SlideShare a Scribd company logo
1 of 64
Download to read offline
Quality Training
#3
Project Induction Program
February 11, 2016
Quality Department1
Session-18
“Good Morning”
&
Welcome to All !
AKo/EIt
Project Induction Program
New Team Members
AKo/EIt
To
Overview
1. Introduction
2. Brief Details of the Contracts (SC & CC)
3. Project Stakeholders & Management
4. Supervision Site Management Teams
5. General SC’s Responsibilities
6. Project Scope of Work
7. Project Standards & References
8. Brief Details of the Project (Disciplines wise)
9. Major Project Quantities
10. Project Submittals
11. Audits & Evaluations
12. Progress Photographs
13. Progress Videos
AKo/EIt
1. Introduction
The purpose of this induction is to formally
introduce each party on the new project, gain
an overview understanding of the contract
requirements and Supervision Consultant’s role
and management undertakings.
1.1 Introduction of the Parties:
PMC & SC Management
1.2 Introduction of the SC Department/Section
and Teams
1.3 Introduction of individual SC Personnel for
Contract 1
AKo/EIt
2.1 Supervision Consultant’s (SC) Contract
Professional Services Agreement For Pre and Post-Contract
Professional Consultancy Services for the Expressway
Projects Group 8a
Group No. Group 8a Projects
Group 8a Projects P007-C1, P007-C2, P007-C3, P007-C5
Project I.D. No. IA 12/13 DS 002-ST
Agreement No. P2013/39
Authority /Client Public Works Authority (PWA) = ASHGHAL
AKo/EIt
2.2 Construction Contractor‘s (CC) Contract
CONTRACT-1 (P007-C1) Project
Contract Name: Construction and Upgrade of Rayyan
Road Project 7: Contract 1 West of
New Rayyan R/A to East of Bani Hajer
R/A
Contractor: Sixco – Boom CC Joint Venture
Project No./Contract No: P007-C1 /C2013/88
Project Code lA 12/13 C 057 ST
Letter of Acceptance 23 December 2013
Agreement Date: 09 January 2014
Commencement Date: 16 February 2014
Contract Duration: 900 days Construction+400 days
Maintenance
Completion Date: 03 August 2016
AKo/EIt
Central Area /P007 -1 Key Plan
AKo/EIt
General Plan Layout – C1
AKo/EIt
Site
Office
Site Office Location – C1
AKo/EIt
Site
Office
Site
Office
Site Office Location – C1
AKo/EIt
3. Project Stakeholders & Management
3.1 Client = PWA(Ashghal) – Expressway Department
Client’s Representative – Mr. MANAR H.Y. ABDUGHALWA
3.2 Programme Management Consultant = KBR – Engineer
PMC Project Manager – Mr. ANGELOS VOLANIS
PMC Senior Site Engineer– Mr. REYNALDO MIRANDA
PMC Senior QA Engineer– Mr. ANSHUL PARASHAR
PMC HSE Engineer– Mr. SHAJI THOMAS
3.3 Supervision Consultant = EGIS International
Project Director – Mr. YANNICK CHAUMET
Senior Resident Engineer (SRE) – Mr. ADRIAN PETER CLEASBY
3.4 Design Consultant (DC) = KEO International Consultant
3.5 Contractor = Six Construct – Boom CC (JV)
Project Director – Mr. BERNARD PATZE
Deputy Project Director – Mr. RAMI SAAIFAN
AKo/EIt
 MMUP
 KAHRAMAA
(Water & Electricity)
 ASHGHAL Drainage
 Qatar Petroleum (QP)
 QTel (Ooredoo)
 Vodafone
 Qatar National Broadband
Network (QNBN)
 ICT Qatar
 MoI – DSS
 Civil Defense Dept.
 Qatar Gas
 Qatar Armed Forces (QAF)
 Qatar Rail Interface
 Qatar Foundation
3. Project Stakeholders & Management
Cont’d
AKo/EIt
4. Supervision Site Management Teams
SENIOR RESIDENT ENGINEER (SRE)
(Adrian Peter Cleasby)
1. GENERAL SUPPORT SERVICES TEAM – Public Relation Officer
2. QUALITY TEAM – Quality Manager, Engineer, Inspectors
3. SAFETY TEAM – Safety Engineer / Officers, Road Safety Auditor.
4. STRUCTURES & TUNNELS TEAM – Resident Engineer, AREs, Inspectors
5. UTILITIES TEAM - Resident Engineer, Assistant REs, Inspectors
6. M&E TEAM - Resident Engineer, Senior/Electrical Engineers, Inspectors
7. ROADS TEAM - Resident Engineer, Assistant REs, Inspectors
8. SUPPORTING TECHNICAL STAFF - Senior/Materials Engineers/Testing
Inspectors, Landscape Engineer/Inspector, Senior Pavement
Specialist, Senior QS/QS, Senior Highway Surveyor/Surveyors, Design
Co-ordinator / CAD operators, , Document Controllers, Bilingual
Secretaries, Logistic Officer, Drivers & IT Support.
AKo/EIt
5. General SC Responsibilities
 Fulfill the role of construction supervision, implement all
requirements and demonstrate conformance with the
contract requirement;
 Review, approve or reject CC’s submittals and
