Background
4
Pilot Project Overview
 Early pilot work funded by the Northwest Energy Efficiency
Alliance (NEEA)
 New high efficiency Heat Recovery Ventilation (HRV) unit
 Vertical mounting for existing RTU ductwork
 1000 cfm max flow
 Greater than 80% sensible heat recovery efficiency
5
Pilot Project Overview
 Target Building Sector:
 Small commercial (< 25,000 ft2)
 Includes small office, retail, schools, restaurants, small
assembly
 Makes up approx. half of the commercial building floor area in
the Pacific Northwest.
 Smaller HVAC systems; typically not engineered.
6
Pilot Project Overview
Ventilation +
Heating (or Cooling)
Outdoor
Air
Return Air
Exhaust
Air
Packaged Rooftop Unit
7
Pilot Project Overview
Dedicated Outdoor Air System
Outdoor Air
Ventilation Exhaust
Air
Heat Recovery
Exhaust Air
Heat Pump
Zone-Level
Heating (or
Cooling)
8
Pilot Projects
 8 pilot projects to date
#4 Office
Libby MT#6 Office
Seattle WA
Dorm #8
Darby MT
#1 Office
Portland OR
#3 Restaurant
Corvallis OR
#5 Restaurant
Portland OR
#2 Office
Corvallis OR
#7 Office
Seattle WA
9
# Location
Building
Type
Occupied Hours
Conditioned
Area, ft2 (m2)
1 Portland, OR Office M-F, 7am-6pm
11,600
(1,080)
2 Corvallis, OR Office M-F, 8am-5pm
13,200
(1,225)
3 Corvallis, OR Restaurant
Su-W, 11am-11pm
Th-Sa, 11am-12am
1,600
(162)
4 Libby, MT
Office w/
Garage
M-F, 9am-5pm
5,600
(520)
5 Portland, OR Restaurant
M-F, 11am-9pm
Sa-Su, 9am-9pm
1,150
(110)
6 Seattle, WA Office M-F, 9am-5pm
5,900
(550)
7 Seattle, WA Office M-F, 8am-5pm
24,300
(2,260)
Wide range
of climates
Applicable to most
building types
Size ranges from
~1,150ft2 to 24,300ft2
10
Pilot Project Overview
 PART 1: Establish Baseline Conditions
 PART 2: Calibrate Baseline Energy Model
 PART 3: DOAS Conversion
 PART 4: Establish Post-Conversion Conditions
 PART 5: Calibrate Post-Conversion Energy Model
11
Methodology
12
Pre-Conversion Baseline Model Calibration
 Calibration based on monthly electricity and natural gas bills
0
10
20
30
40
50
60
70
80
0
2
4
6
8
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
OutdoorDryBulb(°F)
EUI(kBtu/ft2)
CVRMSE: 2.1 (elec) / 6.4 (gas)
NMBE: 3.8 (elec) / 2.1 (gas)
Coefficient of Variation of the Root Mean Squared Error (CVRMSE) < 10% and Normalized Mean Bias Error (NMBE) <
5% as per ASHRAE Guideline 14 for calibration of whole building energy simulation to monthly utility data.
Actual Elec/Gas (2014) Modeled Elec/Gas (2014)
13
Post-Conversion Comparison
 Comparison of modeled TMY to actual post-conversion use
 Re-calibration done after 1-year post-conversion data
0
10
20
30
40
50
60
70
80
0
2
4
6
8
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
OutdoorDryBulb(°F)
EUI(kBtu/ft2
)
Modeled Elec/Gas (TMY) Actual Elec/Gas (2016/17)
Avg Monthly Temp (2016/17) Avg Monthly Temp (TMY)
Actual Elec/Gas (2016/17) Modeled Elec/Gas (TMY)
14
Monitoring Equipment
 Energy Data
 Utility Billing
 Electricity Sub-metering
 Indoor Environmental Quality
 Carbon Dioxide
 Temperature
 Relative Humidity
15
Air Leakage Testing
 Conducted pre- and post-conversion
 US Army Corps of Engineers (USACE) test protocol
16
 Energy Savings
Summary of Project Results
17
Summary of Energy Savings
 Pre and Post-Retrofit energy end use breakdown compared
Offices Restaurants
0
50
100
150
200
250
300
350
EUI(kWh/m2)
Fans
Cooling
Heating
Other
PRE-CONVERSION
POST-CONVERSION
NOT
MODELLED
0
500
1000
1500
2000
2500
3000
3500
4000
EUI(kWh/m2)
18
Summary of Energy Savings
Pre,
kBtu/ft2
(kWh/m2)
Post,
kBtu/ft2
(kWh/m2)
Savings
Pre,
kBtu/ft2
(kWh/m2)
Post,
kBtu/ft2
(kWh/m2)
Savings
1
Portland,
OR
Office
48
(153)
14
(44)
71%
63
(200)
29
(91)
54%
2
Corvallis,
OR
Office
33
(103)
25
(80)
22%
57
(180)
50
(158)
13%
3
Corvallis,
OR
Restaurant
313
(990)
146
(461)
53%
1,082
(3,418)
914
(2,890)
15%
4
Libby,
MT
Office/Garage
84
(265)
45
(141)
47%
105
(333)
66
(209)
37%
5
Portland,
OR
Restaurant
193
(609)
58
(182)
70%
773
(2,444)
638
(2,017)
17%
6
Seattle,
WA
Office
19
(60)
10
(33)
45%
42
(133)
34
(106)
20%
7
Seattle,
WA
Office TBD TBD TBD TBD TBD TBD
22% to 71% 13% to 54%
19
 Air Leakage
Summary of Project Results
20
Air Leakage Testing
 Typical leakage ~0.2 to 0.5 cfm/ft2 @75Pa (1.0 to 2.5 L/s·m2)
 Building #3 (restaurant) was an outlier <1.6 cfm/ft2 @75Pa (8.1 L/s·m2)
due to kitchen equipment openings
 51% decrease in Building #4: removal of two swamp coolers
