section for every 30m
• All detail of cross drainage work
• Topographical detail
• Soil survey
• Total land width of highway
• Tangent points and intersection pointsPrakash Kumar Sekar
17. Route Survey for water ways
• Have both historical and modern
importance
• ocean water transportation
– 75% of world trade
– Also passenger transportation
– Military purposes
Prakash Kumar Sekar
18. Route Survey for water ways
• Inland water transportation
– Oldest form of transportation
– Uses canal or river
– Factors affecting inland transportation
• Diversion of rivers
• Deforestation
• Less importance
Prakash Kumar Sekar
19. Route Survey for water ways
• Topographical survey, hydrographic survey
and soil investigation
• Regular dredge to avoid silt formation
– Bucket or ladder dredger
– Hydraulics or cutter dredger
– Grab dredger
– Dipper dredger
– Rock dredger