SlideShare a Scribd company logo
1 of 4
Download to read offline
Professional Staff CV
Proposed Position: Mechanical Engineer
Date of Birth: Apr.22.1972
Nationality: Iraqi
Mobile (Al-atheer):00964(0)7801448225
E-mail: h.alhaideri@yahoo.com
Membership in Professional Societies
Member of the Iraqi Engineering Union Since 1997.
Previous Employment, Key Qualifications and Achievements:
• September 1999- January 2000, as a lecturer of metals lesson at Basra technology institute for second
stage.
• January 2000- January 2004, as Mechanical maintenance engineer at Petroleum Pipelines Co.,
Shuaiba Oil Products depot and pumping station, Basra.
• January 2004- October 2004, as Site manager for the Installation and Operation of Sewage
Treatment Plant at Basra Airport with Snafee Co. as subcontractor with Bechtel Co.
• October 2004 – October 2005 ,as Mechanical Engineering Section Manager at Petroleum Pipelines
Co. Khor al Zubair Exports and Imports Terminal , Basra.
• October 2005 – December 2005, as Site Engineer for Installation and Operation of Firefighting
system at Basra Court, Iraq.
• December 2005 – July 2007, as representative with GE Oil & Gas., to follow up all company projects
in south region of Iraq, and I have two training courses with GE Oil & Gas Nouvo Pignone in
ITALY , FLORENCE on March 2006 & February 2007 in Oil Field.
• July 2007 – September 2007, as Site Engineer for Manual Digging and installation instrument cables
(16 km) with Snafee Co. as subcontractor with KBR Co.
• September 2007 – October 2008 as Projects Manager with KihroMaa Co.
• October 2008 – Jan. 2014 as CIO and OWNER of Decision Wisdom Co.
• Jan.2014– April 2014 as Generators Maintenance Enginer with Bibluss Bank.
• April 2014 to date as Projects Manager of Motion Energy Projection.
.
Education:
1. Graduated from the Technology University, Baghdad in 1997, with a B.Sc degree in mechanical
engineering.
2. Graduated from the Nassiryah secondary school in 1991.
3. I have training courses in :
1. Turbines maintenance and installation in oil cultural center in 2000.
2. Pumps maintenance and installation in oil cultural center in 2001and 2014
3. Firefighting and safety in oil cultural center in 2002.
4. Operational researches in oil cultural center in 2004 and 2013
5. Compressors maintenance and installation in oil cultural center in 2004
6. 2 Training Courses with GE Oil & Gas Nouvo Pignone in ITALY , FLORENCE in March
2006 & February 2007 in Oil Field.
7. HSE Course in Shuaibah Station in May 2015 .
8. Training course in installation, calibration and mintenance of Weighing Bridge system in
general systems company on 26-29/10/2015.
Employment record:
• April 2014 to date as Projects Manager of Motion Energy Projection.
1-Subcontractor with SHELL to install 5 skid metering system 2014.
2-Subcontractor with SCOP to install one metering skid 2013 and their fittings.
3-Design and fabricates metering skid (PD meter ) in Khor Alzubair Terminal 2012.
• Jan.2014– April 2014 as Generators Maintenance Enginer with Bibluss Bank.
1- Mechaanical maintenance for two generators .
2- Replaced any damaged parts .
3- Daily checking for the oil , water and others.
• October 2008 – Jan. 2014 as CIO and OWNER of Decision Wisdom Co.
1- Project of Clean all Storm water Network in Basrah International Airport. 2008
2- Concrete Repairing and construction of a new Rooms in Basrah International Airport. 2008
3- Construction of Wastewater Pumping Station in Abualkhaseeb Q. ( 2009)
• September 2007 – October 2008 as Projects Manager with KihroMaa Co.
1- Almishraq Q. Water pipeline Project.
2- Alhussein Q. Wastewater pipeline project .
• July 2007 – September 2007, as Site Engineer in Bulk Storge ( SGC ) with Snafee Co. as
subcontractor with KBR Co.
1- Manual Digging and installation instrument cables (16 km).
2- My staff was:-
(i) 4 engineers
(ii) 20 supervisor
(iii) 313 labourers
(iv) 2 Accountants
(v) 30 security guards
(vi) 5 Safety man
• December 2005 – July 2007, as representative with GE Oil & Gas.
1- Follow up all GE projects in south region of Iraq.
2- Received and printed all GE proposals and delivered them to Clients.
3- Follow up all Payments Procedures of all GE Projects.
• October 2005 – December 2005, as Site Engineer for Installation and Operation of Firefighting
system at Basra Court. my works was:
1. I designed the whole system by AutoCAD program.
2. Installation two electrical pumps and one diesel pump.
3. Installation all gate valves and check valves.
4. Layout all pipes and their accessories for (pumps and diffusers).
5. Installation two water tanks (16 m^3).
6. Operation all system.
• October 2004 – October 2005 ,as Mechanical Engineering Section Manager at Petroleum
Pipelines Co. Khor al Zubair Exports and Imports Terminal , Basra, my works was:
1. Installation and maintenance of electrical pumps for oil products.
2. Installation and maintenance of electrical pumps for sea water.
3. installation and maintenance of submersibles pumps for sea water
4. Installation and maintenance of diesel pumps for oil products.
5. Installation and maintenance of electrical generators.
6. Installation and maintenance of firefighting system and their pumps.
7. Installation and maintenance of flow meter for oil products.
8. Installation and maintenance of valves and check valves.
9. Layout oil products and water pipes and their accessories for (pumps, tanks, loading arms
…etc).
10 Design and construction Z-configuration metering ( PD Meters ) system skid .
• January 2004- October 2004, as Site engineer for the Installation and Operation of Sewage
Treatment Plant at Basra Airport with Snafee Co. as subcontractor with Bechtel Co. our works
was:
1. Cleaning.
a. Five pumping stations and their accessories
b. Aeration tanks.
c. Settling tanks.
d. Digestion tanks.
e. Inlet system.
f. Blowers’ house.
2.Replaced all submersibles pumps, valves (gate valves & butterfly valves) and check valves.
3. Install three blowers and one compressor.
4. Install 8 ventilation fans.
5. Install macerator machine.
6. Install aerators domes.
7. Layout H.D.P.E pipes and their accessories.
8. Layout C.S pipes and their accessories.
9. Layout U.P.V.C pipes and their accessories.
10. Layout S.S pipes and their accessories.
11. Replaced all damaged pipes in network pipelines.
12. Install four airlift pumps.
13. Replaced all kinds of cables (4200 m) with new.
14. Install anew main control panels.
15. Construct three drying beds (30, 15, 1) m for each.
16. Design and construct anew pumping station with their accessories.
17. Install chlorine system.
18. Replaced all penstocks, drip plate ,plug valves and screen.
19. All civilian engineering works.
• January 2000-January 2004, as Mechanical maintenance engineer at Petroleum Pipelines Co.,
Shuaiba Oil Products depot and pumping station, Basra. our works was:
1. Installation and maintenance of electrical pumps for oil products and LPG in Shuaiba,
Naseriah and Diwaniah pumping stations.
2. Installation and maintenance of diesel pumps for oil products in Shuaiba, Naseriah and
Diwaniah pumping stations.
3. Installation and maintenance of electrical generators in Shuaiba, Naseriah and Diwaniah
pumping stations.
4. Installation and maintenance of electrical pumps for RO water.
5. Installation and maintenance of valves and check valves.
6. Installation and maintenance of firefighting system and their pumps
Interests:
I have interest in AutoCAD program, Internet, reading and sports
Languages:
• Arabic, is my mother tongue.
• My English language is very good (read &write)
• I had a course in English language and computer in AL-SHABAKA Institute in Basra in 2000 and in
oil cultural center in 2014 .
• I have course in Italian language .
Family:
I’m married and have 5 children (Muntader 13 years, Zaynab 11 years , Fatimah 7 years and Dhuha 4
years and Mohammed 1 years old), my wife is a teacher, all of them and me are living at the same home,
• My father is a consultant engineer (electrical engineer) he was responsible of technical department in
Basra water directorate and he is now working with UNDP as a consultant engineer .
• My mother is housewife and she has secondary school certificate.
• My first sister has an A.M degree in English language, and her husband is civil Engineer.
• My second sister is a doctor and her husband is a doctor too.
• My brother is a doctor and his wife is a pharmacist.
• My youngest sister is a doctor and her husband is a doctor too .
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this data correctly describes my
qualifications, my experience, and me.
Signature: Hazim J. Alhaideri
Date: Jan, 20, 2016

