SlideShare a Scribd company logo
#PassiveLogical 
Understanding Renewables in DEAP 
Simon McGuinness MRIAI, Dip.Arch., B.Arch.Sc., CEPHD
DEAP: New Build, Retrofit & Renewables 
 Current Building Regulations 
 Residential - A3 
 Non-Residential - 2005 
 Retrofit 
 Future Building Regulations to meet EPBD/EED (nZEB) 
 Residential to nZEB 
 Non-Residential to nZEB 
 Retrofit to nZEB 
 Renewables requirement in DEAP 
 Case Study: BRE Scotland, 
 Case Study: Galway Passive House Retrofit
DEAP – Dwelling Energy Assessment Procedure 
 Only acceptable proof of 
compliance with Part L for 
new build 
 EPC < 0.400 and 
 CPC < 0.460 
 Does not yet apply to 
retrofit, extensions or 
material changes 
 BER required if grants are 
sought from SEAI 
 BER required for property 
sale, lease of all properties
DEAP – calculation of energy systems 
Primary energy and CO2 
factors for space heating
DEAP – calculation of energy systems
DEAP – calculation of energy systems 
CHIMNEY/OPEN FIRE: 
- Fuel efficiency penalty 
- Ventilation losses 
penalty 
- CO2 penalty
DEAP – PE factor for Electricity
DEAP – Renewables as % of total energy
DEAP – Projected PE factor
DEAP – Effect of PE reduction to 1.4 
Dwelling built in 2013 with air/water heat pump, PV panel and underfloor heating
DEAP – Effect of PE reduction to 1.4 
Dwelling built in 2013 with air/water heat pump, PV panel and underfloor heating 
2014 BER assessment 2024 BER assessment 
1.0 ach 6.7 ach
DEAP – Effect of airtightness 
Dwelling designed in 2014 with air/water heat pump, PV panel, radiators and MVHR 
6.7 ach 
1.0 ach
DEAP – Effect of airtightness + PE factor 
Dwelling designed in 2014 with air/water heat pump, PV panel, radiators and MVHR 
6.7 ach 
1.0 ach 1.0 ach + 1.4 PEf
PHPP – Effect of airtightness 
Passive House retrofit designed in 2012 with air/water heat pump, radiators and MVHR 
Typical Irish 
New Build 
to Part L 2011 
6.7 ach 
Good Irish 
Passive 
House Retrofit 
0.37 ach
Simplification of RES for New Build 
2008 (BER of B3) 2014 (BER of A3) 
 Wood pellet boiler 
 Pellet storage & delivery 
 Radiators & Underfloor 
 Solar Thermal 
 200ltr HWC 
 Immersion backup 
 3 zones time control 
 20,000 kWh/y 
 €16,000 
 140 man-hrs, 3 subcontractors 
 High maintenance cost 
 Heat pump 
 Low temp radiators 
 PV array 
 300ltr Accumulator 
 Immersion backup 
 Time/temp/compensation 
 6,000 kWh/y 
 €13,000 
 70 man-hrs, 1 subcontractor 
 Low maintenance cost
Further Simplification of RES for nZEB 
2016 Rural (nZEB) 2016 Urban (nZEB) 
 Wood pellet boiler 
 Pellet storage & delivery 
 Radiators & Underfloor 
 200ltr HWC 
 Immersion backup 
 Time/temp/compensation 
 6,000 kWh/y 
 €10,000 
 120 man-hrs, 2 
subcontractors 
 Moderate maintenance cost 
 Electric radiators 
 PV array 
 Instantaneous water heaters 
 4,500 kWh/y 
 €7,000 
 40 man-hrs, 1 subcontractor 
 Very low maintenance cost
Building Regulations for Retrofit 
 0.1.3 Existing dwellings 
 0.1.3.1 
 This amendment applies to all works to 
existing dwellings that are covered by 
the requirements of the Building 
Regulations, including extensions, 
material alterations, material changes of 
use and window and door replacement. 
 In carrying out this work, the aim should 
be to limit energy requirements for the 
operation of the dwelling and associated 
CO2 emissions as far as practicable as 
required by Regulation L1. 
 Specifically, Regulation L2(d) provides 
