SlideShare a Scribd company logo
1 of 7
Download to read offline
CURRICULUM VITAE
NAME : MR. EDWARD AFFUL-PACKSON
DATE OF BIRTH : 25TH
APRIL 1961
NATIONALITY : SOUTH AFRICAN
LANGUAGES : ENGLISH
TWI (Ghanaian Language)
GA (Ghanaian Language)
DRIVERS LICENCE : CODE 8
ID No. : 6104255332086
E-mail : edpackson@yahoo.co.uk
edpackson25@gmail.com
EDUCATION
1. BUILDING DRAUGHTMANSHIP - GRADE II
2. EBENEZER SECONDARY SCHOOL. ACCRA. 1976 – 1981- GRADE II
3. ST. AQUINAS SECONDARY SCHOOL, ACCRA. 1981–1982 GRADE II
SOFTWARE APPLICATIONS EXPERIENCE
Autodesk/AutoCAD Designer Software –Excellent.
ArcGIS Software - Average knowledge.
Microsoft Excel Programme - Excellent.
Microsoft Word Programme - Excellent.
Information Technology – Average
PROFESSIONAL REGISTRATION
SOUTH AFRICAN INSTITUTE OF DRAUGHTING – AFFILIATE MEMBER
( # AF 16007)
Furthermore has gained great experience in the following fields:
• Project Management – AutoCAD Quality Review
• Site Investigations, Supervisions & Inspections
• Training of technicians in the use of AutoCAD software
PREVIOUS EMPLOYERS EXPERIENCE
OSEI-KUFUOR SOHNE AND PARTNERS(1986-1990)
I was the AutoCAD operator involved in the architectural, electrical, mechanical,
civil and structural drawings using AutoCAD software on the following projects in
various parts of Ghana:
a) PERGASUS HOUSE – ACCRA
Estimated value $160,000.00
b) GHANA COMMERCIAL BANK- ACCRA NEW TOWN
Estimated value $480,000.00
c) SHELL FILLING STATION- ACCRA
Estimated value $380,000.00
d) GHANA COMMERCIAL BANK- TEMALE
Estimated value $550,000.00
e) CHINESE EMBASSY-ACCRA
Estimated value $1,250,000.00
ERGS CONSORTIUM (1990-1998)
a. KORLE-BU TEACHING HOSPITAL, ACCRA
i) Maternity Block
ii) Surgical Block
Iii) Children’s Block
b. ACCRA SPORTS STADIUM FLOOD LIGHTS
c. EFFIA-NKWANTA REGIONAL HOSPITAL, SEKONDI-TAKORADI
d. KOMFO ANOKYE TEACHING HOSPITAL, KUMASI
e. YENDI DISTRICT HOSPITAL, YENDI
f. KIBI DISTRICT HOSPITAL, KIBI
g. KETA DISTRICT HOSPITAL, KETA
h. SHELF HELP ELECTRIFICATION PROJECT (SHEP)
i. SSNIT OFFICE COMPLEX, ACCRA
j. NEW CENTRAL REGIONAL HOSPITAL – PEDU, CAPE COAST.
k. BEKWAI DISTRICT HOSPITAL, BEKWAI
l. TARKWA DISTRICT HOSPITAL, TARKWA
STONE AND WEBSTER WEST AFRICA (1998-2002)
i) Construction of Takoradi Thermal Power Plant
ii) Estimated value $40,250,000.00
My responsibilities included modification of all constructional OF civil, electrical,
mechanical and preparation of all as-built drawings using AutoCAD software.
HANI MALIK PROJECTS (2002-2007)
WATER & IRRIGATION SCHEMES:
a) Cobosi Water Supply
b) Jojweni Water Supply
c) Tshatshu Irrigation Scheme
d) Xonxa Irrigation Scheme
ACCESS ROADS
e) TENTERGATE ACCESS ROADS AND STORMWATER
f) DUBENI ACCESS ROAD.
Length of road – 5.455m.
g) NEW MTHONYAMA PRIMARY SCHOOL –TENTERGATE
Estimated value R2, 537,778.00
h) NEW NANISO PRIMARY SCHOOL – TENTERGATE
Estimated cost at R3, 063,259.00
i) NEW KWINANA PRIMARY SCHOOL -TENTERGATE
Estimated cost at R784, 776.00
j) NXUBA PRIMARY SCHOOL – CRADOCK
Estimated cost at R2, 428,200.00
k) SOYISILE SENIOR SECONDARY SCHOOL – WHITTLESEA
Estimated cost at R2,755,283.95
l) MARUPING PRIMARY SCHOOL - BURGERSDORP
Estimated cost at R4,670,000.00
m) EGQILI HIGH SCHOOL – ALIWAL NORTH
) Estimated cost at R4, 690,447.00
n) JONAS GODUKA SENIOR SECONDARY SCHOOL –SKERTSPRUIT
Estimated cost at R2, 916,554.40
o) EMERGENCY MEDICAL SERVICES CONTROL CENTRE
– QUEENSTOWN
Estimated cost at R8,000,000.00
p) NEW MACUBENI CLINIC – LADY FRERE
Estimated cost at R3, 524,916.00