More Related Content

What's hot

Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015
ayub mundu
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
Ravi Prakash
 
waleed ameer cv (1)
waleed ameer cv (1)waleed ameer cv (1)
waleed ameer cv (1)
waleed ameer
 
CV4updated November 2014
CV4updated November 2014CV4updated November 2014
CV4updated November 2014
Mike Peacock
 
C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)
Baig Ali
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
Martin Bennie
 
Auberry Proposal 20110318
Auberry Proposal 20110318Auberry Proposal 20110318
Auberry Proposal 20110318
Jon Zuber
 
Jaime Pielago Evor1
Jaime Pielago Evor1Jaime Pielago Evor1
Jaime Pielago Evor1
jaime evora
 
King Street Staion: 3rd floor walls demolition
King Street Staion: 3rd floor walls demolitionKing Street Staion: 3rd floor walls demolition
King Street Staion: 3rd floor walls demolition
allieger
 

What's hot (20)

Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
waleed ameer cv (1)
waleed ameer cv (1)waleed ameer cv (1)
waleed ameer cv (1)
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
CV4updated November 2014
CV4updated November 2014CV4updated November 2014
CV4updated November 2014
 
AMT CV (3)
AMT CV (3)AMT CV (3)
AMT CV (3)
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
QAQC-E&I -Resume
QAQC-E&I -ResumeQAQC-E&I -Resume
QAQC-E&I -Resume
 
C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)C&ess presentation drm (30.10.13)
C&ess presentation drm (30.10.13)
 
russell resume
russell resumerussell resume
russell resume
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
 
Auberry Proposal 20110318
Auberry Proposal 20110318Auberry Proposal 20110318
Auberry Proposal 20110318
 
Jaime Pielago Evor1
Jaime Pielago Evor1Jaime Pielago Evor1
Jaime Pielago Evor1
 
CV Manongar Sitio
CV Manongar SitioCV Manongar Sitio
CV Manongar Sitio
 
King Street Staion: 3rd floor walls demolition
King Street Staion: 3rd floor walls demolitionKing Street Staion: 3rd floor walls demolition
King Street Staion: 3rd floor walls demolition
 
ASIM CV
ASIM CVASIM CV
ASIM CV
 
CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)
 

Similar to Professional Staff (20)

Ehab C.V (1)
Ehab C.V  (1)Ehab C.V  (1)
Ehab C.V (1)
 
SABER CV
SABER CVSABER CV
SABER CV
 
C.V.Haider-2015 Last Final Augest-15
C.V.Haider-2015 Last  Final Augest-15C.V.Haider-2015 Last  Final Augest-15
C.V.Haider-2015 Last Final Augest-15
 
Resume
ResumeResume
Resume
 
ali al omari CV
ali al omari CVali al omari CV
ali al omari CV
 
ahmed cv finall ing
ahmed cv finall ingahmed cv finall ing
ahmed cv finall ing
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
CV -mosleh
CV -moslehCV -mosleh
CV -mosleh
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
My resume
My resumeMy resume
My resume
 
CV Denstar Ricardo Silalahi
CV Denstar Ricardo SilalahiCV Denstar Ricardo Silalahi
CV Denstar Ricardo Silalahi
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
c v ziouane
c v  ziouanec v  ziouane
c v ziouane
 
Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOC
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Tony achkar cv
Tony achkar cvTony achkar cv
Tony achkar cv
 

