NIRMAL THOMAS
M.TECH ROBOTICS
SRM ROBOTICS
BATCH : 2013-2015
ROBOT CYCLE TIME ANALYSIS
TIME ………………..Every Seconds Count
“TIME IS MONEY.” – BENJAMIN FRANKLIN
1. This is true when applied to industrial manufacturing. The longer a system takes to get back
online, the more money a company loses.
2. Think about it. When you are not producing, you are not making money. The longer
manufacturing and maintenance takes, the more money you lose. It is an ugly fact.
3. However, the faster the tool the faster the job is completed and the faster you get back to
producing.
4. For manufacturing within the specified time you need to operate faster, product should be
perfect and complete in all sense
• CYCLE TIME ANALYSIS :The period required to complete one cycle
of an operation; or to complete a function, job, or task from
start to finish. Cycle time is used in differentiating total duration
of a process from its run time.
A cycle time analysis is any method that collects and analyzes time data for a process to improve
the total process or system.
Benefits of CTA
1. Easy to use
2. Identifies time required to complete specified tasks
3. Allows for easy identification of process improvements and efficiencies
How to Use CTA
Step 1. Identify the process and detail the scope to be studied.
Step 2. Map the process. (Process Chart)
Step 3. Take several time measurements at varying points.
Step 4. Study the process between measuring points to determine if there is wasted time.
Step 5. Analyze the data.
Step 6. Make changes as needed.
Robot Cycle Time Analysis…
Cycle time determines the robot production rate for the job, which is a significant factor in
the economics service Installation.
1. MTM (Methods of the Measurements)
2. RTM (Robot Time and motion) by Nof and Lechtman at Purdue University.
 In this each action of the robot is expressed as different elements so that we can
easily calculate the time of each action.
RTM Elements
These 10 elements can be categorized into
four major group
1. Motion Element : These are manipulator movements performed either with or without load
2. Sensing Element : These are sensory activities performed by robot equipment's with sensing
capabilities (VI & F)
3. End effector Elements : End effector action of the robot (GRi)
4. Delay Elements : These are delay time resulting from waiting and processing conditions in
the work cycle (T & D)
4 Major Approach In RTM
4 major approaches are used to determine the element time and analyze a robot cycle with RTM
1. Table of Elements :- Just recording the time taken for each action from clock. In this time
values are determined for the different elements listed in the table
2. Regression Equation :- In this regression equations are formed for the complicated elements
whose values are functionally related to several factors. Once the equation is developed for
the given elements , the user simply puts the values into the equation to calculate the time.
3. Motion Control :- Motion control is concerned with the kinematics and dynamics analysis of
the manipulator movements. It determines the element time values by considering the
distance moved and velocity to make the move.
4. Path Geometry :- This approach is similar to motion control and requires specification of the
motion path to be followed together with robot joint and arm velocities.
Problem
The work cycle consist of simple task in which the robot must move parts weighing 3lb from one
conveyor to another conveyor. The conveyor delivers a part to a fixed position every 15 seconds
Sequence
1. Robot pick up part from first conveyor.
2. Robot transfer the part to second conveyor and release the part.
3. Robot moves back to ready position at first conveyor.
Conveyor 2
Conveyor
1
Robot
Start position
Pick Up point
Drop Position
1.2 inch (0.12 ft)
1 Feet = 12 inch
Work piece 3lb
Process Flow Chart
The flow process chart in industrial engineering is a graphical and symbolic representation of the
processing activities performed on the work piece.
When to use it ?
1. It is used when observing a physical process, to record actions as they happen and thus get
an accurate description of the process.
2. It is used when analyzing the steps in a process, to help identify and eliminate waste.
3. It is used when the process is mostly sequential, containing few decisions.
Symbols in Process Chart

More Related Content

What's hot

Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
Vibhas Purushu
 
Electric drive systems in Robotics
Electric drive systems in RoboticsElectric drive systems in Robotics
Electric drive systems in Robotics
Elambaruthi Elambaruthi
 
Introduction to robotics
Introduction to roboticsIntroduction to robotics
Introduction to robotics
shalet kochumuttath Shaji
 