 23% increase in Building #6: difficulty sealing ductwork between floors
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
EnclosureAirLeakage
(cfm/ft2@75Pa)
Pre-conversion
Post-conversion
NotTested
21
 Temperature
Summary of Project Results
22
0
20
40
60
80
100
120
60
70
80
90
100
OutdoorDryBulb(°F)
InteriorTemperature(°F)
Office 6 Office 3 Reception Outdoor Dry Bulb
Post-conversion
Pre-conversion
HVACConversion
Drybulb Temperature – Building #2 – Office, Oregon
 Primary use: confirm space setpoint/setback being met
 Secondary use: troubleshooting and optimizing operation
 Initially tight control of space temperature
 Occupant adjustments causes deviation
 Spaces deviate but small temperature band in each
23
0
20
40
60
80
100
120
60
70
80
90
100
OutdoorDryBulb(°F)
InteriorTemperature(°F)
Back Front Outdoor Dry Bulb
Post-conversionPre-
conversion
HVACConversion
Drybulb Temperature – Building #3 – Restaurant, Oregon
 Primary use: confirm space setpoint/setback being met
 Secondary use: troubleshooting and optimizing operation
 Significant daily variations in space temperature
 Challenges maintaining setpoint during summer
24
 Carbon Dioxide
Summary of Project Results
25
0
20
40
60
80
100
120
0
400
800
1200
1600
2000
2400
2800
OutdoorDryBulb(°F)
CO2Concentration(ppm)
Open Office Private Office Garage
Post-conversionPre-conversion
HVACConversion
Building #4 – Office, Montana
 Pre-conversion ventilation system provided good IAQ
 Reduction in peak CO2 concentration post-conversion
26
0
20
40
60
80
100
120
0
400
800
1200
1600
2000
2400
2800
OutdoorDryBulb(°F)
CO2Concentration(ppm)
Back Front Outdoor Dry Bulb
Post-conversionPre-
conversion
HVACConversion
Building #3 – Restaurant, Oregon
 Pre-conversion CO2 variation is significant, concentration
often in excess of 1,000ppm
 Post-conversion concentration shows minor reduction in peak
concentration
 Greatest concentration is after HRV operating hours (staff
clean-up)
27
Carbon Dioxide Concentration
Project
Number
Occupancy
Frequency
above
1000ppm
Pre
Frequency
above
1000ppm
Post
Average
Occupied Pre
Average
Occupied
Post
1 Office N/A 0.2% N/A 500
2 Office 0.7% 0.1% 615 565
3 Restaurant
23% 15%
900 740
4 Office/Garage
2.6% 0.1%
620 545
5 Restaurant
7.2% N/A
760 N/A
6 Office N/A 0.0% N/A 500
7 Office 0.0% 2.7% 480 560
Project
Number
Occupancy
Frequency
above
1000ppm
Pre
Frequency
above
1000ppm
Post
1 Office N/A 0.2%
2 Office 0.7% 0.1%
3 Restaurant
23% 15%
4 Office/Garage
2.6% 0.1%
5 Restaurant
7.2% N/A
6 Office N/A 0.0%
7 Office 0.0% 2.7%
Project
Number
Occupancy
1 Office
2 Office
3 Restaurant
4 Office/Garage
5 Restaurant
6 Office
7 Office
0% to 24%
0% to 15%
480 to
900ppm
500 to
740ppm
28
Lessons Learned
29
Lessons Learned
 Successful DOAS conversion depends on several
factors, including:
 Reduction in ventilation air volumes; demand controlled
ventilation (DCV)
 Very low ventilation fan power (0.5 Watts/cfm or less)
 Very high ventilation heat/energy recovery efficiency
 Can be a challenge due to limited equipment meeting
required specifications
 Implementation has led to a number of lessons
learned:
30
Air Leakage
 Commissioning of HRV airflow at diffusers found rates up to 25% below
design conditions
 Initial solution from contractors was to increase the airflow rate at the
HRV until space supply flowrates were met
 Root cause identified to be air leakage at ductwork at fittings
 Challenges repurposing existing ductwork due to the leaks
 Care required at new duct joints
31
Contractor Education
 Several pilots initially specified old equipment capacity
 Relied heavily on design assistance from heat pump equipment
suppliers
 Typically leads to extra features
 Tools and/or technical support for selecting proper equipment
required for broad scale implementation
32
Occupant Education
 Operation changes required to account for the separation of the ventilation
from A/C
 Occupants initially hesitant to adjust setpoint temperature despite
dissatisfaction with the indoor temperature
 Others made changes without understanding the impact
 Proper instruction around the intended system operation and periodic follow-
up is required to ensure both comfort and energy goals are achieved
33
Discussion + Questions
FOR FURTHER INFORMATION PLEASE VISIT
 www.rdh.com
 www.buildingsciencelabs.com
OR CONTACT US AT
 jmontgomery@rdh.com

