SlideShare a Scribd company logo
1 of 12
Download to read offline
Komthon Ruxsuntisarnti 1 of 12
CURRICULUM VITAE
NAME : MR. KOMTHON RUXSUNTISARNTI
RESIDENCE : 144/258 Phyathai Village Pakked
Nontaburi 11120, Thailand
TELEPHONE : Fax. (662) 584-4728, Mob. +66 8 1421-6152
EMAIL ADDRESS : komthorn_100@yahoo.co.th
PERSONAL DATA
DATE/PLACE OF BIRTH : January 10, 1958 / Singburi
SEX/STATUS : Male/ Married
HEIGHT/WEIGHT : 174 Cm. / 65 Kg.
RELIGION : Buddhism
NATIONALITY : Thai
I.D.CARD : 3-1702-001-0015-32-8
HEALTH : Excellent
EDUCATION BACKGROUND
Bachelor Degree : Rajamangala University of Technology Thewet Camp
Bangkok ,Thailand
Diploma : Uthenthawai Technical Institute of Technology
Bangkok , Thailand
Scholarship : Thai National Bank Co., Ltd.
(From Unthenthawai Technical Institute)
WORKING EXPERIENCE
• 30 Years on Construction & Progressing
• Project Manager, Construction Manager
• Mechanical completion / Construction co-ordinator.
• Civil Superintendent, Civil Engineer
• Senior Cost Engineer, Senior Civil Engineer
• Lead Civil and Steel Structure Engineer.
• Steel Fabricated Formwork Designer
• Civil QA, QC, Building
• Piping Superintendent
• Mechanical completion.
• Commissioning and startup team.
Komthon Ruxsuntisarnti 2 of 12
EXPERIENCE HISTORIES.
PERIOD OF EMPLOYMENT: July 31, 2013 TO PRESENT
COMPANY : Pro-En Technologies.
PROJECT : NVRS – INTERCONNECTING 28” GAS PIPELINE PROJ.
POSITION : Project CO-ORDINATOR. [ pipeline ]
DUTIES & RESPONSIBILITIES
• Supervise preparation and regular update of detailed schedule, cost forecasting,
maintenance of current budget, change control in budget level
• Supervise the cost engineering / manhour estimating, planning / scheduling, document
control and reporting disciplines
• Project planning and scheduling – for Engineering/Procurement/Construction
Management projects
• Project budgeting & resource planning
• Schedule control, cost control, and change control
• Project progress monitoring
• Project performance review
• Coordination with project teams
• Write summary reports / Prepare weekly project status reports
• Provide expert assistance to the Proposal Manager in creating a schedule and cost
model identifying its sensitivities and drivers.
• Support to the project risk management process
• Liaise, assist and guide internal Project Controls team, external contractor and client for
all aspect of project controls system
• Maintain a close working relationship with the client representative to ensure efficient
communication on all project controls issues.
• Quality Assurance – Responsible for working within the provisions and guidelines of the
Quality Assurance system relevant to the CSG, etc.
• Safety – Responsible for personal safety safe working practices for the CSG, etc.
Understand and
follow
PERIOD OF EMPLOYMENT: April. 1, 2011 – July 31, 2013
Komthon Ruxsuntisarnti 3 of 12
COMPANY : Penspen Joint Venture with Pro-En Technologies.
PROJECT : Fourth Transmission Pipeline Project.[ dia.42” gas line]
POSITION : Pipeline Superintendent
DUTIES & RESPONSIBILITIES
• Monitors and daily reporting directed to Construction Manager.
• Preparation comment to contractor Civil, Mechanical, Pipeline, Welding procedure,
Coating etc. and report to Construction Manager.
• Regularly site supervision of all contractor activities.
• Preparation planning over all schedule and two weeks brief the schedule to confirm the
project schedule control.
• Co-ordinate with Engineering and Construction meeting regulation.
• Manage and Controller the officer and construction meeting.
• Monitors quality control of civil,mechanical pipeing activities.
PERIOD OF EMPLOYMENT: May. 1, 2010 –March 31, 2011
COMPANY : PURAC THAILAND CO., LTD.
PROJECT : Emerald Project. (Lactide Extend phase II)
POSITION : Deputy Construction Manager.
DUTIES & RESPONSIBILITIES
As the previously of project starting, I according to my experience in the project control
management, field construction coordinate, have been issued to supporting the standard
project requirement.
Civil work : Expeditor and management incl. coordination the
subcontractor to confirm the mechanical & electrical
schedule.
Steel Structure work : Site coordinate, expeditor the contractor (Q-TECH) to
confirm project requirements.
Steel structure erection planning 500 Tons.
- Erection steel structure of Pipe rack.
- Erection control for process building.
- Punch work for Steel structure.
Mechanical-Piping : Management supported to subcontractor
Adviser pipeline installation from the existing plant to the
new plant.
(Q-TECH & HERTEL-WILLICH)
Overall equipment installation control
- All tanks, Vessels, Heat exchanger erection control.
- Internal column tank installation erection
supervised (SULZER)
- All mechanical pump installation control.
- All mechanical pump cooling tower 9 Ea erection.
Komthon Ruxsuntisarnti 4 of 12
- Piping, Valve, Instrument etc. erection.
- All mechanical, piping preparation punch work and
hand-over document.
Electrical & Instrument : Coordinate contractor (ABB) to confirm the schedule work
for each construction division
Utilities : Management directed to involve the scaffolding work,
Heavy & light duty requirement erection installation,
mechanical completion and support for start up
(Pre-commissioning)
Safety : That the major subject issued to project requirement.
PERIOD OF EMPLOYMENT: Nov. 1, 2008 – Apr 1, 2010
COMPANY : Technip (BENALUX)
PROJECT : Maptaput Orifin Company (MOC)
8 Nos of Cracking furnaces
POSITION : Piping Superintendent, Mechnical completion and
Commissioning team (start-up).
DUTIES & RESPONSIBILITIES
• Site coordinator between structure module, Mechanical, Piping, Electrical and
Instrument.
• Structure module installation supervised heavy and light equipment including.
• Piping around 200,000 diameter inch (Large and small bore piping) supervision and
advised construction control work for contractor (STECON)
• Control site welding to confirmed schedule [ RT.incl.]
• Control Hydro Static and Pre-Numetric Test.
• 8 units MOV valve installation.
- Control valve erection supervisor (whole plant)
- Leader for steam blow down.
- Repairing pipe welding joint (P91)
- Document hand-over to client (SCG)
• Mechanical punch preparation and hand-over to commissioning team and OWNER
(SCG)
• 1 unit elevator lift install (60.00 m, High) supervised.
• Co-ordinate with 8 units air intake fan vendor
- Alignment and start up.
• Commissioning team supporting and one in the start-up team work.
• Preparation for mechanical punch.
• HSE site coordinate and attended in the meeting.
• Adviser and Inspection pipeline installation and pressure test.
PERIOD OF EMPLOYMENT: Feb. 1, 2006 – Oct. 31, 2008
COMPANY : PURAC THAILAND CO., LTD.
Komthon Ruxsuntisarnti 5 of 12
PROJECT : Quinten Lactic Acid Project.
POSITION : Deputy Construction Manager.
DUTIES & RESPONSIBILITIES
As the previously of project starting, I according to my experience in the project control
management, field construction coordinate, have been issued to supporting the standard
