ABC INTERNATIONAL REGIONAL
HEADQUARTERS COMPLEX
PROPOSED OFFICE BUILDING SITE
Project: 1201-15
Date: 6/4/2016
LEWIS GENERAL CONTRACTORS
2929 BROOK AVENUE
TEMECULA, CALIFORNIA 92590
EXISTING SITE AERIAL VIEW MAP
ABC International Headquarters
Complex
Proposed 2 story office building site
Corner of Ynez Road & Temecula Valley Parkway
City of Temecula, California
County of Riverside
APN# 916-400-025-3
PROPOSED SITE AERIAL VIEW OVERLAY- PART 1
PROPOSED SITE AERIAL VIEW OVERLAY- PART 2
Proposed Site
▪ Cost of Land $1,250,000
▪ Total Area - Landscaping 52,794 sf
▪ Total Area - Hardscape (Parking, Drive Isles, Sidewalks) 79,193 sf
▪ Total Area – Property 31,987 sf or 3.03 acres
Proposed Office Building
▪ Total Area- Open Office Space (both floors) 10,357 sf
▪ Total Area – Executive Office Space (both floors) 576 sf
▪ Total Area – Conference Rooms (both floors) 2,450 sf
▪ Total Area - Mechanical and Utility Rooms 1,186 sf
▪ Total Net Area – Useable space 13,383 sf
▪ Total Gross Area – All rooms and spaces 15,024 sf
PROPOSED SITE & OFFICE BUILDING AREA CALCULATION TABULATION
PROPOSED OFFICE BUILDING-1ST FLOOR PLAN
7,464 SF
PROPOSED OFFICE BUILDING 2ND FLOOR PLAN
7,560 SF
PROPOSED OFFICE BUILDING-ROOF PLAN
7,560 SF
PROPOSED OFFICE BUILDING-PARTIAL EXTERIOR ELEVATION
32’-0” MAXIMUM BUILDING HEIGHT
EXAMPLE BUILDING DESIGN-FRONT VIEW- EXHIBIT A
• TYPE II-A CONSTRUCTION
• FULL FIRE SPRINKLER SYSTEM
• OCCUPANCY ‘B’ OFFICE
• STEEL SKELTON FRAME
• METAL STUD EXTERIOR BACKER WALL ENCLOSURE
• BRICK VENEER WAINSCOT
• EXTERIOR FINISH INSULATION SYSTEM (EFIS)
Exhibit A
EXAMPLE BUILDING DESIGN-LEFT, RIGHT, & FRONT VIEWS- EXHIBITS B, C & D
• TYPE II-A CONSTRUCTION
• FULL FIRE SPRINKLER SYSTEM
• OCCUPANCY ‘B’ OFFICE
• STEEL SKELTON FRAME
• METAL STUD EXTERIOR BACKER WALL ENCLOSURE
• BRICK VENEER WAINSCOT
• EXTERIOR FINISH INSULATION SYSTEM (EFIS)
Exhibit B
Exhibit D
Exhibit C
PROPOSED SITE CONSTRUCTION UTILIZATION PLAN (SUP)
LGC’S ORGANIZATION CHART- EXHIBIT A
• G10 Site Preparation
• G30 Site Mechanical Utilities
• A10 Foundations
• B10 Superstructure
• B20 Exterior Enclosure
• B30 Roofing
• C20 Stairs
• D10 Conveying
• C10 Interior Construction
• D20 Plumbing
• D30 HVAC
• D40 Fire Protection
• D50 Electrical
• C30 Interior Finishes
• G20 Site Improvements
• G40 Site Electrical Utilities
WORK BREAKDOWN SCHEDULE (WBS)- GROUP ELEMENTS LEVEL 2
Group Elements-Level II Construction Estimated Payment Due Scheduled Pay
Phases Base Cost per Phase Request Per
G10 Site Preparation Phase 1 $96,537.99 $302,762.99 June 6th to July 5th- Initial First Payment
G30 Site Mechanical Phase 1 $206,225.00
Utilities
A10 Foundations Phase 2 $8,418.74 $24,602.18 July 6th to August 5th
B10 Superstructure Phase 2 $16,183.44
B20 Exterior Enclosure Phase 3 $12,191.40 $562,511.27 August 6th to September 5th
B30 Roofing Phase 3 $8,319.87
C20 Stairs Phase 3 $258,000.00
D10 Conveying Phase 3 $284,000.00
C10 Interior Construction Phase 4 $16,867.89 $217,296.32 September 6th to October 5th
D20 Plumbing Phase 4 $49,000.00
D30 HVAC Phase 4 $123,000.00
D40 Fire Protection Phase 4 $13,111.96
D50 Electrical Phase 4 $15,316.47
C30 Interior Finishes Phase 5 $16,867.89 $473,108.85 October 6th to October 20th-
G20 Site Improvements Phase 5 $82,978.99 Final Payment & total of retainer
G40 Site Electrical Utilities Phase 5 $229,600.00 included ($143,661.96 @ 10%)
Duration of Completion
(Linear Days)
14
8
8
16
14
9
6
4
16
12
10
9
10
8
12
7
LGC’S CONSTRUCTION COST & DURATION (WBS) SUMMARY
