FINAL PROJECT
PROJECT PROPOSAL ON THE ESTABLISHMENT OF
SKYBAR & SKYPARK AT BLOCK E LEVEL 2
CLEMENT CHEN- 0319574
LEE REN JET- 0319058
MS NORMA
FNBE 0414
APRIL INTAKE 2014
AUGUST 2014
TABLE OF CONTENTS
1. Project Proposal Details
1.1 Project Summary
1.2 Project description and application
1.3 Project quotation
2. Introduction to Site
2.1 Location
2.2 Site analysis
2.3 Concept
3. Design
3.1 Site master plan
3.2 Details
4. Authority Procedures
5. Bill of Quantities
6. Conclusion
Project Proposal Details
1.1 Project summary
This project envisages the establishment of a SKYBAR restaurant and SKYPARK
recreation area in the Taylor’s University Block E Level 2 area.
Since there is no bar and recreation parks in Taylor’s University that can enhance
the lives of students, the demand for the service is very attractive
The total initial investment requirement is estimated at RM 250,000.00 of which 95%
is for building construction.
The project will create employment opportunities for 10 persons
1.2 Project description and Application
SKYBAR and SKYPARK are facilities where food, drinks, recreation and other
services are provided in an efficient, cordial and pleasant manner and style.
Operating restaurant and parks both integrated to a learning institution enhances
student life, giving them a place to hangout, release stress and strengthen social
communication.
1.3 Project Quotation
Our proposal shall apply to the areas as indicated in our enclosed summary. We have made several
design assumptions which then followed and accepted totally by the consulting engineer will make this
alternative pricing for the pre-construction works valid for use.
Quotation
Our quotation is subject to terms & conditions enclosed herewith on the following assumed
design parameters as contained in the technical paper enclosed herewith.
Price
Our price, subject to terms & conditions stated herewith, for the sub-contract works shall be as
follows:
[1] Design, supply and install of post-tensioning works including raw materials and necessary
accessories and works to do the following:
SKYBAR [RM]
A. Design fees RM 50,000.00
B. Construction works RM 200,000.00
SKYPARK Recreation Area [RM]
A. Design fees RM 3,000.00
B. Construction works RM 10,000.00
Introduction to Site
2.1 Location
- Location of SKYBAR & SKYPARK
Block E level 2 open area
2.2 Site Analysis
Our site is located at block E besides the strategic development & international
relations office. It has a great view towards the basketball court, lake and the
commercial block. Regarding about the weather. The sun will rise from the east and is
partly blocked by other blocks. In the afternoon, one of our site will not get hot easily
since the sun is located at the south. But during the evening, our site is the ideal
choice for recreational since the sun will be blocked from the west! The wind
blows from the south east to north west therefore our site is quite windy during
the day.
Our 30x30 site
Direction of sunlight at 3pm
Lake view from our site at 3pm
Easy access from parking
Walking distance from new residence
block
View towards the East at 3pm
Entrance towards the site
(South Elevation)
View from site towards Block E
(North Elevation)
2.3 Concept
Bar Area during the day
Bar Area during the night
Planting concept
- At night it provides a sense of atmosphere, vibrant and a view for the
customers
Example (Not to scale) :
Site Master Plan
ITEM NAME QUANTITY
1 DRINK BAR 4
2 WATER FOUNTAIN 2
3 TABLES & CHAIR SET 10
2 2
3
1
DETAILS
- Drink Bar (Elevation & Perspective)
ITEM DESCRIPTION IMAGE
1 VARISHIELD SELF-TINTING GLASS
http://www.ssg.com.sg/product-
catalogue/eco-
products/product/30-
varishield/2-eco-products
1
2
2 TEMPERED SAFETY GLASS
http://www.ssg.com.sg/product-
catalogue/core-
products/product/1-duraglas-
t/1-core-products
- Water Fountain
- Tables & Chair Set
BILL OF QUANTITIES
DESCRIPTION UNIT/SIZE RATE(RM) RATE AMOUNT TOTAL AMOUNT
A
HARDSCAPE
WORK
1 AIRCONDITIONERS NOS 1288 3 3864
2
CLUBBING
STOOLS NOS 220 30 6600
3
BARTENDER
TABLE NOS 2000 2 4000
4 METAL RAILLING M² 120 24 2880
5 PARK BENCHES NOS 300 3 900
6
WOODEN PLANK
FLOORING FT² 9 165 1485
7 FOUNTAIN NOS 6750 2 13500
8 DINING TABLES NOS 400 50 20000
9
SELF TINTING
PANELS NOS 1000 30 30000
HARDSCAPE TOTAL 83229 sad
B
SOFTSCAPE
WORKS
10 SCRUB M² 55 15 825
11
ARTIFICIAL SMALL
TREES NOS 30 2 60
12 SHADE TREES NOS 400 2 800
13 FERTILIZERS KG 10.90 20 218
14 SAND KG 20 30 600
15
HYDRANGEA
PLANT
NOS
(POT) 42 50 2100 42
16 LAWN TURF M² 11 7.5 82.5
SOFTSCAPE TOTAL 4685.5 2673.5
SUB
TOTAL 87914.5 51699.5
CORRECTION TOTAL RM 87915 51700
MAINTAINANCE PLAN
ITEM
DESCRIPTI
ON
UNIT/SI
ZE
USA
GE
LIST
RATE(R
M)
QUANTI
TY AMOUNT
1
WATER
USAGE
MONTH
(M³)
0-20 0.57 30 17.1
>20-
35 1.03 21 21.63
>35 2 5000 10000
2
ELECTRIC
USAGE MONTH 0-200 0.218 300 65.4
3
GARDENE
R MONTH 1000 2 2000
4 PLUMBER
MONT
H
2200 2
4400
22773.06
92
SUBTOTAL
165
04.1
3 2800
CORRECTION TOTAL
16504
Authority Procedures
1. Submit and obtain Development through OSC
• Planning plan
• Building plan
• Engineering plan (earthwork, road & drainage plan, road excavation permit & street
lighting plan)
• Landscape plan
• Water supply plan
• Sewerage plan
• Infrastructure communication plan
• Fire safety plan
Estimated Processing Costs
1. Planning plan = MYR 500.00
2. Building plan= MYR 1,300.
3. Engineering plan = MYR 100.00
4. Water supply plan = MYR 1,000.00
1. Submission to Local Authority through OSC
2. Obtain Development Order (DO) from Planning Department
3. Obtain Water Approval
4. Obtain Sewerage Approval
5. Obtain Fire Safety (Arch) Comment
6. Obtain Earthwork Approval
7. Obtain Road and Drainage Approval
8. Obtain Landscape Approval
9. Obtain Street Lighting Approval
10. Obtain MSMA and SPAH Approvals
11. Obtain Building Plan Approval
12. Obtain Fire Safety (M&E) Approval
2. Submit pre-construction notifications to OSC
All notifications are submitted via OSC. OSC will then distribute notifications to the
relevant agencies such as:
• Building Department (B Form - notification to start building work)
• Engineering Department (B Form - notification to start earthwork)
• Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work)
3. Request final utilities inspections through OSC
