SlideShare a Scribd company logo
1 of 32
1
Baig Ali
Chief Engineer (Civil) - Operations
As of October 30, 2013
2
CONSTRUCTION ANDCONSTRUCTION AND
ENGINEERING SUPPORTENGINEERING SUPPORT
SERVICES DEPARTMENTSERVICES DEPARTMENT
3
Cost estimates are based on MES Schedule of Rates.
Civil Works Procedure 1984:
• Start of work & cost estimation simultaneously.
• Procurement of materials according to Store Procedure.
• Hiring of skilled & unskilled manpower.
• Repair and maintence services during operations.
Revised Engineering Works Procedure 2013:
• Cost estimate and AFE approvals.
• Tender documents preparation and contract administration.
• Departmental works utilizing available resources.
• Procurement of material & services as per PPRA & PEC.
Working MethodologyWorking Methodology
4
ENGG.WORKS DETAILENGG.WORKS DETAIL
Pre Drilling & other Works
Description 2012-13 2013-14
Completed 22 06
In progress - 05
In Tender process - 05
5
CIVIL WORKS DETAILSCIVIL WORKS DETAILS
PERMANENT STRUCTURE WORKS
Description Total Amount in
millions
Civil works carried out through EFPs 77 1555.97
Pipeline & WHA works carried out through FGCPs 99 442.590
Contract Section Works before going on PPRA Rules:
a.Consultancy Works completed
b.Consultancy Works in progress
c.Construction Works completed
3
3
4
Contract Section Works after adoption of PPRA Rules:
a.Tender Documents/Process for Head Office
b.Tender Documents/Process for Pre Drilling work
c.Tender Documents/Process for Field works
36
18
09
Water Supply through C&ESS Department 104.26
million Gallons
Vehicle Repaired Annually
I-9 Base Workshop Islamabad 2408 11.168
S.
No
Name of Work Status Approved
Cost
Works carried
out by
Contractor
Departmental
Works
1 Engineering works for Sohniwala Well # 1 at Tehsil
Ahmedpur Distt. Jhang
Completed Rs: 39.810 M Rs: 14.669 M Rs: 25.141 M
2 Engineering works for Jand well # 1 Distt. Attock Completed Rs: 54.284 M Rs: 19.387 M Rs: 34.897 M
3 Construction of Pre Drilling Engineering Works At
Rajian-8 District Chakwal Punjab
Completed Rs: 60.100 M Rs: 23.889 M Rs: 36.211 M
4 Construction of Foundation for installation of
Weigh Bridge at Nashpa Oil Field
Contract
execution awaited
Rs: 1.147 M Rs: 1.148 M Rs: 0.00 M
5 Engineering works for Qadirpur HRL well # 7 Distt.
Ghotki Sindh
Completed Rs: 47.609 M Rs: 42.377 M Rs: 5.232 M
6 Engineering works for Qadirpur Well # 50 at Distt.
Ghotki Sindh
Completed Rs: 39.422 M Rs: 27.782 M Rs:11.64 M
7 Construction of Pre-Drilling Engineering Works at
QP-51 District Ghotki, Sindh.
Contract execution
awaited
Rs: 127.920 M Rs: 72.378 M Rs: 55.542 M
8 Engineering works for Jakhro West Well # 1 at Distt.
Sanghar Sindh
Completed Rs:47.60 0M Rs: 42.377 M Rs: 5.224 M
9 Construction of Pre Drilling Civil Works at Well
Kunnar Deep # 09 District Hyderabad
Completed Rs: 35.470 M Rs: 22.50 M Rs: 12.974 M
10 Construction of Pre Drilling Civil Works at Well
Chak # 5 Dim # 3.
Rig shifting in
Progress.
Rs: 40.609 M Rs: 28.23 M Rs: 12.379 M
11 Construction of Pre Drilling Engineering Works AT
Chak 25C-1, District Sanghar, Sindh.
Work is in
Progress.
Rs: 28.474 M Rs: 20.067 M Rs: 8.407 M
12 Construction of Pre-Drilling Engineering works at
Manna-1 (Tay X-2), Distt. Hyderabad, Sindh.
Work is in
Progress.
Rs: 27.464 M Rs: 19.834 M Rs: 7.63 M
13 Uch-II – Gathering System for Six Wells Completed Rs.98.240 M Rs.77.200 M Rs.21.040 M
Works carried out after the adoption of Revised
Engineering Works Procedure
Construction & Engineering Support Services
Department
Summary of Establishment
7
8
Sr.
No.
Title of Post Sanction
ed
Held Daily
WagesRegular Contract
1 General Manager 01 01 - -
2 Managers 08 05 01 -
3 Chief Engineers 11 07 - -
4 Dy. Chief Engineers/ Chief
Technical Officers
11 09 - -
5 Sr. Engineer/ Principal
Technical Officers
23 11 - -
6 Jr. Engr./Sr. Technical
Officers/ Admin Officer
25 14 - -
7 Asstt. Engineers/ Technical
Officer
32 35 - 13
Total
111 82 01 13
111 96
Detail of Manpower of C&ESS Department Officer
9
Sr. No. EFPs Technical Officer of
C&ESS
Supporting Officer Staff of C&ESS Supporting Staff
Regular Cont. Daily
Wages
Regular Cont. Daily
Wages
Regular Cont Daily
Wages
Regular Cont. Daily
Wages
01 EFP-I 05 - 05 03 - 01 68 1 - 60 - 38
02 EFP-2 09 - - 05 - 01 65 4 07 54 - 15
03 EFP-3 10 - - 05 - - 67 9 80 72 - 12
04 EFP-4 09 - - 04 - 01 15 2 22 31 08 20
05 EFP-5 07 - 03 09 - - 40 3 25 42 - 46
06 FGCP-1 05 - 01 08 - - 23 1 48 47 - 10
07 FGCP-2 04 - - 03 - - 21 - 09 28 - 34
08 I-9 WKP 02 - - 02 - - 23 1 07 10 - 03
09 KBW 01 - - 01 - - 26 - 01 04 - 01
Total: 52 - 09 40 - 03 348 21 199 348 08 179
LOCATION-WISE BREAK-UP OF MANPOWER OF C&ESS DEPARTRMENT
•124 Civil Helpers (Bughti) posted at Pikoh/ Loti (Production Department)
SUMMARY OF OFFICIALS WITH C&ESS DEPARTMENT
S. No Category
Status
C&ESS Supporting
1 Regular 52 40
2 Contract - 03
3 Daily Wages 09 -
Total 61 43
S. No Category
Status
C&ESS Supporting
1 Regular (348)
369
348
2 Contract (21) 08
3 Daily Wages 199 179
Total 568 534
OFFICERS STAFF
10
Detail of Manpower of C&ESS Department Staff
S. No Title of Post Sanctioned Held Daily Wages
Regular Contract
1 Supervisor Civil 05 03 - 01
2 Work Mistry Cl-III/III/I 05 11 - 01
3 Assistant Technician (Civil) - 02 - 03
4 Electric Foreman - 01 - -
5 Painter Cl-IV/III/II/I 09 04 - 02
6 Plumber Cl-IV/III/II/I 07 04 - 03
7 Carpenter Cl-IV/III/II/I 09 01 - 07
8 Mason Cl-IV/III/II/I 20 31 - 02
9 Mechanic Cl-IV/III/II/I 144 88 - 03
10 Welder Cl-IV/III/II/I 43 17 - 04
11 E/Driver/Pump Optr. Cl-IV/III/II/I 130 104 - 30
12 Auto Electrician Cl-IV/III/II/I 13 12 - 03
13 Power Electrician Cl-IV/III/II/I 10 14 - 02
14 Ac Mechanic Cl-IV/III/II/I 05 01 - -
15 Overseer 01 03 - -
16 Motor Grader Operator 03 02 - 01
17 Heavy Machine Operator - - - 15
18 Spray Painter - 02 - -
19 Fitter 04 - - -
20 Steel Fixer - 02 - -
21 Denter 03 01 - -
22 Machinist 08 05 - -
23 Foreman - 02 - -
24 X-Ray Welder 12 01 - -
25 Grinder Man 18 04 - -
26 Fabricator 03 02 - -
27 Asstt. Tech (Elect) - 01 - 04
28 Cushion Maker 02 - - -
29 Helper(Mech/ Water Supply) 384 23 - 118
30 Helper Deceased Quota (Contract) - - 21 -
31* Helper (Civil) posted in Prod. Deptt. (Pirkoh/Loti) - 06 - -
Total 838 348 21 199
838 568
11
Sr. No. Title of Post Sanctioned Held Daily Wages
Regular Contract
1. Accounts Assistant 09 06 - -
2 Store Assistant 07 09 - 01
3 Store Man 10 16 - 05
4 Dispenser 07 12 - 04
5 Security Inspector 05 - - -
6 Sr/ Admin Asstt./UDC/LDC 30 70 01 05
7 Cook 14 14 - 25
8 Bearer 14 13 - 25
9 Radio Operator 05 16 - 02
10 HTV/LTV/Driver 142 109 - 27
11 Mess Helper 05 - - 07
12 Naib Qasid - 15 06 03
13 Mali 02 - - -
14 Sweeper 04 04 01 -
15 Sr. Transport Assistant - 01 - -
16 HSEQ Professional - - - 16
17 Dispatcher - 01 - -
18 Loader - 01 - -
19 Tel. Supervisor - 01 - -
20 Medical Attendant - 01 - -
21 Sr. Personnel Assistant - 01 - -
22 Sr. Accountant - 01 - -
23 Security Helper - 10 - -
24 Seismic Driller - 01 - -
25 Security Guard - 22 - -
26 Dish Washer - - - 10
27 HSE Watch Man - - - 04
28 Chapati Maker - 01 - -
29* Moazzan (As per MOS) 07 - - 03
30* Washer Man (As per MOS) 07 04 - 08
31* Sanitary Worker (As per MOS) 14 05 - 10
32* Pesh Imam (As per MOS) 07 04 - 05
33* Barber (As per MOS) 07 06 - 06
34* Mali (As per MOS) 07 02 - 13
Total 303 348 08 179
303 535
Detail of Manpower
of
C&ESS Department
(Supporting Staff)
12