TOTAL ESTIMATED CONSTRUCTION COST= $1,612,605.54
TOTAL LINEAR DURATION= 163 WORKING DAYS OR 7 MONTHS
LGC’S CONSTRUCTION PROJECT SCHEDULE-GANTT CHART
LGC’S CONSTRUCTION SAFETY POLICY STATEMENT
It is the policy of Lewis General Contractors (LGC) to provide its employees, subcontractors, suppliers, vendors, as well as our clients with safe and healthy job
sites that are free from existing and potential hazards that can or will cause minor, serious or fatal physical and/or mental harm. LGC is also committed to comply
with all applicable OSHA standards and regulations. In efforts to make this attainable all must work together to make job sites safe. LGC feels strongly confident
that we will receive your full cooperation and support in all safety practices.
• Sign-off by the safety engineer of LGC on attendance of a required ‘Safety Orientation Lecture
and Video’ to include provided written safety materials and documentation for all
subcontractors and their employees that are expected to provide work onsite
• Minimum of at least 10-hour OSHA safety training certification for all subcontractors and their
employees that are expected to provide work onsite.
• All subcontractors and their employees must participate in regularly scheduled job site safety
meetings with the safety engineer and construction manager as well as, on the job safety
training with supervisors.
• All subcontractors are to provide a current and to date emergency contact list to include a
direct supervisor, a competent person, and any other persons deemed necessary by the
subcontractor.
• A ‘Job Safety Analysis’-JSA is to be provided by all subcontractors that covers each task specific
to work per the contract. It must include detailed steps, existing & potential hazards, &
controls to mitigate them.
• All subcontractors are required to provide their employees with ‘Personal Protection
Equipment’-PPE and that they are trained in the use of it and of what is required per OSHA PPE
standards specific to the work hazard.
• A ‘Materials Safety Data Sheet’-MSDS outlined in a written safety manual must be provided by
all subcontractors for supplies, chemicals, and materials used to perform the work and as
specified per the contract documents that are specific to the work.
LGC’S CONSTRUCTION SAFETY PLAN
ABC INTERNATIONAL REGIONAL HEADQUARTERS COMPLEX
PROPOSED OFFICE BUILDING SITE –ADDENDUM -001
A GREENER SUSTAINABLE LEED APPROACH
PROPOSED OFFICE BUILDING-1ST FLOOR PLAN- ADDENDUM-001
7,464 SF
PROPOSED OFFICE BUILDING 2ND FLOOR PLAN- ADDENDUM-001
7,560 SF
PROPOSED OFFICE BUILDING-ROOF PLAN- ADDENDUM-001
7,560 SF
ADDENDUM-001
PROPOSED OFFICE BUILDING-PARTIAL EXTERIOR ELEVATION- ADDENDUM-001
32’-0” MAXIMUM BUILDING HEIGHT
Group Elements-Level II Construction Estimated
Phases Base Cost
G10 Site Preparation Phase 1 $96,537.99
G30 Site Mechanical Phase 1 $206,225.00
Utilities
A10 Foundations Phase 2 $8,418.74
B10 Superstructure Phase 2 $16,183.44
B20 Exterior Enclosure Phase 3 $12,191.40
B30 Roofing Phase 3 $8,319.87
C20 Stairs Phase 3 $258,000.00
D10 Conveying Phase 3 $284,000.00
C10 Interior Construction Phase 4 $16,867.89
D20 Plumbing Phase 4 $49,000.00
D30 HVAC Phase 4 $123,000.00
D40 Fire Protection Phase 4 $13,111.96
D50 Electrical Phase 4 $15,316.47
C30 Interior Finishes Phase 5 $16,867.89
G20 Site Improvements Phase 5 $82,978.99
G40 Site Electrical Utilities Phase 5 $229,600.00
TOTAL ESTIMATED CONSTRUCTION COST= $1,754,605.54
(AN INCREASE OF $142,200 IN ADDITIONAL COST)
