SlideShare a Scribd company logo
1 of 22
 I’m a PMI certified Scheduling professional, having over 8 years 3 months of work experience spanning across all
aspects in construction of industrial projects in India & abroad (Oman).
 Experienced in Power, petrochemical, oil & gas sectors, during this tenure I have handled projects both in greenfield
and brownfield (Process facility areas)
 Currently for the past 3 years am associated with M/s. Bahwan Engineering Group, my earlier association was with
M/s. Petron Engineering & Construction Ltd and M/s. EDAC Engineering Ltd.
 As I’m handling role of planning Engineer for Multi-discipline function for EPC project , I’m confident enough to
handle the same if opportunities given
1.Credentials
2.Roles & responsibilities
3.List of Projects handled
4.Project Information
S.no Certification/Approval Approving Authority
1. Certified scheduling professional; PMI-SP PMI-Project Management Institute
2. Primavera P6 CADD CENTRE
3. Contracts, delays & claims certification in line with Primavera P6 CEM solutions/Udemy
4. Approved Planning Engineer Petroleum Development Oman
5. Bachelors in Mechanical Engineering Anna University
S.no Role Frequency of
update
1. Detailed study on Project scope by interpreting drawings and scope statement Frequent
2. Preparation of Various levels of Activity & resource schedule based on Client or
Managements requirement for their approval
As required
3. Preparation/Assisting Project manager in preparing Project budgets/Target cost/Control
accounts
Initiation stage
4. Preparation of Micro-schedules & resource allocation to set targets to Site supervisors
based on standard productivity
Frequent
5. Monitoring & recording progress updates, project concerns and circulating it to the
required stakeholders
Frequent
6. Preparation of Lookahead schedules considering the rescheduling of backlogged
activities to meet baseline agreed with client
Monthly
7. Tracking, monitoring & controlling the Project progress w.r.to baseline schedule on
parameters such as time, cost and physical completion through “S” curves and EVM to
measure cost and schedule overrun
Monthly
S.no Role Frequency of
update
8. Monitoring resource productivity and reporting it against available organization
productivity standards
Frequent
9. Regular Follow up on critical/long lead materials that may hamper project deadlines Frequent
10. Preparation of MIS Reports
*Organization chart
*Daily, Weekly & monthly reports generation.
*Generation & updating Lessons learnt resisters, uploading the same in company
database for records
*Generation & updating delay registers for arbitration and further project claims
As required
11. Timely updating the project expenditures with respect to budget for generation of
forecast CTC.
Quarterly
12. Preparation of project invoices as per contractual requirements with supporting
documentation
Monthly
13. Preparation & updating of cash flow scenarios Monthly
14. Preparation of Microlevel schedule, resource program and work pack for shutdown As required
List of Projects Handled
S.no Company Projects Completion
Percentage
1.
Bahwan Engineering
Company LLC
Marmul Pumps Replacement Project 93%
2. Fire Fighting system upgradation project 68%
3. Gas compression & Evacuation Facility Project 94%
4. Rationalization Project 78%
5. Demolition Projects 79%
6. Shutdown 100%
7. Petron Engineering
Construction Limited
Construction of PTA Plant (OSBL Scope of Works) 37%
8. EDAC Engineering Limited Erection, Testing & commissioning of 500MW coal fired Boiler &
Auxiliaries
92%
Marmul Projects Plot Plan Pumps Replacement Project
Substation#04 Water booster
pumps-2nos
Wet crude
transfer
pumps-3nos
Main oil
pumps-3nos
Crude transfer
pumps-3nos
Water disposal
pumps-2nos
Control Building
Substation#05
Blanket gas
network
Gas compression &
Evacuation facility Project
Sludge Pit
Rationalization Project
Marmul Projects Plot Plan
Thuleilat AP
Flare
Qaharir AP
Flare
Direct Manpower-900 workmen
IN-Direct Manpower-180 no's
Pumps Replacement Project
S.no Scope description Uom Scope Progress
Achieved
%
Achieved
Overall Project progress 93%
1. Erection, testing & commissioning of Pumps
Water disposal pumps-2nos
Water booster pumps-2nos
Crude transfer pumps-3nos
Wet crude transfer pumps-3nos
Main Oil transfer pumps-3nos
Nos 13 10 79%
2. Construction of Foundations & Structural erection for Pumps,
sheds & related pipe supports
MT 900 820 91%
