Alignment: The position or the layout of the central line of the highway on the ground is called the alignment.
Highway Alignment includes both
a) Horizontal alignment includes straight and curved paths, the deviations and horizontal curves.
b) Vertical alignment includes changes in level, gradients and vertical curves.
The clear distance ahead of vehicle which is visible to the driver is known as sight distance
The minimum distance within which a driver can safely stop his vehicle without any collision with some vehicle, animal or any other object is known as stopping sight distance.
Alignment: The position or the layout of the central line of the highway on the ground is called the alignment.
Highway Alignment includes both
a) Horizontal alignment includes straight and curved paths, the deviations and horizontal curves.
b) Vertical alignment includes changes in level, gradients and vertical curves.
The clear distance ahead of vehicle which is visible to the driver is known as sight distance
The minimum distance within which a driver can safely stop his vehicle without any collision with some vehicle, animal or any other object is known as stopping sight distance.
types of pavement materials
types of paving material
types of road pavement
types of flexible pavement
flexible pavement of road construction
types of pavement for driveways
types of rigid pavements
asphalt pavement types
types of flexible pavements
flexible pavement design
flexible pavement manual
flexible pavement construction
flexible pavement vs rigid pavement
flexible pavement design example
flexible pavement of road construction
flexible pavement ppt
types of rigid pavements
rigid pavement design
rigid pavement pdf
rigid pavement construction
rigid pavement design example
rigid pavement construction michigan
aashto rigid pavement design
aashto rigid pavement design spreadsheet
The overtaking sight distance or passing sight distance is measured along the center line of the road over which a driver with his eye level 1.2 m above the road surface can see the top of an object 1.2 m above the road surface.
passing sight distance formula
aashto intersection sight triangles
highway sight distance
stopping sight distance formula
stopping sight distance calculator
headlight sight distance equation
headlight sight distance
aashto sight triangle standards
stopping site distance
safe stopping sight distance
aashto stopping sight distance
sight distance in geometric design
stopping sight distance example
ssd stopping sight distance
stopping site distance calculation
headlight sight distance
Design of rigid pavements. IRC method of design of rigid pavement. Transportation Engineering. Civil Engineering. Wheel loads on rigid pavement. Action of various stresses on rigid pavement. Highway engineering. How rigid pavements different from flexible pavements
Highway planning and alignment: Different modes of transportation – historical Development of road construction- Highway Development in India –Classification of roads- Road pattern
– Highway planning in India- Highway alignment - Engineering Surveys for alignment – Highway Project- Important Transport/Highway related agencies in India. PMGSY project.
Introduction about IRC, NRRDA
Highway Engineering for BE Civil Engineering Students
History of Roads in India, IRC, CRRI, Classification of Roads, Three 20 year Road Development Plans, Road patterns, Accident Studies,
types of pavement materials
types of paving material
types of road pavement
types of flexible pavement
flexible pavement of road construction
types of pavement for driveways
types of rigid pavements
asphalt pavement types
types of flexible pavements
flexible pavement design
flexible pavement manual
flexible pavement construction
flexible pavement vs rigid pavement
flexible pavement design example
flexible pavement of road construction
flexible pavement ppt
types of rigid pavements
rigid pavement design
rigid pavement pdf
rigid pavement construction
rigid pavement design example
rigid pavement construction michigan
aashto rigid pavement design
aashto rigid pavement design spreadsheet
The overtaking sight distance or passing sight distance is measured along the center line of the road over which a driver with his eye level 1.2 m above the road surface can see the top of an object 1.2 m above the road surface.
passing sight distance formula
aashto intersection sight triangles
highway sight distance
stopping sight distance formula
stopping sight distance calculator
headlight sight distance equation
headlight sight distance
aashto sight triangle standards
stopping site distance
safe stopping sight distance
aashto stopping sight distance
sight distance in geometric design
stopping sight distance example
ssd stopping sight distance
stopping site distance calculation
headlight sight distance
Design of rigid pavements. IRC method of design of rigid pavement. Transportation Engineering. Civil Engineering. Wheel loads on rigid pavement. Action of various stresses on rigid pavement. Highway engineering. How rigid pavements different from flexible pavements
Highway planning and alignment: Different modes of transportation – historical Development of road construction- Highway Development in India –Classification of roads- Road pattern
– Highway planning in India- Highway alignment - Engineering Surveys for alignment – Highway Project- Important Transport/Highway related agencies in India. PMGSY project.
