Measurement 4
ELEMENTAL COST
ANALYSIS
SCHOOL OF ARCHITECTURE BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING
MEMBERS OF GROUP B
MAYBELLE WANG SZE KHER 0327553
WENDY TEO SIEW YEN 0328242
ERVINNA ANAK ENDELA @ ENDELLA 0327508
AISHATH HUSSAIN 0320429
CHUANG JING 0322934
JACKSON TING SHII HANG 0324326
KONG ZHEN CHUNG 0319528
LAU CHIN SHENG 0317899
LEONG KARR KHEI 0324362
YONG SING YEW 0318766
ELLIOT PANG TIU SENG 0319438
GOH MING HANN WILLIAM 0317949
HAZIM BIN ABDUL AZIZ 0315773
Job Title : Proposed 1 Block of 3 Storey Nursing
Home.
BUILDING TO BE ANALYSED
NURSING HOME
Client : Synod Diocese Malaysia Barat
Project : Cadangan Pembangunan 1 Blok 3
Tingkat Rumah Kebajikan (“Nursing”)
Location : Lot No. PT. 3720, Jalan Besar, Kg.
Baru Sungai Buloh, Seksyen U19,
40160 Shah Alam, Selangor Darul
Ehsan.
PROJECT INFO
• Contract Sum : RM 2,997,700
• Date of Commencement : 14th June 2004
• Date of Completion : 13th December 2005
• Deflect Liability : 18 Months
• LAD
TNB Substation (14th August 2005) RM 1,000 per day
Building Works (13th December 2005) RM 1,000 per day
• Work Programme : 7 days upon the receive of this
letter.
• Period of Interim Certificate : once in a month. Thirty
(30) days from the date of the architects certificate.
• Period of Delay : 3 Months
CONTRACT DETAILS
Measurement 4
ELEMENTAL COST
ANALYSIS:
FORM 1
A. Reinforced
concrete framed
construction 3-Storey building
Gross Floor Area of the
building
Motor Room
Second Floor
First Floor
Ground Floor
GROSS FLOOR AREA TO BE MEASURED
Ground Floor Upper Floor
1003m2 1307m2
Total Gross Floor Area = 2310m2
SUMMARY OF GROSS FLOOR AREA
USABLE AREA CIRCULATION
AREA
ANCILLARY
AREA
INTERNAL
DIVISION
NET FLOOR AREA
GROUND FLOOR
Ancillary area
= 323.63m2 Circulation area
= 248.48m2
Usable area
= 392.15m2
Internal divisions
= 38.87m2
FIRST FLOOR
Usable area
= 426.93m2
Circulation
area =
161.48m2
Ancillary
area =
58.98m2
Internal
division =
27.68m2
Ancillary area
= 29.11m2
Circulation area
= 218.50m2
Usable area
= 298.70m2
Internal divisions
= 26.00m2
SECOND FLOOR
++
Ancillary area
= 48.03m2
Circulation area
= 11.29m2
FLOOR SPACES NOT ENCLOSED
Not enclosed space
= 182.79m²
ROOF PLAN
Roof area
= 997.00m²
4.15 m
Total Circulation : 639.75m2
Total Ancillary : 459.75m2
Total Usable : 1117.78m2
Total Internal Division : 92.55m2
SUMMARY OF NET FLOOR AREA FROM
GROUND FLOOR TO UPPER FLOOR
Contingencies/
(Contract sum
–
Contingencies)
x 100%
Preliminaries/
(Contract sum -
Contingencies -
Preliminaries) x
100%
Functional Unit
cost = (Contract
sum – external
works)/
Functional Unit
Measurement 4
ELEMENTAL COST
ANALYSIS:
FORM 2
Particular
elemental
total cost
extracted
from BQ
Total cost
of element
/ GFA
Refer to
manual
section 16.
Eg :-For Piling, only total length of pile is taken.
Total cost of
element /
Element
unit
quantity
Element
unit
quantity /
GFA
Convert unit from BQ to required unit
GROSS FLOOR AREA : m2 TENDER DATE :
Convert unit from BQ to required unit.
E.g.
Concrete given in m2 (Quantity x height of slab)
Reinforcement given in m2 (Quantity x weightage)
Formwork given in m (Quantity x thickness)
GROSS FLOOR AREA : m2 TENDER DATE :
Identify the internal door from plan.