3. Piping works interconnected to Pumps & Storage Tanks ID 60000 52000 87%
4. Demolition of redundant Storage Tank-1no & pumps-5nos 60%
5. Construction of substations as an electrical feed to the new Pumps-
2nos
100%
6. Construction of OHL steel frame towers & stringing 100%
7. E & I work required for pumps 90%
Firefighting System upgradation Project
S.no Scope description Uom Scope Progress
Achieved
% Achieved
Overall Project progress 68%
1. Laying of UG GRE Pipeline for the entire Marmul Production station;
installation of foam & deluge systems
km 5.6 3.2 58%
2. Construction of Fire water tanks Nos 2 2 100%
3. Construction of Fire water pumps Nos 3 3 90%
4. Construction of Piping network from Well to feed Fire water tanks
and deluge system piping
ID 35000 18000 51%
5. E & I works required for energization of Pumps 15%
Gas compression & Evacuation facility Project
S.no Scope description Uom Scope Progress
Achieved
% Achieved
Overall Project progress 94%
1. Installation of Blanket gas piping network for FWKO & Storage
tanks-8nos for approx. of -0.8 km
ID 8900 8900 100%
2. Support structure & Valve Access platforms MT 490 490 100%
3. Blanket gas Line testing & commissioning
4. Construction of Control building-1no 100%
5. Construction of Substation-1no 100%
Marmul Rationalization Project
S.no Scope description Uom Scope Progress
Achieved
% Achieved
Overall Project progress 78%
1. Construction of Sludge pits, Transfer pumps & Pipe line from Sludge
pit to Storage tanks
100%
2. Construction of AP & LP Flares Nos 4 3 75%
5. Construction of Flare Piping ID 23000 21000 88%
6. Installation of Gas recovery compressor, associated piping 62%
7. E & I works related to the system 24%
Demolition Projects
S.no Scope description % Achieved
Overall Project progress 79%
1. Demolition of Ware houses-7nos for future facility construction (approx.25000 sqm) 88%
2. Redundant heaters-10nos & associated piping demolition 62%
3. Marmul D & E gathering stations demolition 93%
Major Shutdown Works
S.no Scope description Remarks
1. Production station shutdown Dec’16-Completion of 82
Tie ins required for future Project execution.
Successfully completed & reinstated the lines to
Operations as per stipulated time of 18 hrs. duration
without any Production loss
2. Storage Tank Shutdown Jul’17- Replacement of 30” Oil
& Water O/L Piping-170m long with additional Tie in as
a feed to newly constructed pumps
Successfully completed & reinstated the lines in 48 hrs.
ahead of scheduled time of 60 hrs.; thereby restricting
production loss
3. Successfully performed various Unit SD tie ins in
coordination with operation teams with minimal
deferment in production
CCR
SS#02
SS#01
Pipe Racks & Process piping
Cooling water Network
AG Fire water piping
Major Scope of Works-OSBL Plot
Total plant UG Firewater network
Composite works comprising civil, structural, Underground Piping, Mechanical Piping, Insulation,
Painting, Electrical & Instrumentation works for JBF PTA OSBL Project at Mangalore
S.no Scope description Uom Scope Progress
Achieved
%
Achieved
Overall Project Progress 37%
1. CIVIL RCC 18908 15087 72%
2. STRUCTURE MT 3881 583 15%
3. AG PIPING 4%
AG Piping Welding ID 120194 19897
Erection IM 708947 8220
4. UG PIPING-Cooling Water 88%
UG Piping Welding ID 10254 9830
Erection IM 63828 60851
5. UG PIPING-Firewater 35%
UG Piping Welding ID 17272
Erection IM 84097 19200
6. UG PIPING-Raw water, Drinking water, sewage water 2%
UG Piping Welding ID 16043
Erection IM 34393 520
7. EQUIPMENT MT 506 400 79%
8. ELECTRICAL 4%
9. INSTRUMENTATION 0%
Contract Type-Construction Contract
Contract duration-15 months
Project Value- Rs.196 Crores
Direct Manpower-700 workmen
IN-Direct Manpower-120 no's
UNIT -02 Boiler and its Auxiliaries
Erection, Testing & Commissioning of Unit-02 of 2 X 500 MW Boiler & its
Auxiliaries
S.no Scope description Uom Scope Progress
Achieved
%
Achieved
Over all Project Progress 92%
1. Structures MT 6356 6184 97%
2. Pressure parts MT 5346 5346 100%
3. Non Pressure parts-Furnace,
Ducting
MT 3285 3285 100%
4. Rotating Equipments-Coal mills,
ID, FD, PA Fans.
MT 1844 1844 100%
Completed Drainable Hydrotest with Zero leaks
Completed Non drainable Hydrotest
System completion & readiness for Boiler Light up
Contract Type-Construction Contract
Contract duration-24 months
Project Value- Rs.26 Crores
Direct Manpower-350 workmen
IN-Direct Manpower-45 no's
Project Controls planning & Scheduling Engineer-Portfolio