deliverables including baseline, programs, proposals,
claims and billings;
 Ensure CC perform their contractual obligations with
compliance through out the course of the project.
 Ensure Quality Assurance and safety for the project;
 Submit all SC’s document requirements and reports as
per schedules;
 Ensure document management system and numbering in
accordance with Engineer’s (PMC) required format,
coding and sequence;
AKo/EIt
5. General SC Responsibilities
 Ensure CC’s follow their procedures, Method Statements,
ITPs including materials procurements and installations
with quality workmanship;
 Ensure CC’s engage with approved Sub-cons, suppliers
including plants & laboratories that could deliver the
technical, document and workmanship requirements for
the project;
 Ensure required sampling, testing and results for all
permanent construction materials;
 Maintain reliability of Plants, Labs, measuring & testing
equipment;
 Response to all types of inspection request (IR) &
Material Delivery to Site (MDS);
Cont’d
AKo/EIt
5. General SC Responsibilities
 Exercise preventive measures against nonconformity &
resolve NCR/CAR issues with approved corrective
measures;
 Maintain good line of communication and coordination
with PMC & CC;
 Conduct audit, surveillance walk and evaluate the CC’s
KPI regularly;
 Resolve any Client’s complaint as soon as possible;
 Capture lessons learned for Continual Improvement;
 Ensure CC perform commissioning (as applicable) prior
to handover;
 Deliver the project according to the contractual
obligation.
Cont’d
AKo/EIt
6. Project Scope of Work
1. Site offices and other installations;
2. Traffic diversions, temporary traffic control and
management;
3. Structural survey of all properties within 20m of the Right
of Way corridor for the construction project;
4. Site clearance, including demolitions, removal of signs,
lighting columns and other street furniture;
5. Reinforced concrete pedestrian underpass;
6. Reinforced concrete vehicle structures;
7. Earthworks, including excavation and
recycling/disposal of existing road pavement,
temporary shoring etc.;
AKo/EIt
8. Surface water drainage, including gullies, connections
to existing storm sewers and soak-ways;
9. Construction of kerbs, footways and paved areas;
10. Construction of high specification flexible pavement;
11. Directional and other traffic signage and road markings;
12. Provision of sign gantries;
13. Traffic signals (design and build element);
14. Extensive high specification hard and soft landscaping,
including varied paving, architectural features, arts
cape, tree planting, irrigation, and streetscape furniture;
Cont’d
6. Project Scope of Work
AKo/EIt
6. Project Scope of Work
15. Public and private utility services: provision for future
services, diversions and protection of existing services
for the following:
a) Water supply network;
b) Sewage collection and disposal systems;
c) Treated sewerage effluent;
d) Extensive EHV, HV, MV, LV electricity networks;
e) Street lighting, underpass and structure lighting;
f) Q-Tel, Vodafone and Qatar National Broadband
Network;
g) Qatar Armed Forces (QAF) network;
h) Ministry of Interior Security System Department
network (MoI-SSD).
Cont’d
AKo/EIt
7. Project Standards & References
1. Group 8a, Professional Services Agreement (P007-C1)
2. Qatar Construction Standards / Specifications 2010
3. Interim Advice Notes -IANs (Amendments to QCS 2010)
4. Contract Drawings / IFC Plans (Rev.CA, CB, CC & CD)
5. Supervision Consultant Quality Requirements Specification:
EXW-GENL- 0000-QM-KBR-SS-00015-003 Rev. A2;
6. Contractor’s Contract No. C2013/88
(Tender# MRPSC/008/2012-2013/L)
7. Project Quality Plan (PQP):
EXW-P007-0101-QM-EGI-PL-00001 Rev.CC;
8. ISO 9001:2008 Quality Management System Requirements.
9. Standard Document Numbering and Coding:
EXW-GENL-0000-DM-KBR-SS-00004-001 Rev.22
AKo/EIt
 The total length is 3.1 km
 The length of side roads is 2.0 km
 The length of service roads is approximately 5.8 km
 The scheme will provide four traffic lanes in each direction
(plus turning lanes at junctions) with a dividing median
 Three interchanges (R2-At grade, R3-UP, R4-UP).
8.1 Road Works
8. Brief Details of the Project
AKo/EIt
8.2 Main Typical Section
AKo/EIt
8.3 Road Works:
Junction R2 (currently named Q-Tel R/A)
Al Rayyan Road/Al Wajbah Street Interchange: at grade right- in/right-out
junction with Al Rayyan Road free flow at grade
AKo/EIt
8.4 Structural Works:
Junction R3 (currently named Al Shafi R/A)
AI Rayyan Road/AI Salam Street Interchange: Two level interchange with Al
Rayyan Road free flow beneath a signalized junction and a free flow ramp
for northbound to westbound traffic.
AKo/EIt
Junction R4 (currently named Castle RIA)
AI Rayyan Road/AI Qalah Street interchange: two level interchange with AI
Rayyan Road free flow beneath a signalized junction.
Cont’d
AKo/EIt
Architectural Design for Underpass Retaining Wall
Cont’d
Option 1
AKo/EIt
Architectural Design for Underpass Retaining Wall
Cont’d
Option 2
AKo/EIt
Architectural Design for Underpass Retaining Wall
Cont’d
Option 3
AKo/EIt
8.5 Typical Landscaping
(Footpath, Cycle-path & Bus Stop)
AKo/EIt
Public and private utility services (provision for future services,
diversions and protection of existing services) for the following:
Storm water Drainage works with 4.8 km Micro-Tunnel/3mDia
Water supply network
Electricity works with 1.2 km Power Galleries & 6 Substations
Street lighting
Telecommunications Works
Qatar Armed Forces (QAF) network
MoI – SSD (Security System Department)
ITS Works
Waste Water and TSE Works
8.6 Utilities Works
AKo/EIt
Micro-tunnel (length) - 4,800 m(3m Dia)
Power Galleries (length) - 1,200 m
Concrete Works - 270,000 m3
Reinforcement - 20,000 Tons
Asphalt works - 450,000 m2
Electrical cables - 65,000 m
Pipes - 52,000 m
Excavation or Filling - 500,000 m3
9. Major Project Quantities
AKo/EIt
 Project Organizational Structure
 Project Management Plan (PMP)
 Project Quality Plan (PQP) & Procedures
 Project Specific Logistic Plan
 HSE Plan & Procedures
 HSE Reports (Weekly/Monthly Statistics, Audit, Incident)
 Monthly Progress Report
 Quality Reports (Quality-Monthly , Questionnaire, Audit)
 Daily Report
 Key Performance Indicators (KPI) Evaluation Report
 NCR Register and Action log
 SC’s Claims & Billings.
10. Project Submittals
AKo/EIt
10.1 Supervision Consultant (SC)
 Clause 14 Programme of Works (Baseline)
 Project Quality Plan & Procedures
 Method Statements/ Risk Assessments
 Materials’ Schedule /Procurement Schedule
– Long Lead Items;
 Sub-Contractor & Suppliers Approvals
 Project List of applicable Standards
 Construction Management Forms
 HSE Plan and Safety Procedures
 Construction Environmental Management Plan
 Traffic Control & Management Plan
 Proposal, claims & billings
10.2 Construction Contractor (CC)
AKo/EIt
10. Project Submittals
 Inspection & Test Plans with Checklists
 Monthly Report (Progress, Quality & Ashghal’s -QA/QC
Site Questionnaire)
 HSE Reports (Weekly/Monthly Statistics, Audit, Incident)
 Prequalification Schedule (sub-con & Suppliers-materials)
 Material Procurement Report
 List of Manpower/Equipment
 Organizational Chart
 Curriculum Vitae (CVs) of Key Personnel
 Shop Drawings
 Inspection Request (IR), Test Reports, Certificates
 Warrantees, O & M Manuals
Cont’d
AKo/EIt
10.2 Construction Contractor (CC)
10. Project Submittals
 11.1 Types of Audits
11.1.1 Quality Assurance Audit
 Internal Audit – within SC Site Management Teams
 External (2nd Party) Audit – To CC , Sub-cons & Suppliers
 System Audit – Needed Plans, Procedures &
Management
 Compliance Audit – On System & process work activities
 Product Audit – On particular deliverable products
 Close-out Audit - to verify the preparation of deliverables
against contract requirements.
11.1.2 HSE Audit
11.1.3 Road Safety Audit
 11.2 Key Performance Indicators (KPI) Evaluation
11. Audit & Evaluations
AKo/EIt
12. Progress Photographs
AKo/EIt
Road Works
Major Diversions
12. Progress Photographs
AKo/EIt
Temporary Road Diversion (26.12.2014)
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
Temporary Road Diversion (24.04.2015)
P007-C1
P005
12. Progress Photographs
AKo/EIt
Temporary Road Diversion (24.04.2015)
P007-C1
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
Cable Tunnel, Underpasses,
Diversions etc.
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
13. Progress Videos
AKo/EIt
Monthly Progress
January - 2016
AKo/EIt
Thank you!
Presentation by
Quality Team @ C1
AKo/EIt