Under OSC 1Submission, the builder has to request for inspections via OSC. OSC will
arrange and coordinate inspections and connections schedule with relevant agencies
1. TELCO connection = MYR495.00
2. Water connection = MYR 30.00
3. Fire safety inspection = MYR 111.00
4. Receive Road and Drainage Final Inspection
Once the road and drainage works has been completed, the builder will request the
Road and Drainage clearance letter from the Engineering Department of CHKL. The
builder has to submit a construction report notification and by signing form G 17, the
Engineer certifies that all works were carried out according to regulations. Form G17 will
be filed along with Form F (Certificate of Completion and Compliance (CCC) via OSC to
the Engineering Department.
5. Obtain Road and Drainage Clearance Letter
A date for the inspection will be set-up prior to the issuance of clearance letter for the
road and drainage work
Agency: Sewerage Certifying Agency (IWK)12 daysno charge6
7. Receive Sewage Final Inspection
The Sewerage Certifying Agency (IWK) will carry out an inspection of the
sewerage system and issue to the builder a clearance letter for sewerage.
8. Obtain Sewage Clearance Letter
Once the inspection has been carried out, a clearance letter is issued to the
Builder. This clearance letter will allow the Engineer to issue the Certificate of
Completion and compliance (CCC).
9. Receive Fire Safety Final Inspection
Fire and Rescue Department will carry out fire safety inspection
10.Obtain Fire Safety Final Letter
Fire and Rescue Department will issue to the builder the clearance letter for fire
safety
11.Receive Water Inspection
Water Authority SYABAS will conduct an onsite inspection of the works and make
the connection to the public pipe.
12.Submit Water Test and Commissioning (T&C) Report
Water Authority SYABAS will conduct an onsite inspection of the works and make
the connection to the public pipe.
13.Obtain Water Clearance Letter
The Water Authority SYABAS will issue a clearance letter to the builder and
install the water meter at the same time for water connection.
14.Builder’s Principal Submitting Person files the Certificate of Completion
and compliance (CCC)
The Builder’s Principal Submitting Person (professional, architect) will issue
Certificate of Completion and compliance (Form F - CCC) to the Builder/Owner
and 2 copies of the CCC will be filed at the OSC for the Building Department
(JRBB) and the Board of Architects/Engineers (LAM/LJM).
15.Obtain Water Connection
MPSJ.RK.KPT(OSC)-07
PINDAAN: 01
KERAJAAN MALAYSIA
JABATAN KERAJAAN TEMPATAN
KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN
SENARAI SEMAK DOKUMEN DAN
SENARAI
SEMAK TERPERINCI AGENSI TEKNIKAL
DALAMAN DAN LUARAN
(PELAN TAMBAHAN & UBAHSUAIAN)
TARIKH KUATKUASA : 01 MEI2014
47610 SUBANG JAYA,
SELANGOR DARUL EHSAN.
TEL : 03 – 8026 3131
FAX : 03 – 8026 3295 WEB :
www.mpsj.gov.my
FEBRUARI 2013
HAKCIPTA TERPELIHARA
No. Ruj. OSC : MPSJ /____ /_____
No. Ruj. OSC terdahulu (jika
ada)
:_____________________________
Tarikh Daftar :
_____________________________
Masa :
_____________________________
Jenis permohonan yang dikemukakan :-
1) Permohonan Tambahan dan Ubahsuaian Bangunan bagi bangunan perusahaan /
Perniagaan/Kemudahan Awam
2) Permohonan Tambahan dan Ubahsuaian Bangunan dan Perubahan Material
Kegunaan Bangunan
3) Permohonan Tambahan Bilangan Tingkat Bangunan
PERSIARAN PERPADUAN USJ 5,
PUSATSETEMPAT( )OSC
MAJLIS PERBANDARAN SUBANG JAYA (MPSJ)
Persiaran Perpaduan USJ 5,
47610Subang Jaya,
Selangor Darul Ehsan.
Tel : 03–8026 3131
Fax : 03–8026 3295
Web : www.mpsj.gov.my
SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN DAN
UBAHSUAIAN
Tajuk
Permohonan
: ...........................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
...................................................................................................................................................................
Pemilik /
Pemaju
: ............................................................................................................................................................
Alamat
Pemilik/Pemaju
: ............................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
Tel. & Fax : ............................................................................................................................................................
Perunding : ............................................................................................................................................................
Alamat
Perunding
: ............................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
Tel. & Fax : ............................................................................................................................................................
Nama : ............................................................................................................................................................
Perakuan Pemohon/Perunding:
Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen-
dokumen yang disertakan adalah benar serta mematuhi keperluan permohonan pembangunan di
Majlis Perbandaran Subang Jaya (MPSJ)
.......................…………………………….
Nama, Tandatangan & Cop Pemohon /
Perunding
.......................…………………………….
Nama, Tandatangan &
Cop Pegawai OSC 1
.......................……………………………
Nama, Tandatangan &
Cop Pegawai OSC 2
Tarikh : …………………… Tarikh : ……………………… Tarikh : ……………………..
MAKLUMAN
Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5
Tahun 2009 (rujukan KPKT(02)799/6 Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai
Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan Pemajuan Melalui Pusat
Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei
2011. Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada:
KETUA PENGARAH
Jabatan Kerajaan Tempatan
Kementerian Perumahan & Kerajaan Tempatan
Aras 4, Blok K, Pusat Bandara Damansara,
50782 Kuala Lumpur
(u.p.: Bahagian Penyelidikan dan Perundangan Teknikal)
No. Telefon : 03-20947033 / 2087 4501
No. Fax : 03-2095 5180 / 2095 3717
Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi
agensi / jabatan teknikal yang berkaitan.
SENARAI SEMAK DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN &
UBAHSUAIAN
1) JABATAN BANGUNAN
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1
Borang A;
(Di Peraku oleh
Arkitek/Jurutera/Pelukis Pelan
Berdaftar)- Dapatkan di Kaunter OSC.
( Jadual
Kedua UKBS 1984 )
1
2
Surat Permohonan yang
ditandatangani oleh pemilik atau
perunding berdaftar ( Cover letter )
2
3
Salinan geran atau surat hakmilik
tanah asal yang telah disahkan ATAU
‘S & P’ (Sale &
Purchase)
1
4
Salinan ‘Tenancy Agreement’ (Jika
Dipohon oleh penyewa) 1
5
Salinan resit semasa cukai pintu
Januari-Jun
Julai-Disember
1
6
Salinan Sijil Layak Menduduki
(CFO)/”Certificate
Completion & Compliance” (CCC)-
Borang F
1
7
Dokumen sokongan bagi tambahan
dan ubahsuai yang melebihi 50%
kelulusan asal dan tambahan
bilangan tingkat.
Salinan surat kelulusan Kebenaran
Merancang Perubahan Matan
1
JABATAN/AGENSI TEKNIKALDALAMAN
Bangunan daripada Jabatan
Perancangan Bandar, MPSJ.
8
Dokumen sokongan bagi permohonan
Pelan Tambahan/ubahsuaian
bangunan kedai pejabat kepada
Pusat Pembelajaran/Pusat Tuisyen/
Budget Hotel/Bangunan
Keagamaan/ Kareoke/Asrama.
Salinan surat kelulusan Kebenaran
Merancang Perubahan Matan
Bangunan daripada Jabatan
Perancangan Bandar, MPSJ
1
9
Salinan surat dari Kementerian
Pelancongan untuk ‘Rating Star’ bagi
tambahan dan ubahsuai kepada
Budget Hotel. (Jika Berkaitan)
1
10
Salinan surat kelulusan arah kiblat
dari MAIS untuk tambahan dan
ubahsuai yang mempunyai ruang baru
tambahan bagi surau. (Jika
Berkaitan)
1
11
Pengenalan seperti Nama,Jawatan,
(jika
berkenaan) alamat terkini,No.Kad
Pengenalan dan Nombor pendaftaran
Setiap Perunding
(Jurutera/Arkitek/Pelukis Pelan)
Pemilik dan Pemaju hendaklah ditulis
atas setiap helaian pelan.
12
Pelan Tapak ( mengandungi lokasi
tapak yang
ditandakan, tunjuk arah utara)
Penyediaan Pelan dalam skala metric
(Termasuk 1 set linen)
Pelan perlu ditandatangani oleh
Pemilik/ Pemaju &
Perunding/ Arkitek/Jurutera/
Pelukis Pelan Berdaftar Pelan
Dikemukakan dalam lipatan A4
Memanjang
Pelan-pelan perlu diwarnakan
5
13
Template perkiraan Fi yuran proses
mengikut
Jadual Pertama UKBS 1984
(Yang telah Di Sahkan oleh Jabatan
Bangunan)
1
14
Gambar Tapak bersaiz A4 – ‘Hard
Copy’
berwarna – jpeg (Pandangan
Hadapan/Belakang/Tepi)
1
15
Salinan surat permohonan daripada
Perunding
Jurutera (C & S)-Cover Letter. (Jika
Berkaitan)
1
16
Borang A Di Peraku Oleh Perunding
Jurutera
C&S- Dapatkan di Kaunter OSC.
( Jadual Kedua
UKBS 1984 )- (Jika Berkaitan)
1
17
Pelan Struktur lengkap
ditandatangani oleh
Pemilik/Pemaju & Perunding Jurutera
C & S/ Pelukis Pelan Berdaftar dan di
perakui oleh perunding Jurutera C &
S- (Jika Berkaitan)
1 (Linen)
18
Pelan Sanitary lengkap
ditandatangani oleh
Pemilik/Pemaju & Perunding Jurutera
C & S/ Pelukis Pelan Berdaftar dan di
perakui oleh perunding Jurutera C &
S- (Jika Berkaitan)
1(linen)
1) JABATAN BOMBA DAN PENYELAMAT
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1 Surat Permohonan Rasmi
(Cover Letter) 2
2 Pelan Bangunan dalam skala
Metric
2
3 Pelan Lantai 2
4 Pelan Keratan Rentas 2
5 Pelan Pandangan Sisi 2
6 Tajuk Cadangan Pemajuan
Dengan Tepat
7 Skala Pelan hendaklah 1:100 atau
1:200 ( skala lain dengan
kebenaran )
8 Perakuan Tanggungjawab ,
Tandatangan Dan Cop Rasmi
‘Orang Yang Berkelayakan’ di
setiap helaian pelan.
9 Mencatitkan Kehendak-Kehendak
Kelengkapan
Menentang Kebakaran Atau
Perpasangan
Keselamatan Kebakaran Di Muka
Hadapan
Setiap Perenggan Pelan
* NOTA Dokumen Perlu Diasingkan Dan Diikat Mengikut Susunan
Setiap Jabatan Yang Di tetapkan.
JABATAN/AGENSI TEKNIKAL LUARAN
Pengarah,
Jabatan Bomba & Penyelamat, Malaysia,
No. 3 Persiaran Tebar Layar,
Bukit Jelutung, Seksyen U8,
40150 Shah Alam, Selangor
Darul Ehsan.
Pejabat Zon Petaling,
Balai Bomba dan Penyelamat Puchong,
Jalan Bandar 2, Pusat Bandar Puchong
47100 Puchong Selangor D.E
SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN
PENYELAMAT MALAYSIA
BIL DOKUMEN BILANGAN
SET
SEMAKAN
KAUNTER
SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL
1 Surat Permohonan Rasmi 1
2 Pelan Arkitektural Lengkap 2
3 Pernyataan Tajuk Projek Dengan Jelas / Betul -
4 Pengiraan Beban Mengikut UBBL 1984 1
5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain
Dengan Kebenaran)
-
6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses
Perkakasan Bomba
1
7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba
Mengikut UBBL 1984 (Diwarnakan Kuning)
-
8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih
Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang
Lain) Dan Diwarnakan Merah.
-
9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan
Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984)
1
10 Pelan Arkitektural Perubahan/Tambahan Struktur Di
Warnakan Merah
-
11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada)
Diwarnakan Biru
-
12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang
Berkelayakan Di Setiap Helaian Pelan Arkitektural
-
13 Mencatitkan “Senarai Syor-Syor Kebombaan” Di Muka
Hadapan Setiap Set Pelan Arkitektural.
-
14
Keperluan Kehendak-Kehendak Menentang Dan Mencegah
Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah
Diwarnakan Merah
-
Tandatangan :
Nama Pemohon : ……………………………………………………
Nama Syarikat : ……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
No Telefon : ……………………………………………………
SEMAKAN JBPM – DITERIMA / TOLAK *
COP JBPM
PEGAWAI PENERIMA : ……………………………………………………..
TARIKH : ………………………………………………………
* Potong Yang Tidak Berkaitan
CONCLUSION
In conclusion, our improved site is now much better and multipurpose.
Without the team, I don’t think we could able to make it through! This site
here is known for its environment and especially the weather, It would be an
ideal place for all people to enjoy/studying. During the process,we learned
how to reconstruct a blank site into a multipurpose and useful bar + park for
all the students. We also learned how to write a report and our master plan
properly.
We hope that our sky bar & park will bring lots of benefit to all the students
and also our lecturers. We also would hope that they would use it wisely and
enjoy their meal without walking all the way to commercial block to have a
good meal. We would love to see all the students enjoy and have their new
way of studying and learning inside the park.