More Related Content

What's hot

Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSIslam Nassef
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment
 
Giles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationGiles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationFairfax County
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Gadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsGadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsFairfax County
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 

What's hot (20)

DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
DAMAC Heights Project
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
 
Current resume
Current resumeCurrent resume
Current resume
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
Contract 2 - Project Progress Status. Oct-13
Contract 2 - Project Progress Status. Oct-13Contract 2 - Project Progress Status. Oct-13
Contract 2 - Project Progress Status. Oct-13
 
cv
cvcv
cv
 
Giles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationGiles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
 
KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Gadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsGadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer Repairs
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
3 - 01 - 2015
3 - 01 - 20153 - 01 - 2015
3 - 01 - 2015
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 

Similar to Project Controls planning & Scheduling Engineer-Portfolio

Similar to Project Controls planning & Scheduling Engineer-Portfolio (20)

Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
Vinoth
VinothVinoth
Vinoth
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
jahangir
jahangirjahangir
jahangir
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
M Imran
M ImranM Imran
M Imran
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Project Quality control Progress .pptx
Project Quality control  Progress .pptxProject Quality control  Progress .pptx
Project Quality control Progress .pptx
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 

Recently uploaded

女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证obuhobo
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...Suhani Kapoor
 
Zeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effectZeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effectPriyanshuRawat56
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipSoham Mondal
 
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfSoham Mondal
 
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...Suhani Kapoor
 
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceanilsa9823
 
Low Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service Cuttack
Low Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service CuttackLow Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service Cuttack
Low Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service CuttackSuhani Kapoor
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...Suhani Kapoor
 
Employee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India ResearchEmployee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India ResearchSoham Mondal
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsNiya Khan
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)Soham Mondal
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Madekojalkojal131
 
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...gurkirankumar98700
 
Delhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girlsshivangimorya083
 
OSU毕业证留学文凭,制做办理
OSU毕业证留学文凭,制做办理OSU毕业证留学文凭,制做办理
OSU毕业证留学文凭,制做办理cowagem
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士obuhobo
 
The Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdfThe Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdftheknowledgereview1
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 

Recently uploaded (20)

女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
 
Zeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effectZeeman Effect normal and Anomalous zeeman effect
Zeeman Effect normal and Anomalous zeeman effect
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management Internship
 
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
 
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
VIP Russian Call Girls Amravati Chhaya 8250192130 Independent Escort Service ...
 
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
 
Low Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service Cuttack
Low Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service CuttackLow Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service Cuttack
Low Rate Call Girls Cuttack Anika 8250192130 Independent Escort Service Cuttack
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
 
Employee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India ResearchEmployee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India Research
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
 
Résumé (2 pager - 12 ft standard syntax)
Résumé (2 pager -  12 ft standard syntax)Résumé (2 pager -  12 ft standard syntax)
Résumé (2 pager - 12 ft standard syntax)
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
 
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
 
Delhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Greater Noida 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
 
OSU毕业证留学文凭,制做办理
OSU毕业证留学文凭,制做办理OSU毕业证留学文凭,制做办理
OSU毕业证留学文凭,制做办理
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
 
The Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdfThe Impact of Socioeconomic Status on Education.pdf
The Impact of Socioeconomic Status on Education.pdf
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 

