Program Evaluation & Review
                                                                                         Technique (PERT)
                                                                            • PERT was developed by the US Navy for the
                                                                              planning and control of the Polaris missile
           Program Evaluation & Review                                        program
                 Technique (PERT)                                           • The emphasis of PERT is on completing the
                                                                              program in the shortest possible time.
                               Presented by:                                • PERT has the ability to cope with uncertain
                                           Anupam Kumar                       activity completion times.
                                                  Reader                    • e.g.
                                             SMS Varanasi                        – for a particular activity the most likely completion
                                                                                   time is 4 weeks but it could be anywhere between 3
                                                                                   weeks and 8 weeks.




           Program Evaluation & Review
                                                                                                               PERT
                 Technique (PERT)
       • In PERT activities are shown as                                    • The procedure of PERT takes into
          – a network of precedence relationships using                       consideration the following time estimates:
          – activity-on-arrow network construction
                                                                            Te = Expected activity time
       • PERT is used in Project management
                                                                            To = Optimistic time
          – for non-repetitive jobs (research and development work),
                                                                            Tp = Pessimistic time
          – where the time and cost estimates tend to be quite
            uncertain.                                                      Tm = Most likely time
          – This technique uses probabilistic time estimates.               σ = Event Standard Deviation
       • PERT has                                                           Te = (To + 4Tm + Tp) / 6
          – Multiple time estimates                                         σ = (Tp - To) / 6
          – Probabilistic activity times




                            Illustration 1                                                      Illustration 1 (Contd.)
                                                                                                    Activity                 Time Estimate
       • Project planners have sought the judgment of
                                                                                          Description          Number   To        Tm         Tp
         various knowledgeable engineers, foremen and
                                                                            Design Plant                        1–2     10        12         16
         vendors and have developed the time estimate as                    Select Site                         2–3     2         8          36
         follows.                                                           Select Vendor                       2–4     1         4          5
          – Determine the critical path.                                    Select Personnel                    2–6     2         3          4
          – What is the probability the project will be finished within 4   Prepare Site                        3–5     8         12         20
            years?                                                          Manufacture Generator               4–5     15        18         30
                                                                            Prepare Manual                      4–6     3         5          8
          – Calculate the overall variance for the project schedule.
                                                                            Install Generator                   5–7     2         4          8
                                                                            Train Operator                      6–7     6         9          12
                                                                            License Plant                       7–8     4         6          14
                                                              Hint




© Copyright 2013 Anupam Kumar                                                                                                                     1
Illustration 1 (Soln.)                                                               PERT
                                                                                       The procedure of PERT takes into consideration the following
                        Activity                          Time Estimate
                                                                                       time estimates:
              Description          Number   To       Tm       Tp          Te    σ2
       Design Plant                 1–2     10       12       16     12.33      1      Te = Expected activity time    σ = (Tp - To) / 6
       Select Site                  2–3     2        8        36     11.67     32.11   To = Optimistic time           Z = (Tx - Te) / σ
       Select Vendor                2–4     1        4        5       3.67     0.44
                                                                                       Tp = Pessimistic time          • Based on the value of Z, one
       Select Personnel             2–6     2        3        4           3    0.11
                                                                                                                          can find the probability of
       Prepare Site                 3–5     8        12       20     12.67      4      Tm = Most likely time              the project getting
       Manufacture Generator        4–5     15       18       30      19.5     6.25
                                                                                       σ = Event Standard                 completed at any time.
       Prepare Manual               4–6     3        5        8       5.17     0.694
       Install Generator            5–7     2        4        8       4.33      1
                                                                                               Deviation              If Tx < Te then value is the
       Train Operator               6–7     6        9        12          9     1      Te = (To + 4Tm + Tp) / 6           probability else probability
       License Plant                7–8     4        6        14          7    2.78
                                                                                                                          is (0.5 – P(Z))




                                   PERT / CPM                                                  Limitation of PERT / CPM
       Benefits                                  Questions that are answered           • The procedures of PERT / CPM can be applied
       • Useful at many stages of                • Completion date?                      only for activities which are clearly defined,
         project management                      • On Schedule?                          independent and stable.
       • Mathematically simple                   • Within Budget?
       • Give critical path and slack
                                                                                       • The activities should have specified
                                                 • Critical Activities?
         time                                    • How can the project be
                                                                                         precedence relationships.
       • Provide project                           finished early at the least         • The procedure lays over emphasis on critical
         documentation                             cost?                                 paths.
       • Useful in monitoring costs




