International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 839
Study of Lean construction tools for Workflow Improvement
-A Review
Rakesh E M1, Yedhu Krishna2, Boby Jacob3
1 2Rakesh E M, M.Tech Student, Department of Civil Engineering, Mar Athanasius College of Engineering,
Kothamangalam
2Yedhu Krishna, M.Tech Student, Department of Civil Engineering, Mar Athanasius College of Engineering,
Kothamangalam
3 Boby Jacob, Professor, Department of Civil Engineering, Mar Athanasius College of Engineering,
Kothamangalam
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - In this study, a technology called Value Stream
Mapping (VSM) is used to find and get rid of these
unproductive operations, optimising the workflow in the
process. Value Stream Mapping is regarded as a potent lean
method for removing waste and making any organization's
value stream lean and responsive. It is used tocharttheflowof
labour, resources, and information necessary to organise the
tasks carried out by all project participants in order to deliver
the finished product to the clients. The mapping of the present
and future states is a component of VSM. The inefficiencies in
the process and the inefficient, non-value-adding actions are
revealed by mapping the existing state.
Key Words: Value Stream Mapping, Workflow, Mapping
1. INTRODUCTION
A literature review is a crucial componentof everyendeavor.
It must be done in order to comprehend different project
facets and will aid in the project's successful conclusion.This
chapter considers and reviews research that has been done
in the fields of Lean construction, workflow in construction,
and value stream mapping.
Research on a Lean Implementation Success Model for the
Construction Industrywasconducted bySevilayDemirkesen
et al. in 2020. This study's main goal is to put out a thorough
success model for Lean implementation in the construction
sector. A list of success criteria is defined within this
framework, and these criteria are categorized into seven
groups: financial, managerial, technological, workforce,
cultural, governmental, and communication. When the
relevance weights of these attributes have been determined
by the five-person expert team, an analytical network
process (ANP) model is then created to identify the
connections between the success-related attributes. Eight
seasoned civil engineerscompleteda two-part questionnaire
to provide the information needed for the ANP model. The
key success criteria for Lean implementation were
determined to be market share, access to Lean tools and
practices, and lean training. The study isanticipatedtoassist
Lean practitioners and engineeringmanagersinovercoming
implementation process problems and advise them on
success criteria to take into account and tasks to be
prioritized when implementing Lean in their firms.
Framework for the selection of leanconstructiontoolsbased
on lean aims and functionality was the subjectofresearch by
Mughees Aslam et al. in 2020. Lean construction is regarded
as a viable project management methodology to handle
challenges in the construction sector and resolve some
productivity and waste issues. Various lean tools have been
developed to make the adoption of LeanConstruction easier.
Currently, the first choice of lean tools is mostly made based
on objectives, with little thought given to how well it
conforms to the building technique. This study intends to
clarify constructors' first selection phase decision-making
processes by shedding light on their mental models. Each
Lean tool's goals and capabilities are listed in the study. The
findings show that many tools have objectives that are
practically identical but have distinct functionality. As a
result, the selection criteria must take into account the
functionalities of the lean tools. For the successful
implementation of LC, the features of lean tools must be
compatible with the relevant building processes. In the
study, a framework for choosing the best lean tools was put
forth. The main benefit of this study is that it will help
constructors make better decisions when choosing the tool
that would function best with their construction.
Research on multi-objective optimization of batch and pull
production for lean-based repeated scheduling was
conducted by Dina A. Saad et al. in 2021. According to the
study, repetitivescheduling usingtraditional approacheshas
a number of issues because of imposed resource continuity
assumptions that add time and money. As a result of the
unit's downtime in between tasks, it also results in a higher
inventory of units with work in progress. In order to
decrease Work in Progress, time, and cost, this research
established a new batch- and pull-based repetitive
scheduling technique that is lean-driven. It contains a built-
in multi-objective optimization algorithmtochoosetheright
number of crews and batches to use in order to cut down on
time and expenses while taking resource and unit idleness
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 840
into account. To compare the effectiveness of the new
technique to the ones already in use, a real-world case study
was performed. The outcomes proved the superiority of the
Pull-Batch-based Repetitive scheduling technique and the
capacity of the optimization model to provide ideal
schedules.