More Related Content

What's hot

Looking for Energy Savings In All The Right Places - Eric Oliver
Looking for Energy Savings In All The Right Places - Eric OliverLooking for Energy Savings In All The Right Places - Eric Oliver
Looking for Energy Savings In All The Right Places - Eric Oliver
Chris Cheatham
 
NZEB Office Building by David Walshe
NZEB Office Building by  David WalsheNZEB Office Building by  David Walshe
NZEB Office Building by David Walshe
SustainableEnergyAut
 
NZEB Office Building including renewable energy ratio calculation orla coyle
NZEB Office Building including renewable energy ratio calculation  orla coyleNZEB Office Building including renewable energy ratio calculation  orla coyle
NZEB Office Building including renewable energy ratio calculation orla coyle
SustainableEnergyAut
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
RDH Building Science
 
NZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongNZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean Armstrong
SustainableEnergyAut
 
Innovation in Building presentation 12 Sept 2014
Innovation in Building presentation 12 Sept 2014Innovation in Building presentation 12 Sept 2014
Innovation in Building presentation 12 Sept 2014
Simon McGuinness
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
SustainableEnergyAut
 
Nzeb case study esb
Nzeb case study   esbNzeb case study   esb
Nzeb case study esb
SustainableEnergyAut
 
Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...
Totok R Biyanto
 
Carbon Neutral Apartment Retrofits
Carbon Neutral Apartment RetrofitsCarbon Neutral Apartment Retrofits
Carbon Neutral Apartment Retrofits
RDH Building Science
 
Energy in Schools by John Dolan
Energy in Schools by John DolanEnergy in Schools by John Dolan
Energy in Schools by John Dolan
SustainableEnergyAut
 
Health Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan ReddingtonHealth Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan Reddington
SustainableEnergyAut
 
NZEB - innovation through simplicity
NZEB - innovation through simplicityNZEB - innovation through simplicity
NZEB - innovation through simplicity
SustainableEnergyAut
 
Examples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongExamples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John Furlong
SustainableEnergyAut
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
energytrustor
 
CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)
TE Studio
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 Update
Illinois ASHRAE
 
Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2
patmcmmc
 
Risk mitigation strategies for retrofits
Risk mitigation strategies for retrofitsRisk mitigation strategies for retrofits
Risk mitigation strategies for retrofits
SustainableEnergyAut
 
Energy Conservation Building Code ECBC
Energy Conservation Building Code ECBCEnergy Conservation Building Code ECBC
Energy Conservation Building Code ECBC
Amar Relan
 

What's hot (20)

Looking for Energy Savings In All The Right Places - Eric Oliver
Looking for Energy Savings In All The Right Places - Eric OliverLooking for Energy Savings In All The Right Places - Eric Oliver
Looking for Energy Savings In All The Right Places - Eric Oliver
 
NZEB Office Building by David Walshe
NZEB Office Building by  David WalsheNZEB Office Building by  David Walshe
NZEB Office Building by David Walshe
 
NZEB Office Building including renewable energy ratio calculation orla coyle
NZEB Office Building including renewable energy ratio calculation  orla coyleNZEB Office Building including renewable energy ratio calculation  orla coyle
NZEB Office Building including renewable energy ratio calculation orla coyle
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
 
NZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean ArmstrongNZEB Interm Specification by Sean Armstrong
NZEB Interm Specification by Sean Armstrong
 
Innovation in Building presentation 12 Sept 2014
Innovation in Building presentation 12 Sept 2014Innovation in Building presentation 12 Sept 2014
Innovation in Building presentation 12 Sept 2014
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
 
Nzeb case study esb
Nzeb case study   esbNzeb case study   esb
Nzeb case study esb
 
Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...Optimization of Energy Efficiency and Conservation in Green Building Design U...
Optimization of Energy Efficiency and Conservation in Green Building Design U...
 
Carbon Neutral Apartment Retrofits
Carbon Neutral Apartment RetrofitsCarbon Neutral Apartment Retrofits
Carbon Neutral Apartment Retrofits
 
Energy in Schools by John Dolan
Energy in Schools by John DolanEnergy in Schools by John Dolan
Energy in Schools by John Dolan
 
Health Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan ReddingtonHealth Business Services, HSE NZEB approach by Brendan Reddington
Health Business Services, HSE NZEB approach by Brendan Reddington
 
NZEB - innovation through simplicity
NZEB - innovation through simplicityNZEB - innovation through simplicity
NZEB - innovation through simplicity
 
Examples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongExamples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John Furlong
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
 
CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 Update
 
Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2Energy Efficiency Methods And Techniques V.2
Energy Efficiency Methods And Techniques V.2
 
Risk mitigation strategies for retrofits
Risk mitigation strategies for retrofitsRisk mitigation strategies for retrofits
Risk mitigation strategies for retrofits
 
Energy Conservation Building Code ECBC
Energy Conservation Building Code ECBCEnergy Conservation Building Code ECBC
Energy Conservation Building Code ECBC
 

Similar to Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial Buildings

Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
energytrustor
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for Cooling
Graybar
 
Performance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi SystemsPerformance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi Systems
Center for Energy and Environment
 
Modern farmers mini-design_project
Modern farmers mini-design_projectModern farmers mini-design_project
Modern farmers mini-design_project
Abhimanyu Sehrawat
 
Energy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large BuildingsEnergy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large Buildings
Center for Energy and Environment
 
Eco cooling
Eco cooling Eco cooling
Eco cooling
JISC RSC Eastern
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
JoePessa
 
Gard analytics DOE energy modeling
Gard analytics DOE energy modelingGard analytics DOE energy modeling
Gard analytics DOE energy modeling
Steve Klein
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
NazrulIslam657555
 
The Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsThe Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial Buildings
Center for Energy and Environment
 
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
buildpulse
 
Title 24 2019 Part 6 - Your Greatest Ideas Turned Into Code Change
Title 24 2019 Part 6 - Your Greatest Ideas Turned Into Code ChangeTitle 24 2019 Part 6 - Your Greatest Ideas Turned Into Code Change
Title 24 2019 Part 6 - Your Greatest Ideas Turned Into Code Change
Red Car Analytics
 
ASHRAE Standard 100
ASHRAE Standard 100ASHRAE Standard 100
ASHRAE Standard 100
Illinois ASHRAE
 
Afcom air control solution presentation
Afcom air control solution presentation Afcom air control solution presentation
Afcom air control solution presentation
stacygriggs
 