Cnc feed drives
Cnc feed drivesCnc feed drives
Cnc feed drives
Akhil Krishnan G
 
Application of industrial robotics
Application of industrial roboticsApplication of industrial robotics
Application of industrial robotics
Shubham Maurya
 
Robotics and machine vision system
Robotics and machine vision systemRobotics and machine vision system
Robotics and machine vision system
Gowsick Subramaniam
 
ROBOT DRIVE SYSTEMS AND END EFFECTORS
ROBOT DRIVE SYSTEMS AND END EFFECTORSROBOT DRIVE SYSTEMS AND END EFFECTORS
ROBOT DRIVE SYSTEMS AND END EFFECTORS
TAMILMECHKIT
 
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGEANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
Manoj Gowda K
 
selection of robot
selection of robotselection of robot
selection of robotnabil130290
 
ROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICS
ROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICSROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICS
ROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICS
TAMILMECHKIT
 
Grippers
GrippersGrippers
Grippers
gujjubharat
 
Precision of movement
Precision of movementPrecision of movement
Precision of movementVetri Vel
 
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMINGROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
TAMILMECHKIT
 
Robot control
Robot controlRobot control
Robot control
Hiran Gabriel
 
Robot kinematics
Robot kinematicsRobot kinematics
Robot kinematics
Varinder Singh
 
Robo unit4- Robot Programming.pptx
Robo unit4- Robot Programming.pptxRobo unit4- Robot Programming.pptx
Robo unit4- Robot Programming.pptx
Priya429658
 
Chapter 2 robot kinematics
Chapter 2   robot kinematicsChapter 2   robot kinematics
Chapter 2 robot kinematicsnguyendattdh
 
Industrial robotics
Industrial roboticsIndustrial robotics
Industrial roboticsjjenishmech
 
Manufacturing Automation
Manufacturing AutomationManufacturing Automation
Manufacturing Automation
Dhaval Chauhan
 

What's hot (20)

Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
Electric drive systems in Robotics
Electric drive systems in RoboticsElectric drive systems in Robotics
Electric drive systems in Robotics
 
Introduction to robotics
Introduction to roboticsIntroduction to robotics
Introduction to robotics
 
Cnc feed drives
Cnc feed drivesCnc feed drives
Cnc feed drives
 
Application of industrial robotics
Application of industrial roboticsApplication of industrial robotics
Application of industrial robotics
 
Robotics and machine vision system
Robotics and machine vision systemRobotics and machine vision system
Robotics and machine vision system
 
ROBOT DRIVE SYSTEMS AND END EFFECTORS
ROBOT DRIVE SYSTEMS AND END EFFECTORSROBOT DRIVE SYSTEMS AND END EFFECTORS
ROBOT DRIVE SYSTEMS AND END EFFECTORS
 
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGEANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
ANALYSIS OF TRANSFER LINE WITH BUFFER STORAGE
 
selection of robot
selection of robotselection of robot
selection of robot
 
ROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICS
ROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICSROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICS
ROBOTICS- IMPLEMENTATION AND ROBOT ECONOMICS
 
Grippers
GrippersGrippers
Grippers
 
Precision of movement
Precision of movementPrecision of movement
Precision of movement
 
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMINGROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
 
Robot control
Robot controlRobot control
Robot control
 
Industrial robotics
Industrial roboticsIndustrial robotics
Industrial robotics
 
Robot kinematics
Robot kinematicsRobot kinematics
Robot kinematics
 
Robo unit4- Robot Programming.pptx
Robo unit4- Robot Programming.pptxRobo unit4- Robot Programming.pptx
Robo unit4- Robot Programming.pptx
 
Chapter 2 robot kinematics
Chapter 2   robot kinematicsChapter 2   robot kinematics
Chapter 2 robot kinematics
 
Industrial robotics
Industrial roboticsIndustrial robotics
Industrial robotics
 
Manufacturing Automation
Manufacturing AutomationManufacturing Automation
Manufacturing Automation
 

Viewers also liked

Supercharged Content Marketing
Supercharged Content MarketingSupercharged Content Marketing
Supercharged Content Marketing
Eric T. Tung
 