SIGODI MARAH MARTIN (2007-2010)
1) SEYISI ROAD RENOVATIONS:
Estimated construction value at R6,000,000.00
2) MISSIONVALE BEP (BUCKET ERADICATION PROGRAMME)
WATER RETICULATION
SEWER RETICULATION
Estimated construction value at R100,000,000.00
3) MODAL INTERCHANGE PROJECTS FOR 2010 PROJECTS
Estimated construction value at R60,000,000.00
4) NEW BRIGHTON TAXI RANK CONTRACT
MODAL INTERCHANGE PROJECTS FOR 2010 PROJECTS
Estimated construction value at R2,520,000.00
5) PORT ELIZABETH CENTRAL BUSINESS DISTRICT PROJECT
Estimated construction value at R60,000,000.00
6) EXTENSION OF TYINIRA STREET PROJECT
Estimated construction value at R50,000,000.00
7) KWANOBOHLE WATER AND SEWERAGE PROJECT
Estimated construction value at R10,000,000.00
8) UITENHAGE-KWANOBOHLE TARRING OF GRAVEL ROADS PROJECT
Estimated construction value at R200,000,000.00
9) KWADWESI ROADS PROJECT
Estimated construction value at R4,000,000.00
8) RESERVOIR REHABILITATION PROJECTS
Estimated construction value at R40,000,000.00
10) COEGA ZONE 6 -ROADS AND SEWERAGE PROJECT
Estimated construction value at R700,000,000.00
CAMDEKON ENGINEERS (3RD
SEPTEMBER, 2010- JUNE, 2015)
1. OR TAMBO DISTRICT PROJECTS
Bridge Inspection Drawings
2. ALFRED NZO DISTRICT PROJECTS
Technical Support design Drawings
3. CHRIS HANI DISTRICT MUNICIPALITY PROJECTS
Rocklands Roads Upgrade design drawings
Beccles Farm Roads Upgrade design drawings
4. COEGA DEVELOPMENT CORPORATION-IDZ ZONE 6
AutoCAD Designer and Quality Review of all Infrastructure Services
drawings via Camdekon Engineers on behalf other Joint Venture
members.
5. NELSON MANDELA BAY MUNICIPALITY
DROUGHT EMERGENCY PROJECT
AutoCAD Designer responsible for infrastructure services drawings for the
municipality.
6. DEPARTMENT OF PUBLIC WORKS - BHISO SAPS ACADEMY
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs
drawings for the department.
7. DEPARTMENT OF PUBLIC WORKS - KING WILLIAMS PRISON
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
8. DEPARTMENT OF PUBLIC WORKS – UGIE MAGISTRATE OFFICE
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
9. DEPARTMENT OF PUBLIC WORKS - CWERELAND SAPS
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
10. DEPARTMENT OF PUBLIC WORKS – KWAAIMAN SAPS
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
11. AIRPORT COMPANY OF SOUTH AFRICA PE Airport
AutoCAD Designer and Quality Review of all Infrastructure Services
drawings via Camdekon Engineers on behalf other Joint Venture
members.
CURRENT EMPLOYERS EXPERIENCE
BVI CONSULTING ENGINEERS (1ST JULY, 2015 TO DATE)
1. NMBM DROUGHT EMERGENCY
AutoCAD Designer and Quality Review of all detailed Drawings.
2. GRAAFF REINET WATER PLAN
AutoCAD Designer and Quality Review of all Infrastructure Services
and details.
REFEREES
1. MR. ANDRE SCHEEPERS
DIRECTOR
BVI CONSULTING ENGINEERS EASTERN CAPE (Pty) LTD
72, RING ROAD
3RD
FLOOR, CORPORATE PLACE
GREENACRES
PORT ELIZABETH, 6045
SOUTH AFRICA.
PHONE: +27 41 373 4343
CELL: +27 72 227 2191
E-mail: as@bviec.co.za
2. MR. FRANCOIS VAN GRAAN
HEAD OF CIVILS DEPARTMENT
BVI CONSULTING ENGINEERS EASTERN CAPE (Pty) LTD
72, RING ROAD
3RD FLOOR, CORPORATE PLACE
GREENACRES
PORT ELIZABETH, 6045
SOUTH AFRICA.
PHONE: +27 41 373 4343
CELL: +27 82 852 7725
E-mail: fvg@bviec.co.za
3. MR. BARRY LIZAMORE
(Pr Tech Eng) PrC Mentor SACPEMP
LA CONSULTING ENGINEER
No. 36, UNIT 3
NEWTON STREET, NEWTON PARK
PORT ELIZABETH, 6045
SOUTH AFRICA.
PHONE: +27 (0)
FAX: +27 (0)
CELL: +27 82 445 8828
E-mail: barry@la-eng.co.za