that replacement oil and gas boilers 
should achieve a seasonal efficiency of 
90% where practicable. The key issues 
to be addressed are: -
Building Regulations - RETROFIT 
Main Requirement Applicability 
Fabric insulation: 
- sub-sections 2.1.2 and 2.1.3 
Backstop U-values, Glazing area %, 
LTB, Condensation Risk Analysis, 
Air tightness: 
- sub-section 2.1.4 
Specify, detail, inspect and record 
installation (no testing required) 
Boiler efficiency: 
- sub-section 2.2.2 
90% efficient from HARP database 
Building Services Controls: 
- sub-section 2.2.3 
Time and temperature control to 
extension, remainder retained as is 
Insulation of pipes, ducts and 
vessels: 
- sub-section 2.2.4 
Insulate any modifications to the 
primary pipework, or any running 
outside of the thermal envelope
Energy Performance of Buildings Directive 
 Article 9 
 (a) by 31 December 2020, all new buildings are nearly zero-energy 
buildings; and 
 (b) after 31 December 2018, new buildings occupied and owned by public 
authorities are nearly zero-energy buildings 
 Member States shall draw up national plans for increasing the number of 
nearly zero-energy buildings. develop policies and take measures such as 
the setting of targets in order to stimulate the transformation of buildings 
that are refurbished into nearly zero-energy buildings, and 
 Article 5 
 Cost optimal retrofitting based on LCA 
 Article 7 
 More than 25% of surface area retrofitted
Building Regulations – Part L, 2016? 
 0.1.3 Existing dwellings … 
 Where over 25% of surface 
area is effected by the 
works (e.g. window 
replacement) 
 Energy performance must 
be nZEB (possibly a BER of 
A2?) 
 Can be achieved in one or 
more steps as part of a 
strategic plan 
 But must be based on an 
economic appraisal (LCA) of 
what is “cost optimal”
Case Studies 
#PassiveLogic 
Simon McGuinness MRIAI, Dip.Arch., B.Arch.Sc., CEPHD 
al
Building Research Establishment 
BRE Scotland, Ravenscraig
BRE Innovation Park
4-in-a-Block Retrofit
Energy Result
BRE Retrofit Analysis 
DEAP 180 kWh/m2a “C2” SAP 202 kWh/m2a “B” 85
BRE Retrofit Analysis 
DEAP 35 kWh/m2a “A2” SAP 104 kWh/m2a “B” 83
Systems Strategy: All Electric 
DEAP 42 kWh/m2a BER - A2
Renewables Strategy: PV
Fabric Strategy - U-values 
1.72 W/m2K 0.22 W/m2K 0.11 W/m2K
Ventilation Strategy: Demand 
Controlled
Sustainability Assessment
Case Study – Passive House retrofit 
Passive House Systems 
 4.5kW A-W Heat Pump 
 3 low temp radiators 
 250ltr Accumulator HWC 
 MVHR with post-heater 
 1,800 kWh/y space heat demand 
 €15,000 
 100 man-hours, 1 contractor 
 Low maintenance
PHPP Retrofit – Certification Pending 
Passive House retrofit designed in 2012 with air/water heat pump, radiators and MVHR 
BER? 
… 
B1
PHPP Retrofit – Certification Pending 
Passive House retrofit designed in 2012 with air/water heat pump, radiators and MVHR
DIT School of Architecture, Bolton St 
Advanced professional courses for Assigned, Design and Ancillary 
Certifiers under S.I. 9 2014 (Engineers, Architects, Surveyors and 
Architectural Technologists) 
 Postgraduate Certificate in Digital Analysis & Energy Retrofit 
1 year part-time, Fridays, €2,350 
 MSc in Energy Retrofit 
2.5 years part-time, Fridays, €2,350 per year 
 Postgraduate Certificate in Linear Thermal Bridge modelling 
15 weeks part-time €1,200 (NSAI Registered)
Follow me on twitter: @PassiveLogical 
Simon McGuinness MRIAI, Dip.Arch., B.Arch.Sc., CEPHD