© Copyright 2013 Anupam Kumar                                                                                                                            2

More Related Content

What's hot

Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
Sachin Kapoor
 
PM scheduling techniques
PM scheduling techniquesPM scheduling techniques
PM scheduling techniques
Nazish khalid
 
Project management - CPM & PERT
Project management   - CPM & PERTProject management   - CPM & PERT
Project management - CPM & PERT
Dr. Varaprasada Rao Manda
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
S.Vijaya Bhaskar
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
Naveed Salman
 
Cpm pert
Cpm pertCpm pert
Cpm pert
Jags Jagdish
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
Vignesh Jayakumar
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
Ragjni Govindaraju
 
Pert Analysis
Pert AnalysisPert Analysis
Pert Analysis
Kaizer Dave
 
crashing of project
crashing of project crashing of project
crashing of project
Mir Zafarullah
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
Dr. Varaprasada Rao Manda
 
#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi
#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi
#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi
SN Panigrahi, PMP
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
Jignesh Kariya
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
rathodjaydeep2
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertRaj J Das
 
6 time PMBOK
6 time PMBOK6 time PMBOK
6 time PMBOK
Waseem Siddique
 
PERT MBO GANTT CHART
PERT MBO GANTT CHARTPERT MBO GANTT CHART
PERT MBO GANTT CHART
NAVANEETA KUSUM
 

What's hot (20)

Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
 
PM scheduling techniques
PM scheduling techniquesPM scheduling techniques
PM scheduling techniques
 
cpmpertmy (1)
cpmpertmy (1)cpmpertmy (1)
cpmpertmy (1)
 
Project management - CPM & PERT
Project management   - CPM & PERTProject management   - CPM & PERT
Project management - CPM & PERT
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
Cpm pert
Cpm pertCpm pert
Cpm pert
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Pert Analysis
Pert AnalysisPert Analysis
Pert Analysis
 
crashing of project
crashing of project crashing of project
crashing of project
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi
#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi
#Project Scheduling - Network Diagrams : PERT & CPM# By SN Panigrahi
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gert
 
6 time PMBOK
6 time PMBOK6 time PMBOK
6 time PMBOK
 
Pert
PertPert
Pert
 
PERT MBO GANTT CHART
PERT MBO GANTT CHARTPERT MBO GANTT CHART
PERT MBO GANTT CHART
 

Viewers also liked

Assignment Theoretical Operations Management
Assignment Theoretical Operations ManagementAssignment Theoretical Operations Management
Assignment Theoretical Operations ManagementAnupam Kumar
 
Numerical assignment
Numerical assignmentNumerical assignment
Numerical assignmentAnupam Kumar
 
Critical path method
Critical path methodCritical path method
Critical path methodAnupam Kumar
 
Basic concepts of network analysis
Basic concepts of network analysisBasic concepts of network analysis
Basic concepts of network analysisAnupam Kumar
 
Inventory management & control
Inventory management & controlInventory management & control
Inventory management & controlAnupam Kumar
 
Business Functions And Organisation
Business Functions And OrganisationBusiness Functions And Organisation
Business Functions And Organisation
Governance Learning Network®
 
Types of Organisation
 Types of Organisation Types of Organisation
Health-care providers fall short on stress management!
Health-care providers fall short on stress management!Health-care providers fall short on stress management!
Health-care providers fall short on stress management!
David Grinstead, MA
 
Principles of management
Principles of managementPrinciples of management
Principles of management
Sahil Jindal
 
Chapter 4 organizing
Chapter 4 organizingChapter 4 organizing
Chapter 4 organizing
Ram Kumar
 
14 Principles of HENRI FAYOL project on KFC Class-XII
14 Principles of HENRI FAYOL  project on KFC Class-XII14 Principles of HENRI FAYOL  project on KFC Class-XII
14 Principles of HENRI FAYOL project on KFC Class-XII
Atif Khan
 
Business Studies (Principles of Management) Project Class 12th CBSE
Business Studies (Principles of Management) Project Class 12th CBSE Business Studies (Principles of Management) Project Class 12th CBSE
Business Studies (Principles of Management) Project Class 12th CBSE
Dheeraj Kumar
 
ppt on Stress management
ppt on Stress managementppt on Stress management
ppt on Stress managementRam Jagraon
 