project requirement and preparation construction report directly to project manager [Dutch.]
Civil work : Expeditor and management incl. coordination the
Subcontractor[RITTA]confirm the mechanical & electrical
schedule.
Steel Structure work : Site coordinate, expeditor the contractor (STP&I) to
confirm project requirements.
Steel structure erection planning 500 Tons.
- Erection steel structure of Pipe rack.
- Erection control for process building.
- Punch work for Steel structure.
Mechanical-Piping : Management supported to subcontractor
(Q-TECH & SHI-ASIA)
Overall equipment installation control
- All tanks, Vessels, Heat exchanger erection control.
- Internal column tannic installation erection
supervised (SULZER)
- All mechanical pump installation control.
- All mechanical pump cooling tower 9 Ea erection.
- Piping, Valve, Instrument etc. erection.
- All mechanical, piping preparation punch work and
hand-over document.
Electrical & Instrument : Coordinate contractor (ABB) to confirm the schedule work
for each construction division
Utilities : Management directed to involve the scaffolding work,
Heavy & light duty requirement erection installation,
mechanical completion and support for start up
(pre-commissioning)
Safety : That the major subject issued to project requirement.
PERIOD OF EMPLOYMENT: Jun. 2004 – Jan. 2006
COMPANY : SIAM GULF PETROCHEMICAL CO., LTD.
PROJECT : 50,000 BPD Refinery
POSITION : Construction Manager.
DUTIES & RESPONSIBILITIES
Komthon Ruxsuntisarnti 6 of 12
As the previously of project starting, I according to my experience in the project control
management, field construction coordinate, have been issued to supporting the standard
project requirement and preparation construction report directly to project manager [Dutch.]
Civil work : Expeditor and management incl. coordination the
subcontractor to confirm the mechanical & electrical
schedule.
Steel Structure work : Site coordinate, expeditor the contractor (STP&I) to
confirm project requirements.
Mechanical-Piping : Management supported to subcontractor
Adviser pipeline installation from jetty to the tank farm.
Electrical & Instrument : Coordinate contractor (S, Anan) to confirm the schedule
work for each construction division
Utilities : Management directed to involve the scaffolding work,
Heavy & light duty requirement erection installation,
mechanical completion and support for start up
(pre-commissioning)
Safety : That the major subject issued to project requirement.
PERIOD OF EMPLOYMENT: Feb. 2003 - May 2004
COMPANY : KVAERNER E&C (THAILAND) LTD.,
PROJECT : Thai Copper Smelter & Refinery Project
POSITION : Sr. Civil Structure Steel Supervisor
: Mechanical Completion Supervisor
DUTIES & RESPONSIBILITIES
• Over-all steel structure control, Building, Pipe-rack, Furnace and Refractory.
• Checking design drawings and shop drawing.
• Materials checking (Shaping, Dimension and Quantities).
• Support for Mechanical and Piping work at Refinery area.
• Co-ordinate with Sub-contractor.[ SCC / ABB ]
• Site Controller for coating & Lining (Acid System).
• Control the schedule target (Ensure that the Sub-contractor can follow-up our target).
• QC. for Refractory (No pin hole for cement mortar).
• Length = 250 m Steel conveyor tray supervision.
• Heavy equipment installation [ Furnace ]
• Mechanical punch item preparation.
• Coordinate construction progress with Owner.
• Support to start-up commissioning team.
Komthon Ruxsuntisarnti 7 of 12
PERIOD OF EMPLOYMENT: Mar. 1999- Jan 2003
COMPANY : RAYTHEON EMBASSCO LTD.
PROJECT : Ratchaburi CCPP [2100 MW]
POSITION : Lead Civil and Steel structure.& Coordinator.
Since 1999 started working with Raytheon Ebassco Overseas Limited as Lead Civil and Steel
Structure Engineer for the Combined Cycle Power Plant (2100 MW) situated in Ratchaburi .I
according to my experience in construction field, I am responsible for the following:
• Supervision of entire civil construction and co-ordination with client (EGA T) and various
sub contractors.
• During initial stages of the project, took care of soil testing, site preparation, earthwork,
piling work, bar bending, concrete pouring and form work erection etc.
• Quality control for concrete plant, reinforcement bar and form work to stick to the
contractual requirements.
• Providing and verifying quantity survey for concrete, reinforcement bar, steel frame
shuttle etc. Expediting the site work with sub contractor to meet the project schedule
(civil/steel structure)
• Review and verify site civil/steel structure drawing design to cooperate with
vendor(TOMOE - CORPORATION) drawing
• Supervise HVAC, duct work and air handling unit installation.
• Supervise and installation for mechanical equipment.
• Supervise the over all steel structure work in turbine building, utility rack etc.
• Providing and verifying the extra cost (back-charge) for any deviation from approved
drawing and specification.
• Preparing and providing field design change note (FDCN)
• Mechanical stop log design / advised all lifting equipment installation.
• Play and active role in weekly construction meeting to provide the status of work and
highlight the attention towards critical areas.
• Rectify / Preparation the final Dwg. to confirm with Egat.requirements and submittal.
• Attending weekly safety meeting to know about possible safety hazards and to report
any un-safe working conditions.
PERIOD OF EMPLOYMENT: Feb. 15, 1998 – Dec. 31, 1998
COMPANY : MITSUI ENGINEERING & SHIPBUILDING CO., LTD.
: Bangchak Petroleum Co., Ltd. Bangkok Thailand
POSITION : Civil Steel Structure Superintendent
DUTIES & RESPONSIBILITIES
• All civil and steel structure work to be controlled.
• 1 Unit electrical sub-station bldg.
• 1 Unit south & main pipe rack bldg.
• 1 Unit "A" Structure bldg.
• Co-ordinator with BCP (owner), Foster Wheeler (Proj. Consult) & Subcontractor
(Unithai Steel Structure Fabrication Shop)
• Concrete & Asphalt Road all around project
Komthon Ruxsuntisarnti 8 of 12
• Site drainage, gutter manhole overall
• Steel Structure supervision such as "A" Structure & Utility Pipe/Rack, Quantity
(Civil and Steel Structure) Surveyor
• Heavy Equipment such as steel tank and vessel tank installation.
• Punch list whole project
PERIOD OF EMPLOYMENT: Apr. 1997 – Dec. 1997
COMPANY : JGC CORPORATION (NIKKI K K.)
PROJECT : Thai Paraxelene Project (TPX Project)
Sriracha, Au-Udom, Chonburi
POSITION : Civil and Steel Structure SuperIntendent.
DUTIES & RESPONSIBILITIES
• All civil & building to be controlled
• Site preparation whole project (PIONEER)
• Earthwork, roadwork, groundwork, drainage work, gutter, manhole over all
• Piping work for main pipe rack & ADM bldg.
• Coordination with Thai Oil (owner) & Foster Wheeler (Project consult also sub
contractor) (CMT, SCC, Sino-Thai, PACO)
• Steel structure supervision over all project.
• Vessel tank installation supervision.
• Supervision the pipe support installation.
• Scaffloding installation control.
• Support for Comisioning Team.
• Attend in the construction site meeting.