Analysis of the Work Flow in a Complex Project was the
subject of research by Adam Frandson et al. (2012). The
investigation was carried out ata sizableSouthernCalifornia
hospital with 360 beds and 730,000+ square feet. The
findings are presented in the publication. The study's
primary goals were to look into the trades' work processes
on the project site and to pinpoint any issues that might be
impeding the smooth operation of the dry wall, electrical,
and mechanical crafts operating in various rooms. A variety
of techniques were used to gather the data, including
interviews, document analysis, value stream mapping,
document analysis, and direct observation of the work and
trade meetings. The project's section on creating repeated
units is the subject of this essay. The delay in finishing the
units was largely attributable to waiting and idle periods
brought on by issues with the information flow, particularly
with regard to how employees commit to carrying out these
duties.
Research on Lean Construction -ApplicationofValueStream
Mapping on Infra Structure Project was conducted by Khaja
Layeequddin et al. (2017). This study indicates that value
stream mapping may be used to move information within
infrastructure projects and process it there as well.
Currently, casting one slab takes roughly 40 days. The value
stream map reveals that non-value-added work like waiting
and backlogs makes up 7 days of this time. Value-added and
non-value-added operations on the value stream map can
both be detected using Lean technologies. Theprocesscould
be enhanced after improvements are made, as shown by the
future state map. The difficulty lies in structuring the data in
the VSM to eliminate orminimizethenon-value-addedsteps.
Contrary to production systems, information flows
sometimes employ ad hoc scheduling and might be loosely
structured, making it challenging to identify and map their
value streams. However, businesses can utilize the value
stream mapping tool in the same manner they do in
manufacturing for office processes.
Research on the Workflow Model for Systems and Interior
Finishing Works in Building Construction was conducted by
Irina Brodetskaia et al. in 2011. The inadequacy of standard
critical path modelling to capture characteristics of these
activities, such as uncertainty, instability, non-linear and
interrupted value-addingprocesses,andre-entrantflow, has
hampered modelling the flow of systems and interior
finishing works in building construction. A uniqueworkflow
model that explicitly predicts the movements of products
and crews at a fine-grained level is proposed, drawing on
real data gathered during a work study of a significant
residential project. The overall model consists of a trade
workflow model with a module for each type of work-
package and a model at the project level with integrated
trade modules. The model was put to the test bysimulatinga
construction project with seven work packages that was
carried out in a 20-story residential tower with 120 custom
flats. The crew movements through the test building were
modelled to replicate the same behavioral traits seen in
building sites. The model makes it possible to evaluate the
effect of management policies on the production flow at
various levels of specificity. It can be used as a research tool
and in the creation of construction management software in
the future.
The development of a lean model for house construction
using value stream mapping was the subject of research by
Haitao Yu et al. (2009). Many home buildersarelookingfora
more efficient manufacturing model that will shorten the
overall lead time, enhance quality, and increase process
reliability due to lengthydeliverytimesandsignificant waste
in the construction process. Housing construction offers the
most accurate comparison to manufacturing, but the high
amount of variability prohibits a direct transfer of the lean
mindset and procedures. In this study, a systematic strategy
based on the value stream mapping technique is built in
partnership with a nearby home builder in order to assess
the current procedure and create a lean production model.
The model has four primary characteristics, including
synchronized first-in, first-out lane-based flow, production
levelling at pacemaker, task rearrangement, and increased
operational reliability. A simulation template is created to
help with the creation of intermediate implementation
models and to verify the model. In this paper, specific
adjustments for the lean production model are
recommended, along with data gathering and value stream
selection.
A study on "Learning to perceive" the Effects of Improved
Workflow in Civil Engineering Projects was conducted by
Peter Simonsson et al. in 2012.Thisstudydemonstrateshow
allowing the site management to monitor and observe the
workflow on the construction site can enhance the
performance of civil engineering projects. The on-site
management is able to comprehend the possible impact of
enhancing the current workflow by "learning to perceive"
workflow. It is rarely sufficient to change long-standing
habits by just recognizing potential waste and schematically
modelling the usual flow of work. As is the case when
employing the Value Stream Mapping (VSM) method, the
emphasis should be switched to the entire process rather