Decision making
Decision makingDecision making
Decision making
Seta Wicaksana
 
Project management
Project managementProject management
Project management
Satish Yadavalli
 
Stress Management Presentation
Stress Management PresentationStress Management Presentation
Stress Management PresentationPk Doctors
 

Viewers also liked (18)

Assignment Theoretical Operations Management
Assignment Theoretical Operations ManagementAssignment Theoretical Operations Management
Assignment Theoretical Operations Management
 
Numerical assignment
Numerical assignmentNumerical assignment
Numerical assignment
 
Evolution part 2
Evolution part 2Evolution part 2
Evolution part 2
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Basic concepts of network analysis
Basic concepts of network analysisBasic concepts of network analysis
Basic concepts of network analysis
 
Inventory management & control
Inventory management & controlInventory management & control
Inventory management & control
 
Business Functions And Organisation
Business Functions And OrganisationBusiness Functions And Organisation
Business Functions And Organisation
 
Different Types of Business Organisation
Different Types of Business OrganisationDifferent Types of Business Organisation
Different Types of Business Organisation
 
Types of Organisation
 Types of Organisation Types of Organisation
Types of Organisation
 
Health-care providers fall short on stress management!
Health-care providers fall short on stress management!Health-care providers fall short on stress management!
Health-care providers fall short on stress management!
 
Principles of management
Principles of managementPrinciples of management
Principles of management
 
Chapter 4 organizing
Chapter 4 organizingChapter 4 organizing
Chapter 4 organizing
 
14 Principles of HENRI FAYOL project on KFC Class-XII
14 Principles of HENRI FAYOL  project on KFC Class-XII14 Principles of HENRI FAYOL  project on KFC Class-XII
14 Principles of HENRI FAYOL project on KFC Class-XII
 
Business Studies (Principles of Management) Project Class 12th CBSE
Business Studies (Principles of Management) Project Class 12th CBSE Business Studies (Principles of Management) Project Class 12th CBSE
Business Studies (Principles of Management) Project Class 12th CBSE
 
ppt on Stress management
ppt on Stress managementppt on Stress management
ppt on Stress management
 
Decision making
Decision makingDecision making
Decision making
 
Project management
Project managementProject management
Project management
 
Stress Management Presentation
Stress Management PresentationStress Management Presentation
Stress Management Presentation
 

Similar to Programme evaluation and review technique (pert)

PERT-CPM for project management .pptx
PERT-CPM for project management    .pptxPERT-CPM for project management    .pptx
PERT-CPM for project management .pptx
Naresh136982
 
PERT
PERTPERT
PERT
vibha79
 
Programme evaluation &amp; review technique (pert)
Programme evaluation &amp; review technique (pert)Programme evaluation &amp; review technique (pert)
Programme evaluation &amp; review technique (pert)
AnkitaKadam20
 
Program_Evaluation_and_Review_Technique.pptx
Program_Evaluation_and_Review_Technique.pptxProgram_Evaluation_and_Review_Technique.pptx
Program_Evaluation_and_Review_Technique.pptx
mamtabisht10
 
Pert cpm
Pert cpm Pert cpm
Pert cpm
Drprem Jerusha
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
Deepak Paithankar
 
PERT (Program evaluation review technique)
PERT (Program evaluation review technique) PERT (Program evaluation review technique)
PERT (Program evaluation review technique)
Tanoj Patidar
 
Programme Evaluation and Review Technique
Programme Evaluation and Review TechniqueProgramme Evaluation and Review Technique
Programme Evaluation and Review Technique
DrAsifMohammad
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 
unit-3 POM.pptx
unit-3 POM.pptxunit-3 POM.pptx
unit-3 POM.pptx
jaya315652
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii reference
ahsanrabbani
 
PERT
PERTPERT
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
Amrit Mty
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx
virshit
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
McLachlan Lister Pty Limited
 
Cpm critical path method
Cpm   critical path methodCpm   critical path method
Cpm critical path method
Prathima Girish
 
PERT-CPM.pdf
PERT-CPM.pdfPERT-CPM.pdf
PERT-CPM.pdf
limchoy
 
Cpm n pert
Cpm n pertCpm n pert
Cpm n pert
Sheetu Goel
 
The Techniques Used In Project Managament
The Techniques Used In Project ManagamentThe Techniques Used In Project Managament
The Techniques Used In Project Managamentitsvineeth209
 

Similar to Programme evaluation and review technique (pert) (20)