Project Controls planning & Scheduling Engineer-Portfolio

  • 1.  I’m a PMI certified Scheduling professional, having over 8 years 3 months of work experience spanning across all aspects in construction of industrial projects in India & abroad (Oman).  Experienced in Power, petrochemical, oil & gas sectors, during this tenure I have handled projects both in greenfield and brownfield (Process facility areas)  Currently for the past 3 years am associated with M/s. Bahwan Engineering Group, my earlier association was with M/s. Petron Engineering & Construction Ltd and M/s. EDAC Engineering Ltd.  As I’m handling role of planning Engineer for Multi-discipline function for EPC project , I’m confident enough to handle the same if opportunities given
  • 2. 1.Credentials 2.Roles & responsibilities 3.List of Projects handled 4.Project Information
  • 3. S.no Certification/Approval Approving Authority 1. Certified scheduling professional; PMI-SP PMI-Project Management Institute 2. Primavera P6 CADD CENTRE 3. Contracts, delays & claims certification in line with Primavera P6 CEM solutions/Udemy 4. Approved Planning Engineer Petroleum Development Oman 5. Bachelors in Mechanical Engineering Anna University
  • 4. S.no Role Frequency of update 1. Detailed study on Project scope by interpreting drawings and scope statement Frequent 2. Preparation of Various levels of Activity & resource schedule based on Client or Managements requirement for their approval As required 3. Preparation/Assisting Project manager in preparing Project budgets/Target cost/Control accounts Initiation stage 4. Preparation of Micro-schedules & resource allocation to set targets to Site supervisors based on standard productivity Frequent 5. Monitoring & recording progress updates, project concerns and circulating it to the required stakeholders Frequent 6. Preparation of Lookahead schedules considering the rescheduling of backlogged activities to meet baseline agreed with client Monthly 7. Tracking, monitoring & controlling the Project progress w.r.to baseline schedule on parameters such as time, cost and physical completion through “S” curves and EVM to measure cost and schedule overrun Monthly
  • 5. S.no Role Frequency of update 8. Monitoring resource productivity and reporting it against available organization productivity standards Frequent 9. Regular Follow up on critical/long lead materials that may hamper project deadlines Frequent 10. Preparation of MIS Reports *Organization chart *Daily, Weekly & monthly reports generation. *Generation & updating Lessons learnt resisters, uploading the same in company database for records *Generation & updating delay registers for arbitration and further project claims As required 11. Timely updating the project expenditures with respect to budget for generation of forecast CTC. Quarterly 12. Preparation of project invoices as per contractual requirements with supporting documentation Monthly 13. Preparation & updating of cash flow scenarios Monthly 14. Preparation of Microlevel schedule, resource program and work pack for shutdown As required
  • 6. List of Projects Handled S.no Company Projects Completion Percentage 1. Bahwan Engineering Company LLC Marmul Pumps Replacement Project 93% 2. Fire Fighting system upgradation project 68% 3. Gas compression & Evacuation Facility Project 94% 4. Rationalization Project 78% 5. Demolition Projects 79% 6. Shutdown 100% 7. Petron Engineering Construction Limited Construction of PTA Plant (OSBL Scope of Works) 37% 8. EDAC Engineering Limited Erection, Testing & commissioning of 500MW coal fired Boiler & Auxiliaries 92%
  • 7.
  • 8. Marmul Projects Plot Plan Pumps Replacement Project Substation#04 Water booster pumps-2nos Wet crude transfer pumps-3nos Main oil pumps-3nos Crude transfer pumps-3nos Water disposal pumps-2nos Control Building Substation#05 Blanket gas network Gas compression & Evacuation facility Project Sludge Pit Rationalization Project
  • 9. Marmul Projects Plot Plan Thuleilat AP Flare Qaharir AP Flare Direct Manpower-900 workmen IN-Direct Manpower-180 no's
  • 10. Pumps Replacement Project S.no Scope description Uom Scope Progress Achieved % Achieved Overall Project progress 93% 1. Erection, testing & commissioning of Pumps Water disposal pumps-2nos Water booster pumps-2nos Crude transfer pumps-3nos Wet crude transfer pumps-3nos Main Oil transfer pumps-3nos Nos 13 10 79% 2. Construction of Foundations & Structural erection for Pumps, sheds & related pipe supports MT 900 820 91% 3. Piping works interconnected to Pumps & Storage Tanks ID 60000 52000 87% 4. Demolition of redundant Storage Tank-1no & pumps-5nos 60% 5. Construction of substations as an electrical feed to the new Pumps- 2nos 100% 6. Construction of OHL steel frame towers & stringing 100% 7. E & I work required for pumps 90%