TOTAL LINEAR DURATION= 203 WORKING DAYS OR 8 ¾ MONTHS
(AN INCREASE OF 40 WORKING DAYS DUE TO MORE MAN HOURS REQUIRED)
LGC’S CONSTRUCTION COST & DURATION (WBS) SUMMARY- ADDENDUM-001
Proposed Sustainable Base Cost of Original Duration New Duration Change in Duration
Method Sustainable Method of Completion of Completion of Completion
(Linear Days) (Linear Days) (Linear Days)
Rain Harvest System $3,400.00 14 18 4
Rain Harvest System $9,200.00 8 13 5
8 8 0
16 16 0
14 14 0
Solar Power System $15,900.00 9 17 8
6 6 0
4 4 0
16 16 0
Rain Harvest System $10,500.00 12 18 6
10 10 0
9 9 0
Solar Power System $8,500.00 10 15 5
8 8 0
All systems $82,300.00 12 19 7
Solar Power System $12,400.00 7 12 5
PROPOSED LEED SUSTAINABLE TECHNOLOGICAL FEATURES
ADDENDUM- 001
PROPOSED SOLAR POWER GENERATION SYSTEM- EXHIBITS A, B & C- ADDENDUM- 001
KEY FEATURES
• PROVIDES AN ALTERNATIVE SOURCE OF ELECTRICAL POWER
• INSTALLATION OF SOLAR PANELS ON BUILDING ROOFTOP
INSTALLATION OF SOLAR PANELS ON PARKING LOT SHADE CANOPIES
• TIED INTO POWER GRID OF SOUTHERN CALIFORNIA EDISON
• CONTROLS/ INVERTERS LOCATED IN THE BUILDING ELECTRICAL ROOM
• PROVIDES POWER FOR INTERIOR/ EXTERIOR BUILDING & SITE LIGHTING
• FULLY RELIABLE WITH LOW MAINTENANCE
Exhibit B
Exhibit A
Exhibit C
PROPOSED RAINWATER HARVESTING SYSTEM- EXHIBITS A & B- ADDENDUM- 001
KEY FEATURES
• COLLECTS RAINWATER RUNOFF FROM BUILDING ROOFTOP
• COLLECTS RAINWATER RUNOFF FROM SHADE CANOPY ROOFTOP
• COLLECTS RAINWATER RUNOFF FROM SITE HARDSCAPE & PARKING LOT
• 8 FT. DIA. 10,000-GALLON CAPACITY
• FIBERGLASS REINFORCED UNDERGROUND TANK
• CAPABLE OF PUMPING WATER TO THE SITE IRRIGATION SYSTEM
• CUSTOM CONFIGURATION
• 30” DIA. ACCESS OPENING, INLET ,OUTLET, & ACCESS LADDER
• DEADMEN ANCHORING SYSTEM
Exhibit BExhibit A
PROPOSED LENNOX HVAC SYSTEMS- EXHIBITS A & B- ADDENDUM- 001
KEY FEATURES
• LENNOX 5 TON 60HZ ENERGENCE ROOFTOP UNIT
• GAS/ ELECTRIC DRIVEN
• SMART AIR FLOW SYSTEM
• MSVA SUPPLY FAN
• ENERGY STAR QUALIFIED
• LOW MAINTENANCE
• DEPENDABLE
Exhibit BExhibit A
KEY FEATURES
• LENNOX SLP98V GAS FURNACE
• 60,000- 132,000 BTUH
• SLIM LINE PROFILE QUITE DESIGN
• VARIABLE CAPACITY TECHNOLOGY
• ENERGY STAR QUALIFIED
• RELIABLE SURELIGHT IGNITER
• LOW MAINTENANCE
• DEPENDABLE
PROPOSED MISCELLANEOUS SUSTAINABLE DESIGN & CONSTRUCTION FEATURES-
ADDENDUM- 001
• DOUBLE PANE INSULATED WINDOW GLAZING SYSTEMS-UV/UAV TINT PROTECTION
• AIR SEALING/CAULKING AROUND ALL EXTERIOR DOOR OPENINGS
• AIR SEALING/CAULKING AROUND ALL EXTERIOR PIPE PENETRATIONS
• R30 BATT INSULATION IN EXTERIOR WALL CAVITIES & CEILINGS
• RIGID INSULATION AT ROOF PENDULUM SPACE
• ENERGY STAR QUALIFIED APPLIANCES & ELECTRONIC DEVICES
• LOW FLOW AUTOMATIC FAUCETS
• STONE VENEER WAINSCOT
• EXTERIOR FINISH INSULATION SYSTEM (EFIS)
• DROUGHT TOLERANT TREES, SHRUBS & GROUNDCOVER
• DRIP IRRIGATION SYSTEM
IN CONCLUSION
LGC is extremely thrilled to be a part of this bidding process. We look forward to being selected as your general
contractor and construction management firm for your proposed office building site. We know you will be fully
satisfied with our professionalism, work ethic, knowledge base, experience, skillset, and of course the finished
product. We hope that this presentation provides you with useful insight in regards to the design and construction
options we have provided If you have any questions or concerns, please feel free to reach out to our firm.
Sincerely,
LGC
Chris P. Lewis CCM/ CCMA
Director of Construction

