Building Economics Cost Appraisal
PREPARED BY
Tan Kiah Chun
Welson Lum Wei Jiunn
Yong Sing Yew
Tan Jia Yi
Yap Jia En
Yeo Dor Een
Wendy Teo
Sylvester Tang Kiok Heng
Proposed commercial building at
Cecil Street/ Teluk Ayer Street
LECTURER
Ms Dianne Kok
Proposed commercial building at Teluk Ayer Street
Area GFA (m2) CFA (m2)
Office 61,653 67,819
Other Commercial Uses - Retail 15,413 16,955
Basement Car Parks (Office) 2,817
Basement Car Parks (Retail) 704
Additional 70 Car Parking Lots for Public
Use
875
Plot A2 F&B Kiosk 100
Total 77,067 89,296
1. Office Building (23 Storey)
1
1. Office Building (23 Storey)
2. Retail Shop (5 Storey)
2
1. Office Building (23 Storey)
2. Retail Shop (5 Storey)
3. Basement Car Park
3
1. Office Building (23 Storey)
2. Retail Shop (5 Storey)
3. Basement Car Park
4. Open Space
4
1. Office Building (23 Storey)
2. Retail Shop (5 Storey)
3. Basement Car Park
4. Open Space
5
5. Underground Pedestrian Walkway
1. Office Building (23 Storey)
2. Retail Shop (5 Storey)
3. Basement Car Park
4. Open Space
6
5. Underground Pedestrian Walkway
6. Garden Roof Top
a) Suitable to install at most of
the types of soil conditions.
b) Less vibration is created by
using bored pile. (Reduce risk of
crack and damage)
c) Minimise noise during
installation which will avoid
sound pollution to the
surrounding areas.
a) Eliminate usage of concrete of
floor slab & reduce the
deadweight of a building.
b) Recycled plastic bubbles as
void former eliminate at least
30% of the building’s dead
weight.
c) No plywood formwork needed
as the Bubble Deck act as the
permanent formwork
a) High-quality products and
minimum waste
b) Faster completion and cheaper
total construction cost
c) Stronger and safer work
platform
d) Safer, cleaner and more
organized site
CONSTRUCTION METHODOLOGY
1. Bored Piling 2. Bubbledeck System 3. IBS
TOTAL CONSTRUCTION COST
Plot A1- Office (RM 4173/m2)
Plot A1-Retail (RM 2954/m2)
Plot A2- Open Spaces (RM869/m2)
Amenities
Playground Solar Street Light Bench Set BIN
Cost Associated to Land Parcel (Allowance)
Others (Allowance)
GREEN FEATURES (Green Building Index -Platinum Level)
GBI’s 6 Key Criteria:
ENERGY EFFICIENCY (EE) INDOOR ENVIRONMENTAL QUALITY (EQ)
SUSTAINABLE SITE PLANNING AND
MANAGEMENT (SM)
• Floor to ceilingSolar panel
• Solar Panel
• A high performance double-glazed
facade
• Rooftop garden and green spaces
• Pedestrian walkway between
building and public transportation
MATERIALS AND RESOURCES (MR) WATER EFFICIENCY (WE) INNOVATION (IN)
• Environmentally friendly and
sustainable materials and
resources
• Reusing old materials and
recycling
• Rainwater harvesting
• Water saving fittings
• Promotes sustainable living
• Tailoring the building depends
on local needs
GREEN FEATURES (Green Building Index -Platinum Level)

Be presentation rev

  • 1.
    Building Economics CostAppraisal PREPARED BY Tan Kiah Chun Welson Lum Wei Jiunn Yong Sing Yew Tan Jia Yi Yap Jia En Yeo Dor Een Wendy Teo Sylvester Tang Kiok Heng Proposed commercial building at Cecil Street/ Teluk Ayer Street LECTURER Ms Dianne Kok
  • 2.
    Proposed commercial buildingat Teluk Ayer Street Area GFA (m2) CFA (m2) Office 61,653 67,819 Other Commercial Uses - Retail 15,413 16,955 Basement Car Parks (Office) 2,817 Basement Car Parks (Retail) 704 Additional 70 Car Parking Lots for Public Use 875 Plot A2 F&B Kiosk 100 Total 77,067 89,296
  • 3.
    1. Office Building(23 Storey) 1
  • 4.
    1. Office Building(23 Storey) 2. Retail Shop (5 Storey) 2
  • 5.
    1. Office Building(23 Storey) 2. Retail Shop (5 Storey) 3. Basement Car Park 3
  • 6.
    1. Office Building(23 Storey) 2. Retail Shop (5 Storey) 3. Basement Car Park 4. Open Space 4
  • 7.
    1. Office Building(23 Storey) 2. Retail Shop (5 Storey) 3. Basement Car Park 4. Open Space 5 5. Underground Pedestrian Walkway
  • 8.
    1. Office Building(23 Storey) 2. Retail Shop (5 Storey) 3. Basement Car Park 4. Open Space 6 5. Underground Pedestrian Walkway 6. Garden Roof Top
  • 9.
    a) Suitable toinstall at most of the types of soil conditions. b) Less vibration is created by using bored pile. (Reduce risk of crack and damage) c) Minimise noise during installation which will avoid sound pollution to the surrounding areas. a) Eliminate usage of concrete of floor slab & reduce the deadweight of a building. b) Recycled plastic bubbles as void former eliminate at least 30% of the building’s dead weight. c) No plywood formwork needed as the Bubble Deck act as the permanent formwork a) High-quality products and minimum waste b) Faster completion and cheaper total construction cost c) Stronger and safer work platform d) Safer, cleaner and more organized site CONSTRUCTION METHODOLOGY 1. Bored Piling 2. Bubbledeck System 3. IBS
  • 10.
  • 11.
    Plot A1- Office(RM 4173/m2) Plot A1-Retail (RM 2954/m2)
  • 12.
    Plot A2- OpenSpaces (RM869/m2) Amenities Playground Solar Street Light Bench Set BIN
  • 13.
    Cost Associated toLand Parcel (Allowance)
  • 14.
  • 15.
    GREEN FEATURES (GreenBuilding Index -Platinum Level) GBI’s 6 Key Criteria: ENERGY EFFICIENCY (EE) INDOOR ENVIRONMENTAL QUALITY (EQ) SUSTAINABLE SITE PLANNING AND MANAGEMENT (SM) • Floor to ceilingSolar panel • Solar Panel • A high performance double-glazed facade • Rooftop garden and green spaces • Pedestrian walkway between building and public transportation
  • 16.
    MATERIALS AND RESOURCES(MR) WATER EFFICIENCY (WE) INNOVATION (IN) • Environmentally friendly and sustainable materials and resources • Reusing old materials and recycling • Rainwater harvesting • Water saving fittings • Promotes sustainable living • Tailoring the building depends on local needs GREEN FEATURES (Green Building Index -Platinum Level)