PERIOD OF EMPLOYMENT: Jan. 1997 – Apr. 1997
COMPANY : THAI LEIGHTON CO., LTD.
PROJECT : CCPP. AMATA ECCO Project
Bangpakong Park 2 Project Chonburi
POSITION : Senior Cost Engineer / Construction Coordinator
DUTIES & RESPONSIBILITIES
• Costing preparation, summary of B.O.Q. and extra charge for whole project
charged for site instruction overall
• 1 unit gas turbine bldg. (Steel Structure)
• 1 unit main control room bldg.
• Foundation, fabrication, erection
• Installation for steel tank , vessel tank
• Coordinate field work construction , civil / mechanical / piping.
• Leader for construction site meeting.[civil,mech.pipe,elect.and instrument.]
• Mechanical completion.
• Site safety management & meeting.
PERIOD OF EMPLOYMENT: Jan. 1996 – Jan. 1997
COMPANY : THAINOX STEEL CO., LTD.
Komthon Ruxsuntisarnti 9 of 12
PROJECT : Thainox Phase 2 (Expansion Project)
Mapkha, Maptaphut, Rayong
POSITION : Civil and Steel Structure Superintendent
: Mechanical Completion
DUTIES & RESPONSIBILITIES
• All civil & building to be controlled, costing preparation and controlled 80MM
bore-pile 180 no. 5, construction basement
• Heavy and light equipment installation supervise and control.
• Mechanical / piping supervised overall project.
• 1 unit oil cellar building (-9.00 m.)
• Sendzimiser Building (-6.00 m. underground)
• M.C.B. Building (-3.00 m. underground)
• 1 unit electrical substation
• Underground –9.00 m. elec. with tunnel
• Water treatment plant, new workshop
• 7,000 tons supervised steel structure building erection
• Coordination with sub-contractor ITD, EMCO and Owner
• Zendzimer 1,200 tons.installation and supervision.
• Over Head Crane installation supervision.
• Schedule & Planning work and punch list whole project
PERIOD OF EMPLOYMENT: Jan. 1994 – Dec. 1996
COMPANY : JGC. CORPORATION. (NIKKI K.K.)
Sriracha, Au-Udom, Chonburi
POSITION : Site Construction Manager (CMT, SAMSUNG)
DUTIES& RESPONSIBILITIES
• Re-checking cost for tender (bidding)
• Construction materials & equipment management control.
• Site preparation earthwork, roadwork Management control.
• Supervision for Infar Structure / Civil / Mechanical / Piping work.
• Expeditor steel structure erection and Mechanical installation.
• Schedule & Planning work Management and Expiditor.
• Construction method document providing Heavy / Light Equipment installation.
• Main control building (-9.00 m. underground) Management Control.
• 2 unit electrical sub-station building Management Control.
• Field auxiliary room building
• 2 unit gate housing building
• Safety meeting and management
• Site construction report to Project Manager
PERIOD OF EMPLOYMENT: Jan. 1993 – Nov. 1994
COMPANY : T.K.V. CONSTRUCTION (Housing Project)
PROJECT : Pharuay Housing Project
Bangbuathong, Nonthaburi
Komthon Ruxsuntisarnti 10 of 12
POSITION : Construction Manager
DUTIES & RESPONSIBILITIES
• Drawing designer and project costing preparation
• Construction, materials and equipment control
• Site preparation, earthwork and roadwork
• Supervision for drainage manhole and sewage overall
• 4,000 no. piling & drainage supervision
• Mechanical installation / Piping work. Management and Control.
• Electrical / Instrument Management and Control.
• Subcontractor management
• Construction supervision
• Safety & security management
COMPANY : CONTRACTER OWNER (TURNKEY)
PROJECT : 2 Unit Apartments
5 fl. /12.00 m. /64.00 m.
Klongton, Prakanong, Bangkok
POSITION : Project Manager
DUTIES & RESPONSIBILITIES
• Established the requirements of the project regarding to the scope of work and
organized the schedule work
• Structural & Architect designer
• Bidder costing preparation
• Construction Management
• Material & Equipment management
• Costing & Manpower Management
• Schedule & Planning work
• Construction & Supervision
These are period as I was started working in Middle East (Since 1981-
1991 = 10 years 9 months) after I already engineering education complete,
many of project I have experience such as Refinery, Power Plant, Super
Structure etc. as identified in the attached my resume , by under Saudi
Condreco Co., Ltd. only
PERIOD OF EMPLOYMENT: 1989 – 1991
COMPANY : SAUDI CONDRECO CO., LTD.
PROJECT : Medina Tunnel Project
Jeddah, Saudi Arabia
POSITION : Civil Engineer Fabrication Steel Structure
DUTIES & RESPONSIBILITIES
• Tending cost preparation
• Steel tunnel formwork designer
Komthon Ruxsuntisarnti 11 of 12
• Steel fabrication supervisor
• Construction supervisor
• Schedule & Planning work
• Construction & safety meeting
• Punch list & diary work report to site manager
PERIOD OF EMPLOYMENT: 1987 – 1989
COMPANY : SAUDI CONDRECO CO., LTD.
PROJECT : Aden Port Authority Republic of Aden
POSITION : Civil Engineer, Fabrication Structure Steel Designer,
DUTIES & RESPONSIBILITIES
• Tendering cost preparation
• Site preparation & Earth work
• Construction supervision (Civil & Steel Structure)
• 4 Units warehouse Bldg. (Steel Structure)
• Concrete & Steel Form work slant block
• Slant block construction
• Jetty & Quay - Wall supervision
• Steel structure supervision
• Safety & Construction meeting
• Schedule & Planning work
PERIOD OF EMPLOYMENT: 1985 – 1987
COMPANY : SAUDI CONDRECO CO., LTD.
PROJECT : Cairo C-25 Project (Concrete Twin Tunnel)
Cairo Egypt
POSITION : Civil Engineer, Fabrication Steel Structure Design
DUTIES & RESPONSIBILITIES
• Tendering cost preparation
• Construction Twin Tunnel Supervision
• 2/2.50/2.50/16.00 KM.
• Steel formwork designer (8 sets)
• Steel fabrication shop controller
• Schedule & Planning work
• Safety & Construction meeting
• Etc.
PERIOD OF EMPLOYMENT: 1983 – 1985
COMPANY : SAUDI CONDRECO CO., LTD.
PROJECT : Farafan Bridge Project
Farafan Saudi Arabia (K.S.A)
POSITION : Civil Engineer, Steel Structure Supervisor
DUTIES & RESPONSIBILITIES
• B.O.Q. preparation (CONC; F/W, Re-bar)
• Construction supervision
• Site preparation, Earthwork and road work
Komthon Ruxsuntisarnti 12 of 12
• Pre-cast conc. beam, parapet and barriers
• Conc. Column & Capping beam
• Steel form work design and control steel fabrication shop
• Report work to site manager
PERIOD OF EMPLOYMENT: 1981 – 1983
COMPANY : SAUDI CONDRECO CO., LTD.
PROJECT : Yanbu Refinery Project
Yanbu Saudi Arabia
POSITION : Civil Engineer, Steel Structure Supervisor
DUTIES & RESPONSIBILITIES
• Gas, Fuel, Conc. Pipe supporter supervision
• Steel clamp for gas, fuel fixed supervision
• 7.00 KM. pipeline Construction supervision
• Mechanical installation and supervised.
• As Built drawing preparation
• Site construction coordinator.
• Materials & Equipment controller
• Diary construction reporting
PERIOD OF EMPLOYMENT: 1977 – 1979
COMPANY : CH. KANCHANG CO., LTD.
PROJECT : CH. Kanchang Bldg. Huaykwang, Bangkok
POSITION : Asst. Estimator (Part time)
DUTIES & RESPONSIBILITIES
• Bills of materials to be preparation for Thai Army Military such as;
- Ware house bldg.
- Canteen bldg.
- Barrage bldg. - School bldg.
- Asphaltic & Conc. Road
- Drawing controller & Distributed
- Material control, stock keeper
- Building foreman and draftsman
- Etc.