More Related Content

What's hot

ahart resume
ahart resumeahart resume
ahart resumeAndy Hart
 
Ahart resume
Ahart resumeAhart resume
Ahart resumeAndy Hart
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015Partha Gorain
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)Pieter Venter
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONElliott Molnar
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioSyed Arafath, PMI-SP certified
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 

What's hot (20)

ahart resume
ahart resumeahart resume
ahart resume
 
Ahart resume
Ahart resumeAhart resume
Ahart resume
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
RCS Project Profiles
RCS Project ProfilesRCS Project Profiles
RCS Project Profiles
 
Experience
ExperienceExperience
Experience
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
WHETTONMarkResume
WHETTONMarkResumeWHETTONMarkResume
WHETTONMarkResume
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
Giridhar
GiridharGiridhar
Giridhar
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
AMT CV (3)
AMT CV (3)AMT CV (3)
AMT CV (3)
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 

Viewers also liked

Kolejny sklep www.tremark.pl/sklep
Kolejny sklep www.tremark.pl/sklepKolejny sklep www.tremark.pl/sklep
Kolejny sklep www.tremark.pl/sklepTremark Sp. z. o.o
 
Accolades slide
Accolades slideAccolades slide
Accolades slideErin Ham
 
Парикмахерский бренд Joico в прессе июнь 2016
Парикмахерский бренд Joico в прессе июнь 2016Парикмахерский бренд Joico в прессе июнь 2016
Парикмахерский бренд Joico в прессе июнь 2016nk010282
 
รวมข้อสอบ 183 หน้า
รวมข้อสอบ 183 หน้ารวมข้อสอบ 183 หน้า
รวมข้อสอบ 183 หน้าthepower mancity
 
PPC CC-DRA-L4
PPC CC-DRA-L4PPC CC-DRA-L4
PPC CC-DRA-L4savomir
 
WALLPAPER quick sheet for site
WALLPAPER quick sheet for siteWALLPAPER quick sheet for site
WALLPAPER quick sheet for siteNathan Vaughan
 
Andrew DBXLH-8585B-R2M
Andrew DBXLH-8585B-R2MAndrew DBXLH-8585B-R2M
Andrew DBXLH-8585B-R2Msavomir
 

Viewers also liked (12)

Kolejny sklep www.tremark.pl/sklep
Kolejny sklep www.tremark.pl/sklepKolejny sklep www.tremark.pl/sklep
Kolejny sklep www.tremark.pl/sklep
 