More Related Content

What's hot

Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control EngineerVICTORIA NGOZI U.
 
Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Fairfax County
 
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015Fairfax County
 
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018Fairfax County
 
l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]Komthorn Sing
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportNgo Quan
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioSyed Arafath, PMI-SP certified
 
C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)Baig Ali
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016peter mcelwee
 
CV4updated November 2014
CV4updated November 2014CV4updated November 2014
CV4updated November 2014Mike Peacock
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocationPang Khai Shuen
 
Power Point BLCC End of year Review
Power Point BLCC End of year ReviewPower Point BLCC End of year Review
Power Point BLCC End of year ReviewTom Atkinson
 

What's hot (19)

Professional Staff
Professional Staff Professional Staff
Professional Staff
 
Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control Engineer
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015
 
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
 
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
 
l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY report
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
 
Academic Transcript
Academic TranscriptAcademic Transcript
Academic Transcript
 
C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
CV4updated November 2014
CV4updated November 2014CV4updated November 2014
CV4updated November 2014
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocation
 
Power Point BLCC End of year Review
Power Point BLCC End of year ReviewPower Point BLCC End of year Review
Power Point BLCC End of year Review
 

Viewers also liked

Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...
Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...
Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...AisyahNajihan
 
Jadual bertugas harian guru kantin 2012
Jadual bertugas harian guru kantin 2012Jadual bertugas harian guru kantin 2012
Jadual bertugas harian guru kantin 2012Uswaton Hasanah Salleh
 
Borang senarai semak
Borang senarai semakBorang senarai semak
Borang senarai semaknorlizajais
 
Contoh Report LI Jabatan perdagangan
Contoh Report LI Jabatan perdaganganContoh Report LI Jabatan perdagangan
Contoh Report LI Jabatan perdaganganAhmadShafiqJamian
 
Laporan Latihan Industri Bab 1, 2 , 3
Laporan Latihan Industri Bab 1,  2 , 3Laporan Latihan Industri Bab 1,  2 , 3
Laporan Latihan Industri Bab 1, 2 , 3CikBeyla Nabiella
 
Gp pengiktirafan bess-web
Gp pengiktirafan bess-webGp pengiktirafan bess-web
Gp pengiktirafan bess-webRoiamah Basri
 
Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)
Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)
Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)Rizalshah Zulkifli
 
Practical training report
Practical training reportPractical training report
Practical training reportNicolai Sidek
 
Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Rizalshah Zulkifli
 

Viewers also liked (11)

Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...
Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...
Senarai semak dokumen_temu_duga_bagi_permohonan_ke_jawatan_pegawai_perkhidmat...
 
Research comp1
Research comp1Research comp1
Research comp1
 
Borang Kendiri 2
Borang Kendiri 2Borang Kendiri 2
Borang Kendiri 2
 
Jadual bertugas harian guru kantin 2012
Jadual bertugas harian guru kantin 2012Jadual bertugas harian guru kantin 2012
Jadual bertugas harian guru kantin 2012
 
Borang senarai semak
Borang senarai semakBorang senarai semak
Borang senarai semak
 
Contoh Report LI Jabatan perdagangan
Contoh Report LI Jabatan perdaganganContoh Report LI Jabatan perdagangan
Contoh Report LI Jabatan perdagangan
 
Laporan Latihan Industri Bab 1, 2 , 3
Laporan Latihan Industri Bab 1,  2 , 3Laporan Latihan Industri Bab 1,  2 , 3
Laporan Latihan Industri Bab 1, 2 , 3
 
