HYDROTEST
SDP-1 V.P.SHUKLA
TESTS
• DESTRUCTIVE TESTS
– Tensile, Impact, Bend etc
• NON-DESTRUCTIVE TESTS
– Radiography
– Ultrasonic
– Dye Penetration
– Magnetic Particle
– Leak tests like Air test,Ammonia test etc.
– Hydrostatic test
WHY HYDROSTATIC TEST
• To ensure the integrity of the equipment
• To ensure the strength of the weld joints &
material
• To ensure the strength of the nozzle flange
joints
• To relieve the stresses
• Ensures safe and reliable performance
during the operational life
HYDRO TEST
• Good planning is essential for completion
of hydrotest in minimum possible time
•Gauges, transducer/ recorder , Sq. Bar,
Hose pipes, Pump
•Location, weight distribution, draining
•Saddles, slope, venting
•Water- quantity,quality & temperature
•Torque tightening / tensioning units
•Flanges, bolts / studs
HYDRO TEST
• The hydro test saddles shall be located on
shell in such a way that all circumferential
seams are free from saddle location. Long
seams if any covered by the saddle; the
corresponding location of saddle material
shall be grooved to facilitate the inspection
of weld joint under test
Sketch for Hydro test
Valves
Pressure Gauge
Towards Venting pipe
Arrangement for Outlet Pressure Gauge
Square Bar
Coupling
From Hydrotest
Pump
Towards Drain
Valves
Pressure Gauge
Square Bar
Coupling
Arrangement for Inlet Pressure Gauge
HYDRO TEST
• Carry out tightening of Nozzle / Man
way covers as per the required
torque
• Use proper tightening unit to meet the
requirement of PSI / Torque and follow
the tightening sequence as per
approved procedure for bolts / studs
• Start filling water after confirmation of
all requirements ( like venting, PPM of
water, Clearance of Job for fill up)
1
2
34
5
6 7
8
TIGHTENING SEQUENCE
(with torque tightening unit)
1
1
22
3
3
4
4
5
5
6
6
7
7
8
8
TIGHTENING SEQUENCE
(with tensioning unit)
HYDRO TEST
• Ensure that the nozzles (top) are
open for air removal
• Let the water flow out of the top
nozzles so that the air is removed
• Close the nozzle & allow the water to
flow from top and confirm absence of
air bubbles
AIR LOCK REMOVAL
1 VESSEL IN HORIZONTAL, INCLINED AT 5 DEG.
Packing
AIR LOCK REMOVAL
2 WHEN INTERNALS LIKE TSRs PROVIDED INSIDE THE VESSEL
AIR LOCK REMOVAL
3 NOZZLES ON DISHEND
HYDRO TEST
• Start the pump for pressurizing the
water inside the equipment. (Selection
of pump depends on the pressure and
discharge of water from pump. Set the
output pressure of pump such that it
should not exceed hydro test pressure
for safer operation)
HYDRO TEST
• Ensure that minimum two pressure
gauges are attached
• The pressure gauges shall have an upper
range of 2 times the test pressure but in
no case less than 1.5 times or more than
4 times the test pressure. The transducer
shall have minimum upper range of 1.25
times the test pressure. Only calibrated
pressure gauge and transducer shall be
used. Validity of calibration shall be
verified on the calibration sticker pasted
on the pressure indicators
HYDRO TEST
• Increase the pressure as per the
requirement given in drawing or the
approved procedure
• During pressurizing from design
pressure to test pressure, no one
shall remain on the vessel or very
near to bolted connections on the
vessel
HYDRO TEST
• Hold the test pressure for minimum
30 minutes or as specified by the
drawing / specification. The test
pressure shall not get dropped
during the holding time. The vessel
connections shall not be inspected
closely for any leakage at this stage
HYDRO TEST
• Reduce the pressure to Design
pressure
• Check for any leakage in weld joints
and bolted joints
• If no leakage is observed,
depressurizing can be started
HYDRO TEST
Depressurizing :
• If cycle is specified , follow the same
• If not specified, reduce pressure
slowly by opening the square bars (at
top) such that pressure drops to zero
• Never open bottom noz./ Sq. bar
• While draining the vessel, the top vent
valve shall be kept open before
opening any nozzle at the bottom. This
is for eliminating the possible collapse
of thin shells due to vacuum created
within the test vessel
HYDRO TEST
• Pressure gauges once used for a
pressure test shall be recalibrated. For
this purpose, the pressure gauges
once used shall be crossed on the
calibration sticker and send to QA

More Related Content

What's hot

Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Varun Patel
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
ram111eg
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
ram111eg
 

What's hot (20)

Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
HAZARDS-Pneumatic Test(1)
HAZARDS-Pneumatic Test(1)HAZARDS-Pneumatic Test(1)
HAZARDS-Pneumatic Test(1)
 
Storage Tank Safety
Storage Tank SafetyStorage Tank Safety
Storage Tank Safety
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Ppt
PptPpt
Ppt
 
Pressure Vessel Safety
Pressure Vessel SafetyPressure Vessel Safety
Pressure Vessel Safety
 
190391352-Pressure-Testing.ppt
190391352-Pressure-Testing.ppt190391352-Pressure-Testing.ppt
190391352-Pressure-Testing.ppt
 
2. Hydrant System.pdf
2. Hydrant System.pdf2. Hydrant System.pdf
2. Hydrant System.pdf
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipe
 
QC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdfQC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdf
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 
Peaking & Banding
Peaking & BandingPeaking & Banding
Peaking & Banding
 
Piping ppt1
Piping ppt1Piping ppt1
Piping ppt1
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Online Pressure Vessel Training.pdf
Online Pressure Vessel Training.pdfOnline Pressure Vessel Training.pdf
Online Pressure Vessel Training.pdf
 

Viewers also liked (9)

Ceramic tiles
Ceramic tilesCeramic tiles
Ceramic tiles
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
Kajaria tiles
Kajaria tilesKajaria tiles
Kajaria tiles
 
Tiles presentations
Tiles presentationsTiles presentations
Tiles presentations
 
Pressure Measurements | Comprehensive search
Pressure Measurements | Comprehensive searchPressure Measurements | Comprehensive search
Pressure Measurements | Comprehensive search
 
Pressure Measurement
Pressure MeasurementPressure Measurement
Pressure Measurement
 
Tiles
TilesTiles
Tiles
 
Tiles presentation
Tiles presentationTiles presentation
Tiles presentation
 
Pressure measuring devices
Pressure measuring devicesPressure measuring devices
Pressure measuring devices
 

Similar to Hydrotest

05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
yudi05
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
Nagesh H
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
Joseph Jaiwin Das
 
Internship Report
Internship ReportInternship Report
Internship Report
Malik Ehsan
 

Similar to Hydrotest (20)

Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
High pressure system- Anaesthesia Machine
High pressure system- Anaesthesia MachineHigh pressure system- Anaesthesia Machine
High pressure system- Anaesthesia Machine
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
 
Safe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSDSafe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSD
 
The basic anaesthesia machine
The basic anaesthesia machineThe basic anaesthesia machine
The basic anaesthesia machine
 
Boiler Mountings
Boiler MountingsBoiler Mountings
Boiler Mountings
 
Compressor operation.pdf
Compressor operation.pdfCompressor operation.pdf
Compressor operation.pdf
 
compressor Operation pdf.pdf
compressor Operation pdf.pdfcompressor Operation pdf.pdf
compressor Operation pdf.pdf
 
Formation Evaluation project (drill stem test DST)
Formation Evaluation project (drill stem test DST)Formation Evaluation project (drill stem test DST)
Formation Evaluation project (drill stem test DST)
 
PRESSFITTING. Uniones de Cobre prensadas
PRESSFITTING. Uniones de Cobre prensadasPRESSFITTING. Uniones de Cobre prensadas
PRESSFITTING. Uniones de Cobre prensadas
 
Leak Tests.pptx
Leak Tests.pptxLeak Tests.pptx
Leak Tests.pptx
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
 
WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19
 
Medical gas cylinders
Medical gas cylindersMedical gas cylinders
Medical gas cylinders
 
Viscosity of crude/ petroleum products by Say-bolt
Viscosity of crude/ petroleum products by Say-boltViscosity of crude/ petroleum products by Say-bolt
Viscosity of crude/ petroleum products by Say-bolt
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Control valve
Control valveControl valve
Control valve
 
SAFE HANDING OVER OF EQUIPMENTS.pptx
SAFE HANDING OVER OF EQUIPMENTS.pptxSAFE HANDING OVER OF EQUIPMENTS.pptx
SAFE HANDING OVER OF EQUIPMENTS.pptx
 

More from Jithu John (17)

Pwht1
Pwht1Pwht1
Pwht1
 
Rolling
RollingRolling
Rolling
 
Saw defects
Saw defectsSaw defects
Saw defects
 
Saw
SawSaw
Saw
 
Ut c
Ut cUt c
Ut c
 
Weld discountinuitie
Weld discountinuitieWeld discountinuitie
Weld discountinuitie
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steels
 