Accolades slide
Accolades slideAccolades slide
Accolades slide
 
Day One Start Training Manual
Day One Start Training ManualDay One Start Training Manual
Day One Start Training Manual
 
Парикмахерский бренд Joico в прессе июнь 2016
Парикмахерский бренд Joico в прессе июнь 2016Парикмахерский бренд Joico в прессе июнь 2016
Парикмахерский бренд Joico в прессе июнь 2016
 
Planificación del marketing
Planificación del marketingPlanificación del marketing
Planificación del marketing
 
resumé_2016
resumé_2016resumé_2016
resumé_2016
 
EVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install GuideEVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install Guide
 
รวมข้อสอบ 183 หน้า
รวมข้อสอบ 183 หน้ารวมข้อสอบ 183 หน้า
รวมข้อสอบ 183 หน้า
 
PPC CC-DRA-L4
PPC CC-DRA-L4PPC CC-DRA-L4
PPC CC-DRA-L4
 
T.R.VINODH
T.R.VINODHT.R.VINODH
T.R.VINODH
 
WALLPAPER quick sheet for site
WALLPAPER quick sheet for siteWALLPAPER quick sheet for site
WALLPAPER quick sheet for site
 
Andrew DBXLH-8585B-R2M
Andrew DBXLH-8585B-R2MAndrew DBXLH-8585B-R2M
Andrew DBXLH-8585B-R2M
 

Similar to LGC PP-ABC Int

Project Management Services
Project Management ServicesProject Management Services
Project Management ServicesBruce Tharp
 
Factory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingFactory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingM+W Group
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxsyedaliabl2023
 
The Drone Brothers Playbook
The Drone Brothers PlaybookThe Drone Brothers Playbook
The Drone Brothers PlaybookDrone Brothers
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportNgo Quan
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009Leo Lastimosa
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetBenjamin Leavy
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)Daniel J Fernandez II
 

Similar to LGC PP-ABC Int (20)

Project Management Services
Project Management ServicesProject Management Services
Project Management Services
 
scott planner resume - Copy
scott planner resume - Copyscott planner resume - Copy
scott planner resume - Copy
 
Factory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingFactory Infrastructure for PV Manufacturing
Factory Infrastructure for PV Manufacturing
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
ECBC Training_02-Scope Admin
ECBC Training_02-Scope AdminECBC Training_02-Scope Admin
ECBC Training_02-Scope Admin
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
The Drone Brothers Playbook
The Drone Brothers PlaybookThe Drone Brothers Playbook
The Drone Brothers Playbook
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY report
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)
 