More Related Content

What's hot (19)

QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Giridhar
GiridharGiridhar
Giridhar
 
ahmed cv finall ing
ahmed cv finall ingahmed cv finall ing
ahmed cv finall ing
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
DAMAC Heights Project
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 
ste p rept 2
ste p rept 2ste p rept 2
ste p rept 2
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
Monitoring Programme Review
 
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
CV OF MOHAMMAD ALI.doc-01
CV OF MOHAMMAD ALI.doc-01CV OF MOHAMMAD ALI.doc-01
CV OF MOHAMMAD ALI.doc-01
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
Resume - Umamaheswaran
Resume - UmamaheswaranResume - Umamaheswaran
Resume - Umamaheswaran
 

Viewers also liked

Mislim zeleno, čuvam zemlju-2.b OŠ Donja Stubica
Mislim zeleno, čuvam zemlju-2.b OŠ Donja StubicaMislim zeleno, čuvam zemlju-2.b OŠ Donja Stubica
Mislim zeleno, čuvam zemlju-2.b OŠ Donja StubicaKsenija Antolković
 
Sustentación davidson alexis suarez acosta pptx
Sustentación davidson alexis suarez acosta pptxSustentación davidson alexis suarez acosta pptx
Sustentación davidson alexis suarez acosta pptxDAVIDSON SUAREZ
 
Case study piotr test
Case study piotr test Case study piotr test
Case study piotr test Piotr Test
 
How does your media product represent particular social
How does your media product represent particular socialHow does your media product represent particular social
How does your media product represent particular socialFlynn Oliphant
 
Windmill14jan16 darryl2
Windmill14jan16 darryl2Windmill14jan16 darryl2
Windmill14jan16 darryl2Mueller Darryl
 
Gestor de proyecto grupo B - SANTIAGO VILA
Gestor de proyecto grupo B - SANTIAGO VILAGestor de proyecto grupo B - SANTIAGO VILA
Gestor de proyecto grupo B - SANTIAGO VILADIPLOMADO6
 
FTE Dynamic Descaler presentation G1
FTE Dynamic Descaler presentation G1FTE Dynamic Descaler presentation G1
FTE Dynamic Descaler presentation G1Budi Santoso
 
Clases de inglés in company
Clases de inglés in companyClases de inglés in company
Clases de inglés in companyGiovanna Mussini
 

Viewers also liked (20)