Introduction about IRC, NRRDA
Highway Engineering for BE Civil Engineering Students
History of Roads in India, IRC, CRRI, Classification of Roads, Three 20 year Road Development Plans, Road patterns, Accident Studies,
Highway engineering is an engineering discipline branching out from civil engineering. This subject involves the planning, design, construction, operation, and maintenance of roads, bridges, and tunnels to ensure safe and effective transportation of people and goods. There are certain geological conditions which should be considered while laying the highways. This module give those details in general.
brief history of road developments in India; present status of roads development Programme in the country in India including different programmes being executed by various agencies.
L2 Highway planning and development Unit 1.1 Sachin PatiL
Highway Planning and Development/ Highway Alignment and Surveys.
Classification of roads based on the different criteria; brief history of road developments in India; present status of roads development Programme in the country in India including different programmes being executed by various agencies
Traffic survey student activity janata bazar kolhapurSachin PatiL
Traffic survey activity carried out by my students as a part of Mandatory academic requirements. Creative Commons Attribution Non Commercial Share Alike 3.0 Unported License. Permissions beyond the scope of this license can be requested at email@skpatil.com.
Traffic survey activity carried out by my students as a part of Mandatory academic requirements. Creative Commons Attribution Non Commercial Share Alike 3.0 Unported License. Permissions beyond the scope of this license can be requested at email@skpatil.com.
Traffic survey activity carried out by my students as a part of Mandatory academic requirements. Creative Commons Attribution Non Commercial Share Alike 3.0 Unported License. Permissions beyond the scope of this license can be requested at email@skpatil.com.
Traffic survey activity carried out by my students as a part of Mandatory academic requirements. Creative Commons Attribution Non Commercial Share Alike 3.0 Unported License. Permissions beyond the scope of this license can be requested at email@skpatil.com.
Institute News Letter for AMGOI, Vathar. My role was initiating the demand, data collection, proof reading, layout preparation as in Desktop publishing (DTP), and Publishing the news letter
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
3.2 Maharashtra regional town planning actSachin PatiL
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
3.1.1 development control rules case studySachin PatiL
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Development control rules,
Maharashtra Regional Town Planning Act,
Land acquisition act,
Village planning: Necessity and principles,
Rural developments- Growth
centre approach, Area Development approach, Integrated rural development
approach.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
L4 engineering surveys for highways 1.3
1. Transportation Engineering
Module 1
Highway Planning and Development
“Engineering Surveys for Highways”
www.skpatil.com
Dr. S.K. Patil
HOD Civil, Gharda Institute of Technology, Lavel
2. Surveys for Highwaywww.skpatil.com 2
■ Before a highway alignment is finalised in highway project,
the engineering survey are to be carried out.
1) Map study
2) Reconnaissance survey
3) Preliminary survey
4) Final location and detailed surveys
3. 1. Map Studywww.skpatil.com 3
■ From the map alternative routes can be suggested in the office, if
the topographic map of that area is available.
■ The probable alignment can be located on the map from the
fallowing details available on the map.
– Avoiding valleys, ponds or lake
– Avoiding bend of river
– If road has to cross a row of hills, possibility of crossing
through mountain pass.
■ Map study gives a rough guidance of the routes to be further
surveyed in the field
4. 2. Reconnaissance Surveywww.skpatil.com 4
■ To confirm features indicated on map.
■ To examine the general character of the area in field for deciding the most feasible
routes for detailed studies.
