E L E M E N T A L
C O S T A N A LY S I S
NO. NAME STUDENT ID
1 CALVIN WONG PING KET 0322481
2 CHAN TIAN JI 0320831
3 VIVIAN TAY HUEY SHUEN 0323869
4 WONG JIA JING 0327221
5 YEAP PHAY SHIAN 0322243
6 SOO PING ZHENG 0331365
7 SOO YON LI 0322821
8 TAM ZHAO WEI 0322587
9 LOO SIAH MONG 0321995
10 MICHELLE TUNG MAN KAYE 0324175
11 LEE FONG YEN 0321976
12 LEE JIA KIAM 0320029
13 LEE LIN HUI 0322797
14 ELISSA CHANG YUH TING 0326909
15 FARAH AIDA 0322962
GROUP F MEMBERS
ECA FORM 1
ECA FORM 1
ECA FORM 1
PROJECT DETAIL
BRISTOL TECHNOLOGY
Client : Bristol Trading Sdn Bhd
Proposed Project : Proposed Corporate Headquarters For
Bristol Trading Sdn Bhd on lot 5178, 5179 and 8609
Location : Mukim Kajang, Daerah Hulu Langat, Selangor Darul
Ehsan.
PROJECT DETAIL
Contract Sum : Lump sum of RM4,898,990.00
Date of Possession of Site : 21st May 2003
Date of Completion : 21st January 2004
Completion Period : 8 months (inclusive of public holidays)
Quantities provided in the Bills of Quantity act only as a
guidance where contractor shall compute their own quantities.
CONTRACT DETAIL
Liquidated and Ascertain Damages for non-completion :
RM 2,000.00 per day
Defects Liability Period : 12 months from the date of
Certificate of Practical Completion
Completion Period of final measurement and valuation :
6 months from the date of Certificate of Practical Completion
CONTRACT DETAIL
LOCATION PLAN
SITE PLAN
Proposed Corporate Headquarters for Bristol Trading Sdn Bhd
on lot 5178, 5179, and 8609
BUILDING ANALYSIS
INTERNAL BUILDING
ECA FORM 1
ECA FORM 1
ECA FORM 1
GROSS FLOOR AREA
TO BE MEASURED
LOWER GROUND FLOOR PLAN OFFICE
GROUND FLOOR PLAN GALLERY & FOYER
MEZZANINE FLOOR PLAN GALLERY, MEETING & TRAINING ROOM
FIRST FLOOR PLAN OFFICE
ROOF PLAN CEO OFFICE
NET FLOOR AREA
Usable Area Circulation Area
Ancillary Area Internal Division
NET FLOOR AREA
Total area of all enclosed spaces fulfilling
the main functional requirements of the
building.
USABLE AREA
CIRCULATION AREA
Total area of all enclosed spaces forming
entrance halls, corridors, staircases, lift
wells, connecting links and the like.
NET FLOOR AREA
ANCILLARY AREA
INTERNAL DIVISION
Total area of all enclosed spaces forming
entrance halls, corridors, staircases, lift
wells, connecting links and the like.
Total area of all enclosed spaces for
lavatories, cloakrooms, kitchens, cleaner’s
room, lift, plant and tank rooms and the
like, supplementary to main function of
the building.
ECA FORM 1
LOWER GROUND FLOOR
LOWER GROUND FLOOR PLAN
Usable Area
Circulation Area
Ancillary Area
Internal Division
GFA :1585 m2
GROUND FLOOR
GROUND FLOOR PLAN
Usable Area
Circulation Area
Ancillary Area
Internal Division
GFA : 1357 m2
UPPER FLOORS
Mezzanine Floor | First Floor | Roof Floor
GFA : 1755m2
MEZZANINE FLOOR PLAN
Usable Area
Circulation Area
Ancillary Area
Internal Division
FIRST FLOOR PLAN
Usable Area
Circulation Area
Ancillary Area
Internal Division
ROOF PLAN
Usable Area
Circulation Area
Ancillary Area
Internal Division
UNENCLOSED AREA
UNENCLOSED AREA
Not Enclosed Area
26.96m2
ROOF AREA
UPPER ROOF PLAN
Upper Roof Area
1956m2
ECA FORM 1
ECA FORM 1
ECA FORM 1
ECA FORM 1
FUNCTIONAL UNIT COST
ECA FORM 2
ECA FORM 2
1. SUBSTRUCTURE
1.1 Work Below Lowest Floor Finish
Total Cost of Element : RM 140,636.10
Cost per m2 GFA : 30.19
Element Unit Quantity : 1585 m2
Element Unit Rate : 88.73
Element Ratio per m2 GFA : 0.340
Reinforced Concrete : 12,399 m3
Reinforcement (kg) : 27,537 kg
Formwork (m2) : 778 m2
1. SUBSTRUCTURE
1.1 Work Below Lowest Floor Finish
1. SUBSTRUCTURE
1.1 Work Below Lowest Floor Finish
2. SUPERSTRUCTURE
Total Cost of Element : RM 307,836.20
Cost per m2 GFA : 66.09
Element Unit Quantity : 4658 m2
Element Unit Rate : 65.54
Element Ratio per m2 GFA : 1.008
Reinforced Concrete : 345 m3