Mislim zeleno, čuvam zemlju-2.b OŠ Donja Stubica
Mislim zeleno, čuvam zemlju-2.b OŠ Donja StubicaMislim zeleno, čuvam zemlju-2.b OŠ Donja Stubica
Mislim zeleno, čuvam zemlju-2.b OŠ Donja Stubica
 
Group 4
Group 4Group 4
Group 4
 
Sustentación davidson alexis suarez acosta pptx
Sustentación davidson alexis suarez acosta pptxSustentación davidson alexis suarez acosta pptx
Sustentación davidson alexis suarez acosta pptx
 
Periferico Lopez Mateos
Periferico Lopez MateosPeriferico Lopez Mateos
Periferico Lopez Mateos
 
VOLTIOS works
VOLTIOS worksVOLTIOS works
VOLTIOS works
 
Umrah packages
Umrah packagesUmrah packages
Umrah packages
 
Case study piotr test
Case study piotr test Case study piotr test
Case study piotr test
 
Caso de Estudio Grupo 3
Caso de Estudio Grupo 3Caso de Estudio Grupo 3
Caso de Estudio Grupo 3
 
How does your media product represent particular social
How does your media product represent particular socialHow does your media product represent particular social
How does your media product represent particular social
 
205_55
205_55205_55
205_55
 
Yordi ppeña
Yordi ppeñaYordi ppeña
Yordi ppeña
 
Windmill14jan16 darryl2
Windmill14jan16 darryl2Windmill14jan16 darryl2
Windmill14jan16 darryl2
 
Mision Sena
Mision SenaMision Sena
Mision Sena
 
OTDK_NSN_final
OTDK_NSN_finalOTDK_NSN_final
OTDK_NSN_final
 
OutdoorHDTV Booklet small
OutdoorHDTV Booklet smallOutdoorHDTV Booklet small
OutdoorHDTV Booklet small
 
Gestor de proyecto grupo B - SANTIAGO VILA
Gestor de proyecto grupo B - SANTIAGO VILAGestor de proyecto grupo B - SANTIAGO VILA
Gestor de proyecto grupo B - SANTIAGO VILA
 
FTE Dynamic Descaler presentation G1
FTE Dynamic Descaler presentation G1FTE Dynamic Descaler presentation G1
FTE Dynamic Descaler presentation G1
 
Clases de inglés in company
Clases de inglés in companyClases de inglés in company
Clases de inglés in company
 
Buisness CV
Buisness CVBuisness CV
Buisness CV
 
Brochure
BrochureBrochure
Brochure
 

Similar to l CURRICULUM VITAE. [ komthorn very up date]

Similar to l CURRICULUM VITAE. [ komthorn very up date] (20)

1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
kkalema
kkalemakkalema
kkalema
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
Vu Duc Hoang_CV
Vu Duc Hoang_CVVu Duc Hoang_CV
Vu Duc Hoang_CV
 
CV_Kao_2015_Jan
CV_Kao_2015_JanCV_Kao_2015_Jan
CV_Kao_2015_Jan
 
CV_Kao_2015_Jan
CV_Kao_2015_JanCV_Kao_2015_Jan
CV_Kao_2015_Jan
 
Resume latest
Resume latestResume latest
Resume latest
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Regidor A. Manalo Sub-Agent (Corporate C.V)
Regidor A. Manalo Sub-Agent  (Corporate C.V)Regidor A. Manalo Sub-Agent  (Corporate C.V)
Regidor A. Manalo Sub-Agent (Corporate C.V)
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

l CURRICULUM VITAE. [ komthorn very up date]