More Related Content

What's hot

CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15Sajan Vijayan
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamedAshraf506
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)afzaal ahmad
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamedAshraf506
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamedAshraf506
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamedAshraf506
 
Mohamed ashraf Land Surveyor
Mohamed ashraf Land SurveyorMohamed ashraf Land Surveyor
Mohamed ashraf Land SurveyorMohamedAshraf506
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamedAshraf506
 
Surveying Engineer cv2001
Surveying Engineer  cv2001Surveying Engineer  cv2001
Surveying Engineer cv2001alaa zaky
 
Former demolition site ready for redevelopment
Former demolition site ready for redevelopmentFormer demolition site ready for redevelopment
Former demolition site ready for redevelopmentNina Johnson
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.vragabata
 
Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PMadhava Kulal
 
Alaa Mahran CV -final update
Alaa Mahran CV -final updateAlaa Mahran CV -final update
Alaa Mahran CV -final updateALAA NABIH MAHRAN
 

What's hot (20)

CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cv
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
cv
cvcv
cv
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Mohamed ashraf Land Surveyor
Mohamed ashraf Land SurveyorMohamed ashraf Land Surveyor
Mohamed ashraf Land Surveyor
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cv
 
Grid Layout-CPs
Grid Layout-CPsGrid Layout-CPs
Grid Layout-CPs
 
Ahmed Saeed C.V
Ahmed Saeed C.VAhmed Saeed C.V
Ahmed Saeed C.V
 
Surveying Engineer cv2001
Surveying Engineer  cv2001Surveying Engineer  cv2001
Surveying Engineer cv2001
 
Former demolition site ready for redevelopment
Former demolition site ready for redevelopmentFormer demolition site ready for redevelopment
Former demolition site ready for redevelopment
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
Said_Ghalayin_Sept 15
Said_Ghalayin_Sept 15Said_Ghalayin_Sept 15
Said_Ghalayin_Sept 15
 
Logan McDowell Resume
Logan McDowell ResumeLogan McDowell Resume
Logan McDowell Resume
 
Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921
 
CURRICULUM Vitae
CURRICULUM VitaeCURRICULUM Vitae
CURRICULUM Vitae
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
 
Alaa Mahran CV -final update
Alaa Mahran CV -final updateAlaa Mahran CV -final update
Alaa Mahran CV -final update
 

Viewers also liked

Robin_Orchard_CV-2016
Robin_Orchard_CV-2016Robin_Orchard_CV-2016
Robin_Orchard_CV-2016Robin Orchard
 
Semiannual report 30 june 2011
Semiannual report 30 june 2011Semiannual report 30 june 2011
Semiannual report 30 june 2011Edison S.p.A.
 