PERT-CPM for project management .pptx
PERT-CPM for project management    .pptxPERT-CPM for project management    .pptx
PERT-CPM for project management .pptx
 
PERT
PERTPERT
PERT
 
Programme evaluation &amp; review technique (pert)
Programme evaluation &amp; review technique (pert)Programme evaluation &amp; review technique (pert)
Programme evaluation &amp; review technique (pert)
 
Program_Evaluation_and_Review_Technique.pptx
Program_Evaluation_and_Review_Technique.pptxProgram_Evaluation_and_Review_Technique.pptx
Program_Evaluation_and_Review_Technique.pptx
 
Pert cpm
Pert cpm Pert cpm
Pert cpm
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
PERT (Program evaluation review technique)
PERT (Program evaluation review technique) PERT (Program evaluation review technique)
PERT (Program evaluation review technique)
 
Programme Evaluation and Review Technique
Programme Evaluation and Review TechniqueProgramme Evaluation and Review Technique
Programme Evaluation and Review Technique
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
unit-3 POM.pptx
unit-3 POM.pptxunit-3 POM.pptx
unit-3 POM.pptx
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii reference
 
PERT
PERTPERT
PERT
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
 
Cpm critical path method
Cpm   critical path methodCpm   critical path method
Cpm critical path method
 
PERT-CPM.pdf
PERT-CPM.pdfPERT-CPM.pdf
PERT-CPM.pdf
 
Cpm n pert
Cpm n pertCpm n pert
Cpm n pert
 
The Techniques Used In Project Managament
The Techniques Used In Project ManagamentThe Techniques Used In Project Managament
The Techniques Used In Project Managament
 

More from Anupam Kumar

Supply Chain Management vs Logistics Management
Supply Chain Management vs Logistics ManagementSupply Chain Management vs Logistics Management
Supply Chain Management vs Logistics Management
Anupam Kumar
 
Socio Economic Analysis
Socio Economic AnalysisSocio Economic Analysis
Socio Economic Analysis
Anupam Kumar
 
Analyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A FrameworkAnalyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A Framework
Anupam Kumar
 
Strategy development patterns and process
Strategy development patterns and processStrategy development patterns and process
Strategy development patterns and process
Anupam Kumar
 
Strategic management in different business context
Strategic management in different business contextStrategic management in different business context
Strategic management in different business context
Anupam Kumar
 
Strategic fit and stretch
Strategic fit and stretchStrategic fit and stretch
Strategic fit and stretch
Anupam Kumar
 
Strategic management model
Strategic management modelStrategic management model
Strategic management model
Anupam Kumar
 
Concept of corporate planning
Concept of corporate planningConcept of corporate planning
Concept of corporate planning
Anupam Kumar
 
Vision & mission statement
Vision & mission statementVision & mission statement
Vision & mission statementAnupam Kumar
 
Foundation of strategic management
Foundation of strategic managementFoundation of strategic management
Foundation of strategic managementAnupam Kumar
 
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital GoodsDynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
Anupam Kumar
 
Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?
Anupam Kumar
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)Anupam Kumar
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality controlAnupam Kumar
 
Quality and quality control
Quality and quality controlQuality and quality control
Quality and quality controlAnupam Kumar
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementAnupam Kumar
 
Time & motion study
Time & motion studyTime & motion study
Time & motion studyAnupam Kumar
 
Concepts of work study
Concepts of work studyConcepts of work study
Concepts of work studyAnupam Kumar
 
Types of layouts
Types of layoutsTypes of layouts
Types of layouts
Anupam Kumar
 

More from Anupam Kumar (20)

Supply Chain Management vs Logistics Management
Supply Chain Management vs Logistics ManagementSupply Chain Management vs Logistics Management
Supply Chain Management vs Logistics Management
 
Socio Economic Analysis
Socio Economic AnalysisSocio Economic Analysis
Socio Economic Analysis
 
Analyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A FrameworkAnalyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A Framework
 
Strategy development patterns and process
Strategy development patterns and processStrategy development patterns and process
Strategy development patterns and process
 
Strategic management in different business context
Strategic management in different business contextStrategic management in different business context
Strategic management in different business context
 
Strategic fit and stretch
Strategic fit and stretchStrategic fit and stretch
Strategic fit and stretch
 
Strategic management model
Strategic management modelStrategic management model
Strategic management model
 
Concept of corporate planning
Concept of corporate planningConcept of corporate planning
Concept of corporate planning
 