  • 1. Komthon Ruxsuntisarnti 1 of 12 CURRICULUM VITAE NAME : MR. KOMTHON RUXSUNTISARNTI RESIDENCE : 144/258 Phyathai Village Pakked Nontaburi 11120, Thailand TELEPHONE : Fax. (662) 584-4728, Mob. +66 8 1421-6152 EMAIL ADDRESS : komthorn_100@yahoo.co.th PERSONAL DATA DATE/PLACE OF BIRTH : January 10, 1958 / Singburi SEX/STATUS : Male/ Married HEIGHT/WEIGHT : 174 Cm. / 65 Kg. RELIGION : Buddhism NATIONALITY : Thai I.D.CARD : 3-1702-001-0015-32-8 HEALTH : Excellent EDUCATION BACKGROUND Bachelor Degree : Rajamangala University of Technology Thewet Camp Bangkok ,Thailand Diploma : Uthenthawai Technical Institute of Technology Bangkok , Thailand Scholarship : Thai National Bank Co., Ltd. (From Unthenthawai Technical Institute) WORKING EXPERIENCE • 30 Years on Construction & Progressing • Project Manager, Construction Manager • Mechanical completion / Construction co-ordinator. • Civil Superintendent, Civil Engineer • Senior Cost Engineer, Senior Civil Engineer • Lead Civil and Steel Structure Engineer. • Steel Fabricated Formwork Designer • Civil QA, QC, Building • Piping Superintendent • Mechanical completion. • Commissioning and startup team.
  • 2. Komthon Ruxsuntisarnti 2 of 12 EXPERIENCE HISTORIES. PERIOD OF EMPLOYMENT: July 31, 2013 TO PRESENT COMPANY : Pro-En Technologies. PROJECT : NVRS – INTERCONNECTING 28” GAS PIPELINE PROJ. POSITION : Project CO-ORDINATOR. [ pipeline ] DUTIES & RESPONSIBILITIES • Supervise preparation and regular update of detailed schedule, cost forecasting, maintenance of current budget, change control in budget level • Supervise the cost engineering / manhour estimating, planning / scheduling, document control and reporting disciplines • Project planning and scheduling – for Engineering/Procurement/Construction Management projects • Project budgeting & resource planning • Schedule control, cost control, and change control • Project progress monitoring • Project performance review • Coordination with project teams • Write summary reports / Prepare weekly project status reports • Provide expert assistance to the Proposal Manager in creating a schedule and cost model identifying its sensitivities and drivers. • Support to the project risk management process • Liaise, assist and guide internal Project Controls team, external contractor and client for all aspect of project controls system • Maintain a close working relationship with the client representative to ensure efficient communication on all project controls issues. • Quality Assurance – Responsible for working within the provisions and guidelines of the Quality Assurance system relevant to the CSG, etc. • Safety – Responsible for personal safety safe working practices for the CSG, etc. Understand and follow PERIOD OF EMPLOYMENT: April. 1, 2011 – July 31, 2013
  • 3. Komthon Ruxsuntisarnti 3 of 12 COMPANY : Penspen Joint Venture with Pro-En Technologies. PROJECT : Fourth Transmission Pipeline Project.[ dia.42” gas line] POSITION : Pipeline Superintendent DUTIES & RESPONSIBILITIES • Monitors and daily reporting directed to Construction Manager. • Preparation comment to contractor Civil, Mechanical, Pipeline, Welding procedure, Coating etc. and report to Construction Manager. • Regularly site supervision of all contractor activities. • Preparation planning over all schedule and two weeks brief the schedule to confirm the project schedule control. • Co-ordinate with Engineering and Construction meeting regulation. • Manage and Controller the officer and construction meeting. • Monitors quality control of civil,mechanical pipeing activities. PERIOD OF EMPLOYMENT: May. 1, 2010 –March 31, 2011 COMPANY : PURAC THAILAND CO., LTD. PROJECT : Emerald Project. (Lactide Extend phase II) POSITION : Deputy Construction Manager. DUTIES & RESPONSIBILITIES As the previously of project starting, I according to my experience in the project control management, field construction coordinate, have been issued to supporting the standard project requirement. Civil work : Expeditor and management incl. coordination the subcontractor to confirm the mechanical & electrical schedule. Steel Structure work : Site coordinate, expeditor the contractor (Q-TECH) to confirm project requirements. Steel structure erection planning 500 Tons. - Erection steel structure of Pipe rack. - Erection control for process building. - Punch work for Steel structure. Mechanical-Piping : Management supported to subcontractor Adviser pipeline installation from the existing plant to the new plant. (Q-TECH & HERTEL-WILLICH) Overall equipment installation control - All tanks, Vessels, Heat exchanger erection control. - Internal column tank installation erection supervised (SULZER) - All mechanical pump installation control. - All mechanical pump cooling tower 9 Ea erection.
  • 4. Komthon Ruxsuntisarnti 4 of 12 - Piping, Valve, Instrument etc. erection. - All mechanical, piping preparation punch work and hand-over document. Electrical & Instrument : Coordinate contractor (ABB) to confirm the schedule work for each construction division Utilities : Management directed to involve the scaffolding work, Heavy & light duty requirement erection installation, mechanical completion and support for start up (Pre-commissioning) Safety : That the major subject issued to project requirement. PERIOD OF EMPLOYMENT: Nov. 1, 2008 – Apr 1, 2010 COMPANY : Technip (BENALUX) PROJECT : Maptaput Orifin Company (MOC) 8 Nos of Cracking furnaces POSITION : Piping Superintendent, Mechnical completion and Commissioning team (start-up). DUTIES & RESPONSIBILITIES • Site coordinator between structure module, Mechanical, Piping, Electrical and Instrument. • Structure module installation supervised heavy and light equipment including. • Piping around 200,000 diameter inch (Large and small bore piping) supervision and advised construction control work for contractor (STECON) • Control site welding to confirmed schedule [ RT.incl.] • Control Hydro Static and Pre-Numetric Test. • 8 units MOV valve installation. - Control valve erection supervisor (whole plant) - Leader for steam blow down. - Repairing pipe welding joint (P91) - Document hand-over to client (SCG) • Mechanical punch preparation and hand-over to commissioning team and OWNER (SCG) • 1 unit elevator lift install (60.00 m, High) supervised. • Co-ordinate with 8 units air intake fan vendor - Alignment and start up. • Commissioning team supporting and one in the start-up team work. • Preparation for mechanical punch. • HSE site coordinate and attended in the meeting. • Adviser and Inspection pipeline installation and pressure test. PERIOD OF EMPLOYMENT: Feb. 1, 2006 – Oct. 31, 2008 COMPANY : PURAC THAILAND CO., LTD.