Leed Modeling
Leed ModelingLeed Modeling
Leed Modeling
Kim Mitchell
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
D.Pawan Kumar
 
Hvac systems presentation_slides
Hvac systems presentation_slidesHvac systems presentation_slides
Hvac systems presentation_slides
guy ygal
 
Re con
Re conRe con
Re con
phong2988
 
Passive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid ClimatesPassive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid Climates
aiahouston
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
EECO2
 

Similar to Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial Buildings (20)

Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for Cooling
 
Performance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi SystemsPerformance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi Systems
 
Modern farmers mini-design_project
Modern farmers mini-design_projectModern farmers mini-design_project
Modern farmers mini-design_project
 
Energy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large BuildingsEnergy Savings from Air Sealing Large Buildings
Energy Savings from Air Sealing Large Buildings
 
Eco cooling
Eco cooling Eco cooling
Eco cooling
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 
Gard analytics DOE energy modeling
Gard analytics DOE energy modelingGard analytics DOE energy modeling
Gard analytics DOE energy modeling
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
 
The Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial BuildingsThe Value of Air Leakage Testing in Large Commercial Buildings
The Value of Air Leakage Testing in Large Commercial Buildings
 
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
Utilizing Analytics to Drive Change in Buildings - Apem Sept 18 2015
 
Title 24 2019 Part 6 - Your Greatest Ideas Turned Into Code Change
Title 24 2019 Part 6 - Your Greatest Ideas Turned Into Code ChangeTitle 24 2019 Part 6 - Your Greatest Ideas Turned Into Code Change
Title 24 2019 Part 6 - Your Greatest Ideas Turned Into Code Change
 
ASHRAE Standard 100
ASHRAE Standard 100ASHRAE Standard 100
ASHRAE Standard 100
 
Afcom air control solution presentation
Afcom air control solution presentation Afcom air control solution presentation
Afcom air control solution presentation
 
Leed Modeling
Leed ModelingLeed Modeling
Leed Modeling
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
Hvac systems presentation_slides
Hvac systems presentation_slidesHvac systems presentation_slides
Hvac systems presentation_slides
 
Re con
Re conRe con
Re con
 
Passive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid ClimatesPassive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid Climates
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 

More from RDH Building Science

High-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility StudyHigh-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility Study
RDH Building Science
 
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
RDH Building Science
 
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
RDH Building Science
 
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
RDH Building Science
 
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
RDH Building Science
 
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesState of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
RDH Building Science
 
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
RDH Building Science
 
Passive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case StudyPassive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case Study
RDH Building Science
 
Structural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick InsulationStructural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick Insulation
RDH Building Science
 
Tall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopTall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the Top
RDH Building Science
 
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
RDH Building Science
 
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
RDH Building Science
 
Attaching Cladding with Long Screws
Attaching Cladding with Long ScrewsAttaching Cladding with Long Screws
Attaching Cladding with Long Screws
RDH Building Science
 
Post Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive HousePost Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive House
RDH Building Science
 
Re-glazing of an All Glass Tower
Re-glazing of an All Glass TowerRe-glazing of an All Glass Tower
Re-glazing of an All Glass Tower
RDH Building Science
 
The Problems With and Solutions for Ventilated Attics
The Problems With and Solutions for Ventilated AtticsThe Problems With and Solutions for Ventilated Attics
The Problems With and Solutions for Ventilated Attics
RDH Building Science
 
Deterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbMDeterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbM
RDH Building Science
 
Airflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential BuildingsAirflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential Buildings
RDH Building Science
 
Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings Today
RDH Building Science
 
NBEC 2014 - Flow Exponent Values and Implications for Air Leakage Testing
NBEC 2014 -  Flow Exponent Values and Implications for Air Leakage TestingNBEC 2014 -  Flow Exponent Values and Implications for Air Leakage Testing
NBEC 2014 - Flow Exponent Values and Implications for Air Leakage Testing
RDH Building Science
 

More from RDH Building Science (20)

High-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility StudyHigh-Rise Passive House Feasibility Study
High-Rise Passive House Feasibility Study
 
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?Window Sill Pan Flashings: Are Liquid Membranes Suitable?
Window Sill Pan Flashings: Are Liquid Membranes Suitable?
 
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
Impact of Heating and Cooling of Expanded Polystyrene and Wool Insulations on...
 
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
Challenges Related to Measuring and Reporting Temperature-Dependent Apparent ...
 