LGC PP-ABC Int

  • 1. ABC INTERNATIONAL REGIONAL HEADQUARTERS COMPLEX PROPOSED OFFICE BUILDING SITE Project: 1201-15 Date: 6/4/2016
  • 2. LEWIS GENERAL CONTRACTORS 2929 BROOK AVENUE TEMECULA, CALIFORNIA 92590
  • 3. EXISTING SITE AERIAL VIEW MAP ABC International Headquarters Complex Proposed 2 story office building site Corner of Ynez Road & Temecula Valley Parkway City of Temecula, California County of Riverside APN# 916-400-025-3
  • 4. PROPOSED SITE AERIAL VIEW OVERLAY- PART 1
  • 5. PROPOSED SITE AERIAL VIEW OVERLAY- PART 2
  • 6. Proposed Site ▪ Cost of Land $1,250,000 ▪ Total Area - Landscaping 52,794 sf ▪ Total Area - Hardscape (Parking, Drive Isles, Sidewalks) 79,193 sf ▪ Total Area – Property 31,987 sf or 3.03 acres Proposed Office Building ▪ Total Area- Open Office Space (both floors) 10,357 sf ▪ Total Area – Executive Office Space (both floors) 576 sf ▪ Total Area – Conference Rooms (both floors) 2,450 sf ▪ Total Area - Mechanical and Utility Rooms 1,186 sf ▪ Total Net Area – Useable space 13,383 sf ▪ Total Gross Area – All rooms and spaces 15,024 sf PROPOSED SITE & OFFICE BUILDING AREA CALCULATION TABULATION
  • 7. PROPOSED OFFICE BUILDING-1ST FLOOR PLAN 7,464 SF
  • 8. PROPOSED OFFICE BUILDING 2ND FLOOR PLAN 7,560 SF
  • 10. PROPOSED OFFICE BUILDING-PARTIAL EXTERIOR ELEVATION 32’-0” MAXIMUM BUILDING HEIGHT
  • 11. EXAMPLE BUILDING DESIGN-FRONT VIEW- EXHIBIT A • TYPE II-A CONSTRUCTION • FULL FIRE SPRINKLER SYSTEM • OCCUPANCY ‘B’ OFFICE • STEEL SKELTON FRAME • METAL STUD EXTERIOR BACKER WALL ENCLOSURE • BRICK VENEER WAINSCOT • EXTERIOR FINISH INSULATION SYSTEM (EFIS) Exhibit A
  • 12. EXAMPLE BUILDING DESIGN-LEFT, RIGHT, & FRONT VIEWS- EXHIBITS B, C & D • TYPE II-A CONSTRUCTION • FULL FIRE SPRINKLER SYSTEM • OCCUPANCY ‘B’ OFFICE • STEEL SKELTON FRAME • METAL STUD EXTERIOR BACKER WALL ENCLOSURE • BRICK VENEER WAINSCOT • EXTERIOR FINISH INSULATION SYSTEM (EFIS) Exhibit B Exhibit D Exhibit C
  • 13. PROPOSED SITE CONSTRUCTION UTILIZATION PLAN (SUP)
  • 15. • G10 Site Preparation • G30 Site Mechanical Utilities • A10 Foundations • B10 Superstructure • B20 Exterior Enclosure • B30 Roofing • C20 Stairs • D10 Conveying • C10 Interior Construction • D20 Plumbing • D30 HVAC • D40 Fire Protection • D50 Electrical • C30 Interior Finishes • G20 Site Improvements • G40 Site Electrical Utilities WORK BREAKDOWN SCHEDULE (WBS)- GROUP ELEMENTS LEVEL 2
  • 16. Group Elements-Level II Construction Estimated Payment Due Scheduled Pay Phases Base Cost per Phase Request Per G10 Site Preparation Phase 1 $96,537.99 $302,762.99 June 6th to July 5th- Initial First Payment G30 Site Mechanical Phase 1 $206,225.00 Utilities A10 Foundations Phase 2 $8,418.74 $24,602.18 July 6th to August 5th B10 Superstructure Phase 2 $16,183.44 B20 Exterior Enclosure Phase 3 $12,191.40 $562,511.27 August 6th to September 5th B30 Roofing Phase 3 $8,319.87 C20 Stairs Phase 3 $258,000.00 D10 Conveying Phase 3 $284,000.00 C10 Interior Construction Phase 4 $16,867.89 $217,296.32 September 6th to October 5th D20 Plumbing Phase 4 $49,000.00 D30 HVAC Phase 4 $123,000.00 D40 Fire Protection Phase 4 $13,111.96 D50 Electrical Phase 4 $15,316.47 C30 Interior Finishes Phase 5 $16,867.89 $473,108.85 October 6th to October 20th- G20 Site Improvements Phase 5 $82,978.99 Final Payment & total of retainer G40 Site Electrical Utilities Phase 5 $229,600.00 included ($143,661.96 @ 10%) Duration of Completion (Linear Days) 14 8 8 16 14 9 6 4 16 12 10 9 10 8 12 7 LGC’S CONSTRUCTION COST & DURATION (WBS) SUMMARY TOTAL ESTIMATED CONSTRUCTION COST= $1,612,605.54 TOTAL LINEAR DURATION= 163 WORKING DAYS OR 7 MONTHS