Professional Staff

  • 1. Professional Staff CV Proposed Position: Mechanical Engineer Date of Birth: Apr.22.1972 Nationality: Iraqi Mobile (Al-atheer):00964(0)7801448225 E-mail: h.alhaideri@yahoo.com Membership in Professional Societies Member of the Iraqi Engineering Union Since 1997. Previous Employment, Key Qualifications and Achievements: • September 1999- January 2000, as a lecturer of metals lesson at Basra technology institute for second stage. • January 2000- January 2004, as Mechanical maintenance engineer at Petroleum Pipelines Co., Shuaiba Oil Products depot and pumping station, Basra. • January 2004- October 2004, as Site manager for the Installation and Operation of Sewage Treatment Plant at Basra Airport with Snafee Co. as subcontractor with Bechtel Co. • October 2004 – October 2005 ,as Mechanical Engineering Section Manager at Petroleum Pipelines Co. Khor al Zubair Exports and Imports Terminal , Basra. • October 2005 – December 2005, as Site Engineer for Installation and Operation of Firefighting system at Basra Court, Iraq. • December 2005 – July 2007, as representative with GE Oil & Gas., to follow up all company projects in south region of Iraq, and I have two training courses with GE Oil & Gas Nouvo Pignone in ITALY , FLORENCE on March 2006 & February 2007 in Oil Field. • July 2007 – September 2007, as Site Engineer for Manual Digging and installation instrument cables (16 km) with Snafee Co. as subcontractor with KBR Co. • September 2007 – October 2008 as Projects Manager with KihroMaa Co. • October 2008 – Jan. 2014 as CIO and OWNER of Decision Wisdom Co. • Jan.2014– April 2014 as Generators Maintenance Enginer with Bibluss Bank. • April 2014 to date as Projects Manager of Motion Energy Projection. . Education: 1. Graduated from the Technology University, Baghdad in 1997, with a B.Sc degree in mechanical engineering. 2. Graduated from the Nassiryah secondary school in 1991. 3. I have training courses in : 1. Turbines maintenance and installation in oil cultural center in 2000. 2. Pumps maintenance and installation in oil cultural center in 2001and 2014 3. Firefighting and safety in oil cultural center in 2002. 4. Operational researches in oil cultural center in 2004 and 2013 5. Compressors maintenance and installation in oil cultural center in 2004 6. 2 Training Courses with GE Oil & Gas Nouvo Pignone in ITALY , FLORENCE in March 2006 & February 2007 in Oil Field. 7. HSE Course in Shuaibah Station in May 2015 . 8. Training course in installation, calibration and mintenance of Weighing Bridge system in general systems company on 26-29/10/2015.
  • 2. Employment record: • April 2014 to date as Projects Manager of Motion Energy Projection. 1-Subcontractor with SHELL to install 5 skid metering system 2014. 2-Subcontractor with SCOP to install one metering skid 2013 and their fittings. 3-Design and fabricates metering skid (PD meter ) in Khor Alzubair Terminal 2012. • Jan.2014– April 2014 as Generators Maintenance Enginer with Bibluss Bank. 1- Mechaanical maintenance for two generators . 2- Replaced any damaged parts . 3- Daily checking for the oil , water and others. • October 2008 – Jan. 2014 as CIO and OWNER of Decision Wisdom Co. 1- Project of Clean all Storm water Network in Basrah International Airport. 2008 2- Concrete Repairing and construction of a new Rooms in Basrah International Airport. 2008 3- Construction of Wastewater Pumping Station in Abualkhaseeb Q. ( 2009) • September 2007 – October 2008 as Projects Manager with KihroMaa Co. 1- Almishraq Q. Water pipeline Project. 2- Alhussein Q. Wastewater pipeline project . • July 2007 – September 2007, as Site Engineer in Bulk Storge ( SGC ) with Snafee Co. as subcontractor with KBR Co. 1- Manual Digging and installation instrument cables (16 km). 2- My staff was:- (i) 4 engineers (ii) 20 supervisor (iii) 313 labourers (iv) 2 Accountants (v) 30 security guards (vi) 5 Safety man • December 2005 – July 2007, as representative with GE Oil & Gas. 1- Follow up all GE projects in south region of Iraq. 2- Received and printed all GE proposals and delivered them to Clients. 3- Follow up all Payments Procedures of all GE Projects. • October 2005 – December 2005, as Site Engineer for Installation and Operation of Firefighting system at Basra Court. my works was: 1. I designed the whole system by AutoCAD program. 2. Installation two electrical pumps and one diesel pump. 3. Installation all gate valves and check valves. 4. Layout all pipes and their accessories for (pumps and diffusers). 5. Installation two water tanks (16 m^3). 6. Operation all system.