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
 
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesState of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
 
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
Solutions to Address Osmosis and the Blistering of Liquid-Applied Waterproofi...
 
Passive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case StudyPassive House Wall Assembly Performance - A Case Study
Passive House Wall Assembly Performance - A Case Study
 
Structural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick InsulationStructural Testing of Screws Through Thick Insulation
Structural Testing of Screws Through Thick Insulation
 
Tall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopTall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the Top
 
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
 
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
Moisture Uptake Testing for CLT Floor Panels in a Tall Wood Building in Vanco...
 
Attaching Cladding with Long Screws
Attaching Cladding with Long ScrewsAttaching Cladding with Long Screws
Attaching Cladding with Long Screws
 
Post Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive HousePost Occupancy Research at the North Park Passive House
Post Occupancy Research at the North Park Passive House
 
Re-glazing of an All Glass Tower
Re-glazing of an All Glass TowerRe-glazing of an All Glass Tower
Re-glazing of an All Glass Tower
 
The Problems With and Solutions for Ventilated Attics
The Problems With and Solutions for Ventilated AtticsThe Problems With and Solutions for Ventilated Attics
The Problems With and Solutions for Ventilated Attics
 
Deterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbMDeterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbM
 
Airflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential BuildingsAirflow in Mid to High-rise Multi-Unit Residential Buildings
Airflow in Mid to High-rise Multi-Unit Residential Buildings
 
Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings Today
 
NBEC 2014 - Flow Exponent Values and Implications for Air Leakage Testing
NBEC 2014 -  Flow Exponent Values and Implications for Air Leakage TestingNBEC 2014 -  Flow Exponent Values and Implications for Air Leakage Testing
NBEC 2014 - Flow Exponent Values and Implications for Air Leakage Testing
 

Recently uploaded

Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
AI-Based Home Security System : Home security
AI-Based Home Security System : Home securityAI-Based Home Security System : Home security
AI-Based Home Security System : Home security
AIRCC Publishing Corporation
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...
cannyengineerings
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 

Recently uploaded (20)

Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
AI-Based Home Security System : Home security
AI-Based Home Security System : Home securityAI-Based Home Security System : Home security
AI-Based Home Security System : Home security
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 

Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial Buildings

  • 1. 1 Energy and Indoor Air Quality Impacts of DOAS Retrofits in Small Commercial Buildings 15TH CANADIAN CONFERENCE ON BUILDING SCIENCE AND TECHNOLOGY NOVEMBER 7TH, 2017 PRESENTED BY: JAMES MONTGOMERY, PHD
  • 2. 2  Background  Methodology  Results  Lessons Learned (to date) Outline
  • 4. 4 Pilot Project Overview  Early pilot work funded by the Northwest Energy Efficiency Alliance (NEEA)  New high efficiency Heat Recovery Ventilation (HRV) unit  Vertical mounting for existing RTU ductwork  1000 cfm max flow  Greater than 80% sensible heat recovery efficiency
  • 5. 5 Pilot Project Overview  Target Building Sector:  Small commercial (< 25,000 ft2)  Includes small office, retail, schools, restaurants, small assembly  Makes up approx. half of the commercial building floor area in the Pacific Northwest.  Smaller HVAC systems; typically not engineered.
  • 6. 6 Pilot Project Overview Ventilation + Heating (or Cooling) Outdoor Air Return Air Exhaust Air Packaged Rooftop Unit
  • 7. 7 Pilot Project Overview Dedicated Outdoor Air System Outdoor Air Ventilation Exhaust Air Heat Recovery Exhaust Air Heat Pump Zone-Level Heating (or Cooling)
  • 8. 8 Pilot Projects  8 pilot projects to date #4 Office Libby MT#6 Office Seattle WA Dorm #8 Darby MT #1 Office Portland OR #3 Restaurant Corvallis OR #5 Restaurant Portland OR #2 Office Corvallis OR #7 Office Seattle WA
  • 9. 9 # Location Building Type Occupied Hours Conditioned Area, ft2 (m2) 1 Portland, OR Office M-F, 7am-6pm 11,600 (1,080) 2 Corvallis, OR Office M-F, 8am-5pm 13,200 (1,225) 3 Corvallis, OR Restaurant Su-W, 11am-11pm Th-Sa, 11am-12am 1,600 (162) 4 Libby, MT Office w/ Garage M-F, 9am-5pm 5,600 (520) 5 Portland, OR Restaurant M-F, 11am-9pm Sa-Su, 9am-9pm 1,150 (110) 6 Seattle, WA Office M-F, 9am-5pm 5,900 (550) 7 Seattle, WA Office M-F, 8am-5pm 24,300 (2,260) Wide range of climates Applicable to most building types Size ranges from ~1,150ft2 to 24,300ft2
  • 10. 10 Pilot Project Overview  PART 1: Establish Baseline Conditions  PART 2: Calibrate Baseline Energy Model  PART 3: DOAS Conversion  PART 4: Establish Post-Conversion Conditions  PART 5: Calibrate Post-Conversion Energy Model
  • 12. 12 Pre-Conversion Baseline Model Calibration  Calibration based on monthly electricity and natural gas bills 0 10 20 30 40 50 60 70 80 0 2 4 6 8 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC OutdoorDryBulb(°F) EUI(kBtu/ft2) CVRMSE: 2.1 (elec) / 6.4 (gas) NMBE: 3.8 (elec) / 2.1 (gas) Coefficient of Variation of the Root Mean Squared Error (CVRMSE) < 10% and Normalized Mean Bias Error (NMBE) < 5% as per ASHRAE Guideline 14 for calibration of whole building energy simulation to monthly utility data. Actual Elec/Gas (2014) Modeled Elec/Gas (2014)
  • 13. 13 Post-Conversion Comparison  Comparison of modeled TMY to actual post-conversion use  Re-calibration done after 1-year post-conversion data 0 10 20 30 40 50 60 70 80 0 2 4 6 8 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC OutdoorDryBulb(°F) EUI(kBtu/ft2 ) Modeled Elec/Gas (TMY) Actual Elec/Gas (2016/17) Avg Monthly Temp (2016/17) Avg Monthly Temp (TMY) Actual Elec/Gas (2016/17) Modeled Elec/Gas (TMY)
  • 14. 14 Monitoring Equipment  Energy Data  Utility Billing  Electricity Sub-metering  Indoor Environmental Quality  Carbon Dioxide  Temperature  Relative Humidity
  • 15. 15 Air Leakage Testing  Conducted pre- and post-conversion  US Army Corps of Engineers (USACE) test protocol
  • 16. 16  Energy Savings Summary of Project Results
  • 17. 17 Summary of Energy Savings  Pre and Post-Retrofit energy end use breakdown compared Offices Restaurants 0 50 100 150 200 250 300 350 EUI(kWh/m2) Fans Cooling Heating Other PRE-CONVERSION POST-CONVERSION NOT MODELLED 0 500 1000 1500 2000 2500 3000 3500 4000 EUI(kWh/m2)
  • 18. 18 Summary of Energy Savings Pre, kBtu/ft2 (kWh/m2) Post, kBtu/ft2 (kWh/m2) Savings Pre, kBtu/ft2 (kWh/m2) Post, kBtu/ft2 (kWh/m2) Savings 1 Portland, OR Office 48 (153) 14 (44) 71% 63 (200) 29 (91) 54% 2 Corvallis, OR Office 33 (103) 25 (80) 22% 57 (180) 50 (158) 13% 3 Corvallis, OR Restaurant 313 (990) 146 (461) 53% 1,082 (3,418) 914 (2,890) 15% 4 Libby, MT Office/Garage 84 (265) 45 (141) 47% 105 (333) 66 (209) 37% 5 Portland, OR Restaurant 193 (609) 58 (182) 70% 773 (2,444) 638 (2,017) 17% 6 Seattle, WA Office 19 (60) 10 (33) 45% 42 (133) 34 (106) 20% 7 Seattle, WA Office TBD TBD TBD TBD TBD TBD 22% to 71% 13% to 54%
  • 19. 19  Air Leakage Summary of Project Results