than sub-optimizing the system by resource or sub-process
usage. As a result, there is enormous potential to combine
reactive production techniques with VSM visualization and
analysistoenhanceworkflow.Theon-site management must
learn to appreciate the advantages of a perfect workflow
utilizing proactive measures like buildability, though, in
order to effectively improve the performance of
construction.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 841
Research on the classification of bricklaying activities in
work sampling categories using accelerometers was
conducted by Koshy Varghese et al. in 2012. Work sampling
has gained recognition as an effective technique for
evaluating worker productivity on construction sites. It aids
in problem-solving and provides guidance for productivity-
improving activities. However, in a work sampling
assignment, watching and categorizing job activities is a
time-consuming and challenging activity. Video-based
systems have been looked into as a substitute for human
observation, however the hostile environment of a
construction site has a significant impact on how well they
identify worker activities. According to preliminary
investigations, accelerometer data can be used to classify
worker activities because it contains rich information about
the movement characteristics of workers. The findings
demonstrate that the accelerometer-based classifier
classified bricklaying activities into groups of effective,
contributing, and ineffective categories with an overall
accuracy of 81.37 percent.
Value stream mapping: a case study in structural masonry
was the subject of a 2017 study by Luane A. P. Melo et al.
Value Stream Mapping (VSM) is a crucial tool for a
methodical Lean implementation. This article presents an
exploratory case study that tries to suggest improvements
for this process because there haven't been many studies
that address the application ofVSMforimprovementslinked
to the execution of structural masonry. The execution of
structural masonry is the activity that has thebiggestimpact
on the budget and schedule in a residential project where
data was gathered. Lean Thinking was used to enlarge on
and analyze the VSM of the existing state based on field
observations, interviews, and examinationofadministrative
paperwork. Future VSM improvements will primarily target
the reduction of transport and surplus (inventory) wastes.
Cycle time is predicted to decrease by 45.5% but Value
Aggregation Time (VAT) is predicted to grow by 32.45 to
60.55 percent. The VSM gave a systematic picture of the
process' value chain, making it easier to identify wastes,
trace their source, and suggest solutions.
8. CONCLUSION
A continuous workflow where the flow of processes,
information, and resources is unhindered and undercontrol
throughout the wholeproductionprocessmustbethegoal of
the future state map. The accuracy of the future state map
with improvements depends on how precisely the current
state map is developed and analyzed.
9. REFERENCES
[1] Adam Frandson, Thais da C.L. Alves, “Analysis of the
work flow in a complex project”, Construction Research
Congress 2012 May 21-23, 2012 ASCE
doi.org/10.1061/9780784412329.028
[2] Dina A. Saad , Mohamed Masoud,HeshamOsman“Multi-
objective optimization of lean-based repetitive
scheduling using batch and pull production”,
Automation in Construction, ELSEVIER, Volume 127,
July2021, 103696, doi.org/10.1016/j.autcon.2021.1036
96
[3] Haitao Yu1, Tarry Tweed, Mohamed Al-Hussein and
Reza Nasseri, “Development of lean model for house
construction using value stream mapping”, Journal Of
Construction Engineering And Management, ASCE Vol.
135, Issue 8 (August 2009), doi.org/10.1061/(ASCE)
0733-9364(2009)135:8(782)
[4] Irina Brodetskaia , Rafael Sacks & Aviad Shapira (2011)
A workflow model for systems and interior finishing
works in building construction, Construction
Management and Economics, 29:12, 1209-1227, DOI:
10.1080/01446193.2011.647829
[5] Khaja Layeequddin and Suebha Khatoon (2017) Lean
Construction– Application of Value Stream Mapping on
Infra Structure Project, International Journal of
Engineering Trends and Technology (IJETT) – Volume-
45 Number1 -March 2017 ISSN: 2231-5381
doi.org/10.14445/22315381/IJETT-V45P208
[6] Liju Joshua and Koshy Varghese (2012) Classificationof
bricklaying activities in work sampling categories using
accelerometers, Construction Research Congress 2012,
ASCE 2012
[7] Mughees Aslam, Zhili Gao & Gary Smith (2020)
Framework for selection of lean construction tools
based on lean objectives and functionalities,
International Journal of ConstructionManagement,DOI:
10.1080/15623599.2020.1729933
[8] Sevilay Demirkesen & Hasan Gokberk Bayhan (2012) A
Lean Implementation Success Model for the
Construction Industry, Engineering Management
Journal, DOI: 10.1080/10429247.2020.1764834
[9] Simonsson, Peter Björnfot,AndersErikshammar,Jarkko
and Olofsson, Thomas (2012) ‘Learning to see’ the
Effects of Improved Workflow in Civil Engineering
Projects. Lean Construction Journal 2012
[10] Fernanda PasqualiniandPauloAntônioZawislak (2005)
Value Stream Mapping In Construction: A Case Study In
A Brazilian Construction Company, 13th Annual
Conference of the International Group for Lean
Construction. Sydney, Australia, 19-21 Jul 2005.pp117-
125