More Related Content

What's hot

Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteSustainableEnergyAut
 
Sustainability and Energy Efficiency by Ciaran O'Connor
Sustainability and Energy Efficiency by Ciaran O'ConnorSustainability and Energy Efficiency by Ciaran O'Connor
Sustainability and Energy Efficiency by Ciaran O'ConnorSustainableEnergyAut
 
Energy Consumption in Mid to High-rise Residential Buildings both Before and ...
Energy Consumption in Mid to High-rise Residential Buildings both Before and ...Energy Consumption in Mid to High-rise Residential Buildings both Before and ...
Energy Consumption in Mid to High-rise Residential Buildings both Before and ...RDH Building Science
 
NZEB Office Building by David Walshe
NZEB Office Building by  David WalsheNZEB Office Building by  David Walshe
NZEB Office Building by David WalsheSustainableEnergyAut
 
Examples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongExamples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongSustainableEnergyAut
 
Energy Simulation of High-Rise Residential Buildings: Lessons Learned
Energy Simulation of High-Rise Residential Buildings: Lessons LearnedEnergy Simulation of High-Rise Residential Buildings: Lessons Learned
Energy Simulation of High-Rise Residential Buildings: Lessons LearnedRDH Building Science
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 UpdateIllinois ASHRAE
 
Part l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsPart l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsSustainableEnergyAut
 
Part L: NZEB Dwellings and major renovations
Part L: NZEB Dwellings and major renovationsPart L: NZEB Dwellings and major renovations
Part L: NZEB Dwellings and major renovationsSustainableEnergyAut
 
Options for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of RenovationOptions for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of RenovationRDH Building Science
 
111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3DenysStephens
 
New Code Requirements for Fenestration Energy Performance
New Code Requirements for Fenestration Energy PerformanceNew Code Requirements for Fenestration Energy Performance
New Code Requirements for Fenestration Energy PerformanceRDH Building Science
 
NZEB - innovation through simplicity
NZEB - innovation through simplicityNZEB - innovation through simplicity
NZEB - innovation through simplicitySustainableEnergyAut
 
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011abdnakhi
 
Building the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero ReadyBuilding the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero ReadyRDH Building Science
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Lauren-Lee Camp
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Rod Yeoh
 
Near Zero Energy Commercial Buildings
Near Zero Energy Commercial BuildingsNear Zero Energy Commercial Buildings
Near Zero Energy Commercial BuildingsSustainableEnergyAut
 

What's hot (20)

Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
 
Nzeb case study esb
Nzeb case study   esbNzeb case study   esb
Nzeb case study esb
 
Sustainability and Energy Efficiency by Ciaran O'Connor
Sustainability and Energy Efficiency by Ciaran O'ConnorSustainability and Energy Efficiency by Ciaran O'Connor
Sustainability and Energy Efficiency by Ciaran O'Connor
 
Energy Consumption in Mid to High-rise Residential Buildings both Before and ...
Energy Consumption in Mid to High-rise Residential Buildings both Before and ...Energy Consumption in Mid to High-rise Residential Buildings both Before and ...
Energy Consumption in Mid to High-rise Residential Buildings both Before and ...
 
NZEB Office Building by David Walshe
NZEB Office Building by  David WalsheNZEB Office Building by  David Walshe
NZEB Office Building by David Walshe
 
Examples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John FurlongExamples of NZEB in the Public Sector by John Furlong
Examples of NZEB in the Public Sector by John Furlong
 
Energy Simulation of High-Rise Residential Buildings: Lessons Learned
Energy Simulation of High-Rise Residential Buildings: Lessons LearnedEnergy Simulation of High-Rise Residential Buildings: Lessons Learned
Energy Simulation of High-Rise Residential Buildings: Lessons Learned
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 Update
 
Part l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsPart l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovations
 
