RAILWAY SURVEYS
Reasons for laying a new
railway line
1. Strategic consideration:
Sometimes it becomes essential to join two
points by a railway line for strategic purposes so
that in case of emergency, the army can be
transferred from one point to the other.
2. Linking of trade centres:
Two trade centres may not be linked up by a
railway line. In such cases, a new railway line is
proposed between two such trade centres. 1
RAILWAY SURVEYS
3. Connecting port with the interior of the
country:
A port is sometimes not connected with the
interior of the country. In such cases, it
becomes essential to have a new railway line
joining the port and the trade centres of the
interior of the country.
2
RAILWAY SURVEYS
4. Shortening existing route:
A route exists between two points. But if it is
possible to shorten the existing route, a new
railway line is to be laid.
3
RAILWAY SURVEYS
5. Laying of a branch line:
It becomes necessary sometimes to lay a
branch line to an existing main line to
develop certain other cities on the proposed
branch line. The new branch line will serve as
feeder line for the existing main railway line.
4
RAILWAY SURVEYS
6. Undeveloped area:
A new railway line is laid to develop an area
which may be rich in mineral resources or
other natural wealth like timber resources.
5
Factors influencing the proposed route:
I. Cost:
Should be minimum
Is composed of:
{capital cost of the project + maintenance cost +
renewal expenditure + working expenses}
The route should be so selected as to bring the
sum of all these costs to a minimum.
6
Factors influencing the proposed route:
II. Safety:
 The available passenger and goods traffic
should be transported safely,
 Route should be so laid as to have minimum
chances of train accidents
III.Speed:
 Route should be so selected as to have
reasonable speed of trains.
7
RAILWAY SURVEYS
In order to have a proper and satisfactory new
route, various surveys are carried out:
1) Reconnaissance Survey
2) Preliminary Survey
3) Location Survey
8
RAILWAY SURVEYS
1) Reconnaissance Survey:
 It is the first engineering survey.
 It is carried out in territory which has not been
previously surveyed for the purpose of laying a
new railway line.
 The main objects are as follows:
i. To obtain general knowledge of the whole territory,
and
ii. To obtain information regarding the salient features
of the territory.
9
RAILWAY SURVEYS
Importance of reconnaissance survey:
• A number of possible alternative routes between
two points can be worked out.
• It is not a science but it is an art.
• Personal factors play an important role in the
reconnaissance survey.
• The successful conduct entirely depends on the
personal qualities of the engineer such as his
training and experience, his capacity of
observation and interpretation
10
RAILWAY SURVEYS
Information gathered in reconnaissance survey:
A reconnaissance survey can broadly be divided
into two categories:
1. Traffic reconnaissance survey
2. Engineering reconnaissance survey
11
RAILWAY SURVEYS
Traffic reconnaissance survey:
This consists of collection of the information
regarding the following:
a) The general character of the country and the
extent of cultivation;
b) Information regarding the local industries and
religious festivals;
c) The general condition as regards prosperity of
people in the locality and density of population
and its distribution;
12
RAILWAY SURVEYS
d) The probable amount of traffic to be served by
new railway line;
e) The probable new traffic lines to be opened up
to join large centres of trade;
f) Nature and volume of exports and their
destination;
g) The amount of imports and centres of their
distribution;
h) Possibilities of development of industries as a
result of the new railway line;
13
RAILWAY SURVEYS
i) Visiting all trade centres and consultation with
prominent citizens and local authorities
regarding the most suitable route for the
railway;
j) Standard of construction required for carrying
the probable traffic;
k) Study of the existing means of transport
14
RAILWAY SURVEYS
Engineering reconnaissance survey:
This consists of collection of information
regarding the following:
a) Physical features of the country;
b) The surface formation of the ground;
c) Nature of soil and its classification;
d) Streams and rivers of the immediate
vicinity, especially those which are likely to cross
the proposed railway line;
e) Positions of hills and lakes; 15
RAILWAY SURVEYS
f) Samples of water from wells, rivers, etc. so as to
ascertain weather the water is suitable for use in
locomotive or not;
g) Availability of materials and labour for use
during construction.
16
RAILWAY SURVEYS
Factors to be kept in view during
reconnaissance survey:
Following factors should be kept in view;
otherwise, the results are likely to be misguiding:
1) Area: A reconnaissance survey should be carried
out for the whole area of the country. It should
never be carried out for a line only.
2) Existing roads: The survey should not be guided
by the existing roads because the ground which
is favourable for construction of roads may not
be useful for the construction of a railway line.
17
RAILWAY SURVEYS
3) Starting of route: The engineer should not reject
a particular route simply because it starts badly
i.e. with curvature or with sudden rise or fall, etc.
He must ascertain that the route continues badly
for a long distance.
4) Assumptions: The assumptions should be made
very carefully as sometimes they are likely to be
proved wrong, when tested by actual
observations.
18
RAILWAY SURVEYS
5) Survey route:
6) Ocular illusions: Ocular illusions should be
prevented. Most common are:
 estimating wrong length of line or offset;
 Estimating wrong curvature;
 Overlaps of hills which may appear as a continuous
ridge from a distance.
7) Revenue: The probable revenue from the
proposed railway line may be worked out.
19
RAILWAY SURVEYS
2) Preliminary Survey:
Object of preliminary survey:
 To conduct the survey work along the alternative
routes found out by reconnaissance survey and;
 to determine with greater accuracy the cost of
the railway line along these alternative routes.
20
RAILWAY SURVEYS
Importance of preliminary survey:
a. It decides the final route and recommends
only one particular route in preference to
other alternative routes;
b. Thus, should be carried out with great
precision as on it depends the alignment of
the final route.
21
RAILWAY SURVEYS
3. Location Survey:
Object of location survey:
 To carry out the detailed survey along the route
which has been found and fixed as the most
economical route from the data of the
preliminary survey.
 It establishes the centre-line of the actual track
to be laid.
 As soon as the location survey is completed, the
construction work is started.
22
RAILWAY SURVEYS
Work of location survey: It is carried out in two
stages:
1. Paper location
2. Field location
1. Paper location:
 The final route selected is put up on paper and
details such as gradient, curves, contours, etc.
are worked out;
 All the working drawings are prepared, even of
minor structures such as signal cabins.
23
RAILWAY SURVEYS
 After the paper location is over, the field work is started
and the centre-line of the track is fixed.
2. Field location:
 The field location transfers paper location on the
ground;
 It gives all the requirements of the construction
engineer such as bench-
marks, levels, measurements, etc.;
 The centre-line pegs are driven at every 300 metres
along the centre-line of the track;
24
RAILWAY SURVEYS
Every change of direction, the beginning and end
of the curve and also the intersecting points are
clearly marked;
In addition to the fixing up of the centre-line of
the track, the centre-lines of bridges, culverts,
tunnels, station buildings, signal cabins, etc.
should also be fixed.
25