More Related Content

Similar to Study of Lean construction tools for Workflow Improvement -A Review

Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET Journal
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET Journal
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
IRJET Journal
 
Using multivariable linear regression technique
Using multivariable linear regression techniqueUsing multivariable linear regression technique
Using multivariable linear regression technique
Pemmasani Srinivas
 
A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...
IJECEIAES
 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
Nat Rice
 
Opportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A ReviewOpportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A Review
IRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
IRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
IRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
Alan Martin Redmond, PhD
 
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET Journal
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET Journal
 
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
IRJET Journal
 
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
IAESIJEECS
 
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
IAESIJEECS
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
IRJET Journal
 
15.pdf
15.pdf15.pdf

Similar to Study of Lean construction tools for Workflow Improvement -A Review (20)

Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
 
Using multivariable linear regression technique
Using multivariable linear regression techniqueUsing multivariable linear regression technique
Using multivariable linear regression technique
 
A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...
 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
 
Opportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A ReviewOpportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A Review
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
 
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
 
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
 
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
15.pdf
15.pdf15.pdf
15.pdf
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Study of Lean construction tools for Workflow Improvement -A Review

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 839 Study of Lean construction tools for Workflow Improvement -A Review Rakesh E M1, Yedhu Krishna2, Boby Jacob3 1 2Rakesh E M, M.Tech Student, Department of Civil Engineering, Mar Athanasius College of Engineering, Kothamangalam 2Yedhu Krishna, M.Tech Student, Department of Civil Engineering, Mar Athanasius College of Engineering, Kothamangalam 3 Boby Jacob, Professor, Department of Civil Engineering, Mar Athanasius College of Engineering, Kothamangalam ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - In this study, a technology called Value Stream Mapping (VSM) is used to find and get rid of these unproductive operations, optimising the workflow in the process. Value Stream Mapping is regarded as a potent lean method for removing waste and making any organization's value stream lean and responsive. It is used tocharttheflowof labour, resources, and information necessary to organise the tasks carried out by all project participants in order to deliver the finished product to the clients. The mapping of the present and future states is a component of VSM. The inefficiencies in the process and the inefficient, non-value-adding actions are revealed by mapping the existing state. Key Words: Value Stream Mapping, Workflow, Mapping 1. INTRODUCTION A literature review is a crucial componentof everyendeavor. It must be done in order to comprehend different project facets and will aid in the project's successful conclusion.This chapter considers and reviews research that has been done in the fields of Lean construction, workflow in construction, and value stream mapping. Research on a Lean Implementation Success Model for the Construction Industrywasconducted bySevilayDemirkesen et al. in 2020. This study's main goal is to put out a thorough success model for Lean implementation in the construction sector. A list of success criteria is defined within this framework, and these criteria are categorized into seven groups: financial, managerial, technological, workforce, cultural, governmental, and communication. When the relevance weights of these attributes have been determined by the five-person expert team, an analytical network process (ANP) model is then created to identify the connections between the success-related attributes. Eight seasoned civil engineerscompleteda two-part questionnaire to provide the information needed for the ANP model. The key success criteria for Lean implementation were determined to be market share, access to Lean tools and practices, and lean training. The study isanticipatedtoassist Lean practitioners and engineeringmanagersinovercoming implementation process problems and advise them on success criteria to take into account and tasks to be prioritized when implementing Lean in their firms. Framework for the selection of leanconstructiontoolsbased on lean aims and functionality was the subjectofresearch by Mughees Aslam et al. in 2020. Lean construction is regarded as a viable project management methodology to handle challenges in the construction sector and resolve some productivity and waste issues. Various lean tools have been developed to make the adoption of LeanConstruction easier. Currently, the first choice of lean tools is mostly made based on objectives, with little thought given to how well it conforms to the building technique. This study intends to clarify constructors' first selection phase decision-making processes by shedding light on their mental models. Each Lean tool's goals and capabilities are listed in the study. The findings show that many tools have objectives that are practically identical but have distinct functionality. As a result, the selection criteria must take into account the functionalities of the lean tools. For the successful implementation of LC, the features of lean tools must be compatible with the relevant building processes. In the study, a framework for choosing the best lean tools was put forth. The main benefit of this study is that it will help constructors make better decisions when choosing the tool that would function best with their construction. Research on multi-objective optimization of batch and pull production for lean-based repeated scheduling was conducted by Dina A. Saad et al. in 2021. According to the study, repetitivescheduling usingtraditional approacheshas a number of issues because of imposed resource continuity assumptions that add time and money. As a result of the unit's downtime in between tasks, it also results in a higher inventory of units with work in progress. In order to decrease Work in Progress, time, and cost, this research established a new batch- and pull-based repetitive scheduling technique that is lean-driven. It contains a built- in multi-objective optimization algorithmtochoosetheright number of crews and batches to use in order to cut down on time and expenses while taking resource and unit idleness
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 840 into account. To compare the effectiveness of the new technique to the ones already in use, a real-world case study was performed. The outcomes proved the superiority of the Pull-Batch-based Repetitive scheduling technique and the capacity of the optimization model to provide ideal schedules. Analysis of the Work Flow in a Complex Project was the subject of research by Adam Frandson et al. (2012). The investigation was carried out ata sizableSouthernCalifornia hospital with 360 beds and 730,000+ square feet. The findings are presented in the publication. The study's primary goals were to look into the trades' work processes on the project site and to pinpoint any issues that might be impeding the smooth operation of the dry wall, electrical, and mechanical crafts operating in various rooms. A variety of techniques were used to gather the data, including interviews, document analysis, value stream mapping, document analysis, and direct observation of the work and trade meetings. The project's section on creating repeated units is the subject of this essay. The delay in finishing the units was largely attributable to waiting and idle periods brought on by issues with the information flow, particularly with regard to how employees commit to carrying out these duties. Research on Lean Construction -ApplicationofValueStream Mapping on Infra Structure Project was conducted by Khaja Layeequddin et al. (2017). This study indicates that value stream mapping may be used to move information within infrastructure projects and process it there as well. Currently, casting one slab takes roughly 40 days. The value stream map reveals that non-value-added work like waiting and backlogs makes up 7 days of this time. Value-added and non-value-added operations on the value