  • 17. LGC’S CONSTRUCTION PROJECT SCHEDULE-GANTT CHART
  • 18. LGC’S CONSTRUCTION SAFETY POLICY STATEMENT It is the policy of Lewis General Contractors (LGC) to provide its employees, subcontractors, suppliers, vendors, as well as our clients with safe and healthy job sites that are free from existing and potential hazards that can or will cause minor, serious or fatal physical and/or mental harm. LGC is also committed to comply with all applicable OSHA standards and regulations. In efforts to make this attainable all must work together to make job sites safe. LGC feels strongly confident that we will receive your full cooperation and support in all safety practices. • Sign-off by the safety engineer of LGC on attendance of a required ‘Safety Orientation Lecture and Video’ to include provided written safety materials and documentation for all subcontractors and their employees that are expected to provide work onsite • Minimum of at least 10-hour OSHA safety training certification for all subcontractors and their employees that are expected to provide work onsite. • All subcontractors and their employees must participate in regularly scheduled job site safety meetings with the safety engineer and construction manager as well as, on the job safety training with supervisors. • All subcontractors are to provide a current and to date emergency contact list to include a direct supervisor, a competent person, and any other persons deemed necessary by the subcontractor. • A ‘Job Safety Analysis’-JSA is to be provided by all subcontractors that covers each task specific to work per the contract. It must include detailed steps, existing & potential hazards, & controls to mitigate them. • All subcontractors are required to provide their employees with ‘Personal Protection Equipment’-PPE and that they are trained in the use of it and of what is required per OSHA PPE standards specific to the work hazard. • A ‘Materials Safety Data Sheet’-MSDS outlined in a written safety manual must be provided by all subcontractors for supplies, chemicals, and materials used to perform the work and as specified per the contract documents that are specific to the work. LGC’S CONSTRUCTION SAFETY PLAN
  • 19. ABC INTERNATIONAL REGIONAL HEADQUARTERS COMPLEX PROPOSED OFFICE BUILDING SITE –ADDENDUM -001 A GREENER SUSTAINABLE LEED APPROACH
  • 20. PROPOSED OFFICE BUILDING-1ST FLOOR PLAN- ADDENDUM-001 7,464 SF
  • 21. PROPOSED OFFICE BUILDING 2ND FLOOR PLAN- ADDENDUM-001 7,560 SF
  • 22. PROPOSED OFFICE BUILDING-ROOF PLAN- ADDENDUM-001 7,560 SF ADDENDUM-001
  • 23. PROPOSED OFFICE BUILDING-PARTIAL EXTERIOR ELEVATION- ADDENDUM-001 32’-0” MAXIMUM BUILDING HEIGHT
  • 24. Group Elements-Level II Construction Estimated Phases Base Cost G10 Site Preparation Phase 1 $96,537.99 G30 Site Mechanical Phase 1 $206,225.00 Utilities A10 Foundations Phase 2 $8,418.74 B10 Superstructure Phase 2 $16,183.44 B20 Exterior Enclosure Phase 3 $12,191.40 B30 Roofing Phase 3 $8,319.87 C20 Stairs Phase 3 $258,000.00 D10 Conveying Phase 3 $284,000.00 C10 Interior Construction Phase 4 $16,867.89 D20 Plumbing Phase 4 $49,000.00 D30 HVAC Phase 4 $123,000.00 D40 Fire Protection Phase 4 $13,111.96 D50 Electrical Phase 4 $15,316.47 C30 Interior Finishes Phase 5 $16,867.89 G20 Site Improvements Phase 5 $82,978.99 G40 Site Electrical Utilities Phase 5 $229,600.00 TOTAL ESTIMATED CONSTRUCTION COST= $1,754,605.54 (AN INCREASE OF $142,200 