Automated Parts Handling
Automated Parts HandlingAutomated Parts Handling
Automated Parts Handling
kezhassan
 
8 automated assembly-systems
8 automated assembly-systems8 automated assembly-systems
8 automated assembly-systems
lizard_mn
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)soojal
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims student
mrgauravkhadse
 
Robotics
RoboticsRobotics
Robotics
Dr K M SONI
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 
Transfer machines
Transfer machines Transfer machines
Transfer machines
Suresh Lal
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’sSudhir Reddy
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineeringrinkimusaddi
 
Bpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentBpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentSwaraj
 
Bpr examples from indian corporate world
Bpr  examples from indian corporate worldBpr  examples from indian corporate world
Bpr examples from indian corporate world
RiTu Karn
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
theairliner
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering Complete
Roy Antony Arnold G
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
Neelkamal Sharma
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
Kavindra Singh
 
Designing and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring systemDesigning and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring system
eSAT Publishing House
 
Andanças e Colagens - CPC USP
Andanças e Colagens - CPC USPAndanças e Colagens - CPC USP
Andanças e Colagens - CPC USP
Aline C Barros
 

Viewers also liked (20)

Supercharged Content Marketing
Supercharged Content MarketingSupercharged Content Marketing
Supercharged Content Marketing
 
Automated Parts Handling
Automated Parts HandlingAutomated Parts Handling
Automated Parts Handling
 
8 automated assembly-systems
8 automated assembly-systems8 automated assembly-systems
8 automated assembly-systems
 
Methods time measurement (mtm)
Methods time measurement (mtm)Methods time measurement (mtm)
Methods time measurement (mtm)
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims student
 
Robotics
RoboticsRobotics
Robotics
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Transfer machines
Transfer machines Transfer machines
Transfer machines
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’s
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineering
 
Bpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentBpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellent
 
Bpr examples from indian corporate world
Bpr  examples from indian corporate worldBpr  examples from indian corporate world
Bpr examples from indian corporate world
 
Bpr ppt
Bpr pptBpr ppt
Bpr ppt
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering Complete
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Designing and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring systemDesigning and installation of low cost optimized wind monitoring system
Designing and installation of low cost optimized wind monitoring system
 
Andanças e Colagens - CPC USP
Andanças e Colagens - CPC USPAndanças e Colagens - CPC USP
Andanças e Colagens - CPC USP
 

Similar to ROBOT CYCLE TIME ANALYSIS

Unit 3 iem part 2
Unit 3  iem part  2Unit 3  iem part  2
Unit 3 iem part 2
Sarravanan R
 
Document 14 (6).pdf
Document 14 (6).pdfDocument 14 (6).pdf
Document 14 (6).pdf
RajMantry
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method Study
Dr. Mohit Sahu
 
Method study
Method studyMethod study
Method study
sparsh maheshwari
 
Work Measurement
Work MeasurementWork Measurement
A Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemA Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control System
IRJET Journal
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
LakshayKumar504432
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
Shivangi Singh
 
SMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedSMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedVIVEK NERURKAR
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET Journal
 
K012556370
K012556370K012556370
K012556370
IOSR Journals
 
K012556370
K012556370K012556370
K012556370
vijay lahri
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docx
ssusera85eeb1
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
Dhyey Shukla
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
Muhammad Hassan
 
Project Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence TechniqueProject Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence Technique
ijtsrd
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
 
Pick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering ApplicationsPick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering Applications
IRJET Journal
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Editor IJARCET
 

Similar to ROBOT CYCLE TIME ANALYSIS (20)

Unit 3 iem part 2
Unit 3  iem part  2Unit 3  iem part  2
Unit 3 iem part 2
 
Document 14 (6).pdf
Document 14 (6).pdfDocument 14 (6).pdf
Document 14 (6).pdf
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method Study
 
Method study
Method studyMethod study
Method study
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
A Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control SystemA Distributed Time Triggered Control for a Feedback Control System
A Distributed Time Triggered Control for a Feedback Control System
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Msms word
Msms wordMsms word
Msms word
 
SMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - RevisedSMED for non-manufacturing sectors - Revised
SMED for non-manufacturing sectors - Revised
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docx
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Project Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence TechniqueProject Report on Maynard Operation Sequence Technique
Project Report on Maynard Operation Sequence Technique
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
Pick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering ApplicationsPick and Place Robotic Claw for Engineering Applications
Pick and Place Robotic Claw for Engineering Applications
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 

ROBOT CYCLE TIME ANALYSIS

  • 1. NIRMAL THOMAS M.TECH ROBOTICS SRM ROBOTICS BATCH : 2013-2015 ROBOT CYCLE TIME ANALYSIS
  • 2. TIME ………………..Every Seconds Count “TIME IS MONEY.” – BENJAMIN FRANKLIN 1. This is true when applied to industrial manufacturing. The longer a system takes to get back online, the more money a company loses. 2. Think about it. When you are not producing, you are not making money. The longer manufacturing and maintenance takes, the more money you lose. It is an ugly fact. 3. However, the faster the tool the faster the job is completed and the faster you get back to producing. 4. For manufacturing within the specified time you need to operate faster, product should be perfect and complete in all sense
  • 3. • CYCLE TIME ANALYSIS :The period required to complete one cycle of an operation; or to complete a function, job, or task from start to finish. Cycle time is used in differentiating total duration of a process from its run time.
  • 4. A cycle time analysis is any method that collects and analyzes time data for a process to improve the total process or system. Benefits of CTA 1. Easy to use 2. Identifies time required to complete specified tasks 3. Allows for easy identification of process improvements and efficiencies How to Use CTA Step 1. Identify the process and detail the scope to be studied. Step 2. Map the process. (Process Chart) Step 3. Take several time measurements at varying points. Step 4. Study the process between measuring points to determine if there is wasted time. Step 5. Analyze the data. Step 6. Make changes as needed.
  • 5. Robot Cycle Time Analysis… Cycle time determines the robot production rate for the job, which is a significant factor in the economics service Installation. 1. MTM (Methods of the Measurements) 2. RTM (Robot Time and motion) by Nof and Lechtman at Purdue University.  In this each action of the robot is expressed as different elements so that we can easily calculate the time of each action. RTM Elements
  • 6. These 10 elements can be categorized into four major group 1. Motion Element : These are manipulator movements performed either with or without load 2. Sensing Element : These are sensory activities performed by robot equipment's with sensing capabilities (VI & F) 3. End effector Elements : End effector action of the robot (GRi) 4. Delay Elements : These are delay time resulting from waiting and processing conditions in the work cycle (T & D)
  • 7. 4 Major Approach In RTM 4 major approaches are used to determine the element time and analyze a robot cycle with RTM 1. Table of Elements :- Just recording the time taken for each action from clock. In this time values are determined for the different elements listed in the table 2. Regression Equation :- In this regression equations are formed for the complicated elements whose values are functionally related to several factors. Once the equation is developed for the given elements , the user simply puts the values into the equation to calculate the time. 3. Motion Control :- Motion control is concerned with the kinematics and dynamics analysis of the manipulator movements. It determines the element time values by considering the distance moved and velocity to make the move. 4. Path Geometry :- This approach is similar to motion control and requires specification of the motion path to be followed together with robot joint and arm velocities.
  • 8. Problem The work cycle consist of simple task in which the robot must move parts weighing 3lb from one conveyor to another conveyor. The conveyor delivers a part to a fixed position every 15 seconds Sequence 1. Robot pick up part from first conveyor. 2. Robot transfer the part to second conveyor and release the part. 3. Robot moves back to ready position at first conveyor.
  • 9. Conveyor 2 Conveyor 1 Robot Start position Pick Up point Drop Position 1.2 inch (0.12 ft) 1 Feet = 12 inch Work piece 3lb
  • 10. Process Flow Chart The flow process chart in industrial engineering is a graphical and symbolic representation of the processing activities performed on the work piece. When to use it ? 1. It is used when observing a physical process, to record actions as they happen and thus get an accurate description of the process. 2. It is used when analyzing the steps in a process, to help identify and eliminate waste. 3. It is used when the process is mostly sequential, containing few decisions.