1. The document provides an elemental cost analysis for the proposed construction of a 4-storey primary school building with 36 classrooms and other facilities, and a single-storey canteen.
2. The total construction cost is estimated to be RM6,949,424.43 excluding contingencies, with the largest cost elements being substructure works, superstructure, finishes, and services.
3. Key specifications outlined include reinforced concrete structural elements, 115mm thick brick walls, metal framed doors and windows, roofing with concrete tiles and insulation, and ceramic wall tiles and ceiling boards for internal finishes.