Part L: NZEB Dwellings and major renovations
Part L: NZEB Dwellings and major renovationsPart L: NZEB Dwellings and major renovations
Part L: NZEB Dwellings and major renovations
 
Options for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of RenovationOptions for Retrofit Regulations at Time of Renovation
Options for Retrofit Regulations at Time of Renovation
 
111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3
 
New Code Requirements for Fenestration Energy Performance
New Code Requirements for Fenestration Energy PerformanceNew Code Requirements for Fenestration Energy Performance
New Code Requirements for Fenestration Energy Performance
 
NZEB - innovation through simplicity
NZEB - innovation through simplicityNZEB - innovation through simplicity
NZEB - innovation through simplicity
 
ASHRAE Standard 100
ASHRAE Standard 100ASHRAE Standard 100
ASHRAE Standard 100
 
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
Ben nakhi's Presentation at Kuwait District Cooling Summit - 2011
 
Building the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero ReadyBuilding the Future: Net Zero and Net Zero Ready
Building the Future: Net Zero and Net Zero Ready
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
 
Near Zero Energy Commercial Buildings
Near Zero Energy Commercial BuildingsNear Zero Energy Commercial Buildings
Near Zero Energy Commercial Buildings
 

Viewers also liked

5 Lessons For Entrepreneurs
5 Lessons For Entrepreneurs5 Lessons For Entrepreneurs
5 Lessons For EntrepreneursIan Lurie
 
EPRI Q3 2014 Meeting - Batteries & Power Optimizers
EPRI Q3 2014 Meeting - Batteries & Power OptimizersEPRI Q3 2014 Meeting - Batteries & Power Optimizers
EPRI Q3 2014 Meeting - Batteries & Power OptimizersJacob McKee
 
Performance Presentation - NREL March 2010
Performance Presentation - NREL March 2010Performance Presentation - NREL March 2010
Performance Presentation - NREL March 2010Jacob McKee
 
11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final
11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final
11128 Denys Stephens Penwith Ha Gshps In Low Income Housing FinalDenysStephens
 
Underfloor Ventilation To Enhance Thermal Comfort
Underfloor Ventilation To Enhance Thermal ComfortUnderfloor Ventilation To Enhance Thermal Comfort
Underfloor Ventilation To Enhance Thermal ComfortGlanblakethomas
 
How to stop designing mouldy buildings
How to stop designing mouldy buildingsHow to stop designing mouldy buildings
How to stop designing mouldy buildingsSimon McGuinness
 
SBTF Article on Insurance - July 2014
SBTF Article on Insurance - July 2014SBTF Article on Insurance - July 2014
SBTF Article on Insurance - July 2014David Black
 
Main findings Working Group 3: Mitigation of Climate Change
Main findings Working Group 3: Mitigation of Climate ChangeMain findings Working Group 3: Mitigation of Climate Change
Main findings Working Group 3: Mitigation of Climate ChangeAndy Dabydeen
 
Under Floor Heating Presentation
Under Floor Heating PresentationUnder Floor Heating Presentation
Under Floor Heating PresentationAnil Kumar Tufchi
 
Climate Change Mitigation &amp; Adaptation
Climate Change  Mitigation &amp; AdaptationClimate Change  Mitigation &amp; Adaptation
Climate Change Mitigation &amp; AdaptationLaurence Mills
 
MultiAgent artificial immune system for network intrusion detection
MultiAgent artificial immune system for network intrusion detectionMultiAgent artificial immune system for network intrusion detection
MultiAgent artificial immune system for network intrusion detectionAboul Ella Hassanien
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project developmentGreenQ Partners
 
Business Intelligence | Competitive Intelligence | Business Intelligence Tools
Business Intelligence | Competitive Intelligence | Business Intelligence ToolsBusiness Intelligence | Competitive Intelligence | Business Intelligence Tools
Business Intelligence | Competitive Intelligence | Business Intelligence ToolsRoland Frasier
 
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Ajjay Kumar Gupta
 
Investment proposal for solar pv system training modules
Investment proposal for solar pv system training modulesInvestment proposal for solar pv system training modules
Investment proposal for solar pv system training modulesAli Ar-Ridha
 