  • 5. Komthon Ruxsuntisarnti 5 of 12 PROJECT : Quinten Lactic Acid Project. POSITION : Deputy Construction Manager. DUTIES & RESPONSIBILITIES As the previously of project starting, I according to my experience in the project control management, field construction coordinate, have been issued to supporting the standard project requirement and preparation construction report directly to project manager [Dutch.] Civil work : Expeditor and management incl. coordination the Subcontractor[RITTA]confirm the mechanical & electrical schedule. Steel Structure work : Site coordinate, expeditor the contractor (STP&I) to confirm project requirements. Steel structure erection planning 500 Tons. - Erection steel structure of Pipe rack. - Erection control for process building. - Punch work for Steel structure. Mechanical-Piping : Management supported to subcontractor (Q-TECH & SHI-ASIA) Overall equipment installation control - All tanks, Vessels, Heat exchanger erection control. - Internal column tannic installation erection supervised (SULZER) - All mechanical pump installation control. - All mechanical pump cooling tower 9 Ea erection. - Piping, Valve, Instrument etc. erection. - All mechanical, piping preparation punch work and hand-over document. Electrical & Instrument : Coordinate contractor (ABB) to confirm the schedule work for each construction division Utilities : Management directed to involve the scaffolding work, Heavy & light duty requirement erection installation, mechanical completion and support for start up (pre-commissioning) Safety : That the major subject issued to project requirement. PERIOD OF EMPLOYMENT: Jun. 2004 – Jan. 2006 COMPANY : SIAM GULF PETROCHEMICAL CO., LTD. PROJECT : 50,000 BPD Refinery POSITION : Construction Manager. DUTIES & RESPONSIBILITIES
  • 6. Komthon Ruxsuntisarnti 6 of 12 As the previously of project starting, I according to my experience in the project control management, field construction coordinate, have been issued to supporting the standard project requirement and preparation construction report directly to project manager [Dutch.] Civil work : Expeditor and management incl. coordination the subcontractor to confirm the mechanical & electrical schedule. Steel Structure work : Site coordinate, expeditor the contractor (STP&I) to confirm project requirements. Mechanical-Piping : Management supported to subcontractor Adviser pipeline installation from jetty to the tank farm. Electrical & Instrument : Coordinate contractor (S, Anan) to confirm the schedule work for each construction division Utilities : Management directed to involve the scaffolding work, Heavy & light duty requirement erection installation, mechanical completion and support for start up (pre-commissioning) Safety : That the major subject issued to project requirement. PERIOD OF EMPLOYMENT: Feb. 2003 - May 2004 COMPANY : KVAERNER E&C (THAILAND) LTD., PROJECT : Thai Copper Smelter & Refinery Project POSITION : Sr. Civil Structure Steel Supervisor : Mechanical Completion Supervisor DUTIES & RESPONSIBILITIES • Over-all steel structure control, Building, Pipe-rack, Furnace and Refractory. • Checking design drawings and shop drawing. • Materials checking (Shaping, Dimension and Quantities). • Support for Mechanical and Piping work at Refinery area. • Co-ordinate with Sub-contractor.[ SCC / ABB ] • Site Controller for coating & Lining (Acid System). • Control the schedule target (Ensure that the Sub-contractor can follow-up our target). • QC. for Refractory (No pin hole for cement mortar). • Length = 250 m Steel conveyor tray supervision. • Heavy equipment installation [ Furnace ] • Mechanical punch item preparation. • Coordinate construction progress with Owner. • Support to start-up commissioning team.
  • 7. Komthon Ruxsuntisarnti 7 of 12 PERIOD OF EMPLOYMENT: Mar. 1999- Jan 2003 COMPANY : RAYTHEON EMBASSCO LTD. PROJECT : Ratchaburi CCPP [2100 MW] POSITION : Lead Civil and Steel structure.& Coordinator. Since 1999 started working with Raytheon Ebassco Overseas Limited as Lead Civil and Steel Structure Engineer for the Combined Cycle Power Plant (2100 MW) situated in Ratchaburi .I according to my experience in construction field, I am responsible for the following: • Supervision of entire civil construction and co-ordination with client (EGA T) and various sub contractors. • During initial stages of the project, took care of soil testing, site preparation, earthwork, piling work, bar bending, concrete pouring and form work erection etc. • Quality control for concrete plant, reinforcement bar and form work to stick to the contractual requirements. • Providing and verifying quantity survey for concrete, reinforcement bar, steel frame shuttle etc. Expediting the site work with sub contractor to meet the project schedule (civil/steel structure) • Review and verify site civil/steel structure drawing design to cooperate with vendor(TOMOE - CORPORATION) drawing • Supervise HVAC, duct work and air handling unit installation. • Supervise and installation for mechanical equipment. • Supervise the over all steel structure work in turbine building, utility rack etc. • Providing and verifying the extra cost (back-charge) for any deviation from approved drawing and specification. • Preparing and providing field design change note (FDCN) • Mechanical stop log design / advised all lifting equipment installation. • Play and active role in weekly construction meeting to provide the status of work and highlight the attention towards critical areas. • Rectify / Preparation the final Dwg. to confirm with Egat.requirements and submittal. • Attending weekly safety meeting to know about possible safety hazards and to report any un-safe working conditions. PERIOD OF EMPLOYMENT: Feb. 15, 1998 – Dec. 31, 1998 COMPANY : MITSUI ENGINEERING & SHIPBUILDING CO., LTD. : Bangchak Petroleum Co., Ltd. Bangkok Thailand POSITION : Civil Steel Structure Superintendent DUTIES & RESPONSIBILITIES • All civil and steel structure work to be controlled. • 1 Unit electrical sub-station bldg. • 1 Unit south & main pipe rack bldg. • 1 Unit "A" Structure bldg. • Co-ordinator with BCP (owner), Foster Wheeler (Proj. Consult) & Subcontractor (Unithai Steel Structure Fabrication Shop) • Concrete & Asphalt Road all around project
  • 8. Komthon Ruxsuntisarnti 8 of 12 • Site drainage, gutter manhole overall • Steel Structure supervision such as "A" Structure & Utility Pipe/Rack, Quantity (Civil and Steel Structure) Surveyor • Heavy Equipment such as steel tank and vessel tank installation. • Punch list whole project PERIOD OF EMPLOYMENT: Apr. 1997 – Dec. 1997 COMPANY : JGC CORPORATION (NIKKI K K.) PROJECT : Thai Paraxelene Project (TPX Project) Sriracha, Au-Udom, Chonburi POSITION : Civil and Steel Structure SuperIntendent. DUTIES & RESPONSIBILITIES • All civil & building to be controlled • Site preparation whole project (PIONEER) • Earthwork, roadwork, groundwork, drainage work, gutter, manhole over all • Piping work for main pipe rack & ADM bldg. • Coordination with Thai Oil (owner) & Foster Wheeler (Project consult also sub contractor) (CMT, SCC, Sino-Thai, PACO) • Steel structure supervision over all project. • Vessel tank installation supervision. • Supervision the pipe support installation. • Scaffloding installation control. • Support for Comisioning Team. • Attend in the construction site meeting. PERIOD OF EMPLOYMENT: Jan. 1997 – Apr. 1997 COMPANY : THAI LEIGHTON CO., LTD. PROJECT : CCPP. AMATA ECCO Project Bangpakong Park 2 Project Chonburi POSITION : Senior Cost Engineer / Construction Coordinator DUTIES & RESPONSIBILITIES • Costing preparation, summary of B.O.Q. and extra charge for whole project charged for site instruction overall • 1 unit gas turbine bldg. (Steel Structure) • 1 unit main control room bldg. • Foundation, fabrication, erection • Installation for steel tank , vessel tank • Coordinate field work construction , civil / mechanical / piping. • Leader for construction site meeting.[civil,mech.pipe,elect.and instrument.] • Mechanical completion. • Site safety management & meeting. PERIOD OF EMPLOYMENT: Jan. 1996 – Jan. 1997 COMPANY : THAINOX STEEL CO., LTD.