Reinforcement (kg) : 70,257 kg
Formwork (m2) : 4462 m2
2. SUPERSTRUCTURE
2.1 Frame
2. SUPERSTRUCTURE
2.1 Frame
Total Cost of Element : RM 233,346.70
Cost per m2 GFA : 50.10
Element Unit Quantity : 3278 m2
Element Unit Rate : 71.19
Element Ratio per m2 GFA : 0.704 m2
Reinforced Concrete : 421.00 m3
Reinforcement (kg) : 41,342.00 kg
Formwork (m2) : 2,812.00 m2
2. SUPERSTRUCTURE
2.2 Upper Floors
2. SUPERSTRUCTURE
2.2 Upper Floors
Total Cost of Element : RM 407,168.30
Cost per m2 GFA : 87.41
Element Unit Quantity : 1,671 m2
Element Unit Rate : 243.67
Element Ratio per m2 GFA : 0.359
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
2. SUPERSTRUCTURE
2.3 Roof
2. SUPERSTRUCTURE
2.3 Roof
2. SUPERSTRUCTURE
2.3 Roof
2. SUPERSTRUCTURE
2.3 Roof
Total Cost of Element : RM 98,529.00
Cost per m2 GFA : 21.15
Element Unit Quantity : -
Element Unit Rate : -
Element Ratio per m2 GFA : -
Reinforced Concrete : 64 m2
Reinforcement (kg) : 1791 kg
Formwork (m2) : 352 m2
2. SUPERSTRUCTURE
2.4 Stairs
2. SUPERSTRUCTURE
2.4 Stairs
Total Cost of Element : RM 135,746.00
Cost per m2 GFA : 29.14
Element Unit Quantity : 2,114 m2
Element Unit Rate : 64.21
Element Ratio per m2 GFA : 0.450
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
2. SUPERSTRUCTURE
2.5 External Walls
2. SUPERSTRUCTURE
2.5 External Walls
Total Cost of Element : RM 402,028.90
Cost per m2 GFA : 86.31
Element Unit Quantity : 763 m2
Element Unit Rate : 526.91
Element Ratio per m2 GFA : 0.164
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
2. SUPERSTRUCTURE
2.6 Windows & External Doors
2. SUPERSTRUCTURE
2.6 Windows & External Doors
Total Cost of Element : RM 63,218.90
Cost per m2 GFA : 13.57
Element Unit Quantity : 2142 m2
Element Unit Rate : 29.51
Element Ratio per m2 GFA : 0.460
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
2. SUPERSTRUCTURE
2.7 Internal Walls & Partitions
2. SUPERSTRUCTURE
2.7 Internal Walls & Partitions
Total Cost of Element : RM 24,346.90
Cost per m2 GFA : 53.01
Element Unit Quantity : 614 m2
Element Unit Rate : 39.65
Element Ratio per m2 GFA : 0.132
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
2. SUPERSTRUCTURE
2.8 Internal Doors
2. SUPERSTRUCTURE
2.8 Internal Doors
3. FINISHES
Total Cost of Element : RM33,140
Cost per m2 GFA : 7.11
Element Unit Quantity : 1657
Element Unit Rate : 20.00
Element Ratio per m2 GFA : 0.356
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
3. FINISHES
3.1 Wall Finishes
3. FINISHES
3.1 Wall Finishes
Total Cost of Element : RM103,748
Cost per m2 GFA : 22.27
Element Unit Quantity : 5608
Element Unit Rate : 18.50
Element Ratio per m2 GFA : 1.204
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
3. FINISHES
3.2 Internal Wall Finishes
3. FINISHES
3.2 Internal Wall Finishes
4. FITTINGS & FURNISHINGS
4. FITTINGS & FURNISHINGS
5. SERVICES
5. SERVICES
Total Cost of Element : RM35,395
Cost per m2 GFA : 7.60
Element Unit Quantity : 211 No.
Element Unit Rate : 167.75
Element Ratio per m2 GFA : 0.045
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
5.1 Sanitary Appliances
5. SERVICES
5.1 Sanitary Appliances
5. SERVICES
5.1 Sanitary Appliances
5. SERVICES
6. EXTERNAL WORKS
Total Cost of Element : RM 120,000.00
Cost per m2 GFA : RM25.76
Element Unit Quantity : -
Element Unit Rate : -
Element Ratio per m2 GFA : -
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
6. EXTERNAL WORKS
6.1 Site Work
6. EXTERNAL WORKS
6.1 Site Work
Total Cost of Element : RM 14,860.00
Cost per m2 GFA : RM3.19
Element Unit Quantity : -
Element Unit Rate : -
Element Ratio per m2 GFA : -
Reinforced Concrete : -
Reinforcement (kg) : -
Formwork (m2) : -
6. EXTERNAL WORKS
6.2 Drainage
6. EXTERNAL WORKS
6.2 Drainage
ECA FORM 2
ECA FORM 3
ECA FORM 3
ECA FORM 3
ECA FORM 3
ECA FORM 3
ECA FORM 3
ECA FORM 3
THANK YOU!