Types of heat emitters used in underfloor heating systems
Types of heat emitters used in underfloor heating systemsTypes of heat emitters used in underfloor heating systems
Types of heat emitters used in underfloor heating systemscatherinelindsay
 

Viewers also liked (20)

5 Lessons For Entrepreneurs
5 Lessons For Entrepreneurs5 Lessons For Entrepreneurs
5 Lessons For Entrepreneurs
 
Respond! Clare Presentation 2015 A
Respond! Clare Presentation 2015 ARespond! Clare Presentation 2015 A
Respond! Clare Presentation 2015 A
 
EPRI Q3 2014 Meeting - Batteries & Power Optimizers
EPRI Q3 2014 Meeting - Batteries & Power OptimizersEPRI Q3 2014 Meeting - Batteries & Power Optimizers
EPRI Q3 2014 Meeting - Batteries & Power Optimizers
 
Performance Presentation - NREL March 2010
Performance Presentation - NREL March 2010Performance Presentation - NREL March 2010
Performance Presentation - NREL March 2010
 
11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final
11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final
11128 Denys Stephens Penwith Ha Gshps In Low Income Housing Final
 
Underfloor Ventilation To Enhance Thermal Comfort
Underfloor Ventilation To Enhance Thermal ComfortUnderfloor Ventilation To Enhance Thermal Comfort
Underfloor Ventilation To Enhance Thermal Comfort
 
Racpa
RacpaRacpa
Racpa
 
How to stop designing mouldy buildings
How to stop designing mouldy buildingsHow to stop designing mouldy buildings
How to stop designing mouldy buildings
 
SBTF Article on Insurance - July 2014
SBTF Article on Insurance - July 2014SBTF Article on Insurance - July 2014
SBTF Article on Insurance - July 2014
 
Hybrid hvac
Hybrid hvacHybrid hvac
Hybrid hvac
 
Under Floor Heating
Under Floor Heating Under Floor Heating
Under Floor Heating
 
Main findings Working Group 3: Mitigation of Climate Change
Main findings Working Group 3: Mitigation of Climate ChangeMain findings Working Group 3: Mitigation of Climate Change
Main findings Working Group 3: Mitigation of Climate Change
 
Under Floor Heating Presentation
Under Floor Heating PresentationUnder Floor Heating Presentation
Under Floor Heating Presentation
 
Climate Change Mitigation &amp; Adaptation
Climate Change  Mitigation &amp; AdaptationClimate Change  Mitigation &amp; Adaptation
Climate Change Mitigation &amp; Adaptation
 
MultiAgent artificial immune system for network intrusion detection
MultiAgent artificial immune system for network intrusion detectionMultiAgent artificial immune system for network intrusion detection
MultiAgent artificial immune system for network intrusion detection
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
 
Business Intelligence | Competitive Intelligence | Business Intelligence Tools
Business Intelligence | Competitive Intelligence | Business Intelligence ToolsBusiness Intelligence | Competitive Intelligence | Business Intelligence Tools
Business Intelligence | Competitive Intelligence | Business Intelligence Tools
 
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
 
Investment proposal for solar pv system training modules
Investment proposal for solar pv system training modulesInvestment proposal for solar pv system training modules
Investment proposal for solar pv system training modules
 
Types of heat emitters used in underfloor heating systems
Types of heat emitters used in underfloor heating systemsTypes of heat emitters used in underfloor heating systems
Types of heat emitters used in underfloor heating systems
 

Similar to Innovation in Building presentation 12 Sept 2014

Risk mitigation strategies for retrofits
Risk mitigation strategies for retrofitsRisk mitigation strategies for retrofits
Risk mitigation strategies for retrofitsSustainableEnergyAut
 
NBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsNBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsRDH Building Science
 
An Installers Guide to GSHP
An Installers Guide to GSHPAn Installers Guide to GSHP
An Installers Guide to GSHPkensaheatpums
 