Location wise actual held position detail of Manpower
of C&ESS Department Staff
Sr. No. Title of Post Sanctioned Held Difference
On the Strength of C&ESS Deptt. Posted in C&ESS Deptt. Others Deptt.
1. Supervisor Civil 05 04 03 01
2 Work Mistry Cl-III/III/I 05 11 11 -
3 Assistant Technician (Civil) - 02 02 -
4 Electric Foreman - 01 01 -
5 Painter Cl-IV/III/II/I 09 07 04 03
6 Plumber Cl-IV/III/II/I 07 07 04 03
7 Carpenter Cl-IV/III/II/I 09 03 01 02
8 Mason Cl-IV/III/II/I 20 39 31 -
9 Mechanic Cl-IV/III/II/I 144 98 88 10
10 Welder Cl-IV/III/II/I 43 27 17 10
11 E/Driver/Pump Optr. Cl-IV/III/II/I 130 125 104 21
12 Auto Electrician Cl-IV/III/II/I 13 15 12 03
13 Power Electrician Cl-IV/III/II/I 10 21 14 07
14 Ac Mechanic Cl-IV/III/II/I 05 03 01 02
15 Overseer 01 04 03 01
16 Motor Grader Operator 03 02 02 -
17 Heavy Machine Operator - 01 - -
18 Spray Painter - 01 02 -
19 Fitter 04 01 - -
20 Steel Fixer - 01 02 -
21 Denter 03 01 01 -
22 Machinist 08 06 05 01
23 Foreman - 03 02 01
24 X-Ray Welder 12 01 01 -
25 Grinder Man 18 11 04 07
26 Fabricator 03 01 02 -
27 Asstt. Tech (Elect) - 01 01 -
28 Cushion Maker 02 01 01 -
29 Helper(Mech/ Water Supply) 384 29 23 06
30 Helper Deceased Quota (Contract) - - 21 -
31* Helper (Civil) posted in Prod. Deptt. (Pirkoh/Loti) - 141 06 124
Total 838 571 369 202
13
Location wise detail of Manpower of C&ESS Department Staff
Sr. No. Title of Post EFP-1 EFP-2 EFP-3 EFP-4 EFP-5 FGCP-1 FGCP-2 I-9 KBW Total
1 Supervisor Civil - 01 01 01 - - - - - 03
2 Work Mistry Cl-III/III/I 03 01 03 01 03 - - - - 11
3 Assistant Tech.(Civil) - 01 01 - - - - - - 02
4 Electric Foreman - - - - - - 01 - - 01
5 Painter Cl-IV/III/II/I 01 01 01 - 01 - - - - 04
6 Plumber Cl-IV/III/II/I - 01 01 - 01 - 01 - - 04
7 Carpenter Cl-IV/III/II/I - - - - 01 - - - - 01
8 Mason Cl-IV/III/II/I 08 11 04 02 04 01 01 - - 31
9 Mechanic Cl-IV/III/II/I 12 14 20 02 05 02 04 15 14 88
10 Welder Cl-IV/III/II/I 02 02 03 01 02 01 04 01 01 17
11 E/Driver/Pump Optr. Cl-IV/III/II/I 32 23 25 03 09 04 07 01 - 104
12 Auto Electrician Cl-IV/III/II/I 01 01 01 01 01 01 01 04 01 12
13 Power Electrician Cl-IV/III/II/I 06 03 01 01 01 - - 01 01 14
14 Ac Mechanic Cl-IV/III/II/I - - 01 - - - - - - 01
15 Overseer - 02 - - 01 - - - - 03
16 Motor Grader Operator - - - - 02 - - - - 02
17 Heavy Machine Operator - - - - - - - - - -
18 Spray Painter - - - - - - - - 02 02
19 Fitter - - - - - - - - - -
20 Steel Fixer - 01 - - - 01 - - - 02
21 Denter - - - - - - - - 01 01
22 Machinist - - - - - - - - 05 05
23 Foreman - - - - 01 - - - 01 02
24 X-Ray Welder - - - - - 01 - - - 01
25 Grinder Man - - - - - 04 - - - 04
26 Fabricator - - - - - 02 - - - 02
27 Asstt. Tech (Civil) - - - - - - - - - -
28 Asstt. Tech (Elect) - - 01 - - - - - - 01
29 Cushion Maker - - 01 - - - - - - 01
30 Helper(Mech/ Water Supply) 03 03 02 02 05 05 02 01 - 23
31 Helper Deceased Quota (Contract) 01 04 09 02 03 01 - 01 - 21
32* Helper (Civil) posted in Prod. Deptt. (Pirkoh/Loti) - - 01 01 03 01 - - - 06
Total 369
Completed wells during FY-2012-13
S. No Location Name Marked Start date Completion date Rig Type
01 Multan North # 01 10.07.2012 14.07.2012 24.07.2012 Cracow-I
02 Qadirpur # 46 04.07.2012 15.07.2012 12.08.2012 Cracow-I
03 Zin # 05 20.07.2012 31.12.2012 N-55
04 Dakhni # 08 11.08.2012 12.08.2012 31.08.2012 N-3
05 Bahu # 05 15.08.2012 17.08.2012 31.08.2012 F-125
06 Rajian # 07 15.08.2012 03.09.2012 13.09.2012 N-4
07 Mela # 04 30.09.2012 09.01.2013 N-3
08 Bahu # 06 15.08.2012 06.10.2012 04.11.2012 F-125
09 Bobi # 10 02.10.2012 07.10.2012 30.10.2012 GWDC-8
10 Qadirpur # 48 18.11.2012 Cracow-I
11 Bahu # 07 04.11.2012 18.11.2012 09.12.2012 307
12 Bahu # 08 04.11.2012 18.11.2012 14.12.2012 F-125
13 Qadirpur # 47 18.12.2012 19.12.2012 25.01.2013 Cracow-I
14 Qadirpur # 48 14.12.2012 20.12.2012 23.01.2013 GWDC-V
15 Sara West # 4 13.12.2012 26.12.2012 04.02.2013 GWDC
16 Kurram # 01 31.12.2012 11.01.2013 24.02.2013 GWDC
17 Tando Qasir 02.01.2013 17.01.2013 17.02.2013 307
18 Soghri X-1 05.03.2013 07.03.2013 17.03.2013 N-1
19 Sohniwala # 01 16.03.2013 17.04.2013 26.04.2013 F-125
20 Jand # 01 04.01.2013 03.05.2013 14.06.2013 GWDC-6
21 Qadirpur HRL-7 19.03.2013 18.05.2013 06.06.2013 GWDC-5
22 Jakhro West # 01 05.04.2013 30.05.2013 26.05.2013 Sinopac
Completed wells during FY-2012-13
S. No Location Name Marked Start date Completion date Rig Type
16 Kurram # 01 31.12.2012 11.01.2013 24.02.2013 GWDC
17 Tando Qasir 02.01.2013 17.01.2013 17.02.2013 307
18 Soghri X-1 05.03.2013 07.03.2013 17.03.2013 N-1
19 Sohniwala # 01 16.03.2013 17.04.2013 26.04.2013 F-125
20 Jand # 01 04.01.2013 03.05.2013 14.06.2013 GWDC-6
21 Qadirpur HRL-7 19.03.2013 18.05.2013 06.06.2013 GWDC-5
22 Jakhro West # 01 05.04.2013 30.05.2013 26.05.2013 Sinopac
Completed Works during FY-2013-14
S. No Location Name Marked Start date Completion date Rig Type
01 Maru East # 01 10.04.2013 20.07.2013
20.09.2013 30.09.2013
F-125
02 Qadirpur # 50 15.05.2013 05.07.2013 25.07.2013 Cracow-1
03 Rajian # 08 25.06.2013 08.09.2013 02.10.2013 N-2
04 Kunnar Deep # 09 03.07.2013 08.09.2013 03.10.2013 N-6
GWDC-8
05 Zin SML-3 05.02.2013 05.02.2013 22.09.2013 N-55
06 UCH-II Gathering
lines for six wells
- 18.04.2013 30.06.2013 -
In progress Works during FY-2013-14
S. No Location Name Marked Start date Completion date Rig Type
01 Chak Dim-5 # 02 04.07.2013 23.09.2013 Rig shifting started SIN-149
02 Kup # 01 09.07.2013 Awaited Approach Road
leveling in progress
through OGDCL
machinery
N-2
OGDCL machinery mobilized on 11.07.13
Work started 12.07.13
Work stopped for 55 days w.e.f.19.07.13 to 11.09.13
Work again stopped for 3 days w.e.f.14.9.13 to 16.9.13
Restarted on 17.9.13
03 Chak 25-C-1 07.08.2013 Awaited Leveling through
OGDCL machinery in
progress
N-6
04 Manna # 01 07.08.2013 11.10.2013 LOI issued on
09.10.13, Concerting
in Progress
N-5
05 Rajian # 02 Work over 13.08.2013 Awaited LOI issued on
04.10.13, Concerting
in Progress
307
In Tender Process wells during FY-2013-14
S. No Location Name Marked Status Rig Type
01 Qadirpur # 52 21.08.2013 In award approval
process
Cracow-1
02 HRL # 08 21.08.2013 // Cracow-1
03 Nashpa # 05 05.07.2013 NOC awaited N-3
04 Dachra Pur –
Gathering Lines
- LOI Issued
07.10.2013
-
05 UCH-II Gathering
System for 09 Wells
- BOD Approval
Awaited
-
Permanent Structure Works
19
S. No Name of Project Cost in millions Remarks
01 Construction of Sport Shed at Uch 5.703
EFP-I involving an
amount of
Rs.104.934 millions
other than PDCWs
02 06 numbers Police Pickets in Uch area 21.511
03 15 numbers Security Rooms at each well in Uch area 7.028
04 Maintenance of ROW & Approach Road at Uch Gas Field 2.126
05 Boundary wall, watch tower & Security Uch 48.096
06 Construction of Store Shed at Uch 20.470
07 Changes in Works for Rig Kremco at Bahu # 05 26.584
EFP-II involving an
amount of Rs.46.847
millions other than
PDCWs
08 Water Supply to Dhodak Plant -
09 Construction of Executive Annexe at Regional Office Multan 10.074
10 Surface facilities at Bahu Well # 1, 2 & 3 7.268
11 Construction of Engine Operator Room, Hard Standing at Kot
Adu
2.921
12 Water Supply to Dhodak Field -
13 Construction of additional new Room (08 Nos) in Officer’s
Residential Camp at Dakhni
5.522
EFP-III involving an
amount of
Rs.540.274 millions
other than PDCWs
14 Construction of New Production Office at Dakhni 3.274
15 Fencing of Store Boundary/Chemical shed at Dakhni Store