IN ADDITIONAL COST) TOTAL LINEAR DURATION= 203 WORKING DAYS OR 8 ¾ MONTHS (AN INCREASE OF 40 WORKING DAYS DUE TO MORE MAN HOURS REQUIRED) LGC’S CONSTRUCTION COST & DURATION (WBS) SUMMARY- ADDENDUM-001 Proposed Sustainable Base Cost of Original Duration New Duration Change in Duration Method Sustainable Method of Completion of Completion of Completion (Linear Days) (Linear Days) (Linear Days) Rain Harvest System $3,400.00 14 18 4 Rain Harvest System $9,200.00 8 13 5 8 8 0 16 16 0 14 14 0 Solar Power System $15,900.00 9 17 8 6 6 0 4 4 0 16 16 0 Rain Harvest System $10,500.00 12 18 6 10 10 0 9 9 0 Solar Power System $8,500.00 10 15 5 8 8 0 All systems $82,300.00 12 19 7 Solar Power System $12,400.00 7 12 5
  • 25. PROPOSED LEED SUSTAINABLE TECHNOLOGICAL FEATURES ADDENDUM- 001
  • 26. PROPOSED SOLAR POWER GENERATION SYSTEM- EXHIBITS A, B & C- ADDENDUM- 001 KEY FEATURES • PROVIDES AN ALTERNATIVE SOURCE OF ELECTRICAL POWER • INSTALLATION OF SOLAR PANELS ON BUILDING ROOFTOP INSTALLATION OF SOLAR PANELS ON PARKING LOT SHADE CANOPIES • TIED INTO POWER GRID OF SOUTHERN CALIFORNIA EDISON • CONTROLS/ INVERTERS LOCATED IN THE BUILDING ELECTRICAL ROOM • PROVIDES POWER FOR INTERIOR/ EXTERIOR BUILDING & SITE LIGHTING • FULLY RELIABLE WITH LOW MAINTENANCE Exhibit B Exhibit A Exhibit C
  • 27. PROPOSED RAINWATER HARVESTING SYSTEM- EXHIBITS A & B- ADDENDUM- 001 KEY FEATURES • COLLECTS RAINWATER RUNOFF FROM BUILDING ROOFTOP • COLLECTS RAINWATER RUNOFF FROM SHADE CANOPY ROOFTOP • COLLECTS RAINWATER RUNOFF FROM SITE HARDSCAPE & PARKING LOT • 8 FT. DIA. 10,000-GALLON CAPACITY • FIBERGLASS REINFORCED UNDERGROUND TANK • CAPABLE OF PUMPING WATER TO THE SITE IRRIGATION SYSTEM • CUSTOM CONFIGURATION • 30” DIA. ACCESS OPENING, INLET ,OUTLET, & ACCESS LADDER • DEADMEN ANCHORING SYSTEM Exhibit BExhibit A
  • 28. PROPOSED LENNOX HVAC SYSTEMS- EXHIBITS A & B- ADDENDUM- 001 KEY FEATURES • LENNOX 5 TON 60HZ ENERGENCE ROOFTOP UNIT • GAS/ ELECTRIC DRIVEN • SMART AIR FLOW SYSTEM • MSVA SUPPLY FAN • ENERGY STAR QUALIFIED • LOW MAINTENANCE • DEPENDABLE Exhibit BExhibit A KEY FEATURES • LENNOX SLP98V GAS FURNACE • 60,000- 132,000 BTUH • SLIM LINE PROFILE QUITE DESIGN • VARIABLE CAPACITY TECHNOLOGY • ENERGY STAR QUALIFIED • RELIABLE SURELIGHT IGNITER • LOW MAINTENANCE • DEPENDABLE
  • 29. PROPOSED MISCELLANEOUS SUSTAINABLE DESIGN & CONSTRUCTION FEATURES- ADDENDUM- 001 • DOUBLE PANE INSULATED WINDOW GLAZING SYSTEMS-UV/UAV TINT PROTECTION • AIR SEALING/CAULKING AROUND ALL EXTERIOR DOOR OPENINGS • AIR SEALING/CAULKING AROUND ALL EXTERIOR PIPE PENETRATIONS • R30 BATT INSULATION IN EXTERIOR WALL CAVITIES & CEILINGS • RIGID INSULATION AT ROOF PENDULUM SPACE • ENERGY STAR QUALIFIED APPLIANCES & ELECTRONIC DEVICES • LOW FLOW AUTOMATIC FAUCETS • STONE VENEER WAINSCOT • EXTERIOR FINISH INSULATION SYSTEM (EFIS) • DROUGHT TOLERANT TREES, SHRUBS & GROUNDCOVER • DRIP IRRIGATION SYSTEM
  • 30. IN CONCLUSION LGC is extremely thrilled to be a part of this bidding process. We look forward to being selected as your general contractor and construction management firm for your proposed office building site. We know you will be fully satisfied with our professionalism, work ethic, knowledge base, experience, skillset, and of course the finished product. We hope that this presentation provides you with useful insight in regards to the design and construction options we have provided If you have any questions or concerns, please feel free to reach out to our firm. Sincerely, LGC Chris P. Lewis CCM/ CCMA Director of Construction