  • 20. 20 Air Leakage Testing  Typical leakage ~0.2 to 0.5 cfm/ft2 @75Pa (1.0 to 2.5 L/s·m2)  Building #3 (restaurant) was an outlier <1.6 cfm/ft2 @75Pa (8.1 L/s·m2) due to kitchen equipment openings  51% decrease in Building #4: removal of two swamp coolers  23% increase in Building #6: difficulty sealing ductwork between floors 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 EnclosureAirLeakage (cfm/ft2@75Pa) Pre-conversion Post-conversion NotTested
  • 21. 21  Temperature Summary of Project Results
  • 22. 22 0 20 40 60 80 100 120 60 70 80 90 100 OutdoorDryBulb(°F) InteriorTemperature(°F) Office 6 Office 3 Reception Outdoor Dry Bulb Post-conversion Pre-conversion HVACConversion Drybulb Temperature – Building #2 – Office, Oregon  Primary use: confirm space setpoint/setback being met  Secondary use: troubleshooting and optimizing operation  Initially tight control of space temperature  Occupant adjustments causes deviation  Spaces deviate but small temperature band in each
  • 23. 23 0 20 40 60 80 100 120 60 70 80 90 100 OutdoorDryBulb(°F) InteriorTemperature(°F) Back Front Outdoor Dry Bulb Post-conversionPre- conversion HVACConversion Drybulb Temperature – Building #3 – Restaurant, Oregon  Primary use: confirm space setpoint/setback being met  Secondary use: troubleshooting and optimizing operation  Significant daily variations in space temperature  Challenges maintaining setpoint during summer
  • 24. 24  Carbon Dioxide Summary of Project Results
  • 25. 25 0 20 40 60 80 100 120 0 400 800 1200 1600 2000 2400 2800 OutdoorDryBulb(°F) CO2Concentration(ppm) Open Office Private Office Garage Post-conversionPre-conversion HVACConversion Building #4 – Office, Montana  Pre-conversion ventilation system provided good IAQ  Reduction in peak CO2 concentration post-conversion
  • 26. 26 0 20 40 60 80 100 120 0 400 800 1200 1600 2000 2400 2800 OutdoorDryBulb(°F) CO2Concentration(ppm) Back Front Outdoor Dry Bulb Post-conversionPre- conversion HVACConversion Building #3 – Restaurant, Oregon  Pre-conversion CO2 variation is significant, concentration often in excess of 1,000ppm  Post-conversion concentration shows minor reduction in peak concentration  Greatest concentration is after HRV operating hours (staff clean-up)
  • 27. 27 Carbon Dioxide Concentration Project Number Occupancy Frequency above 1000ppm Pre Frequency above 1000ppm Post Average Occupied Pre Average Occupied Post 1 Office N/A 0.2% N/A 500 2 Office 0.7% 0.1% 615 565 3 Restaurant 23% 15% 900 740 4 Office/Garage 2.6% 0.1% 620 545 5 Restaurant 7.2% N/A 760 N/A 6 Office N/A 0.0% N/A 500 7 Office 0.0% 2.7% 480 560 Project Number Occupancy Frequency above 1000ppm Pre Frequency above 1000ppm Post 1 Office N/A 0.2% 2 Office 0.7% 0.1% 3 Restaurant 23% 15% 4 Office/Garage 2.6% 0.1% 5 Restaurant 7.2% N/A 6 Office N/A 0.0% 7 Office 0.0% 2.7% Project Number Occupancy 1 Office 2 Office 3 Restaurant 4 Office/Garage 5 Restaurant 6 Office 7 Office 0% to 24% 0% to 15% 480 to 900ppm 500 to 740ppm
  • 29. 29 Lessons Learned  Successful DOAS conversion depends on several factors, including:  Reduction in ventilation air volumes; demand controlled ventilation (DCV)  Very low ventilation fan power (0.5 Watts/cfm or less)  Very high ventilation heat/energy recovery efficiency  Can be a challenge due to limited equipment meeting required specifications  Implementation has led to a number of lessons learned:
  • 30. 30 Air Leakage  Commissioning of HRV airflow at diffusers found rates up to 25% below design conditions  Initial solution from contractors was to increase the airflow rate at the HRV until space supply flowrates were met  Root cause identified to be air leakage at ductwork at fittings  Challenges repurposing existing ductwork due to the leaks  Care required at new duct joints
  • 31. 31 Contractor Education  Several pilots initially specified old equipment capacity  Relied heavily on design assistance from heat pump equipment suppliers  Typically leads to extra features  Tools and/or technical support for selecting proper equipment required for broad scale implementation
  • 32. 32 Occupant Education  Operation changes required to account for the separation of the ventilation from A/C  Occupants initially hesitant to adjust setpoint temperature despite dissatisfaction with the indoor temperature  Others made changes without understanding the impact  Proper instruction around the intended system operation and periodic follow- up is required to ensure both comfort and energy goals are achieved