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark
 
Superhomes 2.0 ierc conference 300317 final
Superhomes 2.0 ierc conference 300317 finalSuperhomes 2.0 ierc conference 300317 final
Superhomes 2.0 ierc conference 300317 finalSeamus Hoyne
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort StreetShamitha Reddy
 
Towards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell DaviesTowards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell Daviesicarb
 
REHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulationsREHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulationsSitra / Ekologinen kestävyys
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)The SEAM Centre
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsRDH Building Science
 
Reframed Tech Series: Solar panels & deep retrofits
Reframed Tech Series: Solar panels & deep retrofitsReframed Tech Series: Solar panels & deep retrofits
Reframed Tech Series: Solar panels & deep retrofitsPembina Institute
 
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANEUTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANEiQHub
 
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANEUTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANEiQHub
 
Part L and O 2021 – what these changes mean for designers
Part L and O 2021 – what these changes mean for designersPart L and O 2021 – what these changes mean for designers
Part L and O 2021 – what these changes mean for designersIES VE
 
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101IES VE
 
Broan nutone canada green initiatives 2006 2010
Broan nutone canada green initiatives 2006 2010Broan nutone canada green initiatives 2006 2010
Broan nutone canada green initiatives 2006 2010OssoElectric
 
Show and Tell - Heat.pdf
Show and Tell - Heat.pdfShow and Tell - Heat.pdf
Show and Tell - Heat.pdfSIFOfgem
 
Delivering a domestic nearly zero energy building
Delivering a domestic nearly zero energy  buildingDelivering a domestic nearly zero energy  building
Delivering a domestic nearly zero energy buildingSustainableEnergyAut
 
Paul Southall's CP2 Presentation
Paul Southall's CP2 PresentationPaul Southall's CP2 Presentation
Paul Southall's CP2 PresentationSimon Owen FIRP
 

Similar to Innovation in Building presentation 12 Sept 2014 (20)

Risk mitigation strategies for retrofits
Risk mitigation strategies for retrofitsRisk mitigation strategies for retrofits
Risk mitigation strategies for retrofits
 
NBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsNBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance Retrofits
 
An Installers Guide to GSHP
An Installers Guide to GSHPAn Installers Guide to GSHP
An Installers Guide to GSHP
 
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
 
Superhomes 2.0 ierc conference 300317 final
Superhomes 2.0 ierc conference 300317 finalSuperhomes 2.0 ierc conference 300317 final
Superhomes 2.0 ierc conference 300317 final
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort Street
 
Towards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell DaviesTowards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell Davies
 
REHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulationsREHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulations
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
 
Reframed Tech Series: Solar panels & deep retrofits
Reframed Tech Series: Solar panels & deep retrofitsReframed Tech Series: Solar panels & deep retrofits
Reframed Tech Series: Solar panels & deep retrofits
 
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANEUTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
 
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANEUTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
UTILISING CAPTURED CO₂ TO PRODUCE RENEWABLE METHANE
 
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
 
Part L and O 2021 – what these changes mean for designers
Part L and O 2021 – what these changes mean for designersPart L and O 2021 – what these changes mean for designers
Part L and O 2021 – what these changes mean for designers
 
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
Updates on Policy and Codes - BREEAM, Part L, MEES & BB101
 
Broan nutone canada green initiatives 2006 2010
Broan nutone canada green initiatives 2006 2010Broan nutone canada green initiatives 2006 2010
Broan nutone canada green initiatives 2006 2010
 
Show and Tell - Heat.pdf
Show and Tell - Heat.pdfShow and Tell - Heat.pdf
Show and Tell - Heat.pdf
 
Delivering a domestic nearly zero energy building
Delivering a domestic nearly zero energy  buildingDelivering a domestic nearly zero energy  building
Delivering a domestic nearly zero energy building
 
Paul Southall's CP2 Presentation
Paul Southall's CP2 PresentationPaul Southall's CP2 Presentation
Paul Southall's CP2 Presentation
 

