ELEMENTAL COST
ANALYSIS
M E A S U R E M E N T 4
G R O U P M E M B E R S D
Chau Xet Nee 0320222
Wong De Vin 0319814
Gan Kai Loon 0324549
Kiraly Anthony 0320322
Husni Naim 0326126
Lee Kailyn 0320273
Ng Siew Qing 0325750
Nabila Hanim 0321368
Nadhirah 0321366
Tee Sheng Zi 0325741
Yam Hui Shan 0316058
Audrey Ting Ming Fang 0320247
MENARA SENTRAL VISTA
PROJECT TITLE
Cadangan Pembangunan 1 blok Pejabat 20 Tingkat Termasuk
4 Tingkat Car Park Podium
LOCATION
Jalan Tun Sambanthan 4, KL
CLIENT
Yayasan Wilayah Persekutuan
CONTRACT DETAILS
AWARDED CONTRACT SUM : RM 70,562,665.00
DATE OF COMMENCEMENT : 6TH JUNE 2011
DATE OF COMPLETION : 5TH JUNE 2013
F O R M 1
GROSS FLOOR AREA TO BE MEASURED
Ground Floor - Commercial Floor
1st-4th Floor - Carpark
5th Floor - Commercial, Food Court, Management Office
6th-18th Floor - Office Tower
19th Floor - Lift Motor Room, Roof Top
G R O U N D F L O O R A R E A
Usable Area
Circulation Area
Ancillary Area
Usable Area : 900.52 m2
Circulation Area : 300.72 m2
Ancillary Area : 146.37 m2
Internal Division : 52.05
Total GFA : 1399.66 m2
1 S T F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 94.74 m2
Circulation Area : 1515.74 m2
Ancillary Area : 218.51 m2
Internal Division : 113.90 m2
Total GFA : 1942.89 m2
2 N D F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 0 m2
Circulation Area : 1872.81 m2
Ancillary Area : 22.05 m2
Internal Division : 48.03
Total GFA : 1942.89 m2
3 R D F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 14.56 m2
Circulation Area : 1785.49 m2
Ancillary Area : 53.01 m2
Internal Division : 89.88 m2
Total GFA : 1942.89 m2
3 A F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 0 m2
Circulation Area : 1852.18 m2
Ancillary Area : 46.89 m2
Internal Division : 43.82 m2
Total GFA : 1942.89 m2
5 T H F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 427.72 m2
Circulation Area : 238.75 m2
Ancillary Area : 625.05 m2
Internal Division : 59.72 m2
Total GFA : 1351.24 m2
6 - 9 T H , 11 - 12 T H F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 1125.46 m2
Circulation Area : 161.77 m2
Ancillary Area : 22.05 m2
Internal Division : 47.03 m2
Total GFA : 1356.31 m2
1 0 T H F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 1125.46 m2
Circulation Area : 161.77 m2
Ancillary Area : 22.05 m2
Internal Division : 47.03 m2
Total GFA : 1356.31 m2
1 6 T H F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 1117.90 m2
Circulation Area : 161.77 m2
Ancillary Area : 22.05 m2
Internal Division : 30.27 m2
Total GFA : 1331.99 m2
1 8 T H F L O O R
Usable Area
Circulation Area
Ancillary Area
Usable Area : 1158.30 m2
Circulation Area : 133.04 m2
Ancillary Area : 4.45 m2
Internal Division : 60.52 m2
Total GFA : 1356.31 m2
19 TH FLOOR
Circulation Area
Ancillary Area
Circulation Area : 73.28 m2
Ancillary Area : 550.82 m2
Internal Division : 35.62m2
Total GFA : 659.72 m2
SUMMARY OF GROSS FLOOR AREA (GFA)
GF 1399.66
1F-5F 1942.89
6F-9F,11F-12F,18F 1356.31
10F,13F-17F 1331.99
19F 659.72
TOTAL GROSS FLOOR AREA: 28692.61
Usable Area Circulation
Area
Ancillary
Area
Internal
Division
Total in % 55.99 33.85 6.70 3.43
FLOOR SPACE NOT ENCLOSED - 1290.36m2
ROOF AREA ( STRUCTURAL AND PLANT ROOM) - 1576.49M2
External Wall Area
Total External Area
F O R M 2
Substructure
Work below lowest floor finish
Total cost of element (RM)=519,073.68
Cost per m2 GFA (RM)=18.09
Element Unit Quantity=1,399.62
Element Unit Rate (RM)=370.87
Element Unit per ratio GFA =0.049
Reinforced concrete (m3)= 380
Reinforcement (KG) =54,428
Formwork (m2)=2,535
Superstructure
Frame
Total cost of element (RM)=11,806,404.01
Cost per m2 GFA (RM)=411.47
Element Unit Quantity=28,693
Element Unit Rate (RM)=411.47
Element Unit per ratio GFA =1.00
Reinforced concrete (m3)= 5,502
Reinforcement (KG) =323,045
Formwork (m2)=39,847
Frame
Structural Wall
Cont’d...
Upper floor
Total cost of element (RM)=4,429,733.54
Cost per m2 GFA (RM)=154.38
Element Unit Quantity=27,293.00
Element Unit Rate (RM)=162.30
Element Unit per ratio GFA =0.951
Reinforced concrete (m3)=4,430
Reinforcement (KG) =279,083
Formwork (m2)=22,341
Upper Floor
Cost of element = Total cost of upper floor slab - roof slab
Cont’d...
Cont’d...
Cont’d...