Insurance Review #34 - maggio 2016
Insurance Review #34 - maggio 2016Insurance Review #34 - maggio 2016
Insurance Review #34 - maggio 2016Chiara Zaccariotto
 
Bwt03022011
Bwt03022011Bwt03022011
Bwt03022011penneyh
 
BioWorldToday03082016
BioWorldToday03082016BioWorldToday03082016
BioWorldToday03082016steve666
 
UX Scotland - UX Patterns case study
UX Scotland - UX Patterns case studyUX Scotland - UX Patterns case study
UX Scotland - UX Patterns case studyPatty Fronc
 
BioWorld 20th Anniversary Magazine
BioWorld 20th Anniversary MagazineBioWorld 20th Anniversary Magazine
BioWorld 20th Anniversary MagazineNicole Cathcart
 

Viewers also liked (11)

Robin_Orchard_CV-2016
Robin_Orchard_CV-2016Robin_Orchard_CV-2016
Robin_Orchard_CV-2016
 
2014 Annual Report on Corporate Governance
2014 Annual Report on Corporate Governance2014 Annual Report on Corporate Governance
2014 Annual Report on Corporate Governance
 
FATCA Final Agenda
FATCA Final AgendaFATCA Final Agenda
FATCA Final Agenda
 
Semiannual report 30 june 2011
Semiannual report 30 june 2011Semiannual report 30 june 2011
Semiannual report 30 june 2011
 
Insurance Review #34 - maggio 2016
Insurance Review #34 - maggio 2016Insurance Review #34 - maggio 2016
Insurance Review #34 - maggio 2016
 
Bwt03022011
Bwt03022011Bwt03022011
Bwt03022011
 
BioWorld's Biotechnology State of the Industry Report 2011
BioWorld's Biotechnology State of the Industry Report 2011BioWorld's Biotechnology State of the Industry Report 2011
BioWorld's Biotechnology State of the Industry Report 2011
 
BioWorldToday03082016
BioWorldToday03082016BioWorldToday03082016
BioWorldToday03082016
 
UX Scotland - UX Patterns case study
UX Scotland - UX Patterns case studyUX Scotland - UX Patterns case study
UX Scotland - UX Patterns case study
 
BioWorld 20th Anniversary Magazine
BioWorld 20th Anniversary MagazineBioWorld 20th Anniversary Magazine
BioWorld 20th Anniversary Magazine
 
Ashish Garg
Ashish GargAshish Garg
Ashish Garg
 

Similar to CAD Operator_EDWARD AFFUL-PACKSON CV

CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASULAkhtar Rasul
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0Ibrahim Anwer
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016ASHRAF GOMAH MOHAMED
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspectorMuhammad Amjad
 
Detailed (moaz resume)
Detailed (moaz resume)Detailed (moaz resume)
Detailed (moaz resume)Moaz beddah
 
HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016Hamza DAKMAN
 

Similar to CAD Operator_EDWARD AFFUL-PACKSON CV (20)

CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CV
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
En c.v
En c.v En c.v
En c.v
 
Moaz resume
Moaz resumeMoaz resume
Moaz resume
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Detailed (moaz resume)
Detailed (moaz resume)Detailed (moaz resume)
Detailed (moaz resume)
 
HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 

CAD Operator_EDWARD AFFUL-PACKSON CV

  • 1. CURRICULUM VITAE NAME : MR. EDWARD AFFUL-PACKSON DATE OF BIRTH : 25TH APRIL 1961 NATIONALITY : SOUTH AFRICAN LANGUAGES : ENGLISH TWI (Ghanaian Language) GA (Ghanaian Language) DRIVERS LICENCE : CODE 8 ID No. : 6104255332086 E-mail : edpackson@yahoo.co.uk edpackson25@gmail.com EDUCATION 1. BUILDING DRAUGHTMANSHIP - GRADE II 2. EBENEZER SECONDARY SCHOOL. ACCRA. 1976 – 1981- GRADE II 3. ST. AQUINAS SECONDARY SCHOOL, ACCRA. 1981–1982 GRADE II SOFTWARE APPLICATIONS EXPERIENCE Autodesk/AutoCAD Designer Software –Excellent. ArcGIS Software - Average knowledge. Microsoft Excel Programme - Excellent. Microsoft Word Programme - Excellent. Information Technology – Average PROFESSIONAL REGISTRATION SOUTH AFRICAN INSTITUTE OF DRAUGHTING – AFFILIATE MEMBER ( # AF 16007) Furthermore has gained great experience in the following fields: • Project Management – AutoCAD Quality Review • Site Investigations, Supervisions & Inspections • Training of technicians in the use of AutoCAD software
  • 2. PREVIOUS EMPLOYERS EXPERIENCE OSEI-KUFUOR SOHNE AND PARTNERS(1986-1990) I was the AutoCAD operator involved in the architectural, electrical, mechanical, civil and structural drawings using AutoCAD software on the following projects in various parts of Ghana: a) PERGASUS HOUSE – ACCRA Estimated value $160,000.00 b) GHANA COMMERCIAL BANK- ACCRA NEW TOWN Estimated value $480,000.00 c) SHELL FILLING STATION- ACCRA Estimated value $380,000.00 d) GHANA COMMERCIAL BANK- TEMALE Estimated value $550,000.00 e) CHINESE EMBASSY-ACCRA Estimated value $1,250,000.00 ERGS CONSORTIUM (1990-1998) a. KORLE-BU TEACHING HOSPITAL, ACCRA i) Maternity Block ii) Surgical Block Iii) Children’s Block b. ACCRA SPORTS STADIUM FLOOD LIGHTS c. EFFIA-NKWANTA REGIONAL HOSPITAL, SEKONDI-TAKORADI d. KOMFO ANOKYE TEACHING HOSPITAL, KUMASI e. YENDI DISTRICT HOSPITAL, YENDI f. KIBI DISTRICT HOSPITAL, KIBI g. KETA DISTRICT HOSPITAL, KETA h. SHELF HELP ELECTRIFICATION PROJECT (SHEP) i. SSNIT OFFICE COMPLEX, ACCRA j. NEW CENTRAL REGIONAL HOSPITAL – PEDU, CAPE COAST. k. BEKWAI DISTRICT HOSPITAL, BEKWAI l. TARKWA DISTRICT HOSPITAL, TARKWA
  • 3. STONE AND WEBSTER WEST AFRICA (1998-2002) i) Construction of Takoradi Thermal Power Plant ii) Estimated value $40,250,000.00 My responsibilities included modification of all constructional OF civil, electrical, mechanical and preparation of all as-built drawings using AutoCAD software. HANI MALIK PROJECTS (2002-2007) WATER & IRRIGATION SCHEMES: a) Cobosi Water Supply b) Jojweni Water Supply c) Tshatshu Irrigation Scheme d) Xonxa Irrigation Scheme ACCESS ROADS e) TENTERGATE ACCESS ROADS AND STORMWATER f) DUBENI ACCESS ROAD. Length of road – 5.455m. g) NEW MTHONYAMA PRIMARY SCHOOL –TENTERGATE Estimated value R2, 537,778.00 h) NEW NANISO PRIMARY SCHOOL – TENTERGATE Estimated cost at R3, 063,259.00 i) NEW KWINANA PRIMARY SCHOOL -TENTERGATE Estimated cost at R784, 776.00 j) NXUBA PRIMARY SCHOOL – CRADOCK Estimated cost at R2, 428,200.00 k) SOYISILE SENIOR SECONDARY SCHOOL – WHITTLESEA Estimated cost at R2,755,283.95 l) MARUPING PRIMARY SCHOOL - BURGERSDORP Estimated cost at R4,670,000.00 m) EGQILI HIGH SCHOOL – ALIWAL NORTH ) Estimated cost at R4, 690,447.00 n) JONAS GODUKA SENIOR SECONDARY SCHOOL –SKERTSPRUIT Estimated cost at R2, 916,554.40 o) EMERGENCY MEDICAL SERVICES CONTROL CENTRE – QUEENSTOWN Estimated cost at R8,000,000.00 p) NEW MACUBENI CLINIC – LADY FRERE Estimated cost at R3, 524,916.00