More Related Content

What's hot

Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)Dr Orhan Degermenci
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016Simon Baarde
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Dr Orhan Degermenci
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13iain_cameron
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectUrbanSystemsCanada
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspectorMuhammad Amjad
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Huan Duong Quoc
 

What's hot (20)

SomkiatC
SomkiatCSomkiatC
SomkiatC
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
Esr 01 & esr-02 closing meeting
Esr 01 & esr-02 closing meetingEsr 01 & esr-02 closing meeting
Esr 01 & esr-02 closing meeting
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
RS Resume
RS ResumeRS Resume
RS Resume
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
CV2014
CV2014CV2014
CV2014
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
 

Viewers also liked

Fish Market Drainage At Abu Hamour
Fish Market Drainage At Abu HamourFish Market Drainage At Abu Hamour
Fish Market Drainage At Abu HamourMohamed ElSirsy
 
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualAshghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualsyedfaisalali_50
 
Fish market & commercial development
Fish market & commercial developmentFish market & commercial development
Fish market & commercial developmentBIMGENIA S.L.
 
Health & Safety Mm
Health & Safety MmHealth & Safety Mm
Health & Safety MmMarcus9000
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011Clive Burgess
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTStephen Austria
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment InductionDotjo Dev
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Stephen Austria
 
Role Play - Induction Process for new employees
Role Play - Induction Process for new employeesRole Play - Induction Process for new employees
Role Play - Induction Process for new employeesjessrblake
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety inductionadam-de
 

Viewers also liked (20)

Induction
InductionInduction
Induction
 
Fish Market Drainage At Abu Hamour
Fish Market Drainage At Abu HamourFish Market Drainage At Abu Hamour
Fish Market Drainage At Abu Hamour
 
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manualAshghal guide-qatar-sewerage-amp-drainage-design-manual
Ashghal guide-qatar-sewerage-amp-drainage-design-manual
 