Roof
Total cost of element (RM)=2,514,644.39
Cost per m2 GFA (RM)=87.64
Element Unit Quantity=1,576.49
Element Unit Rate (RM)=1,595.09
Element Unit per ratio GFA =0.055
Reinforced concrete (m3)=129
Reinforcement (KG) =9,414
Formwork (m2)=826
Structural Steelwork
Roof
Cost of Element = Total of structural steelwork + total roof finishes + roof slab + handrailing to terrace
Roof Finishes
Roof Slab
Cont’d...
Cont’d...
Handrailing
Staircase
Total cost of element (RM)=659,951.69
Cost per m2 GFA (RM)=23.00
Reinforced concrete (m3)=593
Reinforcement (KG) =28,709
Formwork (m2)=1,700
Staircase Structure
Cost of element = Total of staircase structure + Total of staircase finishes + Total of handrailing
Staircase Finishes
Handrailing of staircase
External wall
Total cost of element (RM)=10,871,459.38
Cost per m2 GFA (RM)=378.89
Element Unit Quantity=4,646.20
Element Unit Rate (RM)=2,339.86
Element Unit per ratio GFA =0.162
Reinforced concrete (m3)= N/A
Reinforcement (KG) = N/A
Formwork (m2)= N/A
External Wall
Cost of element = Total of external wall + Aluminium work and glazing work
Aluminium Work & Glazing Work
Cont’d...
Cont’d...
Internal wall
Total cost of element (RM)=2,957,834.00
Cost per m2 GFA (RM)=103.09
Element Unit Quantity=29,823.57
Element Unit Rate (RM)=99.18
Element Unit per ratio GFA =1.039
Reinforced concrete (m3)= 202
Reinforcement (KG) = 54,248
Formwork (m2)= 1,173
Internal Wall & Partition
Cost of element = Total of internal wall and partition
Cont’d...
Window and External doors
Total cost of element (RM)=855,535.64
Cost per m2 GFA (RM)=29.82
Element Unit Quantity=1,529.66
Element Unit Rate (RM)=559.30
Element Unit per ratio GFA =0.053
Reinforced concrete (m3)= N/A
Reinforcement (KG) = N/A
Formwork (m2)= N/A
Internal doors
Total cost of element (RM)=945,597.23
Cost per m2 GFA (RM)=32.96
Element Unit Quantity=2,453.72
Element Unit Rate (RM)=385.37
Element Unit per ratio GFA =0.086
Reinforced concrete (m3)= N/A
Reinforcement (KG) = N/A
Formwork (m2)= N/A
Finishes
Internal wall finishes
Total cost of element (RM)=2,384,602.00
Cost per m2 GFA (RM)=83.11
Element Unit Quantity=115,918.00
Element Unit Rate (RM)=20.57
Element Unit per ratio GFA =4.04
Reinforced concrete (m3)= N/A
Reinforcement (KG) = N/A
Formwork (m2)= N/A
Internal Wall Finishes
Cost of element = Total of internal wall finishes
Cont’d...
Internal floor finishes
Total cost of element (RM)=1,426,958.44
Cost per m2 GFA (RM)=49.73
Element Unit Quantity=28,087.00
Element Unit Rate (RM)=50.80
Element Unit per ratio GFA =0.979
Internal Floor Finishes
Cont’d...
Cont’d...
Cont’d...
Cont’d...
Cont’d...
Internal ceiling finishes
Total cost of element (RM)=1,031,829.12
Cost per m2 GFA (RM)=35.96
Element Unit Quantity=27,384.00
Element Unit Rate (RM)=37.68
Element Unit per ratio GFA =0.954
Internal Ceiling Finishes
Cont’d...
External finishes
Total cost of element (RM)=651,548.96
Cost per m2 GFA (RM)=22.71
External Finishes
Cost of element = Total of external wall finishes + Total of external floor finishes + Total of external ceiling finishes
External wall finishes
External Floor Finishes
Cont’d...
External Ceiling Finishes
Fittings/furnishes
Total cost of element (RM)= 771,214.27
Cost per m2 GFA (RM)=26.88
Fittings/Furnishes
Stainless steel frame mirror
Fitting/Furnishes
Ironmongeries
Fittings/Furnishes
Sundries
Cont’d...
Signage (Provisional sum)
Services
Services
Sanitary Appliances
Cost of element = Total cost of Sanitary - Cost of stainless steel frame mirror
RM596,112.00 - RM178,040.00 = RM418,272.00
Special installation
Total = RM200,000.00
Services
Builder’s work in connection of services
Cont’d...
Cont’d...
Cont’d...
Total = RM291,287.51
External works & services
External Works & Services
Site Work- Road and carparks
Cont’d...
Total = RM409,719.20
Landscaping work (Provisional sum)
RM419,719.20 + RM770,000 = RM1,179,719.20
Drainage
Total cost = total cost of surface water drains + total cost of sewerage reticulation
Surface water drains Sewerage reticulation
RM236,843.20 + RM144,000.00 = RM380,843.20
External Services
Water Reticulation
Cont’d...
Cont’d... Total = RM228,016.00
ELV (Provisional sum)
RM228,016.00 + RM1,750,000.00 = RM1,978,016.00
Ancillary Buildings
Total = RM32,000.00
F O R M 3
ELEMENT COST ANALYSIS FORM 3:
SUBSTRUCTURE
ELEMENT COST ANALYSIS FORM 3:
SUPERSTRUCTURE
ELEMENT COST ANALYSIS FORM 3:
FINISHES
ELEMENT COST ANALYSIS FORM 3:
FITTINGS & FURNISHING AND SERVICES
ELEMENT COST ANALYSIS FORM 3:
EXTERNAL WORKS