Shed
2.483
Permanent Structure Works
20
S. No Name of Project Cost in millions Remarks
16 Preparation of Effluent water pit at Dakhni (04 numbers) 13.558
17 Construction of new security check post at Dakhni Plant 0.153
18 Sheikhan Plant EWT works 43.367
19 Civil works for reinstallation of TOC Mud Plant at Sheikhan
Production Field
2.227
20 Construction of Boundary wall & provision of Steel Stairs for
watch towers at Sheikhan Field
8.284
21 Construction of Officer’s Colony at Chanda 35.00
22 Security of Security Posts for Platoon # 4 at Chanda/Mela
Plant
5.941
23 Infrastructure Work at Chanda Oil Field 22.874
24 Up-gradation of Road from Shakardara to Kharrapa More 262.04
25 Concrete Flooring at Chanda Plant area 6.743
26 Fencing & Gate at Mela # 03 1.938
27 Construction of Crude Recovery pit at Mela Plant 1.88
28 Construction of Building at Mela Dehydration Plant 1.891
29 Installation of Weigh Bridges at Mela # 03 0.931
Permanent Structure Works
21
S. No Name of Project Cost in millions Remarks
30 Construction of HSEQ Office with Bath & Mini Store at Mela
Field
0.383
31 Nashpa Plant EWT Civil Works 68.572
32 Construction of 3 Km mettaled Road at Nashpa Banda under
Social Welfare
11.948
33 Construction of Recreation Hall for Worker Mess at Nashpa
Plant
0.955
34 Construction of Control Room for Marketing Section at
Nashpa
1.500
35 Construction of two numbers production storage shed &
hard standing at Nashpa Plant
0.133
36 Construction of Security Check Posts at Nashpa # 1,2 & 3 1.89
37 Construction of Security Check Posts out site the Plant 05
numbers
3.598
38 Pre Casted RCC Wall for extension of LPG Plant at Nashpa 13.003
39 Construction of Permanent Woven Wire Mesh Fencing at
Nashpa Well # 03
1.532
Permanent Structure Works
22
S. No Name of Project Cost in millions Remarks
40 Construction of Remaining Portion of Boundary wall at
Rajian # 01
3.741
41 Construction of Hard Standing in Auction Yard Chak Naurang 6.471
42 Construction of Two Rooms for Office at Chak Naurang 1.325
43 Construction of Approach Road at Auction Yard Chak
Naurang
0.470
44 Construction of Semi Covered Shed at I-9 2.247
45 Repair of OGTI Hostel 4.400
46 Relocation of Pirkoh Compressor at Qadirpur 40.00
EFP-IV involving
Rs.156.426 millions
other than PDCWs
47 Work over job at Qadirpur # 11 19.061
48 Construction of Raised Platform # 41 14.551
49 Construction of Raised Platform Qadirpur Deep # 01 15.054
50 Construction of Hard Standing, Parking Shed in from of
Admin Block
6.800
51 Raising of Qadirpur Plant Boundary wall 30.837
52 Foundation & Cable Trenches at Qadirpur Plant 8.494
53 Repair/Fencing including Gate at Qadirpur Well 6.081
54 Raised Platform at Qadirpur # 17 15.548
Permanent Structure Works
23
S. No Name of Project Cost in millions Remarks
55 Construction of Sinjhoro Plant Boundary wall 25.293
EFP-V involving an
amount of
Rs.707.495 million
other than PDCWs
56 Equipment Foundation Civil Works at Sinjhoro Plant
(Phase-I & II) 391.00
57 Building Civil Works of Relocation of Dhodak Plant
58 Earth Filling Works at Sinjhoro Plant 32.157
59 Development of water supply system at Sinjhoro Plant 23.028
60 Internal Electrification for Sinjhoro Plant Building 10.219
61 Sinjhoro Plant Lightning/External Electrification works 42.468
62 Construction of Boundary wall at Bobi Colony 9.836
63 Development of Noor/Bagla Fields 66.005
64 Additional Water Storage Reservoir of 5.6 million Liters
capacity at Bobi Plant
15.232
65 Construction of Foundation for installation of weighing
bridge at Tando Alam Oil Complex
0.931
66 Construction of boundary wall & watch tower at KPD Project 23.968
67 Construction of 10 Nos. Officers Room, 02 Nos. Guest
Room, Dinning Hall, Kitchen & Pantry etc at Kunnar Plant
7.526
68 KPD Phase-II Plant Units 22.421
24
S. No Name of Project Cost in millions Remarks
69 Security Measures at KDS Base Boundary wall extension of
Tubular Yard at Karachi
4.462
70 Construction of FGCP-II New Base Camp at New location 15.760
71 Construction of Room Size 10x10 near Weigh Bridge at TOC 0.275
72 External Electrification at KBS Boundary wall 2.670
73 Compressor Foundation MS Steel Shed & Related other
works at Daru Plant
2.366
74 Installation of water supply system at KDS 5.964
75 Repair of Mesh Fencing/Gates at TOC wells 2.014
76 Renovation work of proposed regional coordinator Karachi
office at 7th
floor Dawood Center
2.000
77 Missan # 01 work over job 1.900
Permanent Structure Works
25
Work Carried out through Field Gathering Sections
S.N FGCP - I Approved Cost REMARKS
01 16” Header of ERW : 4.5KM : QP 18.590M completed
02 8” F/L & WHA HRL#6 : 0.65KM : QP 02.048M completed
03 Emergency repair F/L Well # 36 : QP 00.433M completed
04 Emergency repair 26” Trunk Line : UG - completed
05 Repair 500BBL tanks : 04No. : KAL 01.732M completed
06 Production hook up connection Well#30 : QP 01.827M completed
07 Container Caravan Dining/kitchen cementation :01No : KS 00.806M completed
08 Insu/Cladd F/L Well # 1, 3, 4 & deep-1 : 9KM : DNI 15.554M completed
09 Emergency repair F/L Well # 24 : QP - completed
10 Misc. Jobs ATA-2012 (25.08.12 to 31.08.12) : DNI 0.537 completed
11 Rectification WHA Well# 13 : QP 0.433M completed
12 Emergency repair F/L Well # 07 : QP 0.964M completed
13 Additional 6” Crude transfer line well # 3 : NSH 0.327M completed
14 Fab/Install of Generator Shed : FGCP-I 0.082M completed
15 Emergency repair F/L Well # 36 : QP - completed
16 Emergency repair F/L Well # 36 : QP 0.303M completed
17 Emergency repair F/L Well # 24/41 : QP - completed
18 Emergency repair 26” Trunk Line : UG - completed
19 F/Gathering Sys. (L/Over + ATA Jobs) : BHU 24.00M completed
20 Emergency repair F/L Well # 09 : QP - completed
21 Fab/Install Perm WHA Well#36 :QP 03.052M completed
22 Fab/Install 30” Pub Piece & Valve at Plant : QP 0.595M completed
23 Separator point Well#35,36,38,39,42,17,41,D-1,HRL-2 : QP 1.109M completed
24 Repair Work at 11 Wells & Repair of Sale Gas line – ATA : UG 16.110M completed
25 Emergency Repair F/L Well#43 : QP - completed
26 Emergency Repair F/L Well#07 & 28 : QP - completed
27 8” F/L & WHA Well#46 : 2.5KM : QP 4.507M completed
28 F/L, WHA & Tie-in QP#43 : 100M :QP - completed
29 F/L, WHA & Tie-in QP#42 : 400M :QP - completed
30 Extension 8” Dia F/L QP#36 : 360M : QP 1.900M completed
26
S.N FGCP - I Approved Cost REMARKS
31 Emergency repair F/L QP#33 : QP 0.10M completed
32 Emergency repair F/L QP#09 : QP 0.10M completed
33 Emergency repair F/L HRL#02 : QP 0.10M completed
34 Emergency repair F/L QP#33 0.10M completed
35 Emergency Repair Bahu/PP Header near SS#1 : Bahu 0.518M completed
36 Welding of 14No Joints for production hook Up well Raja-1 : QP 0.10M completed
37 Provision of future tie in at ERW plateform : QP 0.10M completed
38 Renovation of Mess Caravans : FGCP – 1 0.902M completed
39 Extension of 8”dia flow line QP # 37,36 :700 M+360 M : QP 1..90M completed
40 Fab/inst. Of 4” dia FCV spool QP # 01 : QP
0.520M
completed
41 Fab. of 8” dia spool for WHA (20 jts ) QP#29 : QP completed
42 Fab. of 8” dia spool for WHA QP#23 : QP completed
43 Emergency repair Flow Line Well # 33 : QP 0.10M completed
44 Emergency repair 0f 20000 bbl’s tank : NSH 0.10M completed
45 8” Flow Line/WHA& Separation Battery Well # 3 : 4 KM : NSH 15.171M completed
46 Fabrication/installation of WHA : QP#36 3.052M completed