Get the total surface area of the
door. (Area measured over frames)
4. Fittings and Furnishings P.C. Sums
39100.00 16.00 - - - Allowed
5. Services
5.A. Sanitary Appliances 79899.98 32.69 495 No. 161.41 - -
5.B. Plumbing Installation 170000.00 69.56 - - - 170000.00
5.C. Refuse Disposal - - - - - -
5.D. Air conditioning and 15000.00 6.14 - Tm3 15000.00
Ventilation System
5.E. Electrical Installation 365000.00 149.35 - - - 365000.00
5.F. Fire Protection Installation 124000.00 50.74 - - - 124000.00
5.G. Lift and Conveyor Installation 120000.00 49.10 - - - 120000.00
5.H. Communication Installation - - - - - -
5.J Special Installation - - - - - -
5.K. Builder's Profit and Attendance - - - - - -
on Services
5.L. Builder's Work in Connection - - - - - -
with Services
Group Element Total : 873899.98 357.57 794000.00
Sub - total excluding External Works, 2340000.00 957.45
Priliminaries and Contingencies
Ironmongeries: RM 33,100
Signages: RM 6,000
4. Fittings and Furnishings P.C. Sums
39100.00 16.00 - - - Allowed
5. Services
5.A. Sanitary Appliances 79899.98 32.69 495 No. 161.41 - -
5.B. Plumbing Installation 170000.00 69.56 - - - 170000.00
5.C. Refuse Disposal - - - - - -
5.D. Air conditioning and 15000.00 6.14 - Tm3 15000.00
Ventilation System
5.E. Electrical Installation 365000.00 149.35 - - - 365000.00
5.F. Fire Protection Installation 124000.00 50.74 - - - 124000.00
5.G. Lift and Conveyor Installation 120000.00 49.10 - - - 120000.00
5.H. Communication Installation - - - - - -
5.J Special Installation - - - - - -
5.K. Builder's Profit and Attendance - - - - - -
on Services
5.L. Builder's Work in Connection - - - - - -
with Services
Group Element Total : 873899.98 357.57 794000.00
Sub - total excluding External Works, 2340000.00 957.45
Priliminaries and Contingencies
Extracted from Bill No.3-Building Works
Extracted from items under P.C Sum Prices for services only under P.C Sum
6. External Works
6.A. Site Work 119169.50 48.76
6.B. Drainage 167744.50 68.64
6.C. External Services 17086.00 6.99
6.D. Ancillary Buildings 7000.00 2.86
6.E. Recreational Facilities - -
Group Element Total : 311000.00 127.25
Preliminaries 141000.00 57.69
TOTAL ( less
Contingencies ) 2792000.00
•Exclude Dayworks Bill total RM35700.00
•Exclude Provisional Sum for future
expansion of addition floor total RM 20000.00
Amount of items categorized under site
works + Landscaping (P.C Sum)
Amount of items categorized under
drainage + Septic tank & pump sump (P.C
Sum)
Extracted from Contract Bill
Measurement 4
ELEMENTAL COST
ANALYSIS:
FORM 3
Specification
Piling foundation
175mm x 175mm Precast
reinforced concrete piles;
15.0m depth
Specification
Roof: BHP Lysaght
"Trimdeck" colorbond
Metal decking
Door: Timber skeleton
framed flush door
Sanitary appliances:
“Johnson Suisse” Basin
Window: Aluminium
frame glazed window
Ceiling: "Brefill premix"
Skim coating plastering
Floor: Vinyl tile &
homogeneous tile
The Purpose of Form 3
It describes the various components in each
element including the types and quality of
material used
This form provides a brief picture of the building
standards and quality and this information is
important for cost comparison purposes