Gp pengiktirafan bess-web
Gp pengiktirafan bess-webGp pengiktirafan bess-web
Gp pengiktirafan bess-web
 
Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)
Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)
Laporan Penuh Latihan Industri (Pelajar Politeknik Perdagangan)
 
Practical training report
Practical training reportPractical training report
Practical training report
 
Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)
 

Similar to ICI FINAL REPORT PDF

Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016galih wahyu
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 
5th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 20125th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 2012ambercourt
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV Edward Afful-Packson
 
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptxDURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptxkaustav_ju
 
Building Technology 2
Building Technology 2Building Technology 2
Building Technology 2nadiacbass
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)Kee M
 
96011225-Carbon-Brush.pdf
96011225-Carbon-Brush.pdf96011225-Carbon-Brush.pdf
96011225-Carbon-Brush.pdftesfa36
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6MUHAMMAD SALEEM
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Allan Leyte
 

Similar to ICI FINAL REPORT PDF (20)

Ici final project
Ici final projectIci final project
Ici final project
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
FQUP PPT.pptx
FQUP PPT.pptxFQUP PPT.pptx
FQUP PPT.pptx
 
Authorities ici
Authorities iciAuthorities ici
Authorities ici
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
5th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 20125th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 2012
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV
 
pp2 Final account-1
pp2 Final account-1pp2 Final account-1
pp2 Final account-1
 
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptxDURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
 
Building Technology 2
Building Technology 2Building Technology 2
Building Technology 2
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
96011225-Carbon-Brush.pdf
96011225-Carbon-Brush.pdf96011225-Carbon-Brush.pdf
96011225-Carbon-Brush.pdf
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
 
Diploma v semester syllabus
Diploma v semester syllabusDiploma v semester syllabus
Diploma v semester syllabus
 

More from Clement Seong

More from Clement Seong (20)

Final report ADP 2017
Final report ADP 2017Final report ADP 2017
Final report ADP 2017
 
All plates
All platesAll plates
All plates
 
ADP project 1 Slides
ADP project 1 SlidesADP project 1 Slides
ADP project 1 Slides
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Final Essay
Final EssayFinal Essay
Final Essay
 
Comparative analysis essay
Comparative analysis essayComparative analysis essay
Comparative analysis essay
 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building Science
 
Final B.Tech
Final B.TechFinal B.Tech
Final B.Tech
 
Report final
Report finalReport final
Report final
 
B.services case-study
B.services case-studyB.services case-study
B.services case-study
 
Bstruc project-2-report-edited (1)
Bstruc project-2-report-edited (1)Bstruc project-2-report-edited (1)
Bstruc project-2-report-edited (1)
 
In Adaptation ARC 1133
In Adaptation ARC 1133In Adaptation ARC 1133
In Adaptation ARC 1133
 
FInal VIC Board
FInal VIC BoardFInal VIC Board
FInal VIC Board
 
BCON Project 1:Final
BCON Project 1:FinalBCON Project 1:Final
BCON Project 1:Final
 
Falling water
Falling waterFalling water
Falling water
 
Culture & History 2- Project 2
Culture & History 2- Project 2Culture & History 2- Project 2
Culture & History 2- Project 2
 
Journal 2
Journal 2Journal 2
Journal 2
 
Journal 1
Journal 1Journal 1
Journal 1
 
Assignment 1 individual journal
Assignment 1   individual journalAssignment 1   individual journal
Assignment 1 individual journal
 