Recently uploaded

RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 

Recently uploaded (20)

RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 

Innovation in Building presentation 12 Sept 2014

  • 1. #PassiveLogical Understanding Renewables in DEAP Simon McGuinness MRIAI, Dip.Arch., B.Arch.Sc., CEPHD
  • 2. DEAP: New Build, Retrofit & Renewables  Current Building Regulations  Residential - A3  Non-Residential - 2005  Retrofit  Future Building Regulations to meet EPBD/EED (nZEB)  Residential to nZEB  Non-Residential to nZEB  Retrofit to nZEB  Renewables requirement in DEAP  Case Study: BRE Scotland,  Case Study: Galway Passive House Retrofit
  • 3.
  • 4. DEAP – Dwelling Energy Assessment Procedure  Only acceptable proof of compliance with Part L for new build  EPC < 0.400 and  CPC < 0.460  Does not yet apply to retrofit, extensions or material changes  BER required if grants are sought from SEAI  BER required for property sale, lease of all properties
  • 5. DEAP – calculation of energy systems Primary energy and CO2 factors for space heating
  • 6. DEAP – calculation of energy systems
  • 7. DEAP – calculation of energy systems CHIMNEY/OPEN FIRE: - Fuel efficiency penalty - Ventilation losses penalty - CO2 penalty
  • 8. DEAP – PE factor for Electricity
  • 9. DEAP – Renewables as % of total energy
  • 10. DEAP – Projected PE factor
  • 11. DEAP – Effect of PE reduction to 1.4 Dwelling built in 2013 with air/water heat pump, PV panel and underfloor heating
  • 12. DEAP – Effect of PE reduction to 1.4 Dwelling built in 2013 with air/water heat pump, PV panel and underfloor heating 2014 BER assessment 2024 BER assessment 1.0 ach 6.7 ach
  • 13. DEAP – Effect of airtightness Dwelling designed in 2014 with air/water heat pump, PV panel, radiators and MVHR 6.7 ach 1.0 ach
  • 14. DEAP – Effect of airtightness + PE factor Dwelling designed in 2014 with air/water heat pump, PV panel, radiators and MVHR 6.7 ach 1.0 ach 1.0 ach + 1.4 PEf
  • 15. PHPP – Effect of airtightness Passive House retrofit designed in 2012 with air/water heat pump, radiators and MVHR Typical Irish New Build to Part L 2011 6.7 ach Good Irish Passive House Retrofit 0.37 ach
  • 16. Simplification of RES for New Build 2008 (BER of B3) 2014 (BER of A3)  Wood pellet boiler  Pellet storage & delivery  Radiators & Underfloor  Solar Thermal  200ltr HWC  Immersion backup  3 zones time control  20,000 kWh/y  €16,000  140 man-hrs, 3 subcontractors  High maintenance cost  Heat pump  Low temp radiators  PV array  300ltr Accumulator  Immersion backup  Time/temp/compensation  6,000 kWh/y  €13,000  70 man-hrs, 1 subcontractor  Low maintenance cost
  • 17. Further Simplification of RES for nZEB 2016 Rural (nZEB) 2016 Urban (nZEB)  Wood pellet boiler  Pellet storage & delivery  Radiators & Underfloor  200ltr HWC  Immersion backup  Time/temp/compensation  6,000 kWh/y  €10,000  120 man-hrs, 2 subcontractors  Moderate maintenance cost  Electric radiators  PV array  Instantaneous water heaters  4,500 kWh/y  €7,000  40 man-hrs, 1 subcontractor  Very low maintenance cost
  • 18. Building Regulations for Retrofit  0.1.3 Existing dwellings  0.1.3.1  This amendment applies to all works to existing dwellings that are covered by the requirements of the Building Regulations, including extensions, material alterations, material changes of use and window and door replacement.  In carrying out this work, the aim should be to limit energy requirements for the operation of the dwelling and associated CO2 emissions as far as practicable as required by Regulation L1.  Specifically, Regulation L2(d) provides that replacement oil and gas boilers should achieve a seasonal efficiency of 90% where practicable. The key issues to be addressed are: -