■ A survey party may inspect along the proposed alternative routes of the map in the field
with very simple instrument like abney level, tangent clinometer, barometer etc. to
collect additional details.
■ Details to be collected from alternative routes from this survey are,
– Valleys, ponds, lakes, marshy land, hill, permanent structure and other
obstruction.
– Value of gradient, length of gradient and radius of curve.
– Number and type of cross drainage structures.
– High Flood Level(HFL)
– Soil Characteristics.
– Geological features.
– source of construction materials-stone quarries, water sources.
■ Prepare a report on merits and demerits of different alternative routes.
■ As a result a few alternate alignments may be chosen for further study based on
practical considerations observed at the site.
5. 3. Preliminary surveywww.skpatil.com 5
■ Objectives
– To survey the various alternative alignments proposed after
the reconnaissance and to collect all the necessary physical
information and detail of topography, drainage and soil.
– To compare the different proposals in view of the
requirements of the good alignment.
– To estimate quantity of earthwork materials and other
construction aspect and to workout the cost of the alternate
proposals.
6. 3. Preliminary surveywww.skpatil.com 6
■ Methods
– Conventional approach-survey party carries out surveys
using the required field equipment, taking measurement,
collecting topographical and other data and carrying out
soil survey.
■ Longitudinal and cross sectional profile.
– PlainTerrain`:100–200m
– RollingTerrain:50m
– HillyTerrain:30m
■ Other studies
– Drainage, Hydrological survey, soil survey, Traffic and Material
survey.
– Modern Rapid Approach
■ Aerial Photogrammetry, High Res. Satellite Images, Drones
7. 4. Final location and detailed surveywww.skpatil.com 7
■ The alignment finalised at the design office after the
preliminary survey is to be first located on the field by
establishing the centre line.
■ Location survey:
– Transferring the alignment on to ground.
– This is done by transit theodolite.
– Major and minor control points are established on the
ground and centre pegs are driven, checking the
geometric design requirements.
– Centre line stacks are driven at suitable intervals, say
50m interval in plane and rolling terrains and 20m in
hilly terrain
8. 4. Final location and detailed surveywww.skpatil.com 8
■ Detailed Survey
– Temporary benchmarks are fixed at intervals of about
250m and at all drainage and underpass structure.
– Earthwork calculations and drainage details are to be
workout from the level books.
– Cross-sectional levels are taken at intervals of 50-100m in
Plane terrain, 50-75m in Rolling terrain,50m in built-up
area, 20m in Hilly terrain.
– Detail soil survey is to be carried out.
– CBR value of the soils along the alignment may be
determined for design of pavement.
– The data during detailed survey should be elaborate and
complete for preparing detailed plans, design and
estimates of project.
9. Drawing and Reportwww.skpatil.com 9
■ Key map
■ Index map
■ Preliminary survey plans
■ Detailed plan and longitudinal section
■ Detailed cross section
■ Land acquisition plans
■ Drawings of cross drainage and other retaining structures
■ Drawings of road intersections
■ Land plans showing quarries etc.
■ All these information is compiled into DPR.
10. DPR - Detailed Project Reportwww.skpatil.com 10
1. Executive Summary
2. Background
3. General Details
4. Socio-Economic Profile
5. Demographic Profile
6. Traffic surveys & forecast
7. Engineering surveys &
investigation
8. Design standards and
specifications
9. Pavement design details
10.Drainage studies, C/D works
design
11.Environmental considerations
with resettlements plan
12.Material, Equipment and
human resources
13.Analysis & Design
14.Rate analysis & Estimate
15.Construction schedule
16.Traffic management during
construction
17.Conclusion
11. Highway Planning and Development
■ Road Classification based on diff criteria
■ Criteria
– Material
– Location & Function
– Traffic Volume
– Economy
– Rigidity
– Topography
– Traffic Type
– Special Roads
www.skpatil.com 11
12. Life's biggest challenge is deciding
what's important ... then
disregarding the rest - Anonymous
I can be reached at
www.skpatil.com
www.skpatil.com 12