Recently uploaded

Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

ICI FINAL REPORT PDF

  • 1. FINAL PROJECT PROJECT PROPOSAL ON THE ESTABLISHMENT OF SKYBAR & SKYPARK AT BLOCK E LEVEL 2 CLEMENT CHEN- 0319574 LEE REN JET- 0319058 MS NORMA FNBE 0414 APRIL INTAKE 2014 AUGUST 2014
  • 2. TABLE OF CONTENTS 1. Project Proposal Details 1.1 Project Summary 1.2 Project description and application 1.3 Project quotation 2. Introduction to Site 2.1 Location 2.2 Site analysis 2.3 Concept 3. Design 3.1 Site master plan 3.2 Details 4. Authority Procedures 5. Bill of Quantities 6. Conclusion
  • 3. Project Proposal Details 1.1 Project summary This project envisages the establishment of a SKYBAR restaurant and SKYPARK recreation area in the Taylor’s University Block E Level 2 area. Since there is no bar and recreation parks in Taylor’s University that can enhance the lives of students, the demand for the service is very attractive The total initial investment requirement is estimated at RM 250,000.00 of which 95% is for building construction. The project will create employment opportunities for 10 persons 1.2 Project description and Application SKYBAR and SKYPARK are facilities where food, drinks, recreation and other services are provided in an efficient, cordial and pleasant manner and style. Operating restaurant and parks both integrated to a learning institution enhances student life, giving them a place to hangout, release stress and strengthen social communication.
  • 4. 1.3 Project Quotation Our proposal shall apply to the areas as indicated in our enclosed summary. We have made several design assumptions which then followed and accepted totally by the consulting engineer will make this alternative pricing for the pre-construction works valid for use. Quotation Our quotation is subject to terms & conditions enclosed herewith on the following assumed design parameters as contained in the technical paper enclosed herewith. Price Our price, subject to terms & conditions stated herewith, for the sub-contract works shall be as follows: [1] Design, supply and install of post-tensioning works including raw materials and necessary accessories and works to do the following: SKYBAR [RM] A. Design fees RM 50,000.00 B. Construction works RM 200,000.00 SKYPARK Recreation Area [RM] A. Design fees RM 3,000.00 B. Construction works RM 10,000.00
  • 5. Introduction to Site 2.1 Location - Location of SKYBAR & SKYPARK Block E level 2 open area
  • 6. 2.2 Site Analysis Our site is located at block E besides the strategic development & international relations office. It has a great view towards the basketball court, lake and the commercial block. Regarding about the weather. The sun will rise from the east and is partly blocked by other blocks. In the afternoon, one of our site will not get hot easily since the sun is located at the south. But during the evening, our site is the ideal choice for recreational since the sun will be blocked from the west! The wind blows from the south east to north west therefore our site is quite windy during the day. Our 30x30 site Direction of sunlight at 3pm
  • 7. Lake view from our site at 3pm Easy access from parking
  • 8. Walking distance from new residence block View towards the East at 3pm
  • 9. Entrance towards the site (South Elevation) View from site towards Block E (North Elevation)
  • 10. 2.3 Concept Bar Area during the day Bar Area during the night
  • 11. Planting concept - At night it provides a sense of atmosphere, vibrant and a view for the customers
  • 12. Example (Not to scale) :
  • 13. Site Master Plan ITEM NAME QUANTITY 1 DRINK BAR 4 2 WATER FOUNTAIN 2 3 TABLES & CHAIR SET 10 2 2 3 1
  • 14. DETAILS - Drink Bar (Elevation & Perspective) ITEM DESCRIPTION IMAGE 1 VARISHIELD SELF-TINTING GLASS http://www.ssg.com.sg/product- catalogue/eco- products/product/30- varishield/2-eco-products 1 2
  • 15. 2 TEMPERED SAFETY GLASS http://www.ssg.com.sg/product- catalogue/core- products/product/1-duraglas- t/1-core-products - Water Fountain
  • 16. - Tables & Chair Set
  • 17. BILL OF QUANTITIES DESCRIPTION UNIT/SIZE RATE(RM) RATE AMOUNT TOTAL AMOUNT A HARDSCAPE WORK 1 AIRCONDITIONERS NOS 1288 3 3864 2 CLUBBING STOOLS NOS 220 30 6600 3 BARTENDER TABLE NOS 2000 2 4000 4 METAL RAILLING M² 120 24 2880 5 PARK BENCHES NOS 300 3 900 6 WOODEN PLANK FLOORING FT² 9 165 1485 7 FOUNTAIN NOS 6750 2 13500 8 DINING TABLES NOS 400 50 20000 9 SELF TINTING PANELS NOS 1000 30 30000 HARDSCAPE TOTAL 83229 sad B SOFTSCAPE WORKS 10 SCRUB M² 55 15 825 11 ARTIFICIAL SMALL TREES NOS 30 2 60 12 SHADE TREES NOS 400 2 800 13 FERTILIZERS KG 10.90 20 218 14 SAND KG 20 30 600 15 HYDRANGEA PLANT NOS (POT) 42 50 2100 42 16 LAWN TURF M² 11 7.5 82.5 SOFTSCAPE TOTAL 4685.5 2673.5 SUB TOTAL 87914.5 51699.5 CORRECTION TOTAL RM 87915 51700
  • 18. MAINTAINANCE PLAN ITEM DESCRIPTI ON UNIT/SI ZE USA GE LIST RATE(R M) QUANTI TY AMOUNT 1 WATER USAGE MONTH (M³) 0-20 0.57 30 17.1 >20- 35 1.03 21 21.63 >35 2 5000 10000 2 ELECTRIC USAGE MONTH 0-200 0.218 300 65.4 3 GARDENE R MONTH 1000 2 2000 4 PLUMBER MONT H 2200 2 4400 22773.06 92 SUBTOTAL 165 04.1 3 2800 CORRECTION TOTAL 16504
  • 19. Authority Procedures 1. Submit and obtain Development through OSC • Planning plan • Building plan • Engineering plan (earthwork, road & drainage plan, road excavation permit & street lighting plan) • Landscape plan • Water supply plan • Sewerage plan • Infrastructure communication plan • Fire safety plan Estimated Processing Costs 1. Planning plan = MYR 500.00 2. Building plan= MYR 1,300. 3. Engineering plan = MYR 100.00 4. Water supply plan = MYR 1,000.00 1. Submission to Local Authority through OSC 2. Obtain Development Order (DO) from Planning Department 3. Obtain Water Approval 4. Obtain Sewerage Approval 5. Obtain Fire Safety (Arch) Comment 6. Obtain Earthwork Approval 7. Obtain Road and Drainage Approval 8. Obtain Landscape Approval 9. Obtain Street Lighting Approval 10. Obtain MSMA and SPAH Approvals 11. Obtain Building Plan Approval 12. Obtain Fire Safety (M&E) Approval 2. Submit pre-construction notifications to OSC All notifications are submitted via OSC. OSC will then distribute notifications to the relevant agencies such as: • Building Department (B Form - notification to start building work) • Engineering Department (B Form - notification to start earthwork) • Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work)