stream map can both be detected using Lean technologies. Theprocesscould be enhanced after improvements are made, as shown by the future state map. The difficulty lies in structuring the data in the VSM to eliminate orminimizethenon-value-addedsteps. Contrary to production systems, information flows sometimes employ ad hoc scheduling and might be loosely structured, making it challenging to identify and map their value streams. However, businesses can utilize the value stream mapping tool in the same manner they do in manufacturing for office processes. Research on the Workflow Model for Systems and Interior Finishing Works in Building Construction was conducted by Irina Brodetskaia et al. in 2011. The inadequacy of standard critical path modelling to capture characteristics of these activities, such as uncertainty, instability, non-linear and interrupted value-addingprocesses,andre-entrantflow, has hampered modelling the flow of systems and interior finishing works in building construction. A uniqueworkflow model that explicitly predicts the movements of products and crews at a fine-grained level is proposed, drawing on real data gathered during a work study of a significant residential project. The overall model consists of a trade workflow model with a module for each type of work- package and a model at the project level with integrated trade modules. The model was put to the test bysimulatinga construction project with seven work packages that was carried out in a 20-story residential tower with 120 custom flats. The crew movements through the test building were modelled to replicate the same behavioral traits seen in building sites. The model makes it possible to evaluate the effect of management policies on the production flow at various levels of specificity. It can be used as a research tool and in the creation of construction management software in the future. The development of a lean model for house construction using value stream mapping was the subject of research by Haitao Yu et al. (2009). Many home buildersarelookingfora more efficient manufacturing model that will shorten the overall lead time, enhance quality, and increase process reliability due to lengthydeliverytimesandsignificant waste in the construction process. Housing construction offers the most accurate comparison to manufacturing, but the high amount of variability prohibits a direct transfer of the lean mindset and procedures. In this study, a systematic strategy based on the value stream mapping technique is built in partnership with a nearby home builder in order to assess the current procedure and create a lean production model. The model has four primary characteristics, including synchronized first-in, first-out lane-based flow, production levelling at pacemaker, task rearrangement, and increased operational reliability. A simulation template is created to help with the creation of intermediate implementation models and to verify the model. In this paper, specific adjustments for the lean production model are recommended, along with data gathering and value stream selection. A study on "Learning to perceive" the Effects of Improved Workflow in Civil Engineering Projects was conducted by Peter Simonsson et al. in 2012.Thisstudydemonstrateshow allowing the site management to monitor and observe the workflow on the construction site can enhance the performance of civil engineering projects. The on-site management is able to comprehend the possible impact of enhancing the current workflow by "learning to perceive" workflow. It is rarely sufficient to change long-standing habits by just recognizing potential waste and schematically modelling the usual flow of work. As is the case when employing the Value Stream Mapping (VSM) method, the emphasis should be switched to the entire process rather than sub-optimizing the system by resource or sub-process usage. As a result, there is enormous potential to combine reactive production techniques with VSM visualization and analysistoenhanceworkflow.Theon-site management must learn to appreciate the advantages of a perfect workflow utilizing proactive measures like buildability, though, in order to effectively improve the performance of construction.