Vision & mission statement
Vision & mission statementVision & mission statement
Vision & mission statement
 
Foundation of strategic management
Foundation of strategic managementFoundation of strategic management
Foundation of strategic management
 
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital GoodsDynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
 
Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Quality and quality control
Quality and quality controlQuality and quality control
Quality and quality control
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Concepts of work study
Concepts of work studyConcepts of work study
Concepts of work study
 
Types of layouts
Types of layoutsTypes of layouts
Types of layouts
 

Recently uploaded

Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
ShivajiThube2
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Advantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO PerspectiveAdvantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO Perspective
Krisztián Száraz
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
goswamiyash170123
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 

Recently uploaded (20)

Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Advantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO PerspectiveAdvantages and Disadvantages of CMS from an SEO Perspective
Advantages and Disadvantages of CMS from an SEO Perspective
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 

Programme evaluation and review technique (pert)

  • 1. Program Evaluation & Review Technique (PERT) • PERT was developed by the US Navy for the planning and control of the Polaris missile Program Evaluation & Review program Technique (PERT) • The emphasis of PERT is on completing the program in the shortest possible time. Presented by: • PERT has the ability to cope with uncertain Anupam Kumar activity completion times. Reader • e.g. SMS Varanasi – for a particular activity the most likely completion time is 4 weeks but it could be anywhere between 3 weeks and 8 weeks. Program Evaluation & Review PERT Technique (PERT) • In PERT activities are shown as • The procedure of PERT takes into – a network of precedence relationships using consideration the following time estimates: – activity-on-arrow network construction Te = Expected activity time • PERT is used in Project management To = Optimistic time – for non-repetitive jobs (research and development work), Tp = Pessimistic time – where the time and cost estimates tend to be quite uncertain. Tm = Most likely time – This technique uses probabilistic time estimates. σ = Event Standard Deviation • PERT has Te = (To + 4Tm + Tp) / 6 – Multiple time estimates σ = (Tp - To) / 6 – Probabilistic activity times Illustration 1 Illustration 1 (Contd.) Activity Time Estimate • Project planners have sought the judgment of Description Number To Tm Tp various knowledgeable engineers, foremen and Design Plant 1–2 10 12 16 vendors and have developed the time estimate as Select Site 2–3 2 8 36 follows. Select Vendor 2–4 1 4 5 – Determine the critical path. Select Personnel 2–6 2 3 4 – What is the probability the project will be finished within 4 Prepare Site 3–5 8 12 20 years? Manufacture Generator 4–5 15 18 30 Prepare Manual 4–6 3 5 8 – Calculate the overall variance for the project schedule. Install Generator 5–7 2 4 8 Train Operator 6–7 6 9 12 License Plant 7–8 4 6 14 Hint © Copyright 2013 Anupam Kumar 1
  • 2. Illustration 1 (Soln.) PERT The procedure of PERT takes into consideration the following Activity Time Estimate time estimates: Description Number To Tm Tp Te σ2 Design Plant 1–2 10 12 16 12.33 1 Te = Expected activity time σ = (Tp - To) / 6 Select Site 2–3 2 8 36 11.67 32.11 To = Optimistic time Z = (Tx - Te) / σ Select Vendor 2–4 1 4 5 3.67 0.44 Tp = Pessimistic time • Based on the value of Z, one Select Personnel 2–6 2 3 4 3 0.11 can find the probability of Prepare Site 3–5 8 12 20 12.67 4 Tm = Most likely time the project getting Manufacture Generator 4–5 15 18 30 19.5 6.25 σ = Event Standard completed at any time. Prepare Manual 4–6 3 5 8 5.17 0.694 Install Generator 5–7 2 4 8 4.33 1 Deviation If Tx < Te then value is the Train Operator 6–7 6 9 12 9 1 Te = (To + 4Tm + Tp) / 6 probability else probability License Plant 7–8 4 6 14 7 2.78 is (0.5 – P(Z)) PERT / CPM Limitation of PERT / CPM Benefits Questions that are answered • The procedures of PERT / CPM can be applied • Useful at many stages of • Completion date? only for activities which are clearly defined, project management • On Schedule? independent and stable. • Mathematically simple • Within Budget? • Give critical path and slack • The activities should have specified • Critical Activities? time • How can the project be precedence relationships. • Provide project finished early at the least • The procedure lays over emphasis on critical documentation cost? paths. • Useful in monitoring costs © Copyright 2013 Anupam Kumar 2