  • 19. Building Regulations - RETROFIT Main Requirement Applicability Fabric insulation: - sub-sections 2.1.2 and 2.1.3 Backstop U-values, Glazing area %, LTB, Condensation Risk Analysis, Air tightness: - sub-section 2.1.4 Specify, detail, inspect and record installation (no testing required) Boiler efficiency: - sub-section 2.2.2 90% efficient from HARP database Building Services Controls: - sub-section 2.2.3 Time and temperature control to extension, remainder retained as is Insulation of pipes, ducts and vessels: - sub-section 2.2.4 Insulate any modifications to the primary pipework, or any running outside of the thermal envelope
  • 20.
  • 21.
  • 22.
  • 23. Energy Performance of Buildings Directive  Article 9  (a) by 31 December 2020, all new buildings are nearly zero-energy buildings; and  (b) after 31 December 2018, new buildings occupied and owned by public authorities are nearly zero-energy buildings  Member States shall draw up national plans for increasing the number of nearly zero-energy buildings. develop policies and take measures such as the setting of targets in order to stimulate the transformation of buildings that are refurbished into nearly zero-energy buildings, and  Article 5  Cost optimal retrofitting based on LCA  Article 7  More than 25% of surface area retrofitted
  • 24. Building Regulations – Part L, 2016?  0.1.3 Existing dwellings …  Where over 25% of surface area is effected by the works (e.g. window replacement)  Energy performance must be nZEB (possibly a BER of A2?)  Can be achieved in one or more steps as part of a strategic plan  But must be based on an economic appraisal (LCA) of what is “cost optimal”
  • 25. Case Studies #PassiveLogic Simon McGuinness MRIAI, Dip.Arch., B.Arch.Sc., CEPHD al
  • 26. Building Research Establishment BRE Scotland, Ravenscraig
  • 30. BRE Retrofit Analysis DEAP 180 kWh/m2a “C2” SAP 202 kWh/m2a “B” 85
  • 31.
  • 32. BRE Retrofit Analysis DEAP 35 kWh/m2a “A2” SAP 104 kWh/m2a “B” 83
  • 33.
  • 34. Systems Strategy: All Electric DEAP 42 kWh/m2a BER - A2
  • 36. Fabric Strategy - U-values 1.72 W/m2K 0.22 W/m2K 0.11 W/m2K
  • 38.
  • 40. Case Study – Passive House retrofit Passive House Systems  4.5kW A-W Heat Pump  3 low temp radiators  250ltr Accumulator HWC  MVHR with post-heater  1,800 kWh/y space heat demand  €15,000  100 man-hours, 1 contractor  Low maintenance
  • 41. PHPP Retrofit – Certification Pending Passive House retrofit designed in 2012 with air/water heat pump, radiators and MVHR BER? … B1
  • 42.
  • 43. PHPP Retrofit – Certification Pending Passive House retrofit designed in 2012 with air/water heat pump, radiators and MVHR
  • 44. DIT School of Architecture, Bolton St Advanced professional courses for Assigned, Design and Ancillary Certifiers under S.I. 9 2014 (Engineers, Architects, Surveyors and Architectural Technologists)  Postgraduate Certificate in Digital Analysis & Energy Retrofit 1 year part-time, Fridays, €2,350  MSc in Energy Retrofit 2.5 years part-time, Fridays, €2,350 per year  Postgraduate Certificate in Linear Thermal Bridge modelling 15 weeks part-time €1,200 (NSAI Registered)
  • 45. Follow me on twitter: @PassiveLogical Simon McGuinness MRIAI, Dip.Arch., B.Arch.Sc., CEPHD

Editor's Notes

  1. From the most contaminated industrial site in Europe to BREEAM excellent – remediation of the built environment.
  2. From the most contaminated industrial site in Europe to BREEAM excellent – remediation of the built environment.
  3. From the most contaminated industrial site in Europe to BREEAM excellent.
  4. Springboard funded Recognised by NSAI