  • 4. SIGODI MARAH MARTIN (2007-2010) 1) SEYISI ROAD RENOVATIONS: Estimated construction value at R6,000,000.00 2) MISSIONVALE BEP (BUCKET ERADICATION PROGRAMME) WATER RETICULATION SEWER RETICULATION Estimated construction value at R100,000,000.00 3) MODAL INTERCHANGE PROJECTS FOR 2010 PROJECTS Estimated construction value at R60,000,000.00 4) NEW BRIGHTON TAXI RANK CONTRACT MODAL INTERCHANGE PROJECTS FOR 2010 PROJECTS Estimated construction value at R2,520,000.00 5) PORT ELIZABETH CENTRAL BUSINESS DISTRICT PROJECT Estimated construction value at R60,000,000.00 6) EXTENSION OF TYINIRA STREET PROJECT Estimated construction value at R50,000,000.00 7) KWANOBOHLE WATER AND SEWERAGE PROJECT Estimated construction value at R10,000,000.00 8) UITENHAGE-KWANOBOHLE TARRING OF GRAVEL ROADS PROJECT Estimated construction value at R200,000,000.00 9) KWADWESI ROADS PROJECT Estimated construction value at R4,000,000.00 8) RESERVOIR REHABILITATION PROJECTS Estimated construction value at R40,000,000.00 10) COEGA ZONE 6 -ROADS AND SEWERAGE PROJECT Estimated construction value at R700,000,000.00
  • 5. CAMDEKON ENGINEERS (3RD SEPTEMBER, 2010- JUNE, 2015) 1. OR TAMBO DISTRICT PROJECTS Bridge Inspection Drawings 2. ALFRED NZO DISTRICT PROJECTS Technical Support design Drawings 3. CHRIS HANI DISTRICT MUNICIPALITY PROJECTS Rocklands Roads Upgrade design drawings Beccles Farm Roads Upgrade design drawings 4. COEGA DEVELOPMENT CORPORATION-IDZ ZONE 6 AutoCAD Designer and Quality Review of all Infrastructure Services drawings via Camdekon Engineers on behalf other Joint Venture members. 5. NELSON MANDELA BAY MUNICIPALITY DROUGHT EMERGENCY PROJECT AutoCAD Designer responsible for infrastructure services drawings for the municipality. 6. DEPARTMENT OF PUBLIC WORKS - BHISO SAPS ACADEMY STRUCTURAL REPAIRS AutoCAD Designer responsible for infrastructure services repairs drawings for the department. 7. DEPARTMENT OF PUBLIC WORKS - KING WILLIAMS PRISON STRUCTURAL REPAIRS AutoCAD Designer responsible for infrastructure services repairs drawings for the department. 8. DEPARTMENT OF PUBLIC WORKS – UGIE MAGISTRATE OFFICE STRUCTURAL REPAIRS AutoCAD Designer responsible for infrastructure services repairs drawings for the department.
  • 6. 9. DEPARTMENT OF PUBLIC WORKS - CWERELAND SAPS STRUCTURAL REPAIRS AutoCAD Designer responsible for infrastructure services repairs drawings for the department. 10. DEPARTMENT OF PUBLIC WORKS – KWAAIMAN SAPS STRUCTURAL REPAIRS AutoCAD Designer responsible for infrastructure services repairs drawings for the department. 11. AIRPORT COMPANY OF SOUTH AFRICA PE Airport AutoCAD Designer and Quality Review of all Infrastructure Services drawings via Camdekon Engineers on behalf other Joint Venture members. CURRENT EMPLOYERS EXPERIENCE BVI CONSULTING ENGINEERS (1ST JULY, 2015 TO DATE) 1. NMBM DROUGHT EMERGENCY AutoCAD Designer and Quality Review of all detailed Drawings. 2. GRAAFF REINET WATER PLAN AutoCAD Designer and Quality Review of all Infrastructure Services and details.
  • 7. REFEREES 1. MR. ANDRE SCHEEPERS DIRECTOR BVI CONSULTING ENGINEERS EASTERN CAPE (Pty) LTD 72, RING ROAD 3RD FLOOR, CORPORATE PLACE GREENACRES PORT ELIZABETH, 6045 SOUTH AFRICA. PHONE: +27 41 373 4343 CELL: +27 72 227 2191 E-mail: as@bviec.co.za 2. MR. FRANCOIS VAN GRAAN HEAD OF CIVILS DEPARTMENT BVI CONSULTING ENGINEERS EASTERN CAPE (Pty) LTD 72, RING ROAD 3RD FLOOR, CORPORATE PLACE GREENACRES PORT ELIZABETH, 6045 SOUTH AFRICA. PHONE: +27 41 373 4343 CELL: +27 82 852 7725 E-mail: fvg@bviec.co.za 3. MR. BARRY LIZAMORE (Pr Tech Eng) PrC Mentor SACPEMP LA CONSULTING ENGINEER No. 36, UNIT 3 NEWTON STREET, NEWTON PARK PORT ELIZABETH, 6045 SOUTH AFRICA. PHONE: +27 (0) FAX: +27 (0) CELL: +27 82 445 8828 E-mail: barry@la-eng.co.za