47 Repair caravan fabrication shed : FGCP-I 0.292M completed
48 Laing of 12”dia flow line ERW to QP # 17(1.5KM), Ext WHA,s &
8”dia line QP# 42,43 (300 M) , : QP
2.51 M completed
49 Emergency repair Flow Line Well # deep-1 : QP 0.100M completed
50 Headers 26” dia & 30” dia replacement :1.5KM : QP 15.675M completed
51 Emergency repair Flow Line Well # 07 : QP 0.10 M completed
52 Fabrication/installation of WHA & F/L( 700M) for QP#48 : QP 1.00M completed
53 Emergency repair Flow Line Well # 07 : QP 0.10 M completed
54 Fabrication of K.O V for 10 wells : QP 0.45M completed
55 8” Flow Line/WHA& Separation Battery Well # 4 : 2.9 KM : NSH 17.71M completed
56 Fabrication/Installation of 16” dia by pass header at eastern pig
launching station with 05 tie-in points 0f 8’dia
0.364M Completed
57 Fabrication/installation of WHA well DKN#8 : Dakhni 3.052M completed
58 Repair/Rectification of Pin hole on the Flow line of QP#36 - completed
59 Installation of test separators at QP #36& 37 N/A Completed
Work Carried out through Field Gathering Sections
27
S.N FGCP - I Approved Cost REMARKS
60 Laying of 8” dia flow line QP#29 to eastern header N/A Completed
61 Fab/Installation of WHA & Flowline 1.25KM QP, HRL#7 1.0M Completed
62 Repair/ Rectification of pin hole QP#23 - Completed
63 Repair/ Rectification of pin hole QP#24 - Completed
64 Sale Gas pipeline & Fab. of Meter Run Assembly 3.5KM : Nashpa 4.50M completed
65 Repair/ Rectification of pin hole on F/L of QP# 35, 38, 39 - Completed
66 Repair/ Rectification of pin hole QP#07 - completed
67 Repair/ Rectification of pin hole QP#24 - Completed
Sub Total 163.624M
Work Carried out through Field Gathering Sections
S.N FGCP - II Approved Cost REMARKS
01 Rectification/Maintenance Jobs at Plant/wells : KPD 02.648M completed
02 Repair 12000BBL Tank #5 : KUN 3.066M completed
03 Repair/Modification 12000 BBL Tank#4 as Gun Barrel : TOC 3.265M completed
04 6” F/L & WHA JV Well Shah -1 : 1.5KM : KPD 08.796M Completed
05 OGRA requirement jobs at Bobi LPG Plant 11.961M completed
06 Installation connections of K/O Vessel : BOC 0.730M completed
07 Repair of Mithrao/ Chack Din # 5 F/L 38Km : BOC 2.184M completed
08 Installation of Tie-in point of Compressor at DARU 1.722M Completed
09 Repair of 6000 BBL Tanks #02 : KUN 07.00M Completed
10 6” F/L & WHA Baloch -1 to plant : 19.5KM : SNJ - Completed
11 Repair of 6000 BBL Tank : 01No. : TOC 6.620M Completed
12 6” F/L & WHA well KUN West -1A : 5Km : KPD 8.40M Completed
13 Repair furnace heater : TOC 1.922M Completed
14 6” F/L & WHA Chak-2 (1) to plant : 4.5Km : SNJ 8.255M Completed
15 4” Flow Line &WHA Jhakro Well : 30 KM : JKH 41.377M completed
Sub Total 107.945M
28
S.N FGCP - I
Approved
Cost
Start Progress REMARKS
01 Retrieval of Meyal Line : 30 KM : DNI 07.250M 07.04.12 90%
02 Dismantling of Meyal terminal 04.93M 03.09.13 80%
03 Interconnection piping of 20,000 BBL tanks at NASHPA - - -
04 Fab/Installation of WHA’s : 04Nos : MAR/RET 09.336 06.06.11 99% After installation of sale
gas line
05 Installation of 8” dia F/L Dakhni # 12 - 13.02.13 60%
06 Fab/Installation of WHA & F/L 8 “ dia 2.9Km Nashpa#4 17.71M 28.02.13 97%
07 Repair/Renovation of Caravans : 03Nos for FGCP-II 1.90M 30.08.12 92%
08 Dismantling/ Re-Install WHA QP#11 0.552M 15.08.12 30% Waiting for work over
Sub-TOTAL 41.668M
S.N FGCP - II Approved
Cost
Start Progress REMARKS
01 4” F/L & WHA Chak-63#3 to plant : 12.5KM : SNJ 10.588M 28.07.11 50%
02 8” F/L & WHA PSK D-3, KUN-Deep-6&KM : KPD 22.114M 19.04.12 94%
03 6” dia line Resham well#01 to Sinjhoro plant(15km) 18.5M 18%
04 4” Flow Line/WHA Chak - 63 SE(1) to Plant : 9 KM : SNJ 07.805M 01.10.12 9%
05 6” Flow Line/WHA Chak - 2 (1) to Plant : 15.5 KM : SNJ 28.435 M 14.07.11 95%
06 6” Flow Line/WHA Chak - 2 (3) to Plant : 19.5 KM : SNJ 15.513 M 23.01.11 02%
07 6” Flow Line/WHA Chak - 66 to Plant : 11 KM : SNJ 07.831 M - 02%
08 4” Flow Line /WHA Chak - 63 (1) to Plant : 11 KM : SNJ 08.782 M - -
09 Interim Arrangements/Gathering Area - 6 : SNJ 09.784 M 05.06.12 80%
Sub-TOTAL 129.353M
FGCP’s DEPARTMENTLY ONGOING PROJECT REPORT FOR THE YEAR
July, 2012 - Till October, 2013
Sub Total (I + II) = 171.021 M
29
A. CONSULTANCY WORKS COMPLETED
SR.
NO.
NAME OF WORK REMARKS / STATUS
1 Design / Consultancy Services for Construction / retrofitting/strengthening
works for installation of new seismic data processing system at OGDCL
House, 12th
Floor, Tower-C, Iba.
Completed.
2 Residential Staff Houses, (Officers, Assistants, Workers) at Sinjhoro Oil
Field. Completed.
3 Design/Consultancy services for Construction of Uch-II camps at Uch Gas
Field. Completed.
B. CONSULTANCY WORKS UNDER PROGRESS.
1 Construction of heavy traffic metalled road from Uch Plant to UPL Dera
Murad Jamali (47 KMs) at Uch Gas Field.
Work delayed due to law and order
situation. Final Tender Documents
awaited.
2 Gas Field Protective Bund (Physical Model Study of Qairpur bund and
ERWs)
Final Design Report submitted. Final
Tender Documents awaited.
3 Feasibility study of existing tarally steel structure bridge for the use of
heavy loaded vehicles and if required design/consultancy services for
improvement of bridge for heavy traffic situated at road from Karrapa More
to Chanda Oil Field.
Final Design and Drawing submitted and
Final Tender Documents awaited.
C. CONSTRUCTION COMPLETED.
1 Bridge over for Kunner LPG Plant. Completed.
2 Supporting Structural System & Electrical works at Bahu Gas Field.
Completed.
3 Repair / Up-gradation of Road from Karrapa More to Chanda Plant () at
Chanda. Completed.
4 Construction / retrofitting/ strengthening works for installation of new
seismic data processing system at OGDCL House, 12th
Floor, Tower-C,
Islamabad.
Completed.
STATUS OF CIVIL WORKS WITH CONTRACT SECTION
BEFORE NEWLY APPROVED ENGG. WORK PROCEDURE AS ON 10.10.2013.
30
A. HEAD OFFICE TENDERS
S.NO NAME OF WORK NUMBERS
1 Bid Document Stage 04
2 Press Advertisement Stage 09
3 Technical Evaluation Stage 07
4 Financial Evaluation Stage 09
5 Management approval for award 07
6 Under Construction 00
7 Completed 00
TOTAL 36
B. PRE-DRILLING ENGINEERING WORKS
1 Bid Document Stage 00
2 Press Advertisement Stage 02
3 Management approval for award 04
4 Works Under Construction 04
5 Works Completed 08
TOTAL 18
C. OTHER ENGINEERING WORKS
1 Bid Document Stage 01
2 Press Advertisement Stage 01
3 Management approval for award 02
4 Works Under Construction 04
5 Works Completed 01
TOTAL 09
STATUS OF CIVIL WORKS WITH CONTRACT SECTION
AFTER NEWLY APPROVED ENGG. WORK PROCEDURE AS ON 10.10.2013.
Supply of water to Production sites = 08.93 million gallons monthly
Supply of water to Process & Plants = 76.11 million gallons monthly
Supply of water to Drilling sites = 19.22 million gallons monthly
Total water supplied during the month of Sept, 2013 =104.26 million gallons
Water Supply SectionWater Supply Section
31
32
Vehicle Repaired at I-9 Base WorkshopVehicle Repaired at I-9 Base Workshop
Serviced Minor
Repair
Major
Repair
Engine
Overhauling
Expenditure
1204 1071 128 05 Rs.11,168,461/-
The workshop is maintaining 433 light & heavy vehicles including 406 Petrol & 27The workshop is maintaining 433 light & heavy vehicles including 406 Petrol & 27
Diesel vehicles. Diesel vehicles include a fleet of 14 Buses & CoastersDiesel vehicles. Diesel vehicles include a fleet of 14 Buses & Coasters