Fish market & commercial development
Fish market & commercial developmentFish market & commercial development
Fish market & commercial development
 
Induction program final
Induction program finalInduction program final
Induction program final
 
CURRICULM VITAE J.W.Gilpin 2016
CURRICULM VITAE J.W.Gilpin 2016CURRICULM VITAE J.W.Gilpin 2016
CURRICULM VITAE J.W.Gilpin 2016
 
UC-TGMKSM65
UC-TGMKSM65UC-TGMKSM65
UC-TGMKSM65
 
Health & Safety Mm
Health & Safety MmHealth & Safety Mm
Health & Safety Mm
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011
 
Fire Extinguisher 2
Fire Extinguisher 2Fire Extinguisher 2
Fire Extinguisher 2
 
Implementation of QHSE
Implementation of QHSEImplementation of QHSE
Implementation of QHSE
 
184 HAZARDS
184 HAZARDS184 HAZARDS
184 HAZARDS
 
NEBOSH RESULT
NEBOSH RESULTNEBOSH RESULT
NEBOSH RESULT
 
QHSE
QHSEQHSE
QHSE
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORT
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)
 
Role Play - Induction Process for new employees
Role Play - Induction Process for new employeesRole Play - Induction Process for new employees
Role Play - Induction Process for new employees
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety induction
 
Induction QHSE
Induction QHSEInduction QHSE
Induction QHSE
 

Similar to Project Induction Program 11.02.2016

A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerageKhalid Pervez
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management PlanAnuragBhat7
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 

Similar to Project Induction Program 11.02.2016 (20)

DML CV 17
DML CV 17DML CV 17
DML CV 17
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Masterplan.pptx
Masterplan.pptxMasterplan.pptx
Masterplan.pptx
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
CV-Anto-2016
CV-Anto-2016CV-Anto-2016
CV-Anto-2016
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Mep manager surendra yadav 26112016
Mep manager surendra  yadav 26112016Mep manager surendra  yadav 26112016
Mep manager surendra yadav 26112016
 