  • 11. Firefighting System upgradation Project S.no Scope description Uom Scope Progress Achieved % Achieved Overall Project progress 68% 1. Laying of UG GRE Pipeline for the entire Marmul Production station; installation of foam & deluge systems km 5.6 3.2 58% 2. Construction of Fire water tanks Nos 2 2 100% 3. Construction of Fire water pumps Nos 3 3 90% 4. Construction of Piping network from Well to feed Fire water tanks and deluge system piping ID 35000 18000 51% 5. E & I works required for energization of Pumps 15%
  • 12. Gas compression & Evacuation facility Project S.no Scope description Uom Scope Progress Achieved % Achieved Overall Project progress 94% 1. Installation of Blanket gas piping network for FWKO & Storage tanks-8nos for approx. of -0.8 km ID 8900 8900 100% 2. Support structure & Valve Access platforms MT 490 490 100% 3. Blanket gas Line testing & commissioning 4. Construction of Control building-1no 100% 5. Construction of Substation-1no 100%
  • 13. Marmul Rationalization Project S.no Scope description Uom Scope Progress Achieved % Achieved Overall Project progress 78% 1. Construction of Sludge pits, Transfer pumps & Pipe line from Sludge pit to Storage tanks 100% 2. Construction of AP & LP Flares Nos 4 3 75% 5. Construction of Flare Piping ID 23000 21000 88% 6. Installation of Gas recovery compressor, associated piping 62% 7. E & I works related to the system 24%
  • 14. Demolition Projects S.no Scope description % Achieved Overall Project progress 79% 1. Demolition of Ware houses-7nos for future facility construction (approx.25000 sqm) 88% 2. Redundant heaters-10nos & associated piping demolition 62% 3. Marmul D & E gathering stations demolition 93%
  • 15. Major Shutdown Works S.no Scope description Remarks 1. Production station shutdown Dec’16-Completion of 82 Tie ins required for future Project execution. Successfully completed & reinstated the lines to Operations as per stipulated time of 18 hrs. duration without any Production loss 2. Storage Tank Shutdown Jul’17- Replacement of 30” Oil & Water O/L Piping-170m long with additional Tie in as a feed to newly constructed pumps Successfully completed & reinstated the lines in 48 hrs. ahead of scheduled time of 60 hrs.; thereby restricting production loss 3. Successfully performed various Unit SD tie ins in coordination with operation teams with minimal deferment in production
  • 16.
  • 17. CCR SS#02 SS#01 Pipe Racks & Process piping Cooling water Network AG Fire water piping Major Scope of Works-OSBL Plot Total plant UG Firewater network
  • 18. Composite works comprising civil, structural, Underground Piping, Mechanical Piping, Insulation, Painting, Electrical & Instrumentation works for JBF PTA OSBL Project at Mangalore S.no Scope description Uom Scope Progress Achieved % Achieved Overall Project Progress 37% 1. CIVIL RCC 18908 15087 72% 2. STRUCTURE MT 3881 583 15% 3. AG PIPING 4% AG Piping Welding ID 120194 19897 Erection IM 708947 8220 4. UG PIPING-Cooling Water 88% UG Piping Welding ID 10254 9830 Erection IM 63828 60851 5. UG PIPING-Firewater 35% UG Piping Welding ID 17272 Erection IM 84097 19200 6. UG PIPING-Raw water, Drinking water, sewage water 2% UG Piping Welding ID 16043 Erection IM 34393 520 7. EQUIPMENT MT 506 400 79% 8. ELECTRICAL 4% 9. INSTRUMENTATION 0% Contract Type-Construction Contract Contract duration-15 months Project Value- Rs.196 Crores Direct Manpower-700 workmen IN-Direct Manpower-120 no's
  • 19.
  • 20. UNIT -02 Boiler and its Auxiliaries
  • 21. Erection, Testing & Commissioning of Unit-02 of 2 X 500 MW Boiler & its Auxiliaries S.no Scope description Uom Scope Progress Achieved % Achieved Over all Project Progress 92% 1. Structures MT 6356 6184 97% 2. Pressure parts MT 5346 5346 100% 3. Non Pressure parts-Furnace, Ducting MT 3285 3285 100% 4. Rotating Equipments-Coal mills, ID, FD, PA Fans. MT 1844 1844 100% Completed Drainable Hydrotest with Zero leaks Completed Non drainable Hydrotest System completion & readiness for Boiler Light up Contract Type-Construction Contract Contract duration-24 months Project Value- Rs.26 Crores Direct Manpower-350 workmen IN-Direct Manpower-45 no's