More Related Content

What's hot

Incident&accident report date 02.08.2014 by arber dogani example for aplic...
Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...
Incident&accident report date 02.08.2014 by arber dogani example for aplic...Arber Dogani
 
Rig scheduling gantt chart
Rig scheduling gantt chartRig scheduling gantt chart
Rig scheduling gantt chartSuparna K
 
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129James Zhang (Chi, Zhang)
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statisticsArber Dogani
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Thomas Ingrey
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDFClement Seong
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016peter mcelwee
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioSyed Arafath, PMI-SP certified
 

What's hot (12)

Incident&accident report date 02.08.2014 by arber dogani example for aplic...
Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...
Incident&accident report date 02.08.2014 by arber dogani example for aplic...
 
Rig scheduling gantt chart
Rig scheduling gantt chartRig scheduling gantt chart
Rig scheduling gantt chart
 
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
 
JG Smit - CV
JG Smit - CVJG Smit - CV
JG Smit - CV
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDF
 
PIPING DESIGNER
PIPING DESIGNERPIPING DESIGNER
PIPING DESIGNER
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
Jan 2017
Jan 2017Jan 2017
Jan 2017
 
Antonio_Sesto
Antonio_SestoAntonio_Sesto
Antonio_Sesto
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
 

Similar to Construction & Engineering Works Summary

Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15Ptpg Stuc
 
MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1Eko Untung
 
MRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMoolRaj3
 
Torkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdfTorkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdfSajidMumtazGurmani
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
PCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxPCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxEngrMahmud3
 
Final Majarrah rev 0
Final Majarrah rev 0Final Majarrah rev 0
Final Majarrah rev 0Ahmed Mehrem
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxFaisalGulzar19
 
Company profile 2015 rev.4
Company profile 2015   rev.4Company profile 2015   rev.4
Company profile 2015 rev.4Arthit Somkam
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6MUHAMMAD SALEEM
 
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015William Irving
 

Similar to Construction & Engineering Works Summary (20)

Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 
06-03-2020.docx
06-03-2020.docx06-03-2020.docx
06-03-2020.docx
 
MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1
 
MRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptx
 
Torkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdfTorkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdf
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
NExT Schlumberger Drilling Engineer Program Course Outline
NExT Schlumberger Drilling Engineer Program Course OutlineNExT Schlumberger Drilling Engineer Program Course Outline
NExT Schlumberger Drilling Engineer Program Course Outline
 
ERUP WBS
ERUP WBSERUP WBS
ERUP WBS
 
Pdo cv approvals
Pdo cv approvalsPdo cv approvals
Pdo cv approvals
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
PCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxPCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptx
 
Final Majarrah rev 0
Final Majarrah rev 0Final Majarrah rev 0
Final Majarrah rev 0
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptx
 
Company profile 2015 rev.4
Company profile 2015   rev.4Company profile 2015   rev.4
Company profile 2015 rev.4
 
Weekly report no 19
Weekly report no 19Weekly report no 19
Weekly report no 19
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
 