More Related Content

What's hot

Components of railway track
Components of railway trackComponents of railway track
Components of railway track
gayathrysatheesan1
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
Latif Hyder Wadho
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
sharda university
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
KHUSHBU SHAH
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
RAMPRASAD KUMAWAT
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
Vijai Krishnan V
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
Deven Diran
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
Yash Patel
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
Hari Krishna Velpula
 
O and d study
O and d studyO and d study
O and d study
meetmksvs
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
Ghanashyam Prajapati
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
Kavin Raval
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
Ghanashyam Prajapati
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
srinivas2036
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
AkshathaBhandary
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
Souvik Mondal
 
highway development in india
highway development in indiahighway development in india
highway development in india
Prathi Baa
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
Sunil Kumar Meena
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
Arun G
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
Anupama Jha
 

What's hot (20)

Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
O and d study
O and d studyO and d study
O and d study
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
highway development in india
highway development in indiahighway development in india
highway development in india
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
 

Similar to Surveys & alignment of Railway Engineering

4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveys
Mani Vel
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
Saksham Bhutani
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
RNRANGANATH
 
Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new linesNasir Uddin
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
Sachin PatiL
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx
natan82253
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
abhijitsaha99
 
Alignment Survey | Track Alignment | Civil TechMate
Alignment Survey | Track Alignment | Civil TechMateAlignment Survey | Track Alignment | Civil TechMate
Alignment Survey | Track Alignment | Civil TechMate
Civil TechMate
 
Unit 5
Unit 5Unit 5
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
GARRE RAVI KUMAR
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
BalpreetSingh47890
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
ashish502848
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
Rana Ibrahim
 
ROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYING
manashkedia098
 
Lecture 7
Lecture 7Lecture 7
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
KHUSHBU SHAH
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
Gaurav Baviskar
 
Planning Principles Railway Engineering
Planning Principles Railway EngineeringPlanning Principles Railway Engineering
Planning Principles Railway Engineering
Latif Hyder Wadho
 
Planning principles of Railways Engineering
Planning principles of Railways EngineeringPlanning principles of Railways Engineering
Planning principles of Railways Engineering
Latif Hyder Wadho
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
Gowtham G
 

Similar to Surveys & alignment of Railway Engineering (20)

4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveys
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
 
Alignment Survey | Track Alignment | Civil TechMate
Alignment Survey | Track Alignment | Civil TechMateAlignment Survey | Track Alignment | Civil TechMate
Alignment Survey | Track Alignment | Civil TechMate
 
Unit 5
Unit 5Unit 5
Unit 5
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
 
ROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYING
 
Lecture 7
Lecture 7Lecture 7
Lecture 7
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
Planning Principles Railway Engineering
Planning Principles Railway EngineeringPlanning Principles Railway Engineering
Planning Principles Railway Engineering
 
Planning principles of Railways Engineering
Planning principles of Railways EngineeringPlanning principles of Railways Engineering
Planning principles of Railways Engineering
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 

More from Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Latif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
Latif Hyder Wadho
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
Latif Hyder Wadho
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
Latif Hyder Wadho
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
Latif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
Latif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
Latif Hyder Wadho
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
Latif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
Latif Hyder Wadho
 
Bricks
BricksBricks
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
Latif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
Latif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
Latif Hyder Wadho
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
Latif Hyder Wadho
 
Plate load test
Plate load testPlate load test
Plate load test
Latif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
Latif Hyder Wadho
 

More from Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Recently uploaded

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Surveys & alignment of Railway Engineering