More Related Content

What's hot

ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)
Yee Len Wan
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
Kai Yun Pang
 
ECA form
ECA formECA form
ECA form
Arissa Loh
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - Presentation
Kai Yun Pang
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
Lee Pei Gie
 
element
elementelement
element
Lai Vlyn
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
Kai Yun Pang
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
Arissa Loh
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Sow Wei Henn
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
ashleyyeap
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
ashleyyeap
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
ahmong4
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lee Pei Gie
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
Farah Sham
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: Group
Farah Sham
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
ahmong4
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)helmie84
 
PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - Assignment
Quo Ming
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
Arissa Loh
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
ayushida
 

What's hot (20)

ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)ECA: Elemental Cost Analysis (Measurement Workshop)
ECA: Elemental Cost Analysis (Measurement Workshop)
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
ECA form
ECA formECA form
ECA form
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - Presentation
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
element
elementelement
element
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: Group
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)
 
PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - Assignment
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 

Similar to Eca presentation slides

Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.P
Vj NiroSh
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
Anjneya Srivastava
 
Mega kuningan office tower for investor
Mega kuningan office tower for investorMega kuningan office tower for investor
Mega kuningan office tower for investor
Aditya Tumbuan
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
Syafiq Zariful
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
Hamza Waheed
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Avin Kharel
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
galih wahyu
 
Cost comparisons - 3DBuildingprint Vs Traditional Building
Cost comparisons - 3DBuildingprint Vs Traditional Building Cost comparisons - 3DBuildingprint Vs Traditional Building
Cost comparisons - 3DBuildingprint Vs Traditional Building
Stafford Carrington ✔
 
3dbuildingprint vs traditional homes
3dbuildingprint vs traditional homes 3dbuildingprint vs traditional homes
3dbuildingprint vs traditional homes
Stafford Carrington ✔
 
Cost Comparisons 3dbuildingprint vs traditional house methods
Cost Comparisons 3dbuildingprint vs traditional house methods Cost Comparisons 3dbuildingprint vs traditional house methods
Cost Comparisons 3dbuildingprint vs traditional house methods
Stafford Carrington ✔
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
kiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Be assignment-presentation 0
Be assignment-presentation 0Be assignment-presentation 0
Be assignment-presentation 0
Jessyca Than
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
shensin1015
 
Be presentation rev
Be presentation revBe presentation rev
Be presentation rev
Yong Sy
 

Similar to Eca presentation slides (20)

Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.P
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
Mega kuningan office tower for investor
Mega kuningan office tower for investorMega kuningan office tower for investor
Mega kuningan office tower for investor
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
GP Report
GP ReportGP Report
GP Report
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
 
Cost comparisons - 3DBuildingprint Vs Traditional Building
Cost comparisons - 3DBuildingprint Vs Traditional Building Cost comparisons - 3DBuildingprint Vs Traditional Building
Cost comparisons - 3DBuildingprint Vs Traditional Building
 
3dbuildingprint vs traditional homes
3dbuildingprint vs traditional homes 3dbuildingprint vs traditional homes
3dbuildingprint vs traditional homes
 
Cost Comparisons 3dbuildingprint vs traditional house methods
Cost Comparisons 3dbuildingprint vs traditional house methods Cost Comparisons 3dbuildingprint vs traditional house methods
Cost Comparisons 3dbuildingprint vs traditional house methods
 
design c
design cdesign c
design c
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Be assignment-presentation 0
Be assignment-presentation 0Be assignment-presentation 0
Be assignment-presentation 0
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
Be presentation rev
Be presentation revBe presentation rev
Be presentation rev
 

More from ahmong4

Be slides
Be slidesBe slides
Be slides
ahmong4
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
ahmong4
 
BREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONSBREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONS
ahmong4
 
BENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATIONBENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATION
ahmong4
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
ahmong4
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
ahmong4
 
Fm assignment
Fm assignmentFm assignment
Fm assignment
ahmong4
 
Csi journal
Csi journalCsi journal
Csi journal
ahmong4
 
Measurement 4
Measurement 4Measurement 4
Measurement 4
ahmong4
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
ahmong4
 
Final es4 sorry boss pdf
Final es4 sorry boss pdf Final es4 sorry boss pdf
Final es4 sorry boss pdf
ahmong4
 
Pp1 report
Pp1 reportPp1 report
Pp1 report
ahmong4
 
Pp1 group presentation
Pp1 group presentation Pp1 group presentation
Pp1 group presentation
ahmong4
 
Eca forms final
Eca forms final Eca forms final
Eca forms final
ahmong4
 
Estimating presentation 1
Estimating presentation 1Estimating presentation 1
Estimating presentation 1
ahmong4
 
Software app slides
Software app slidesSoftware app slides
Software app slides
ahmong4
 
Software full
Software fullSoftware full
Software full
ahmong4
 
Mong construction techonology 3 report
Mong construction techonology 3 reportMong construction techonology 3 report
Mong construction techonology 3 report
ahmong4
 
Mong ms report
Mong ms reportMong ms report
Mong ms report
ahmong4
 
Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade system
ahmong4
 

More from ahmong4 (20)

Be slides
Be slidesBe slides
Be slides
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
 
BREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONSBREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONS
 
BENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATIONBENCHMARK PROJECT ALLOCATION
BENCHMARK PROJECT ALLOCATION
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Fm assignment
Fm assignmentFm assignment
Fm assignment
 
Csi journal
Csi journalCsi journal
Csi journal
 
Measurement 4
Measurement 4Measurement 4
Measurement 4
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Final es4 sorry boss pdf
Final es4 sorry boss pdf Final es4 sorry boss pdf
Final es4 sorry boss pdf
 
Pp1 report
Pp1 reportPp1 report
Pp1 report
 
Pp1 group presentation
Pp1 group presentation Pp1 group presentation
Pp1 group presentation
 
Eca forms final
Eca forms final Eca forms final
Eca forms final
 
Estimating presentation 1
Estimating presentation 1Estimating presentation 1
Estimating presentation 1
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software full
Software fullSoftware full
Software full
 
Mong construction techonology 3 report
Mong construction techonology 3 reportMong construction techonology 3 report
Mong construction techonology 3 report
 
Mong ms report
Mong ms reportMong ms report
Mong ms report
 
Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade system
 

Recently uploaded

Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 

Recently uploaded (20)

Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 

Eca presentation slides

  • 1. E L E M E N T A L C O S T A N A LY S I S
  • 2. NO. NAME STUDENT ID 1 CALVIN WONG PING KET 0322481 2 CHAN TIAN JI 0320831 3 VIVIAN TAY HUEY SHUEN 0323869 4 WONG JIA JING 0327221 5 YEAP PHAY SHIAN 0322243 6 SOO PING ZHENG 0331365 7 SOO YON LI 0322821 8 TAM ZHAO WEI 0322587 9 LOO SIAH MONG 0321995 10 MICHELLE TUNG MAN KAYE 0324175 11 LEE FONG YEN 0321976 12 LEE JIA KIAM 0320029 13 LEE LIN HUI 0322797 14 ELISSA CHANG YUH TING 0326909 15 FARAH AIDA 0322962 GROUP F MEMBERS
  • 7. BRISTOL TECHNOLOGY Client : Bristol Trading Sdn Bhd Proposed Project : Proposed Corporate Headquarters For Bristol Trading Sdn Bhd on lot 5178, 5179 and 8609 Location : Mukim Kajang, Daerah Hulu Langat, Selangor Darul Ehsan. PROJECT DETAIL
  • 8. Contract Sum : Lump sum of RM4,898,990.00 Date of Possession of Site : 21st May 2003 Date of Completion : 21st January 2004 Completion Period : 8 months (inclusive of public holidays) Quantities provided in the Bills of Quantity act only as a guidance where contractor shall compute their own quantities. CONTRACT DETAIL
  • 9. Liquidated and Ascertain Damages for non-completion : RM 2,000.00 per day Defects Liability Period : 12 months from the date of Certificate of Practical Completion Completion Period of final measurement and valuation : 6 months from the date of Certificate of Practical Completion CONTRACT DETAIL
  • 12. Proposed Corporate Headquarters for Bristol Trading Sdn Bhd on lot 5178, 5179, and 8609 BUILDING ANALYSIS
  • 17. GROSS FLOOR AREA TO BE MEASURED LOWER GROUND FLOOR PLAN OFFICE GROUND FLOOR PLAN GALLERY & FOYER MEZZANINE FLOOR PLAN GALLERY, MEETING & TRAINING ROOM FIRST FLOOR PLAN OFFICE ROOF PLAN CEO OFFICE
  • 18. NET FLOOR AREA Usable Area Circulation Area Ancillary Area Internal Division
  • 19. NET FLOOR AREA Total area of all enclosed spaces fulfilling the main functional requirements of the building. USABLE AREA CIRCULATION AREA Total area of all enclosed spaces forming entrance halls, corridors, staircases, lift wells, connecting links and the like.
  • 20. NET FLOOR AREA ANCILLARY AREA INTERNAL DIVISION Total area of all enclosed spaces forming entrance halls, corridors, staircases, lift wells, connecting links and the like. Total area of all enclosed spaces for lavatories, cloakrooms, kitchens, cleaner’s room, lift, plant and tank rooms and the like, supplementary to main function of the building.
  • 23. LOWER GROUND FLOOR PLAN Usable Area Circulation Area Ancillary Area Internal Division GFA :1585 m2
  • 25. GROUND FLOOR PLAN Usable Area Circulation Area Ancillary Area Internal Division GFA : 1357 m2
  • 26. UPPER FLOORS Mezzanine Floor | First Floor | Roof Floor GFA : 1755m2
  • 27. MEZZANINE FLOOR PLAN Usable Area Circulation Area Ancillary Area Internal Division
  • 28. FIRST FLOOR PLAN Usable Area Circulation Area Ancillary Area Internal Division
  • 29. ROOF PLAN Usable Area Circulation Area Ancillary Area Internal Division
  • 33. UPPER ROOF PLAN Upper Roof Area 1956m2
  • 41. 1. SUBSTRUCTURE 1.1 Work Below Lowest Floor Finish
  • 42. Total Cost of Element : RM 140,636.10 Cost per m2 GFA : 30.19 Element Unit Quantity : 1585 m2 Element Unit Rate : 88.73 Element Ratio per m2 GFA : 0.340 Reinforced Concrete : 12,399 m3 Reinforcement (kg) : 27,537 kg Formwork (m2) : 778 m2 1. SUBSTRUCTURE 1.1 Work Below Lowest Floor Finish
  • 43. 1. SUBSTRUCTURE 1.1 Work Below Lowest Floor Finish