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 

Construction & Engineering Works Summary

  • 1. 1 Baig Ali Chief Engineer (Civil) - Operations
  • 2. As of October 30, 2013 2 CONSTRUCTION ANDCONSTRUCTION AND ENGINEERING SUPPORTENGINEERING SUPPORT SERVICES DEPARTMENTSERVICES DEPARTMENT
  • 3. 3 Cost estimates are based on MES Schedule of Rates. Civil Works Procedure 1984: • Start of work & cost estimation simultaneously. • Procurement of materials according to Store Procedure. • Hiring of skilled & unskilled manpower. • Repair and maintence services during operations. Revised Engineering Works Procedure 2013: • Cost estimate and AFE approvals. • Tender documents preparation and contract administration. • Departmental works utilizing available resources. • Procurement of material & services as per PPRA & PEC. Working MethodologyWorking Methodology
  • 4. 4 ENGG.WORKS DETAILENGG.WORKS DETAIL Pre Drilling & other Works Description 2012-13 2013-14 Completed 22 06 In progress - 05 In Tender process - 05
  • 5. 5 CIVIL WORKS DETAILSCIVIL WORKS DETAILS PERMANENT STRUCTURE WORKS Description Total Amount in millions Civil works carried out through EFPs 77 1555.97 Pipeline & WHA works carried out through FGCPs 99 442.590 Contract Section Works before going on PPRA Rules: a.Consultancy Works completed b.Consultancy Works in progress c.Construction Works completed 3 3 4 Contract Section Works after adoption of PPRA Rules: a.Tender Documents/Process for Head Office b.Tender Documents/Process for Pre Drilling work c.Tender Documents/Process for Field works 36 18 09 Water Supply through C&ESS Department 104.26 million Gallons Vehicle Repaired Annually I-9 Base Workshop Islamabad 2408 11.168
  • 6. S. No Name of Work Status Approved Cost Works carried out by Contractor Departmental Works 1 Engineering works for Sohniwala Well # 1 at Tehsil Ahmedpur Distt. Jhang Completed Rs: 39.810 M Rs: 14.669 M Rs: 25.141 M 2 Engineering works for Jand well # 1 Distt. Attock Completed Rs: 54.284 M Rs: 19.387 M Rs: 34.897 M 3 Construction of Pre Drilling Engineering Works At Rajian-8 District Chakwal Punjab Completed Rs: 60.100 M Rs: 23.889 M Rs: 36.211 M 4 Construction of Foundation for installation of Weigh Bridge at Nashpa Oil Field Contract execution awaited Rs: 1.147 M Rs: 1.148 M Rs: 0.00 M 5 Engineering works for Qadirpur HRL well # 7 Distt. Ghotki Sindh Completed Rs: 47.609 M Rs: 42.377 M Rs: 5.232 M 6 Engineering works for Qadirpur Well # 50 at Distt. Ghotki Sindh Completed Rs: 39.422 M Rs: 27.782 M Rs:11.64 M 7 Construction of Pre-Drilling Engineering Works at QP-51 District Ghotki, Sindh. Contract execution awaited Rs: 127.920 M Rs: 72.378 M Rs: 55.542 M 8 Engineering works for Jakhro West Well # 1 at Distt. Sanghar Sindh Completed Rs:47.60 0M Rs: 42.377 M Rs: 5.224 M 9 Construction of Pre Drilling Civil Works at Well Kunnar Deep # 09 District Hyderabad Completed Rs: 35.470 M Rs: 22.50 M Rs: 12.974 M 10 Construction of Pre Drilling Civil Works at Well Chak # 5 Dim # 3. Rig shifting in Progress. Rs: 40.609 M Rs: 28.23 M Rs: 12.379 M 11 Construction of Pre Drilling Engineering Works AT Chak 25C-1, District Sanghar, Sindh. Work is in Progress. Rs: 28.474 M Rs: 20.067 M Rs: 8.407 M 12 Construction of Pre-Drilling Engineering works at Manna-1 (Tay X-2), Distt. Hyderabad, Sindh. Work is in Progress. Rs: 27.464 M Rs: 19.834 M Rs: 7.63 M 13 Uch-II – Gathering System for Six Wells Completed Rs.98.240 M Rs.77.200 M Rs.21.040 M Works carried out after the adoption of Revised Engineering Works Procedure
  • 7. Construction & Engineering Support Services Department Summary of Establishment 7
  • 8. 8 Sr. No. Title of Post Sanction ed Held Daily WagesRegular Contract 1 General Manager 01 01 - - 2 Managers 08 05 01 - 3 Chief Engineers 11 07 - - 4 Dy. Chief Engineers/ Chief Technical Officers 11 09 - - 5 Sr. Engineer/ Principal Technical Officers 23 11 - - 6 Jr. Engr./Sr. Technical Officers/ Admin Officer 25 14 - - 7 Asstt. Engineers/ Technical Officer 32 35 - 13 Total 111 82 01 13 111 96 Detail of Manpower of C&ESS Department Officer
  • 9. 9 Sr. No. EFPs Technical Officer of C&ESS Supporting Officer Staff of C&ESS Supporting Staff Regular Cont. Daily Wages Regular Cont. Daily Wages Regular Cont Daily Wages Regular Cont. Daily Wages 01 EFP-I 05 - 05 03 - 01 68 1 - 60 - 38 02 EFP-2 09 - - 05 - 01 65 4 07 54 - 15 03 EFP-3 10 - - 05 - - 67 9 80 72 - 12 04 EFP-4 09 - - 04 - 01 15 2 22 31 08 20 05 EFP-5 07 - 03 09 - - 40 3 25 42 - 46 06 FGCP-1 05 - 01 08 - - 23 1 48 47 - 10 07 FGCP-2 04 - - 03 - - 21 - 09 28 - 34 08 I-9 WKP 02 - - 02 - - 23 1 07 10 - 03 09 KBW 01 - - 01 - - 26 - 01 04 - 01 Total: 52 - 09 40 - 03 348 21 199 348 08 179 LOCATION-WISE BREAK-UP OF MANPOWER OF C&ESS DEPARTRMENT •124 Civil Helpers (Bughti) posted at Pikoh/ Loti (Production Department) SUMMARY OF OFFICIALS WITH C&ESS DEPARTMENT S. No Category Status C&ESS Supporting 1 Regular 52 40 2 Contract - 03 3 Daily Wages 09 - Total 61 43 S. No Category Status C&ESS Supporting 1 Regular (348) 369 348 2 Contract (21) 08 3 Daily Wages 199 179 Total 568 534 OFFICERS STAFF
  • 10. 10 Detail of Manpower of C&ESS Department Staff S. No Title of Post Sanctioned Held Daily Wages Regular Contract 1 Supervisor Civil 05 03 - 01 2 Work Mistry Cl-III/III/I 05 11 - 01 3 Assistant Technician (Civil) - 02 - 03 4 Electric Foreman - 01 - - 5 Painter Cl-IV/III/II/I 09 04 - 02 6 Plumber Cl-IV/III/II/I 07 04 - 03 7 Carpenter Cl-IV/III/II/I 09 01 - 07 8 Mason Cl-IV/III/II/I 20 31 - 02 9 Mechanic Cl-IV/III/II/I 144 88 - 03 10 Welder Cl-IV/III/II/I 43 17 - 04 11 E/Driver/Pump Optr. Cl-IV/III/II/I 130 104 - 30 12 Auto Electrician Cl-IV/III/II/I 13 12 - 03 13 Power Electrician Cl-IV/III/II/I 10 14 - 02 14 Ac Mechanic Cl-IV/III/II/I 05 01 - - 15 Overseer 01 03 - - 16 Motor Grader Operator 03 02 - 01 17 Heavy Machine Operator - - - 15 18 Spray Painter - 02 - - 19 Fitter 04 - - - 20 Steel Fixer - 02 - - 21 Denter 03 01 - - 22 Machinist 08 05 - - 23 Foreman - 02 - - 24 X-Ray Welder 12 01 - - 25 Grinder Man 18 04 - - 26 Fabricator 03 02 - - 27 Asstt. Tech (Elect) - 01 - 04 28 Cushion Maker 02 - - - 29 Helper(Mech/ Water Supply) 384 23 - 118 30 Helper Deceased Quota (Contract) - - 21 - 31* Helper (Civil) posted in Prod. Deptt. (Pirkoh/Loti) - 06 - - Total 838 348 21 199 838 568
  • 11. 11 Sr. No. Title of Post Sanctioned Held Daily Wages Regular Contract 1. Accounts Assistant 09 06 - - 2 Store Assistant 07 09 - 01 3 Store Man 10 16 - 05 4 Dispenser 07 12 - 04 5 Security Inspector 05 - - - 6 Sr/ Admin Asstt./UDC/LDC 30 70 01 05 7 Cook 14 14 - 25 8 Bearer 14 13 - 25 9 Radio Operator 05 16 - 02 10 HTV/LTV/Driver 142 109 - 27 11 Mess Helper 05 - - 07 12 Naib Qasid - 15 06 03 13 Mali 02 - - - 14 Sweeper 04 04 01 - 15 Sr. Transport Assistant - 01 - - 16 HSEQ Professional - - - 16 17 Dispatcher - 01 - - 18 Loader - 01 - - 19 Tel. Supervisor - 01 - - 20 Medical Attendant - 01 - - 21 Sr. Personnel Assistant - 01 - - 22 Sr. Accountant - 01 - - 23 Security Helper - 10 - - 24 Seismic Driller - 01 - - 25 Security Guard - 22 - - 26 Dish Washer - - - 10 27 HSE Watch Man - - - 04 28 Chapati Maker - 01 - - 29* Moazzan (As per MOS) 07 - - 03 30* Washer Man (As per MOS) 07 04 - 08 31* Sanitary Worker (As per MOS) 14 05 - 10 32* Pesh Imam (As per MOS) 07 04 - 05 33* Barber (As per MOS) 07 06 - 06 34* Mali (As per MOS) 07 02 - 13 Total 303 348 08 179 303 535 Detail of Manpower of C&ESS Department (Supporting Staff)
  • 12. 12 Location wise actual held position detail of Manpower of C&ESS Department Staff Sr. No. Title of Post Sanctioned Held Difference On the Strength of C&ESS Deptt. Posted in C&ESS Deptt. Others Deptt. 1. Supervisor Civil 05 04 03 01 2 Work Mistry Cl-III/III/I 05 11 11 - 3 Assistant Technician (Civil) - 02 02 - 4 Electric Foreman - 01 01 - 5 Painter Cl-IV/III/II/I 09 07 04 03 6 Plumber Cl-IV/III/II/I 07 07 04 03 7 Carpenter Cl-IV/III/II/I 09 03 01 02 8 Mason Cl-IV/III/II/I 20 39 31 - 9 Mechanic Cl-IV/III/II/I 144 98 88 10 10 Welder Cl-IV/III/II/I 43 27 17 10 11 E/Driver/Pump Optr. Cl-IV/III/II/I 130 125 104 21 12 Auto Electrician Cl-IV/III/II/I 13 15 12 03 13 Power Electrician Cl-IV/III/II/I 10 21 14 07 14 Ac Mechanic Cl-IV/III/II/I 05 03 01 02 15 Overseer 01 04 03 01 16 Motor Grader Operator 03 02 02 - 17 Heavy Machine Operator - 01 - - 18 Spray Painter - 01 02 - 19 Fitter 04 01 - - 20 Steel Fixer - 01 02 - 21 Denter 03 01 01 - 22 Machinist 08 06 05 01 23 Foreman - 03 02 01 24 X-Ray Welder 12 01 01 - 25 Grinder Man 18 11 04 07 26 Fabricator 03 01 02 - 27 Asstt. Tech (Elect) - 01 01 - 28 Cushion Maker 02 01 01 - 29 Helper(Mech/ Water Supply) 384 29 23 06 30 Helper Deceased Quota (Contract) - - 21 - 31* Helper (Civil) posted in Prod. Deptt. (Pirkoh/Loti) - 141 06 124 Total 838 571 369 202
  • 13. 13 Location wise detail of Manpower of C&ESS Department Staff Sr. No. Title of Post EFP-1 EFP-2 EFP-3 EFP-4 EFP-5 FGCP-1 FGCP-2 I-9 KBW Total 1 Supervisor Civil - 01 01 01 - - - - - 03 2 Work Mistry Cl-III/III/I 03 01 03 01 03 - - - - 11 3 Assistant Tech.(Civil) - 01 01 - - - - - - 02 4 Electric Foreman - - - - - - 01 - - 01 5 Painter Cl-IV/III/II/I 01 01 01 - 01 - - - - 04 6 Plumber Cl-IV/III/II/I - 01 01 - 01 - 01 - - 04 7 Carpenter Cl-IV/III/II/I - - - - 01 - - - - 01 8 Mason Cl-IV/III/II/I 08 11 04 02 04 01 01 - - 31 9 Mechanic Cl-IV/III/II/I 12 14 20 02 05 02 04 15 14 88 10 Welder Cl-IV/III/II/I 02 02 03 01 02 01 04 01 01 17 11 E/Driver/Pump Optr. Cl-IV/III/II/I 32 23 25 03 09 04 07 01 - 104 12 Auto Electrician Cl-IV/III/II/I 01 01 01 01 01 01 01 04 01 12 13 Power Electrician Cl-IV/III/II/I 06 03 01 01 01 - - 01 01 14 14 Ac Mechanic Cl-IV/III/II/I - - 01 - - - - - - 01 15 Overseer - 02 - - 01 - - - - 03 16 Motor Grader Operator - - - - 02 - - - - 02 17 Heavy Machine Operator - - - - - - - - - - 18 Spray Painter - - - - - - - - 02 02 19 Fitter - - - - - - - - - - 20 Steel Fixer - 01 - - - 01 - - - 02 21 Denter - - - - - - - - 01 01 22 Machinist - - - - - - - - 05 05 23 Foreman - - - - 01 - - - 01 02 24 X-Ray Welder - - - - - 01 - - - 01 25 Grinder Man - - - - - 04 - - - 04 26 Fabricator - - - - - 02 - - - 02 27 Asstt. Tech (Civil) - - - - - - - - - - 28 Asstt. Tech (Elect) - - 01 - - - - - - 01 29 Cushion Maker - - 01 - - - - - - 01 30 Helper(Mech/ Water Supply) 03 03 02 02 05 05 02 01 - 23 31 Helper Deceased Quota (Contract) 01 04 09 02 03 01 - 01 - 21 32* Helper (Civil) posted in Prod. Deptt. (Pirkoh/Loti) - - 01 01 03 01 - - - 06 Total 369