Project Induction Program 11.02.2016

  • 1. Quality Training #3 Project Induction Program February 11, 2016 Quality Department1 Session-18
  • 3. Project Induction Program New Team Members AKo/EIt To
  • 4. Overview 1. Introduction 2. Brief Details of the Contracts (SC & CC) 3. Project Stakeholders & Management 4. Supervision Site Management Teams 5. General SC’s Responsibilities 6. Project Scope of Work 7. Project Standards & References 8. Brief Details of the Project (Disciplines wise) 9. Major Project Quantities 10. Project Submittals 11. Audits & Evaluations 12. Progress Photographs 13. Progress Videos AKo/EIt
  • 5. 1. Introduction The purpose of this induction is to formally introduce each party on the new project, gain an overview understanding of the contract requirements and Supervision Consultant’s role and management undertakings. 1.1 Introduction of the Parties: PMC & SC Management 1.2 Introduction of the SC Department/Section and Teams 1.3 Introduction of individual SC Personnel for Contract 1 AKo/EIt
  • 6. 2.1 Supervision Consultant’s (SC) Contract Professional Services Agreement For Pre and Post-Contract Professional Consultancy Services for the Expressway Projects Group 8a Group No. Group 8a Projects Group 8a Projects P007-C1, P007-C2, P007-C3, P007-C5 Project I.D. No. IA 12/13 DS 002-ST Agreement No. P2013/39 Authority /Client Public Works Authority (PWA) = ASHGHAL AKo/EIt
  • 7. 2.2 Construction Contractor‘s (CC) Contract CONTRACT-1 (P007-C1) Project Contract Name: Construction and Upgrade of Rayyan Road Project 7: Contract 1 West of New Rayyan R/A to East of Bani Hajer R/A Contractor: Sixco – Boom CC Joint Venture Project No./Contract No: P007-C1 /C2013/88 Project Code lA 12/13 C 057 ST Letter of Acceptance 23 December 2013 Agreement Date: 09 January 2014 Commencement Date: 16 February 2014 Contract Duration: 900 days Construction+400 days Maintenance Completion Date: 03 August 2016 AKo/EIt
  • 8. Central Area /P007 -1 Key Plan AKo/EIt
  • 9. General Plan Layout – C1 AKo/EIt Site Office
  • 10. Site Office Location – C1 AKo/EIt Site Office Site Office
  • 11. Site Office Location – C1 AKo/EIt
  • 12. 3. Project Stakeholders & Management 3.1 Client = PWA(Ashghal) – Expressway Department Client’s Representative – Mr. MANAR H.Y. ABDUGHALWA 3.2 Programme Management Consultant = KBR – Engineer PMC Project Manager – Mr. ANGELOS VOLANIS PMC Senior Site Engineer– Mr. REYNALDO MIRANDA PMC Senior QA Engineer– Mr. ANSHUL PARASHAR PMC HSE Engineer– Mr. SHAJI THOMAS 3.3 Supervision Consultant = EGIS International Project Director – Mr. YANNICK CHAUMET Senior Resident Engineer (SRE) – Mr. ADRIAN PETER CLEASBY 3.4 Design Consultant (DC) = KEO International Consultant 3.5 Contractor = Six Construct – Boom CC (JV) Project Director – Mr. BERNARD PATZE Deputy Project Director – Mr. RAMI SAAIFAN AKo/EIt
  • 13.  MMUP  KAHRAMAA (Water & Electricity)  ASHGHAL Drainage  Qatar Petroleum (QP)  QTel (Ooredoo)  Vodafone  Qatar National Broadband Network (QNBN)  ICT Qatar  MoI – DSS  Civil Defense Dept.  Qatar Gas  Qatar Armed Forces (QAF)  Qatar Rail Interface  Qatar Foundation 3. Project Stakeholders & Management Cont’d AKo/EIt
  • 14. 4. Supervision Site Management Teams SENIOR RESIDENT ENGINEER (SRE) (Adrian Peter Cleasby) 1. GENERAL SUPPORT SERVICES TEAM – Public Relation Officer 2. QUALITY TEAM – Quality Manager, Engineer, Inspectors 3. SAFETY TEAM – Safety Engineer / Officers, Road Safety Auditor. 4. STRUCTURES & TUNNELS TEAM – Resident Engineer, AREs, Inspectors 5. UTILITIES TEAM - Resident Engineer, Assistant REs, Inspectors 6. M&E TEAM - Resident Engineer, Senior/Electrical Engineers, Inspectors 7. ROADS TEAM - Resident Engineer, Assistant REs, Inspectors 8. SUPPORTING TECHNICAL STAFF - Senior/Materials Engineers/Testing Inspectors, Landscape Engineer/Inspector, Senior Pavement Specialist, Senior QS/QS, Senior Highway Surveyor/Surveyors, Design Co-ordinator / CAD operators, , Document Controllers, Bilingual Secretaries, Logistic Officer, Drivers & IT Support. AKo/EIt