More Related Content

What's hot

ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
ECA Presentation
ECA PresentationECA Presentation
ECA PresentationLee Pei Gie
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA FormKai Yun Pang
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityPang Khai Shuen
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)ahmong4
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final ReportArissa Loh
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Sow Wei Henn
 

What's hot (20)

ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
ECA form
ECA formECA form
ECA form
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
element
elementelement
element
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's University
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 

Viewers also liked

FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDONFINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDONGirish Singh
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysisArthur Wilson
 
dome and vault
dome and vaultdome and vault
dome and vaultkaiwan1996
 
The basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaThe basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaBabasab Patil
 
Cost analysis of project
Cost analysis of projectCost analysis of project
Cost analysis of projectVARSHAAWASAR
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment ReportMelvin Lim
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.lucaschinsheng
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment PresentationHaziq1511
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignmentwendyteosy
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)Hasif Alias
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompaHasif Alias
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group AssignmentHaziq1511
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Estimating letters
Estimating lettersEstimating letters
Estimating lettersZIyeeTan
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentHaziq1511
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 AssignmentMelvin Lim
 

Viewers also liked (20)

ECA result - Jayanta
ECA result - JayantaECA result - Jayanta
ECA result - Jayanta
 
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDONFINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
FINITE ELEMENT ANALYSIS OF A PRESTRESSED CONCRETE BEAM USING FRP TENDON
 
SHD Group Report
SHD Group ReportSHD Group Report
SHD Group Report
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 
dome and vault
dome and vaultdome and vault
dome and vault
 
The basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaThe basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mba
 
Cost analysis of project
Cost analysis of projectCost analysis of project
Cost analysis of project
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Group Component
Group ComponentGroup Component
Group Component
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Estimating
EstimatingEstimating
Estimating
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 

Similar to Eca presentation

Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Priyanka Singh
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportNatalie Reid
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oeKashmir Brown
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA sMike Darwich
 
cost appraisal
cost appraisalcost appraisal
cost appraisalahmong4
 
Modul 6 visual penjanaan perjalanan
Modul 6  visual penjanaan perjalananModul 6  visual penjanaan perjalanan
Modul 6 visual penjanaan perjalananshaayesha9
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016galih wahyu
 
PLD-FINAL-REPORT
PLD-FINAL-REPORTPLD-FINAL-REPORT
PLD-FINAL-REPORTadnan malak
 
Tugasan agihan perjalanan a160136
Tugasan agihan perjalanan a160136Tugasan agihan perjalanan a160136
Tugasan agihan perjalanan a160136nurainnajihaidris
 
Gggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhh
GggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhhGggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhh
Gggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhhrahultttt
 

Similar to Eca presentation (20)

Eca form2
Eca  form2Eca  form2
Eca form2
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe
 
pp2 Final account-1
pp2 Final account-1pp2 Final account-1
pp2 Final account-1
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s
 
Ahmed Transcript
Ahmed TranscriptAhmed Transcript
Ahmed Transcript
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
Tugasan 12
Tugasan 12Tugasan 12
Tugasan 12
 
Modul 6 visual penjanaan perjalanan
Modul 6  visual penjanaan perjalananModul 6  visual penjanaan perjalanan
Modul 6 visual penjanaan perjalanan
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
 
PLD-FINAL-REPORT
PLD-FINAL-REPORTPLD-FINAL-REPORT
PLD-FINAL-REPORT
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
Cost - Chapter 4.pptx
Cost - Chapter 4.pptxCost - Chapter 4.pptx
Cost - Chapter 4.pptx
 
Airjet shiva
Airjet shivaAirjet shiva
Airjet shiva
 
Tugasan agihan perjalanan a160136
Tugasan agihan perjalanan a160136Tugasan agihan perjalanan a160136
Tugasan agihan perjalanan a160136
 
Project Floor Plans
Project Floor PlansProject Floor Plans
Project Floor Plans
 
Summer 2015 Trans.
Summer 2015 Trans.Summer 2015 Trans.
Summer 2015 Trans.
 
Gggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhh
GggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhhGggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhh
Gggggggggggghhhhhhhhhhhhhhhhhhhhhhhhhh
 
FYDP Sem 2
FYDP Sem 2FYDP Sem 2
FYDP Sem 2
 

Recently uploaded

ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationAadityaSharma884161
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 

Recently uploaded (20)

ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint Presentation
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 

Eca presentation

  • 1. Measurement 4 ELEMENTAL COST ANALYSIS SCHOOL OF ARCHITECTURE BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING
  • 2. MEMBERS OF GROUP B MAYBELLE WANG SZE KHER 0327553 WENDY TEO SIEW YEN 0328242 ERVINNA ANAK ENDELA @ ENDELLA 0327508 AISHATH HUSSAIN 0320429 CHUANG JING 0322934 JACKSON TING SHII HANG 0324326 KONG ZHEN CHUNG 0319528 LAU CHIN SHENG 0317899 LEONG KARR KHEI 0324362 YONG SING YEW 0318766 ELLIOT PANG TIU SENG 0319438 GOH MING HANN WILLIAM 0317949 HAZIM BIN ABDUL AZIZ 0315773
  • 3. Job Title : Proposed 1 Block of 3 Storey Nursing Home. BUILDING TO BE ANALYSED
  • 4. NURSING HOME Client : Synod Diocese Malaysia Barat Project : Cadangan Pembangunan 1 Blok 3 Tingkat Rumah Kebajikan (“Nursing”) Location : Lot No. PT. 3720, Jalan Besar, Kg. Baru Sungai Buloh, Seksyen U19, 40160 Shah Alam, Selangor Darul Ehsan. PROJECT INFO
  • 5.
  • 6. • Contract Sum : RM 2,997,700 • Date of Commencement : 14th June 2004 • Date of Completion : 13th December 2005 • Deflect Liability : 18 Months • LAD TNB Substation (14th August 2005) RM 1,000 per day Building Works (13th December 2005) RM 1,000 per day • Work Programme : 7 days upon the receive of this letter. • Period of Interim Certificate : once in a month. Thirty (30) days from the date of the architects certificate. • Period of Delay : 3 Months CONTRACT DETAILS
  • 8. A. Reinforced concrete framed construction 3-Storey building Gross Floor Area of the building
  • 9.
  • 10. Motor Room Second Floor First Floor Ground Floor GROSS FLOOR AREA TO BE MEASURED
  • 11. Ground Floor Upper Floor 1003m2 1307m2 Total Gross Floor Area = 2310m2 SUMMARY OF GROSS FLOOR AREA
  • 13. GROUND FLOOR Ancillary area = 323.63m2 Circulation area = 248.48m2 Usable area = 392.15m2 Internal divisions = 38.87m2
  • 14. FIRST FLOOR Usable area = 426.93m2 Circulation area = 161.48m2 Ancillary area = 58.98m2 Internal division = 27.68m2
  • 15. Ancillary area = 29.11m2 Circulation area = 218.50m2 Usable area = 298.70m2 Internal divisions = 26.00m2 SECOND FLOOR
  • 17. FLOOR SPACES NOT ENCLOSED Not enclosed space = 182.79m²
  • 20. Total Circulation : 639.75m2 Total Ancillary : 459.75m2 Total Usable : 1117.78m2 Total Internal Division : 92.55m2 SUMMARY OF NET FLOOR AREA FROM GROUND FLOOR TO UPPER FLOOR
  • 21. Contingencies/ (Contract sum – Contingencies) x 100% Preliminaries/ (Contract sum - Contingencies - Preliminaries) x 100% Functional Unit cost = (Contract sum – external works)/ Functional Unit
  • 25. Refer to manual section 16. Eg :-For Piling, only total length of pile is taken.
  • 26. Total cost of element / Element unit quantity
  • 28. Convert unit from BQ to required unit
  • 29. GROSS FLOOR AREA : m2 TENDER DATE : Convert unit from BQ to required unit. E.g. Concrete given in m2 (Quantity x height of slab) Reinforcement given in m2 (Quantity x weightage) Formwork given in m (Quantity x thickness)