  • 14. Completed wells during FY-2012-13 S. No Location Name Marked Start date Completion date Rig Type 01 Multan North # 01 10.07.2012 14.07.2012 24.07.2012 Cracow-I 02 Qadirpur # 46 04.07.2012 15.07.2012 12.08.2012 Cracow-I 03 Zin # 05 20.07.2012 31.12.2012 N-55 04 Dakhni # 08 11.08.2012 12.08.2012 31.08.2012 N-3 05 Bahu # 05 15.08.2012 17.08.2012 31.08.2012 F-125 06 Rajian # 07 15.08.2012 03.09.2012 13.09.2012 N-4 07 Mela # 04 30.09.2012 09.01.2013 N-3 08 Bahu # 06 15.08.2012 06.10.2012 04.11.2012 F-125 09 Bobi # 10 02.10.2012 07.10.2012 30.10.2012 GWDC-8 10 Qadirpur # 48 18.11.2012 Cracow-I 11 Bahu # 07 04.11.2012 18.11.2012 09.12.2012 307 12 Bahu # 08 04.11.2012 18.11.2012 14.12.2012 F-125 13 Qadirpur # 47 18.12.2012 19.12.2012 25.01.2013 Cracow-I 14 Qadirpur # 48 14.12.2012 20.12.2012 23.01.2013 GWDC-V 15 Sara West # 4 13.12.2012 26.12.2012 04.02.2013 GWDC 16 Kurram # 01 31.12.2012 11.01.2013 24.02.2013 GWDC 17 Tando Qasir 02.01.2013 17.01.2013 17.02.2013 307 18 Soghri X-1 05.03.2013 07.03.2013 17.03.2013 N-1 19 Sohniwala # 01 16.03.2013 17.04.2013 26.04.2013 F-125 20 Jand # 01 04.01.2013 03.05.2013 14.06.2013 GWDC-6 21 Qadirpur HRL-7 19.03.2013 18.05.2013 06.06.2013 GWDC-5 22 Jakhro West # 01 05.04.2013 30.05.2013 26.05.2013 Sinopac
  • 15. Completed wells during FY-2012-13 S. No Location Name Marked Start date Completion date Rig Type 16 Kurram # 01 31.12.2012 11.01.2013 24.02.2013 GWDC 17 Tando Qasir 02.01.2013 17.01.2013 17.02.2013 307 18 Soghri X-1 05.03.2013 07.03.2013 17.03.2013 N-1 19 Sohniwala # 01 16.03.2013 17.04.2013 26.04.2013 F-125 20 Jand # 01 04.01.2013 03.05.2013 14.06.2013 GWDC-6 21 Qadirpur HRL-7 19.03.2013 18.05.2013 06.06.2013 GWDC-5 22 Jakhro West # 01 05.04.2013 30.05.2013 26.05.2013 Sinopac
  • 16. Completed Works during FY-2013-14 S. No Location Name Marked Start date Completion date Rig Type 01 Maru East # 01 10.04.2013 20.07.2013 20.09.2013 30.09.2013 F-125 02 Qadirpur # 50 15.05.2013 05.07.2013 25.07.2013 Cracow-1 03 Rajian # 08 25.06.2013 08.09.2013 02.10.2013 N-2 04 Kunnar Deep # 09 03.07.2013 08.09.2013 03.10.2013 N-6 GWDC-8 05 Zin SML-3 05.02.2013 05.02.2013 22.09.2013 N-55 06 UCH-II Gathering lines for six wells - 18.04.2013 30.06.2013 -
  • 17. In progress Works during FY-2013-14 S. No Location Name Marked Start date Completion date Rig Type 01 Chak Dim-5 # 02 04.07.2013 23.09.2013 Rig shifting started SIN-149 02 Kup # 01 09.07.2013 Awaited Approach Road leveling in progress through OGDCL machinery N-2 OGDCL machinery mobilized on 11.07.13 Work started 12.07.13 Work stopped for 55 days w.e.f.19.07.13 to 11.09.13 Work again stopped for 3 days w.e.f.14.9.13 to 16.9.13 Restarted on 17.9.13 03 Chak 25-C-1 07.08.2013 Awaited Leveling through OGDCL machinery in progress N-6 04 Manna # 01 07.08.2013 11.10.2013 LOI issued on 09.10.13, Concerting in Progress N-5 05 Rajian # 02 Work over 13.08.2013 Awaited LOI issued on 04.10.13, Concerting in Progress 307
  • 18. In Tender Process wells during FY-2013-14 S. No Location Name Marked Status Rig Type 01 Qadirpur # 52 21.08.2013 In award approval process Cracow-1 02 HRL # 08 21.08.2013 // Cracow-1 03 Nashpa # 05 05.07.2013 NOC awaited N-3 04 Dachra Pur – Gathering Lines - LOI Issued 07.10.2013 - 05 UCH-II Gathering System for 09 Wells - BOD Approval Awaited -
  • 19. Permanent Structure Works 19 S. No Name of Project Cost in millions Remarks 01 Construction of Sport Shed at Uch 5.703 EFP-I involving an amount of Rs.104.934 millions other than PDCWs 02 06 numbers Police Pickets in Uch area 21.511 03 15 numbers Security Rooms at each well in Uch area 7.028 04 Maintenance of ROW & Approach Road at Uch Gas Field 2.126 05 Boundary wall, watch tower & Security Uch 48.096 06 Construction of Store Shed at Uch 20.470 07 Changes in Works for Rig Kremco at Bahu # 05 26.584 EFP-II involving an amount of Rs.46.847 millions other than PDCWs 08 Water Supply to Dhodak Plant - 09 Construction of Executive Annexe at Regional Office Multan 10.074 10 Surface facilities at Bahu Well # 1, 2 & 3 7.268 11 Construction of Engine Operator Room, Hard Standing at Kot Adu 2.921 12 Water Supply to Dhodak Field - 13 Construction of additional new Room (08 Nos) in Officer’s Residential Camp at Dakhni 5.522 EFP-III involving an amount of Rs.540.274 millions other than PDCWs 14 Construction of New Production Office at Dakhni 3.274 15 Fencing of Store Boundary/Chemical shed at Dakhni Store Shed 2.483
  • 20. Permanent Structure Works 20 S. No Name of Project Cost in millions Remarks 16 Preparation of Effluent water pit at Dakhni (04 numbers) 13.558 17 Construction of new security check post at Dakhni Plant 0.153 18 Sheikhan Plant EWT works 43.367 19 Civil works for reinstallation of TOC Mud Plant at Sheikhan Production Field 2.227 20 Construction of Boundary wall & provision of Steel Stairs for watch towers at Sheikhan Field 8.284 21 Construction of Officer’s Colony at Chanda 35.00 22 Security of Security Posts for Platoon # 4 at Chanda/Mela Plant 5.941 23 Infrastructure Work at Chanda Oil Field 22.874 24 Up-gradation of Road from Shakardara to Kharrapa More 262.04 25 Concrete Flooring at Chanda Plant area 6.743 26 Fencing & Gate at Mela # 03 1.938 27 Construction of Crude Recovery pit at Mela Plant 1.88 28 Construction of Building at Mela Dehydration Plant 1.891 29 Installation of Weigh Bridges at Mela # 03 0.931
  • 21. Permanent Structure Works 21 S. No Name of Project Cost in millions Remarks 30 Construction of HSEQ Office with Bath & Mini Store at Mela Field 0.383 31 Nashpa Plant EWT Civil Works 68.572 32 Construction of 3 Km mettaled Road at Nashpa Banda under Social Welfare 11.948 33 Construction of Recreation Hall for Worker Mess at Nashpa Plant 0.955 34 Construction of Control Room for Marketing Section at Nashpa 1.500 35 Construction of two numbers production storage shed & hard standing at Nashpa Plant 0.133 36 Construction of Security Check Posts at Nashpa # 1,2 & 3 1.89 37 Construction of Security Check Posts out site the Plant 05 numbers 3.598 38 Pre Casted RCC Wall for extension of LPG Plant at Nashpa 13.003 39 Construction of Permanent Woven Wire Mesh Fencing at Nashpa Well # 03 1.532
  • 22. Permanent Structure Works 22 S. No Name of Project Cost in millions Remarks 40 Construction of Remaining Portion of Boundary wall at Rajian # 01 3.741 41 Construction of Hard Standing in Auction Yard Chak Naurang 6.471 42 Construction of Two Rooms for Office at Chak Naurang 1.325 43 Construction of Approach Road at Auction Yard Chak Naurang 0.470 44 Construction of Semi Covered Shed at I-9 2.247 45 Repair of OGTI Hostel 4.400 46 Relocation of Pirkoh Compressor at Qadirpur 40.00 EFP-IV involving Rs.156.426 millions other than PDCWs 47 Work over job at Qadirpur # 11 19.061 48 Construction of Raised Platform # 41 14.551 49 Construction of Raised Platform Qadirpur Deep # 01 15.054 50 Construction of Hard Standing, Parking Shed in from of Admin Block 6.800 51 Raising of Qadirpur Plant Boundary wall 30.837 52 Foundation & Cable Trenches at Qadirpur Plant 8.494 53 Repair/Fencing including Gate at Qadirpur Well 6.081 54 Raised Platform at Qadirpur # 17 15.548
  • 23. Permanent Structure Works 23 S. No Name of Project Cost in millions Remarks 55 Construction of Sinjhoro Plant Boundary wall 25.293 EFP-V involving an amount of Rs.707.495 million other than PDCWs 56 Equipment Foundation Civil Works at Sinjhoro Plant (Phase-I & II) 391.00 57 Building Civil Works of Relocation of Dhodak Plant 58 Earth Filling Works at Sinjhoro Plant 32.157 59 Development of water supply system at Sinjhoro Plant 23.028 60 Internal Electrification for Sinjhoro Plant Building 10.219 61 Sinjhoro Plant Lightning/External Electrification works 42.468 62 Construction of Boundary wall at Bobi Colony 9.836 63 Development of Noor/Bagla Fields 66.005 64 Additional Water Storage Reservoir of 5.6 million Liters capacity at Bobi Plant 15.232 65 Construction of Foundation for installation of weighing bridge at Tando Alam Oil Complex 0.931 66 Construction of boundary wall & watch tower at KPD Project 23.968 67 Construction of 10 Nos. Officers Room, 02 Nos. Guest Room, Dinning Hall, Kitchen & Pantry etc at Kunnar Plant 7.526 68 KPD Phase-II Plant Units 22.421
  • 24. 24 S. No Name of Project Cost in millions Remarks 69 Security Measures at KDS Base Boundary wall extension of Tubular Yard at Karachi 4.462 70 Construction of FGCP-II New Base Camp at New location 15.760 71 Construction of Room Size 10x10 near Weigh Bridge at TOC 0.275 72 External Electrification at KBS Boundary wall 2.670 73 Compressor Foundation MS Steel Shed & Related other works at Daru Plant 2.366 74 Installation of water supply system at KDS 5.964 75 Repair of Mesh Fencing/Gates at TOC wells 2.014 76 Renovation work of proposed regional coordinator Karachi office at 7th floor Dawood Center 2.000 77 Missan # 01 work over job 1.900 Permanent Structure Works