  • 1. RAILWAY SURVEYS Reasons for laying a new railway line 1. Strategic consideration: Sometimes it becomes essential to join two points by a railway line for strategic purposes so that in case of emergency, the army can be transferred from one point to the other. 2. Linking of trade centres: Two trade centres may not be linked up by a railway line. In such cases, a new railway line is proposed between two such trade centres. 1
  • 2. RAILWAY SURVEYS 3. Connecting port with the interior of the country: A port is sometimes not connected with the interior of the country. In such cases, it becomes essential to have a new railway line joining the port and the trade centres of the interior of the country. 2
  • 3. RAILWAY SURVEYS 4. Shortening existing route: A route exists between two points. But if it is possible to shorten the existing route, a new railway line is to be laid. 3
  • 4. RAILWAY SURVEYS 5. Laying of a branch line: It becomes necessary sometimes to lay a branch line to an existing main line to develop certain other cities on the proposed branch line. The new branch line will serve as feeder line for the existing main railway line. 4
  • 5. RAILWAY SURVEYS 6. Undeveloped area: A new railway line is laid to develop an area which may be rich in mineral resources or other natural wealth like timber resources. 5
  • 6. Factors influencing the proposed route: I. Cost: Should be minimum Is composed of: {capital cost of the project + maintenance cost + renewal expenditure + working expenses} The route should be so selected as to bring the sum of all these costs to a minimum. 6
  • 7. Factors influencing the proposed route: II. Safety:  The available passenger and goods traffic should be transported safely,  Route should be so laid as to have minimum chances of train accidents III.Speed:  Route should be so selected as to have reasonable speed of trains. 7
  • 8. RAILWAY SURVEYS In order to have a proper and satisfactory new route, various surveys are carried out: 1) Reconnaissance Survey 2) Preliminary Survey 3) Location Survey 8
  • 9. RAILWAY SURVEYS 1) Reconnaissance Survey:  It is the first engineering survey.  It is carried out in territory which has not been previously surveyed for the purpose of laying a new railway line.  The main objects are as follows: i. To obtain general knowledge of the whole territory, and ii. To obtain information regarding the salient features of the territory. 9
  • 10. RAILWAY SURVEYS Importance of reconnaissance survey: • A number of possible alternative routes between two points can be worked out. • It is not a science but it is an art. • Personal factors play an important role in the reconnaissance survey. • The successful conduct entirely depends on the personal qualities of the engineer such as his training and experience, his capacity of observation and interpretation 10
  • 11. RAILWAY SURVEYS Information gathered in reconnaissance survey: A reconnaissance survey can broadly be divided into two categories: 1. Traffic reconnaissance survey 2. Engineering reconnaissance survey 11
  • 12. RAILWAY SURVEYS Traffic reconnaissance survey: This consists of collection of the information regarding the following: a) The general character of the country and the extent of cultivation; b) Information regarding the local industries and religious festivals; c) The general condition as regards prosperity of people in the locality and density of population and its distribution; 12
  • 13. RAILWAY SURVEYS d) The probable amount of traffic to be served by new railway line; e) The probable new traffic lines to be opened up to join large centres of trade; f) Nature and volume of exports and their destination; g) The amount of imports and centres of their distribution; h) Possibilities of development of industries as a result of the new railway line; 13
  • 14. RAILWAY SURVEYS i) Visiting all trade centres and consultation with prominent citizens and local authorities regarding the most suitable route for the railway; j) Standard of construction required for carrying the probable traffic; k) Study of the existing means of transport 14
  • 15. RAILWAY SURVEYS Engineering reconnaissance survey: This consists of collection of information regarding the following: a) Physical features of the country; b) The surface formation of the ground; c) Nature of soil and its classification; d) Streams and rivers of the immediate vicinity, especially those which are likely to cross the proposed railway line; e) Positions of hills and lakes; 15
  • 16. RAILWAY SURVEYS f) Samples of water from wells, rivers, etc. so as to ascertain weather the water is suitable for use in locomotive or not; g) Availability of materials and labour for use during construction. 16
  • 17. RAILWAY SURVEYS Factors to be kept in view during reconnaissance survey: Following factors should be kept in view; otherwise, the results are likely to be misguiding: 1) Area: A reconnaissance survey should be carried out for the whole area of the country. It should never be carried out for a line only. 2) Existing roads: The survey should not be guided by the existing roads because the ground which is favourable for construction of roads may not be useful for the construction of a railway line. 17
  • 18. RAILWAY SURVEYS 3) Starting of route: The engineer should not reject a particular route simply because it starts badly i.e. with curvature or with sudden rise or fall, etc. He must ascertain that the route continues badly for a long distance. 4) Assumptions: The assumptions should be made very carefully as sometimes they are likely to be proved wrong, when tested by actual observations. 18
  • 19. RAILWAY SURVEYS 5) Survey route: 6) Ocular illusions: Ocular illusions should be prevented. Most common are:  estimating wrong length of line or offset;  Estimating wrong curvature;  Overlaps of hills which may appear as a continuous ridge from a distance. 7) Revenue: The probable revenue from the proposed railway line may be worked out. 19
  • 20. RAILWAY SURVEYS 2) Preliminary Survey: Object of preliminary survey:  To conduct the survey work along the alternative routes found out by reconnaissance survey and;  to determine with greater accuracy the cost of the railway line along these alternative routes. 20
  • 21. RAILWAY SURVEYS Importance of preliminary survey: a. It decides the final route and recommends only one particular route in preference to other alternative routes; b. Thus, should be carried out with great precision as on it depends the alignment of the final route. 21
  • 22. RAILWAY SURVEYS 3. Location Survey: Object of location survey:  To carry out the detailed survey along the route which has been found and fixed as the most economical route from the data of the preliminary survey.  It establishes the centre-line of the actual track to be laid.  As soon as the location survey is completed, the construction work is started. 22
  • 23. RAILWAY SURVEYS Work of location survey: It is carried out in two stages: 1. Paper location 2. Field location 1. Paper location:  The final route selected is put up on paper and details such as gradient, curves, contours, etc. are worked out;  All the working drawings are prepared, even of minor structures such as signal cabins. 23
  • 24. RAILWAY SURVEYS  After the paper location is over, the field work is started and the centre-line of the track is fixed. 2. Field location:  The field location transfers paper location on the ground;  It gives all the requirements of the construction engineer such as bench- marks, levels, measurements, etc.;  The centre-line pegs are driven at every 300 metres along the centre-line of the track; 24
  • 25. RAILWAY SURVEYS Every change of direction, the beginning and end of the curve and also the intersecting points are clearly marked; In addition to the fixing up of the centre-line of the track, the centre-lines of bridges, culverts, tunnels, station buildings, signal cabins, etc. should also be fixed. 25