Weldability pc
Weldability pcWeldability pc
Weldability pc
 
Weld defects
Weld defectsWeld defects
Weld defects
 
Welding 1
Welding   1Welding   1
Welding 1
 
Welding 2
Welding  2Welding  2
Welding 2
 
Welding 3
Welding  3Welding  3
Welding 3
 
Welding 4
Welding  4Welding  4
Welding 4
 
Welding iv
Welding   ivWelding   iv
Welding iv
 
Welding flaws
Welding flawsWelding flaws
Welding flaws
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 
Radiography
RadiographyRadiography
Radiography
 

Recently uploaded

Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 

Hydrotest

  • 2. TESTS • DESTRUCTIVE TESTS – Tensile, Impact, Bend etc • NON-DESTRUCTIVE TESTS – Radiography – Ultrasonic – Dye Penetration – Magnetic Particle – Leak tests like Air test,Ammonia test etc. – Hydrostatic test
  • 3. WHY HYDROSTATIC TEST • To ensure the integrity of the equipment • To ensure the strength of the weld joints & material • To ensure the strength of the nozzle flange joints • To relieve the stresses • Ensures safe and reliable performance during the operational life
  • 4. HYDRO TEST • Good planning is essential for completion of hydrotest in minimum possible time •Gauges, transducer/ recorder , Sq. Bar, Hose pipes, Pump •Location, weight distribution, draining •Saddles, slope, venting •Water- quantity,quality & temperature •Torque tightening / tensioning units •Flanges, bolts / studs
  • 5. HYDRO TEST • The hydro test saddles shall be located on shell in such a way that all circumferential seams are free from saddle location. Long seams if any covered by the saddle; the corresponding location of saddle material shall be grooved to facilitate the inspection of weld joint under test
  • 7. Valves Pressure Gauge Towards Venting pipe Arrangement for Outlet Pressure Gauge Square Bar Coupling
  • 8. From Hydrotest Pump Towards Drain Valves Pressure Gauge Square Bar Coupling Arrangement for Inlet Pressure Gauge
  • 9. HYDRO TEST • Carry out tightening of Nozzle / Man way covers as per the required torque • Use proper tightening unit to meet the requirement of PSI / Torque and follow the tightening sequence as per approved procedure for bolts / studs • Start filling water after confirmation of all requirements ( like venting, PPM of water, Clearance of Job for fill up)
  • 10. 1 2 34 5 6 7 8 TIGHTENING SEQUENCE (with torque tightening unit)
  • 12. HYDRO TEST • Ensure that the nozzles (top) are open for air removal • Let the water flow out of the top nozzles so that the air is removed • Close the nozzle & allow the water to flow from top and confirm absence of air bubbles
  • 13. AIR LOCK REMOVAL 1 VESSEL IN HORIZONTAL, INCLINED AT 5 DEG. Packing
  • 14. AIR LOCK REMOVAL 2 WHEN INTERNALS LIKE TSRs PROVIDED INSIDE THE VESSEL
  • 15. AIR LOCK REMOVAL 3 NOZZLES ON DISHEND
  • 16. HYDRO TEST • Start the pump for pressurizing the water inside the equipment. (Selection of pump depends on the pressure and discharge of water from pump. Set the output pressure of pump such that it should not exceed hydro test pressure for safer operation)
  • 17. HYDRO TEST • Ensure that minimum two pressure gauges are attached • The pressure gauges shall have an upper range of 2 times the test pressure but in no case less than 1.5 times or more than 4 times the test pressure. The transducer shall have minimum upper range of 1.25 times the test pressure. Only calibrated pressure gauge and transducer shall be used. Validity of calibration shall be verified on the calibration sticker pasted on the pressure indicators
  • 18. HYDRO TEST • Increase the pressure as per the requirement given in drawing or the approved procedure • During pressurizing from design pressure to test pressure, no one shall remain on the vessel or very near to bolted connections on the vessel
  • 19. HYDRO TEST • Hold the test pressure for minimum 30 minutes or as specified by the drawing / specification. The test pressure shall not get dropped during the holding time. The vessel connections shall not be inspected closely for any leakage at this stage
  • 20. HYDRO TEST • Reduce the pressure to Design pressure • Check for any leakage in weld joints and bolted joints • If no leakage is observed, depressurizing can be started
  • 21. HYDRO TEST Depressurizing : • If cycle is specified , follow the same • If not specified, reduce pressure slowly by opening the square bars (at top) such that pressure drops to zero • Never open bottom noz./ Sq. bar • While draining the vessel, the top vent valve shall be kept open before opening any nozzle at the bottom. This is for eliminating the possible collapse of thin shells due to vacuum created within the test vessel
  • 22. HYDRO TEST • Pressure gauges once used for a pressure test shall be recalibrated. For this purpose, the pressure gauges once used shall be crossed on the calibration sticker and send to QA