  • 25. 25 Work Carried out through Field Gathering Sections S.N FGCP - I Approved Cost REMARKS 01 16” Header of ERW : 4.5KM : QP 18.590M completed 02 8” F/L & WHA HRL#6 : 0.65KM : QP 02.048M completed 03 Emergency repair F/L Well # 36 : QP 00.433M completed 04 Emergency repair 26” Trunk Line : UG - completed 05 Repair 500BBL tanks : 04No. : KAL 01.732M completed 06 Production hook up connection Well#30 : QP 01.827M completed 07 Container Caravan Dining/kitchen cementation :01No : KS 00.806M completed 08 Insu/Cladd F/L Well # 1, 3, 4 & deep-1 : 9KM : DNI 15.554M completed 09 Emergency repair F/L Well # 24 : QP - completed 10 Misc. Jobs ATA-2012 (25.08.12 to 31.08.12) : DNI 0.537 completed 11 Rectification WHA Well# 13 : QP 0.433M completed 12 Emergency repair F/L Well # 07 : QP 0.964M completed 13 Additional 6” Crude transfer line well # 3 : NSH 0.327M completed 14 Fab/Install of Generator Shed : FGCP-I 0.082M completed 15 Emergency repair F/L Well # 36 : QP - completed 16 Emergency repair F/L Well # 36 : QP 0.303M completed 17 Emergency repair F/L Well # 24/41 : QP - completed 18 Emergency repair 26” Trunk Line : UG - completed 19 F/Gathering Sys. (L/Over + ATA Jobs) : BHU 24.00M completed 20 Emergency repair F/L Well # 09 : QP - completed 21 Fab/Install Perm WHA Well#36 :QP 03.052M completed 22 Fab/Install 30” Pub Piece & Valve at Plant : QP 0.595M completed 23 Separator point Well#35,36,38,39,42,17,41,D-1,HRL-2 : QP 1.109M completed 24 Repair Work at 11 Wells & Repair of Sale Gas line – ATA : UG 16.110M completed 25 Emergency Repair F/L Well#43 : QP - completed 26 Emergency Repair F/L Well#07 & 28 : QP - completed 27 8” F/L & WHA Well#46 : 2.5KM : QP 4.507M completed 28 F/L, WHA & Tie-in QP#43 : 100M :QP - completed 29 F/L, WHA & Tie-in QP#42 : 400M :QP - completed 30 Extension 8” Dia F/L QP#36 : 360M : QP 1.900M completed
  • 26. 26 S.N FGCP - I Approved Cost REMARKS 31 Emergency repair F/L QP#33 : QP 0.10M completed 32 Emergency repair F/L QP#09 : QP 0.10M completed 33 Emergency repair F/L HRL#02 : QP 0.10M completed 34 Emergency repair F/L QP#33 0.10M completed 35 Emergency Repair Bahu/PP Header near SS#1 : Bahu 0.518M completed 36 Welding of 14No Joints for production hook Up well Raja-1 : QP 0.10M completed 37 Provision of future tie in at ERW plateform : QP 0.10M completed 38 Renovation of Mess Caravans : FGCP – 1 0.902M completed 39 Extension of 8”dia flow line QP # 37,36 :700 M+360 M : QP 1..90M completed 40 Fab/inst. Of 4” dia FCV spool QP # 01 : QP 0.520M completed 41 Fab. of 8” dia spool for WHA (20 jts ) QP#29 : QP completed 42 Fab. of 8” dia spool for WHA QP#23 : QP completed 43 Emergency repair Flow Line Well # 33 : QP 0.10M completed 44 Emergency repair 0f 20000 bbl’s tank : NSH 0.10M completed 45 8” Flow Line/WHA& Separation Battery Well # 3 : 4 KM : NSH 15.171M completed 46 Fabrication/installation of WHA : QP#36 3.052M completed 47 Repair caravan fabrication shed : FGCP-I 0.292M completed 48 Laing of 12”dia flow line ERW to QP # 17(1.5KM), Ext WHA,s & 8”dia line QP# 42,43 (300 M) , : QP 2.51 M completed 49 Emergency repair Flow Line Well # deep-1 : QP 0.100M completed 50 Headers 26” dia & 30” dia replacement :1.5KM : QP 15.675M completed 51 Emergency repair Flow Line Well # 07 : QP 0.10 M completed 52 Fabrication/installation of WHA & F/L( 700M) for QP#48 : QP 1.00M completed 53 Emergency repair Flow Line Well # 07 : QP 0.10 M completed 54 Fabrication of K.O V for 10 wells : QP 0.45M completed 55 8” Flow Line/WHA& Separation Battery Well # 4 : 2.9 KM : NSH 17.71M completed 56 Fabrication/Installation of 16” dia by pass header at eastern pig launching station with 05 tie-in points 0f 8’dia 0.364M Completed 57 Fabrication/installation of WHA well DKN#8 : Dakhni 3.052M completed 58 Repair/Rectification of Pin hole on the Flow line of QP#36 - completed 59 Installation of test separators at QP #36& 37 N/A Completed Work Carried out through Field Gathering Sections
  • 27. 27 S.N FGCP - I Approved Cost REMARKS 60 Laying of 8” dia flow line QP#29 to eastern header N/A Completed 61 Fab/Installation of WHA & Flowline 1.25KM QP, HRL#7 1.0M Completed 62 Repair/ Rectification of pin hole QP#23 - Completed 63 Repair/ Rectification of pin hole QP#24 - Completed 64 Sale Gas pipeline & Fab. of Meter Run Assembly 3.5KM : Nashpa 4.50M completed 65 Repair/ Rectification of pin hole on F/L of QP# 35, 38, 39 - Completed 66 Repair/ Rectification of pin hole QP#07 - completed 67 Repair/ Rectification of pin hole QP#24 - Completed Sub Total 163.624M Work Carried out through Field Gathering Sections S.N FGCP - II Approved Cost REMARKS 01 Rectification/Maintenance Jobs at Plant/wells : KPD 02.648M completed 02 Repair 12000BBL Tank #5 : KUN 3.066M completed 03 Repair/Modification 12000 BBL Tank#4 as Gun Barrel : TOC 3.265M completed 04 6” F/L & WHA JV Well Shah -1 : 1.5KM : KPD 08.796M Completed 05 OGRA requirement jobs at Bobi LPG Plant 11.961M completed 06 Installation connections of K/O Vessel : BOC 0.730M completed 07 Repair of Mithrao/ Chack Din # 5 F/L 38Km : BOC 2.184M completed 08 Installation of Tie-in point of Compressor at DARU 1.722M Completed 09 Repair of 6000 BBL Tanks #02 : KUN 07.00M Completed 10 6” F/L & WHA Baloch -1 to plant : 19.5KM : SNJ - Completed 11 Repair of 6000 BBL Tank : 01No. : TOC 6.620M Completed 12 6” F/L & WHA well KUN West -1A : 5Km : KPD 8.40M Completed 13 Repair furnace heater : TOC 1.922M Completed 14 6” F/L & WHA Chak-2 (1) to plant : 4.5Km : SNJ 8.255M Completed 15 4” Flow Line &WHA Jhakro Well : 30 KM : JKH 41.377M completed Sub Total 107.945M
  • 28. 28 S.N FGCP - I Approved Cost Start Progress REMARKS 01 Retrieval of Meyal Line : 30 KM : DNI 07.250M 07.04.12 90% 02 Dismantling of Meyal terminal 04.93M 03.09.13 80% 03 Interconnection piping of 20,000 BBL tanks at NASHPA - - - 04 Fab/Installation of WHA’s : 04Nos : MAR/RET 09.336 06.06.11 99% After installation of sale gas line 05 Installation of 8” dia F/L Dakhni # 12 - 13.02.13 60% 06 Fab/Installation of WHA & F/L 8 “ dia 2.9Km Nashpa#4 17.71M 28.02.13 97% 07 Repair/Renovation of Caravans : 03Nos for FGCP-II 1.90M 30.08.12 92% 08 Dismantling/ Re-Install WHA QP#11 0.552M 15.08.12 30% Waiting for work over Sub-TOTAL 41.668M S.N FGCP - II Approved Cost Start Progress REMARKS 01 4” F/L & WHA Chak-63#3 to plant : 12.5KM : SNJ 10.588M 28.07.11 50% 02 8” F/L & WHA PSK D-3, KUN-Deep-6&KM : KPD 22.114M 19.04.12 94% 03 6” dia line Resham well#01 to Sinjhoro plant(15km) 18.5M 18% 04 4” Flow Line/WHA Chak - 63 SE(1) to Plant : 9 KM : SNJ 07.805M 01.10.12 9% 05 6” Flow Line/WHA Chak - 2 (1) to Plant : 15.5 KM : SNJ 28.435 M 14.07.11 95% 06 6” Flow Line/WHA Chak - 2 (3) to Plant : 19.5 KM : SNJ 15.513 M 23.01.11 02% 07 6” Flow Line/WHA Chak - 66 to Plant : 11 KM : SNJ 07.831 M - 02% 08 4” Flow Line /WHA Chak - 63 (1) to Plant : 11 KM : SNJ 08.782 M - - 09 Interim Arrangements/Gathering Area - 6 : SNJ 09.784 M 05.06.12 80% Sub-TOTAL 129.353M FGCP’s DEPARTMENTLY ONGOING PROJECT REPORT FOR THE YEAR July, 2012 - Till October, 2013 Sub Total (I + II) = 171.021 M
  • 29. 29 A. CONSULTANCY WORKS COMPLETED SR. NO. NAME OF WORK REMARKS / STATUS 1 Design / Consultancy Services for Construction / retrofitting/strengthening works for installation of new seismic data processing system at OGDCL House, 12th Floor, Tower-C, Iba. Completed. 2 Residential Staff Houses, (Officers, Assistants, Workers) at Sinjhoro Oil Field. Completed. 3 Design/Consultancy services for Construction of Uch-II camps at Uch Gas Field. Completed. B. CONSULTANCY WORKS UNDER PROGRESS. 1 Construction of heavy traffic metalled road from Uch Plant to UPL Dera Murad Jamali (47 KMs) at Uch Gas Field. Work delayed due to law and order situation. Final Tender Documents awaited. 2 Gas Field Protective Bund (Physical Model Study of Qairpur bund and ERWs) Final Design Report submitted. Final Tender Documents awaited. 3 Feasibility study of existing tarally steel structure bridge for the use of heavy loaded vehicles and if required design/consultancy services for improvement of bridge for heavy traffic situated at road from Karrapa More to Chanda Oil Field. Final Design and Drawing submitted and Final Tender Documents awaited. C. CONSTRUCTION COMPLETED. 1 Bridge over for Kunner LPG Plant. Completed. 2 Supporting Structural System & Electrical works at Bahu Gas Field. Completed. 3 Repair / Up-gradation of Road from Karrapa More to Chanda Plant () at Chanda. Completed. 4 Construction / retrofitting/ strengthening works for installation of new seismic data processing system at OGDCL House, 12th Floor, Tower-C, Islamabad. Completed. STATUS OF CIVIL WORKS WITH CONTRACT SECTION BEFORE NEWLY APPROVED ENGG. WORK PROCEDURE AS ON 10.10.2013.
  • 30. 30 A. HEAD OFFICE TENDERS S.NO NAME OF WORK NUMBERS 1 Bid Document Stage 04 2 Press Advertisement Stage 09 3 Technical Evaluation Stage 07 4 Financial Evaluation Stage 09 5 Management approval for award 07 6 Under Construction 00 7 Completed 00 TOTAL 36 B. PRE-DRILLING ENGINEERING WORKS 1 Bid Document Stage 00 2 Press Advertisement Stage 02 3 Management approval for award 04 4 Works Under Construction 04 5 Works Completed 08 TOTAL 18 C. OTHER ENGINEERING WORKS 1 Bid Document Stage 01 2 Press Advertisement Stage 01 3 Management approval for award 02 4 Works Under Construction 04 5 Works Completed 01 TOTAL 09 STATUS OF CIVIL WORKS WITH CONTRACT SECTION AFTER NEWLY APPROVED ENGG. WORK PROCEDURE AS ON 10.10.2013.
  • 31. Supply of water to Production sites = 08.93 million gallons monthly Supply of water to Process & Plants = 76.11 million gallons monthly Supply of water to Drilling sites = 19.22 million gallons monthly Total water supplied during the month of Sept, 2013 =104.26 million gallons Water Supply SectionWater Supply Section 31
  • 32. 32 Vehicle Repaired at I-9 Base WorkshopVehicle Repaired at I-9 Base Workshop Serviced Minor Repair Major Repair Engine Overhauling Expenditure 1204 1071 128 05 Rs.11,168,461/- The workshop is maintaining 433 light & heavy vehicles including 406 Petrol & 27The workshop is maintaining 433 light & heavy vehicles including 406 Petrol & 27 Diesel vehicles. Diesel vehicles include a fleet of 14 Buses & CoastersDiesel vehicles. Diesel vehicles include a fleet of 14 Buses & Coasters