This document provides a cost allocation for various components of a benchmark construction project including an office tower, link bridge, carpark, infrastructure, and basement. It allocates percentages and totals for structures, architecture, mechanical and electrical works, and other costs for each section. The total contract sum for the entire project is RM441,140,000 with the largest allocations to architectural works (25%), structural works (21%), and mechanical and electrical works (23%).