  • 9. Komthon Ruxsuntisarnti 9 of 12 PROJECT : Thainox Phase 2 (Expansion Project) Mapkha, Maptaphut, Rayong POSITION : Civil and Steel Structure Superintendent : Mechanical Completion DUTIES & RESPONSIBILITIES • All civil & building to be controlled, costing preparation and controlled 80MM bore-pile 180 no. 5, construction basement • Heavy and light equipment installation supervise and control. • Mechanical / piping supervised overall project. • 1 unit oil cellar building (-9.00 m.) • Sendzimiser Building (-6.00 m. underground) • M.C.B. Building (-3.00 m. underground) • 1 unit electrical substation • Underground –9.00 m. elec. with tunnel • Water treatment plant, new workshop • 7,000 tons supervised steel structure building erection • Coordination with sub-contractor ITD, EMCO and Owner • Zendzimer 1,200 tons.installation and supervision. • Over Head Crane installation supervision. • Schedule & Planning work and punch list whole project PERIOD OF EMPLOYMENT: Jan. 1994 – Dec. 1996 COMPANY : JGC. CORPORATION. (NIKKI K.K.) Sriracha, Au-Udom, Chonburi POSITION : Site Construction Manager (CMT, SAMSUNG) DUTIES& RESPONSIBILITIES • Re-checking cost for tender (bidding) • Construction materials & equipment management control. • Site preparation earthwork, roadwork Management control. • Supervision for Infar Structure / Civil / Mechanical / Piping work. • Expeditor steel structure erection and Mechanical installation. • Schedule & Planning work Management and Expiditor. • Construction method document providing Heavy / Light Equipment installation. • Main control building (-9.00 m. underground) Management Control. • 2 unit electrical sub-station building Management Control. • Field auxiliary room building • 2 unit gate housing building • Safety meeting and management • Site construction report to Project Manager PERIOD OF EMPLOYMENT: Jan. 1993 – Nov. 1994 COMPANY : T.K.V. CONSTRUCTION (Housing Project) PROJECT : Pharuay Housing Project Bangbuathong, Nonthaburi
  • 10. Komthon Ruxsuntisarnti 10 of 12 POSITION : Construction Manager DUTIES & RESPONSIBILITIES • Drawing designer and project costing preparation • Construction, materials and equipment control • Site preparation, earthwork and roadwork • Supervision for drainage manhole and sewage overall • 4,000 no. piling & drainage supervision • Mechanical installation / Piping work. Management and Control. • Electrical / Instrument Management and Control. • Subcontractor management • Construction supervision • Safety & security management COMPANY : CONTRACTER OWNER (TURNKEY) PROJECT : 2 Unit Apartments 5 fl. /12.00 m. /64.00 m. Klongton, Prakanong, Bangkok POSITION : Project Manager DUTIES & RESPONSIBILITIES • Established the requirements of the project regarding to the scope of work and organized the schedule work • Structural & Architect designer • Bidder costing preparation • Construction Management • Material & Equipment management • Costing & Manpower Management • Schedule & Planning work • Construction & Supervision These are period as I was started working in Middle East (Since 1981- 1991 = 10 years 9 months) after I already engineering education complete, many of project I have experience such as Refinery, Power Plant, Super Structure etc. as identified in the attached my resume , by under Saudi Condreco Co., Ltd. only PERIOD OF EMPLOYMENT: 1989 – 1991 COMPANY : SAUDI CONDRECO CO., LTD. PROJECT : Medina Tunnel Project Jeddah, Saudi Arabia POSITION : Civil Engineer Fabrication Steel Structure DUTIES & RESPONSIBILITIES • Tending cost preparation • Steel tunnel formwork designer
  • 11. Komthon Ruxsuntisarnti 11 of 12 • Steel fabrication supervisor • Construction supervisor • Schedule & Planning work • Construction & safety meeting • Punch list & diary work report to site manager PERIOD OF EMPLOYMENT: 1987 – 1989 COMPANY : SAUDI CONDRECO CO., LTD. PROJECT : Aden Port Authority Republic of Aden POSITION : Civil Engineer, Fabrication Structure Steel Designer, DUTIES & RESPONSIBILITIES • Tendering cost preparation • Site preparation & Earth work • Construction supervision (Civil & Steel Structure) • 4 Units warehouse Bldg. (Steel Structure) • Concrete & Steel Form work slant block • Slant block construction • Jetty & Quay - Wall supervision • Steel structure supervision • Safety & Construction meeting • Schedule & Planning work PERIOD OF EMPLOYMENT: 1985 – 1987 COMPANY : SAUDI CONDRECO CO., LTD. PROJECT : Cairo C-25 Project (Concrete Twin Tunnel) Cairo Egypt POSITION : Civil Engineer, Fabrication Steel Structure Design DUTIES & RESPONSIBILITIES • Tendering cost preparation • Construction Twin Tunnel Supervision • 2/2.50/2.50/16.00 KM. • Steel formwork designer (8 sets) • Steel fabrication shop controller • Schedule & Planning work • Safety & Construction meeting • Etc. PERIOD OF EMPLOYMENT: 1983 – 1985 COMPANY : SAUDI CONDRECO CO., LTD. PROJECT : Farafan Bridge Project Farafan Saudi Arabia (K.S.A) POSITION : Civil Engineer, Steel Structure Supervisor DUTIES & RESPONSIBILITIES • B.O.Q. preparation (CONC; F/W, Re-bar) • Construction supervision • Site preparation, Earthwork and road work
  • 12. Komthon Ruxsuntisarnti 12 of 12 • Pre-cast conc. beam, parapet and barriers • Conc. Column & Capping beam • Steel form work design and control steel fabrication shop • Report work to site manager PERIOD OF EMPLOYMENT: 1981 – 1983 COMPANY : SAUDI CONDRECO CO., LTD. PROJECT : Yanbu Refinery Project Yanbu Saudi Arabia POSITION : Civil Engineer, Steel Structure Supervisor DUTIES & RESPONSIBILITIES • Gas, Fuel, Conc. Pipe supporter supervision • Steel clamp for gas, fuel fixed supervision • 7.00 KM. pipeline Construction supervision • Mechanical installation and supervised. • As Built drawing preparation • Site construction coordinator. • Materials & Equipment controller • Diary construction reporting PERIOD OF EMPLOYMENT: 1977 – 1979 COMPANY : CH. KANCHANG CO., LTD. PROJECT : CH. Kanchang Bldg. Huaykwang, Bangkok POSITION : Asst. Estimator (Part time) DUTIES & RESPONSIBILITIES • Bills of materials to be preparation for Thai Army Military such as; - Ware house bldg. - Canteen bldg. - Barrage bldg. - School bldg. - Asphaltic & Conc. Road - Drawing controller & Distributed - Material control, stock keeper - Building foreman and draftsman - Etc.