  • 45. Total Cost of Element : RM 307,836.20 Cost per m2 GFA : 66.09 Element Unit Quantity : 4658 m2 Element Unit Rate : 65.54 Element Ratio per m2 GFA : 1.008 Reinforced Concrete : 345 m3 Reinforcement (kg) : 70,257 kg Formwork (m2) : 4462 m2 2. SUPERSTRUCTURE 2.1 Frame
  • 47. Total Cost of Element : RM 233,346.70 Cost per m2 GFA : 50.10 Element Unit Quantity : 3278 m2 Element Unit Rate : 71.19 Element Ratio per m2 GFA : 0.704 m2 Reinforced Concrete : 421.00 m3 Reinforcement (kg) : 41,342.00 kg Formwork (m2) : 2,812.00 m2 2. SUPERSTRUCTURE 2.2 Upper Floors
  • 49. Total Cost of Element : RM 407,168.30 Cost per m2 GFA : 87.41 Element Unit Quantity : 1,671 m2 Element Unit Rate : 243.67 Element Ratio per m2 GFA : 0.359 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 2. SUPERSTRUCTURE 2.3 Roof
  • 53. Total Cost of Element : RM 98,529.00 Cost per m2 GFA : 21.15 Element Unit Quantity : - Element Unit Rate : - Element Ratio per m2 GFA : - Reinforced Concrete : 64 m2 Reinforcement (kg) : 1791 kg Formwork (m2) : 352 m2 2. SUPERSTRUCTURE 2.4 Stairs
  • 55. Total Cost of Element : RM 135,746.00 Cost per m2 GFA : 29.14 Element Unit Quantity : 2,114 m2 Element Unit Rate : 64.21 Element Ratio per m2 GFA : 0.450 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 2. SUPERSTRUCTURE 2.5 External Walls
  • 57. Total Cost of Element : RM 402,028.90 Cost per m2 GFA : 86.31 Element Unit Quantity : 763 m2 Element Unit Rate : 526.91 Element Ratio per m2 GFA : 0.164 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 2. SUPERSTRUCTURE 2.6 Windows & External Doors
  • 58. 2. SUPERSTRUCTURE 2.6 Windows & External Doors
  • 59. Total Cost of Element : RM 63,218.90 Cost per m2 GFA : 13.57 Element Unit Quantity : 2142 m2 Element Unit Rate : 29.51 Element Ratio per m2 GFA : 0.460 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 2. SUPERSTRUCTURE 2.7 Internal Walls & Partitions
  • 60. 2. SUPERSTRUCTURE 2.7 Internal Walls & Partitions
  • 61. Total Cost of Element : RM 24,346.90 Cost per m2 GFA : 53.01 Element Unit Quantity : 614 m2 Element Unit Rate : 39.65 Element Ratio per m2 GFA : 0.132 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 2. SUPERSTRUCTURE 2.8 Internal Doors
  • 64. Total Cost of Element : RM33,140 Cost per m2 GFA : 7.11 Element Unit Quantity : 1657 Element Unit Rate : 20.00 Element Ratio per m2 GFA : 0.356 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 3. FINISHES 3.1 Wall Finishes
  • 66. Total Cost of Element : RM103,748 Cost per m2 GFA : 22.27 Element Unit Quantity : 5608 Element Unit Rate : 18.50 Element Ratio per m2 GFA : 1.204 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 3. FINISHES 3.2 Internal Wall Finishes
  • 67. 3. FINISHES 3.2 Internal Wall Finishes
  • 68. 4. FITTINGS & FURNISHINGS
  • 69. 4. FITTINGS & FURNISHINGS
  • 72. Total Cost of Element : RM35,395 Cost per m2 GFA : 7.60 Element Unit Quantity : 211 No. Element Unit Rate : 167.75 Element Ratio per m2 GFA : 0.045 Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 5.1 Sanitary Appliances 5. SERVICES
  • 76. Total Cost of Element : RM 120,000.00 Cost per m2 GFA : RM25.76 Element Unit Quantity : - Element Unit Rate : - Element Ratio per m2 GFA : - Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 6. EXTERNAL WORKS 6.1 Site Work
  • 78. Total Cost of Element : RM 14,860.00 Cost per m2 GFA : RM3.19 Element Unit Quantity : - Element Unit Rate : - Element Ratio per m2 GFA : - Reinforced Concrete : - Reinforcement (kg) : - Formwork (m2) : - 6. EXTERNAL WORKS 6.2 Drainage