  • 15. 5. General SC Responsibilities  Fulfill the role of construction supervision, implement all requirements and demonstrate conformance with the contract requirement;  Review, approve or reject CC’s submittals and deliverables including baseline, programs, proposals, claims and billings;  Ensure CC perform their contractual obligations with compliance through out the course of the project.  Ensure Quality Assurance and safety for the project;  Submit all SC’s document requirements and reports as per schedules;  Ensure document management system and numbering in accordance with Engineer’s (PMC) required format, coding and sequence; AKo/EIt
  • 16. 5. General SC Responsibilities  Ensure CC’s follow their procedures, Method Statements, ITPs including materials procurements and installations with quality workmanship;  Ensure CC’s engage with approved Sub-cons, suppliers including plants & laboratories that could deliver the technical, document and workmanship requirements for the project;  Ensure required sampling, testing and results for all permanent construction materials;  Maintain reliability of Plants, Labs, measuring & testing equipment;  Response to all types of inspection request (IR) & Material Delivery to Site (MDS); Cont’d AKo/EIt
  • 17. 5. General SC Responsibilities  Exercise preventive measures against nonconformity & resolve NCR/CAR issues with approved corrective measures;  Maintain good line of communication and coordination with PMC & CC;  Conduct audit, surveillance walk and evaluate the CC’s KPI regularly;  Resolve any Client’s complaint as soon as possible;  Capture lessons learned for Continual Improvement;  Ensure CC perform commissioning (as applicable) prior to handover;  Deliver the project according to the contractual obligation. Cont’d AKo/EIt
  • 18. 6. Project Scope of Work 1. Site offices and other installations; 2. Traffic diversions, temporary traffic control and management; 3. Structural survey of all properties within 20m of the Right of Way corridor for the construction project; 4. Site clearance, including demolitions, removal of signs, lighting columns and other street furniture; 5. Reinforced concrete pedestrian underpass; 6. Reinforced concrete vehicle structures; 7. Earthworks, including excavation and recycling/disposal of existing road pavement, temporary shoring etc.; AKo/EIt
  • 19. 8. Surface water drainage, including gullies, connections to existing storm sewers and soak-ways; 9. Construction of kerbs, footways and paved areas; 10. Construction of high specification flexible pavement; 11. Directional and other traffic signage and road markings; 12. Provision of sign gantries; 13. Traffic signals (design and build element); 14. Extensive high specification hard and soft landscaping, including varied paving, architectural features, arts cape, tree planting, irrigation, and streetscape furniture; Cont’d 6. Project Scope of Work AKo/EIt
  • 20. 6. Project Scope of Work 15. Public and private utility services: provision for future services, diversions and protection of existing services for the following: a) Water supply network; b) Sewage collection and disposal systems; c) Treated sewerage effluent; d) Extensive EHV, HV, MV, LV electricity networks; e) Street lighting, underpass and structure lighting; f) Q-Tel, Vodafone and Qatar National Broadband Network; g) Qatar Armed Forces (QAF) network; h) Ministry of Interior Security System Department network (MoI-SSD). Cont’d AKo/EIt
  • 21. 7. Project Standards & References 1. Group 8a, Professional Services Agreement (P007-C1) 2. Qatar Construction Standards / Specifications 2010 3. Interim Advice Notes -IANs (Amendments to QCS 2010) 4. Contract Drawings / IFC Plans (Rev.CA, CB, CC & CD) 5. Supervision Consultant Quality Requirements Specification: EXW-GENL- 0000-QM-KBR-SS-00015-003 Rev. A2; 6. Contractor’s Contract No. C2013/88 (Tender# MRPSC/008/2012-2013/L) 7. Project Quality Plan (PQP): EXW-P007-0101-QM-EGI-PL-00001 Rev.CC; 8. ISO 9001:2008 Quality Management System Requirements. 9. Standard Document Numbering and Coding: EXW-GENL-0000-DM-KBR-SS-00004-001 Rev.22 AKo/EIt
  • 22.  The total length is 3.1 km  The length of side roads is 2.0 km  The length of service roads is approximately 5.8 km  The scheme will provide four traffic lanes in each direction (plus turning lanes at junctions) with a dividing median  Three interchanges (R2-At grade, R3-UP, R4-UP). 8.1 Road Works 8. Brief Details of the Project AKo/EIt