  • 20. 3. Request final utilities inspections through OSC Under OSC 1Submission, the builder has to request for inspections via OSC. OSC will arrange and coordinate inspections and connections schedule with relevant agencies 1. TELCO connection = MYR495.00 2. Water connection = MYR 30.00 3. Fire safety inspection = MYR 111.00 4. Receive Road and Drainage Final Inspection Once the road and drainage works has been completed, the builder will request the Road and Drainage clearance letter from the Engineering Department of CHKL. The builder has to submit a construction report notification and by signing form G 17, the Engineer certifies that all works were carried out according to regulations. Form G17 will be filed along with Form F (Certificate of Completion and Compliance (CCC) via OSC to the Engineering Department. 5. Obtain Road and Drainage Clearance Letter A date for the inspection will be set-up prior to the issuance of clearance letter for the road and drainage work Agency: Sewerage Certifying Agency (IWK)12 daysno charge6 7. Receive Sewage Final Inspection The Sewerage Certifying Agency (IWK) will carry out an inspection of the sewerage system and issue to the builder a clearance letter for sewerage. 8. Obtain Sewage Clearance Letter Once the inspection has been carried out, a clearance letter is issued to the Builder. This clearance letter will allow the Engineer to issue the Certificate of Completion and compliance (CCC). 9. Receive Fire Safety Final Inspection Fire and Rescue Department will carry out fire safety inspection 10.Obtain Fire Safety Final Letter Fire and Rescue Department will issue to the builder the clearance letter for fire safety
  • 21. 11.Receive Water Inspection Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe. 12.Submit Water Test and Commissioning (T&C) Report Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe. 13.Obtain Water Clearance Letter The Water Authority SYABAS will issue a clearance letter to the builder and install the water meter at the same time for water connection. 14.Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC) The Builder’s Principal Submitting Person (professional, architect) will issue Certificate of Completion and compliance (Form F - CCC) to the Builder/Owner and 2 copies of the CCC will be filed at the OSC for the Building Department (JRBB) and the Board of Architects/Engineers (LAM/LJM). 15.Obtain Water Connection
  • 22. MPSJ.RK.KPT(OSC)-07 PINDAAN: 01 KERAJAAN MALAYSIA JABATAN KERAJAAN TEMPATAN KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN SENARAI SEMAK DOKUMEN DAN SENARAI SEMAK TERPERINCI AGENSI TEKNIKAL DALAMAN DAN LUARAN (PELAN TAMBAHAN & UBAHSUAIAN) TARIKH KUATKUASA : 01 MEI2014
  • 23. 47610 SUBANG JAYA, SELANGOR DARUL EHSAN. TEL : 03 – 8026 3131 FAX : 03 – 8026 3295 WEB : www.mpsj.gov.my FEBRUARI 2013 HAKCIPTA TERPELIHARA No. Ruj. OSC : MPSJ /____ /_____ No. Ruj. OSC terdahulu (jika ada) :_____________________________ Tarikh Daftar : _____________________________ Masa : _____________________________ Jenis permohonan yang dikemukakan :- 1) Permohonan Tambahan dan Ubahsuaian Bangunan bagi bangunan perusahaan / Perniagaan/Kemudahan Awam 2) Permohonan Tambahan dan Ubahsuaian Bangunan dan Perubahan Material Kegunaan Bangunan 3) Permohonan Tambahan Bilangan Tingkat Bangunan PERSIARAN PERPADUAN USJ 5, PUSATSETEMPAT( )OSC MAJLIS PERBANDARAN SUBANG JAYA (MPSJ) Persiaran Perpaduan USJ 5, 47610Subang Jaya, Selangor Darul Ehsan. Tel : 03–8026 3131 Fax : 03–8026 3295 Web : www.mpsj.gov.my
  • 24. SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN DAN UBAHSUAIAN Tajuk Permohonan : ........................................................................................................................................................... .................................................................................................................................................................. .................................................................................................................................................................. .................................................................................................................................................................. .................................................................................................................................................................. .................................................................................................................................................................. ................................................................................................................................................................... Pemilik / Pemaju : ............................................................................................................................................................ Alamat Pemilik/Pemaju : ............................................................................................................................................................ .................................................................................................................................................................. .................................................................................................................................................................. Tel. & Fax : ............................................................................................................................................................ Perunding : ............................................................................................................................................................ Alamat Perunding : ............................................................................................................................................................ .................................................................................................................................................................. .................................................................................................................................................................. Tel. & Fax : ............................................................................................................................................................ Nama : ............................................................................................................................................................ Perakuan Pemohon/Perunding: Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen- dokumen yang disertakan adalah benar serta mematuhi keperluan permohonan pembangunan di Majlis Perbandaran Subang Jaya (MPSJ)