  • 3. • October 2004 – October 2005 ,as Mechanical Engineering Section Manager at Petroleum Pipelines Co. Khor al Zubair Exports and Imports Terminal , Basra, my works was: 1. Installation and maintenance of electrical pumps for oil products. 2. Installation and maintenance of electrical pumps for sea water. 3. installation and maintenance of submersibles pumps for sea water 4. Installation and maintenance of diesel pumps for oil products. 5. Installation and maintenance of electrical generators. 6. Installation and maintenance of firefighting system and their pumps. 7. Installation and maintenance of flow meter for oil products. 8. Installation and maintenance of valves and check valves. 9. Layout oil products and water pipes and their accessories for (pumps, tanks, loading arms …etc). 10 Design and construction Z-configuration metering ( PD Meters ) system skid . • January 2004- October 2004, as Site engineer for the Installation and Operation of Sewage Treatment Plant at Basra Airport with Snafee Co. as subcontractor with Bechtel Co. our works was: 1. Cleaning. a. Five pumping stations and their accessories b. Aeration tanks. c. Settling tanks. d. Digestion tanks. e. Inlet system. f. Blowers’ house. 2.Replaced all submersibles pumps, valves (gate valves & butterfly valves) and check valves. 3. Install three blowers and one compressor. 4. Install 8 ventilation fans. 5. Install macerator machine. 6. Install aerators domes. 7. Layout H.D.P.E pipes and their accessories. 8. Layout C.S pipes and their accessories. 9. Layout U.P.V.C pipes and their accessories. 10. Layout S.S pipes and their accessories. 11. Replaced all damaged pipes in network pipelines. 12. Install four airlift pumps. 13. Replaced all kinds of cables (4200 m) with new. 14. Install anew main control panels. 15. Construct three drying beds (30, 15, 1) m for each. 16. Design and construct anew pumping station with their accessories. 17. Install chlorine system. 18. Replaced all penstocks, drip plate ,plug valves and screen. 19. All civilian engineering works.
  • 4. • January 2000-January 2004, as Mechanical maintenance engineer at Petroleum Pipelines Co., Shuaiba Oil Products depot and pumping station, Basra. our works was: 1. Installation and maintenance of electrical pumps for oil products and LPG in Shuaiba, Naseriah and Diwaniah pumping stations. 2. Installation and maintenance of diesel pumps for oil products in Shuaiba, Naseriah and Diwaniah pumping stations. 3. Installation and maintenance of electrical generators in Shuaiba, Naseriah and Diwaniah pumping stations. 4. Installation and maintenance of electrical pumps for RO water. 5. Installation and maintenance of valves and check valves. 6. Installation and maintenance of firefighting system and their pumps Interests: I have interest in AutoCAD program, Internet, reading and sports Languages: • Arabic, is my mother tongue. • My English language is very good (read &write) • I had a course in English language and computer in AL-SHABAKA Institute in Basra in 2000 and in oil cultural center in 2014 . • I have course in Italian language . Family: I’m married and have 5 children (Muntader 13 years, Zaynab 11 years , Fatimah 7 years and Dhuha 4 years and Mohammed 1 years old), my wife is a teacher, all of them and me are living at the same home, • My father is a consultant engineer (electrical engineer) he was responsible of technical department in Basra water directorate and he is now working with UNDP as a consultant engineer . • My mother is housewife and she has secondary school certificate. • My first sister has an A.M degree in English language, and her husband is civil Engineer. • My second sister is a doctor and her husband is a doctor too. • My brother is a doctor and his wife is a pharmacist. • My youngest sister is a doctor and her husband is a doctor too . Certification: I, the undersigned, certify that to the best of my knowledge and belief, this data correctly describes my qualifications, my experience, and me. Signature: Hazim J. Alhaideri Date: Jan, 20, 2016