  • 23. 8.2 Main Typical Section AKo/EIt
  • 24. 8.3 Road Works: Junction R2 (currently named Q-Tel R/A) Al Rayyan Road/Al Wajbah Street Interchange: at grade right- in/right-out junction with Al Rayyan Road free flow at grade AKo/EIt
  • 25. 8.4 Structural Works: Junction R3 (currently named Al Shafi R/A) AI Rayyan Road/AI Salam Street Interchange: Two level interchange with Al Rayyan Road free flow beneath a signalized junction and a free flow ramp for northbound to westbound traffic. AKo/EIt
  • 26. Junction R4 (currently named Castle RIA) AI Rayyan Road/AI Qalah Street interchange: two level interchange with AI Rayyan Road free flow beneath a signalized junction. Cont’d AKo/EIt
  • 27. Architectural Design for Underpass Retaining Wall Cont’d Option 1 AKo/EIt
  • 28. Architectural Design for Underpass Retaining Wall Cont’d Option 2 AKo/EIt
  • 29. Architectural Design for Underpass Retaining Wall Cont’d Option 3 AKo/EIt
  • 30. 8.5 Typical Landscaping (Footpath, Cycle-path & Bus Stop) AKo/EIt
  • 31. Public and private utility services (provision for future services, diversions and protection of existing services) for the following: Storm water Drainage works with 4.8 km Micro-Tunnel/3mDia Water supply network Electricity works with 1.2 km Power Galleries & 6 Substations Street lighting Telecommunications Works Qatar Armed Forces (QAF) network MoI – SSD (Security System Department) ITS Works Waste Water and TSE Works 8.6 Utilities Works AKo/EIt
  • 32. Micro-tunnel (length) - 4,800 m(3m Dia) Power Galleries (length) - 1,200 m Concrete Works - 270,000 m3 Reinforcement - 20,000 Tons Asphalt works - 450,000 m2 Electrical cables - 65,000 m Pipes - 52,000 m Excavation or Filling - 500,000 m3 9. Major Project Quantities AKo/EIt
  • 33.  Project Organizational Structure  Project Management Plan (PMP)  Project Quality Plan (PQP) & Procedures  Project Specific Logistic Plan  HSE Plan & Procedures  HSE Reports (Weekly/Monthly Statistics, Audit, Incident)  Monthly Progress Report  Quality Reports (Quality-Monthly , Questionnaire, Audit)  Daily Report  Key Performance Indicators (KPI) Evaluation Report  NCR Register and Action log  SC’s Claims & Billings. 10. Project Submittals AKo/EIt 10.1 Supervision Consultant (SC)
  • 34.  Clause 14 Programme of Works (Baseline)  Project Quality Plan & Procedures  Method Statements/ Risk Assessments  Materials’ Schedule /Procurement Schedule – Long Lead Items;  Sub-Contractor & Suppliers Approvals  Project List of applicable Standards  Construction Management Forms  HSE Plan and Safety Procedures  Construction Environmental Management Plan  Traffic Control & Management Plan  Proposal, claims & billings 10.2 Construction Contractor (CC) AKo/EIt 10. Project Submittals
  • 35.  Inspection & Test Plans with Checklists  Monthly Report (Progress, Quality & Ashghal’s -QA/QC Site Questionnaire)  HSE Reports (Weekly/Monthly Statistics, Audit, Incident)  Prequalification Schedule (sub-con & Suppliers-materials)  Material Procurement Report  List of Manpower/Equipment  Organizational Chart  Curriculum Vitae (CVs) of Key Personnel  Shop Drawings  Inspection Request (IR), Test Reports, Certificates  Warrantees, O & M Manuals Cont’d AKo/EIt 10.2 Construction Contractor (CC) 10. Project Submittals
  • 36.  11.1 Types of Audits 11.1.1 Quality Assurance Audit  Internal Audit – within SC Site Management Teams  External (2nd Party) Audit – To CC , Sub-cons & Suppliers  System Audit – Needed Plans, Procedures & Management  Compliance Audit – On System & process work activities  Product Audit – On particular deliverable products  Close-out Audit - to verify the preparation of deliverables against contract requirements. 11.1.2 HSE Audit 11.1.3 Road Safety Audit  11.2 Key Performance Indicators (KPI) Evaluation 11. Audit & Evaluations AKo/EIt
  • 37. 12. Progress Photographs AKo/EIt Road Works Major Diversions
  • 38. 12. Progress Photographs AKo/EIt Temporary Road Diversion (26.12.2014)
  • 46. 12. Progress Photographs AKo/EIt Temporary Road Diversion (24.04.2015) P007-C1 P005
  • 47. 12. Progress Photographs AKo/EIt Temporary Road Diversion (24.04.2015) P007-C1
  • 51. 12. Progress Photographs AKo/EIt Cable Tunnel, Underpasses, Diversions etc.
  • 62. 13. Progress Videos AKo/EIt Monthly Progress January - 2016