  • 25. .......................……………………………. Nama, Tandatangan & Cop Pemohon / Perunding .......................……………………………. Nama, Tandatangan & Cop Pegawai OSC 1 .......................…………………………… Nama, Tandatangan & Cop Pegawai OSC 2 Tarikh : …………………… Tarikh : ……………………… Tarikh : …………………….. MAKLUMAN Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan KPKT(02)799/6 Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei 2011. Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada: KETUA PENGARAH Jabatan Kerajaan Tempatan Kementerian Perumahan & Kerajaan Tempatan Aras 4, Blok K, Pusat Bandara Damansara, 50782 Kuala Lumpur (u.p.: Bahagian Penyelidikan dan Perundangan Teknikal) No. Telefon : 03-20947033 / 2087 4501 No. Fax : 03-2095 5180 / 2095 3717 Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi agensi / jabatan teknikal yang berkaitan.
  • 26. SENARAI SEMAK DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN & UBAHSUAIAN 1) JABATAN BANGUNAN BIL DOKUMEN BILANGAN DOKUMEN ADA(√) ATAU TIADA(X) CATATAN SEMAKAN PEMOHON SEMAKAN KAUNTER 1 Borang A; (Di Peraku oleh Arkitek/Jurutera/Pelukis Pelan Berdaftar)- Dapatkan di Kaunter OSC. ( Jadual Kedua UKBS 1984 ) 1 2 Surat Permohonan yang ditandatangani oleh pemilik atau perunding berdaftar ( Cover letter ) 2 3 Salinan geran atau surat hakmilik tanah asal yang telah disahkan ATAU ‘S & P’ (Sale & Purchase) 1 4 Salinan ‘Tenancy Agreement’ (Jika Dipohon oleh penyewa) 1 5 Salinan resit semasa cukai pintu Januari-Jun Julai-Disember 1 6 Salinan Sijil Layak Menduduki (CFO)/”Certificate Completion & Compliance” (CCC)- Borang F 1 7 Dokumen sokongan bagi tambahan dan ubahsuai yang melebihi 50% kelulusan asal dan tambahan bilangan tingkat. Salinan surat kelulusan Kebenaran Merancang Perubahan Matan 1 JABATAN/AGENSI TEKNIKALDALAMAN
  • 27. Bangunan daripada Jabatan Perancangan Bandar, MPSJ. 8 Dokumen sokongan bagi permohonan Pelan Tambahan/ubahsuaian bangunan kedai pejabat kepada Pusat Pembelajaran/Pusat Tuisyen/ Budget Hotel/Bangunan Keagamaan/ Kareoke/Asrama. Salinan surat kelulusan Kebenaran Merancang Perubahan Matan Bangunan daripada Jabatan Perancangan Bandar, MPSJ 1 9 Salinan surat dari Kementerian Pelancongan untuk ‘Rating Star’ bagi tambahan dan ubahsuai kepada Budget Hotel. (Jika Berkaitan) 1 10 Salinan surat kelulusan arah kiblat dari MAIS untuk tambahan dan ubahsuai yang mempunyai ruang baru tambahan bagi surau. (Jika Berkaitan) 1 11 Pengenalan seperti Nama,Jawatan, (jika berkenaan) alamat terkini,No.Kad Pengenalan dan Nombor pendaftaran Setiap Perunding (Jurutera/Arkitek/Pelukis Pelan) Pemilik dan Pemaju hendaklah ditulis atas setiap helaian pelan. 12 Pelan Tapak ( mengandungi lokasi tapak yang ditandakan, tunjuk arah utara) Penyediaan Pelan dalam skala metric (Termasuk 1 set linen) Pelan perlu ditandatangani oleh Pemilik/ Pemaju & Perunding/ Arkitek/Jurutera/ Pelukis Pelan Berdaftar Pelan Dikemukakan dalam lipatan A4 Memanjang Pelan-pelan perlu diwarnakan 5
  • 28. 13 Template perkiraan Fi yuran proses mengikut Jadual Pertama UKBS 1984 (Yang telah Di Sahkan oleh Jabatan Bangunan) 1 14 Gambar Tapak bersaiz A4 – ‘Hard Copy’ berwarna – jpeg (Pandangan Hadapan/Belakang/Tepi) 1 15 Salinan surat permohonan daripada Perunding Jurutera (C & S)-Cover Letter. (Jika Berkaitan) 1 16 Borang A Di Peraku Oleh Perunding Jurutera C&S- Dapatkan di Kaunter OSC. ( Jadual Kedua UKBS 1984 )- (Jika Berkaitan) 1 17 Pelan Struktur lengkap ditandatangani oleh Pemilik/Pemaju & Perunding Jurutera C & S/ Pelukis Pelan Berdaftar dan di perakui oleh perunding Jurutera C & S- (Jika Berkaitan) 1 (Linen) 18 Pelan Sanitary lengkap ditandatangani oleh Pemilik/Pemaju & Perunding Jurutera C & S/ Pelukis Pelan Berdaftar dan di perakui oleh perunding Jurutera C & S- (Jika Berkaitan) 1(linen)
  • 29. 1) JABATAN BOMBA DAN PENYELAMAT BIL DOKUMEN BILANGAN DOKUMEN ADA(√) ATAU TIADA(X) CATATAN SEMAKAN PEMOHON SEMAKAN KAUNTER 1 Surat Permohonan Rasmi (Cover Letter) 2 2 Pelan Bangunan dalam skala Metric 2 3 Pelan Lantai 2 4 Pelan Keratan Rentas 2 5 Pelan Pandangan Sisi 2 6 Tajuk Cadangan Pemajuan Dengan Tepat 7 Skala Pelan hendaklah 1:100 atau 1:200 ( skala lain dengan kebenaran ) 8 Perakuan Tanggungjawab , Tandatangan Dan Cop Rasmi ‘Orang Yang Berkelayakan’ di setiap helaian pelan. 9 Mencatitkan Kehendak-Kehendak Kelengkapan Menentang Kebakaran Atau Perpasangan Keselamatan Kebakaran Di Muka Hadapan Setiap Perenggan Pelan * NOTA Dokumen Perlu Diasingkan Dan Diikat Mengikut Susunan Setiap Jabatan Yang Di tetapkan. JABATAN/AGENSI TEKNIKAL LUARAN
  • 30. Pengarah, Jabatan Bomba & Penyelamat, Malaysia, No. 3 Persiaran Tebar Layar, Bukit Jelutung, Seksyen U8, 40150 Shah Alam, Selangor Darul Ehsan. Pejabat Zon Petaling, Balai Bomba dan Penyelamat Puchong, Jalan Bandar 2, Pusat Bandar Puchong 47100 Puchong Selangor D.E SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN PENYELAMAT MALAYSIA BIL DOKUMEN BILANGAN SET SEMAKAN KAUNTER SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL 1 Surat Permohonan Rasmi 1 2 Pelan Arkitektural Lengkap 2 3 Pernyataan Tajuk Projek Dengan Jelas / Betul - 4 Pengiraan Beban Mengikut UBBL 1984 1 5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain Dengan Kebenaran) - 6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses Perkakasan Bomba 1 7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba Mengikut UBBL 1984 (Diwarnakan Kuning) - 8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang Lain) Dan Diwarnakan Merah. - 9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984) 1 10 Pelan Arkitektural Perubahan/Tambahan Struktur Di Warnakan Merah - 11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada) Diwarnakan Biru - 12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang Berkelayakan Di Setiap Helaian Pelan Arkitektural -
  • 31. 13 Mencatitkan “Senarai Syor-Syor Kebombaan” Di Muka Hadapan Setiap Set Pelan Arkitektural. - 14 Keperluan Kehendak-Kehendak Menentang Dan Mencegah Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah Diwarnakan Merah - Tandatangan : Nama Pemohon : …………………………………………………… Nama Syarikat : …………………………………………………… …………………………………………………… …………………………………………………… …………………………………………………… …………………………………………………… …………………………………………………… No Telefon : …………………………………………………… SEMAKAN JBPM – DITERIMA / TOLAK * COP JBPM PEGAWAI PENERIMA : …………………………………………………….. TARIKH : ……………………………………………………… * Potong Yang Tidak Berkaitan
  • 32. CONCLUSION In conclusion, our improved site is now much better and multipurpose. Without the team, I don’t think we could able to make it through! This site here is known for its environment and especially the weather, It would be an ideal place for all people to enjoy/studying. During the process,we learned how to reconstruct a blank site into a multipurpose and useful bar + park for all the students. We also learned how to write a report and our master plan properly. We hope that our sky bar & park will bring lots of benefit to all the students and also our lecturers. We also would hope that they would use it wisely and enjoy their meal without walking all the way to commercial block to have a good meal. We would love to see all the students enjoy and have their new way of studying and learning inside the park.