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 841 Research on the classification of bricklaying activities in work sampling categories using accelerometers was conducted by Koshy Varghese et al. in 2012. Work sampling has gained recognition as an effective technique for evaluating worker productivity on construction sites. It aids in problem-solving and provides guidance for productivity- improving activities. However, in a work sampling assignment, watching and categorizing job activities is a time-consuming and challenging activity. Video-based systems have been looked into as a substitute for human observation, however the hostile environment of a construction site has a significant impact on how well they identify worker activities. According to preliminary investigations, accelerometer data can be used to classify worker activities because it contains rich information about the movement characteristics of workers. The findings demonstrate that the accelerometer-based classifier classified bricklaying activities into groups of effective, contributing, and ineffective categories with an overall accuracy of 81.37 percent. Value stream mapping: a case study in structural masonry was the subject of a 2017 study by Luane A. P. Melo et al. Value Stream Mapping (VSM) is a crucial tool for a methodical Lean implementation. This article presents an exploratory case study that tries to suggest improvements for this process because there haven't been many studies that address the application ofVSMforimprovementslinked to the execution of structural masonry. The execution of structural masonry is the activity that has thebiggestimpact on the budget and schedule in a residential project where data was gathered. Lean Thinking was used to enlarge on and analyze the VSM of the existing state based on field observations, interviews, and examinationofadministrative paperwork. Future VSM improvements will primarily target the reduction of transport and surplus (inventory) wastes. Cycle time is predicted to decrease by 45.5% but Value Aggregation Time (VAT) is predicted to grow by 32.45 to 60.55 percent. The VSM gave a systematic picture of the process' value chain, making it easier to identify wastes, trace their source, and suggest solutions. 8. CONCLUSION A continuous workflow where the flow of processes, information, and resources is unhindered and undercontrol throughout the wholeproductionprocessmustbethegoal of the future state map. The accuracy of the future state map with improvements depends on how precisely the current state map is developed and analyzed. 9. REFERENCES [1] Adam Frandson, Thais da C.L. Alves, “Analysis of the work flow in a complex project”, Construction Research Congress 2012 May 21-23, 2012 ASCE doi.org/10.1061/9780784412329.028 [2] Dina A. Saad , Mohamed Masoud,HeshamOsman“Multi- objective optimization of lean-based repetitive scheduling using batch and pull production”, Automation in Construction, ELSEVIER, Volume 127, July2021, 103696, doi.org/10.1016/j.autcon.2021.1036 96 [3] Haitao Yu1, Tarry Tweed, Mohamed Al-Hussein and Reza Nasseri, “Development of lean model for house construction using value stream mapping”, Journal Of Construction Engineering And Management, ASCE Vol. 135, Issue 8 (August 2009), doi.org/10.1061/(ASCE) 0733-9364(2009)135:8(782) [4] Irina Brodetskaia , Rafael Sacks & Aviad Shapira (2011) A workflow model for systems and interior finishing works in building construction, Construction Management and Economics, 29:12, 1209-1227, DOI: 10.1080/01446193.2011.647829 [5] Khaja Layeequddin and Suebha Khatoon (2017) Lean Construction– Application of Value Stream Mapping on Infra Structure Project, International Journal of Engineering Trends and Technology (IJETT) – Volume- 45 Number1 -March 2017 ISSN: 2231-5381 doi.org/10.14445/22315381/IJETT-V45P208 [6] Liju Joshua and Koshy Varghese (2012) Classificationof bricklaying activities in work sampling categories using accelerometers, Construction Research Congress 2012, ASCE 2012 [7] Mughees Aslam, Zhili Gao & Gary Smith (2020) Framework for selection of lean construction tools based on lean objectives and functionalities, International Journal of ConstructionManagement,DOI: 10.1080/15623599.2020.1729933 [8] Sevilay Demirkesen & Hasan Gokberk Bayhan (2012) A Lean Implementation Success Model for the Construction Industry, Engineering Management Journal, DOI: 10.1080/10429247.2020.1764834 [9] Simonsson, Peter Björnfot,AndersErikshammar,Jarkko and Olofsson, Thomas (2012) ‘Learning to see’ the Effects of Improved Workflow in Civil Engineering Projects. Lean Construction Journal 2012 [10] Fernanda PasqualiniandPauloAntônioZawislak (2005) Value Stream Mapping In Construction: A Case Study In A Brazilian Construction Company, 13th Annual Conference of the International Group for Lean Construction. Sydney, Australia, 19-21 Jul 2005.pp117- 125