  • 30. GROSS FLOOR AREA : m2 TENDER DATE : Identify the internal door from plan. Get the total surface area of the door. (Area measured over frames)
  • 31. 4. Fittings and Furnishings P.C. Sums 39100.00 16.00 - - - Allowed 5. Services 5.A. Sanitary Appliances 79899.98 32.69 495 No. 161.41 - - 5.B. Plumbing Installation 170000.00 69.56 - - - 170000.00 5.C. Refuse Disposal - - - - - - 5.D. Air conditioning and 15000.00 6.14 - Tm3 15000.00 Ventilation System 5.E. Electrical Installation 365000.00 149.35 - - - 365000.00 5.F. Fire Protection Installation 124000.00 50.74 - - - 124000.00 5.G. Lift and Conveyor Installation 120000.00 49.10 - - - 120000.00 5.H. Communication Installation - - - - - - 5.J Special Installation - - - - - - 5.K. Builder's Profit and Attendance - - - - - - on Services 5.L. Builder's Work in Connection - - - - - - with Services Group Element Total : 873899.98 357.57 794000.00 Sub - total excluding External Works, 2340000.00 957.45 Priliminaries and Contingencies Ironmongeries: RM 33,100 Signages: RM 6,000
  • 32. 4. Fittings and Furnishings P.C. Sums 39100.00 16.00 - - - Allowed 5. Services 5.A. Sanitary Appliances 79899.98 32.69 495 No. 161.41 - - 5.B. Plumbing Installation 170000.00 69.56 - - - 170000.00 5.C. Refuse Disposal - - - - - - 5.D. Air conditioning and 15000.00 6.14 - Tm3 15000.00 Ventilation System 5.E. Electrical Installation 365000.00 149.35 - - - 365000.00 5.F. Fire Protection Installation 124000.00 50.74 - - - 124000.00 5.G. Lift and Conveyor Installation 120000.00 49.10 - - - 120000.00 5.H. Communication Installation - - - - - - 5.J Special Installation - - - - - - 5.K. Builder's Profit and Attendance - - - - - - on Services 5.L. Builder's Work in Connection - - - - - - with Services Group Element Total : 873899.98 357.57 794000.00 Sub - total excluding External Works, 2340000.00 957.45 Priliminaries and Contingencies Extracted from Bill No.3-Building Works Extracted from items under P.C Sum Prices for services only under P.C Sum
  • 33. 6. External Works 6.A. Site Work 119169.50 48.76 6.B. Drainage 167744.50 68.64 6.C. External Services 17086.00 6.99 6.D. Ancillary Buildings 7000.00 2.86 6.E. Recreational Facilities - - Group Element Total : 311000.00 127.25 Preliminaries 141000.00 57.69 TOTAL ( less Contingencies ) 2792000.00 •Exclude Dayworks Bill total RM35700.00 •Exclude Provisional Sum for future expansion of addition floor total RM 20000.00 Amount of items categorized under site works + Landscaping (P.C Sum) Amount of items categorized under drainage + Septic tank & pump sump (P.C Sum) Extracted from Contract Bill
  • 35. Specification Piling foundation 175mm x 175mm Precast reinforced concrete piles; 15.0m depth
  • 36. Specification Roof: BHP Lysaght "Trimdeck" colorbond Metal decking Door: Timber skeleton framed flush door Sanitary appliances: “Johnson Suisse” Basin Window: Aluminium frame glazed window Ceiling: "Brefill premix" Skim coating plastering Floor: Vinyl tile & homogeneous tile
  • 37. The Purpose of Form 3 It describes the various components in each element including the types and quality of material used This form provides a brief picture of the building standards and quality and this information is important for cost comparison purposes