SlideShare a Scribd company logo
JOB NO: PREPARED BY:
JOB TITLE:
ELEMENT: DATE:
Item Description Unit Qty Rate Amount RM Sen
GENERAL SUMMARY PAGE
External Walls
Internal Walls and Partitions
Wall Finishes
Floor Finishes
Ceiling Finishes
BUNGALOW KELAS D
TOTAL CARRIED TO SUMMARY
page /
JOB NO: PREPARED BY:
JOB TITLE:
ELEMENT: DATE:
Item Description Unit Qty Rate Amount RM Sen
GENERAL SUMMARY PAGE
External Walls
Internal Walls and Partitions
Wall Finishes
Floor Finishes
Ceiling Finishes
BUNGALOW KELAS D
TOTAL CARRIED TO SUMMARY
page /
JOB NO: PREPARED BY: YIP XIAOJUNG
JOB TITLE: BUNGALOW KELAS D
ELEMENT: EXTERNAL WALL DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
EXTERNAL WALL
Clay brickwork in cement mortar (1:6)
in Stretcher Bond as described:-
A Half brick wall (115mm thick) M² 124
reinforced with and including brick
reinforcement as decribed at every
fourth course
Approved bituminous felt damp
proof course to BS 743 Part 2 Type 5B
lapped 100mm at joints including
25mm bed of cement mortar (1:6)
and coated with hot bitumen
sprinkled with coarse sand as
described on:-
B To half brick wall 115mm wide. M 52
EXTERNAL WALL
CARRIED TO SUMMARY AT THE END
OF BILL NO.1
B 1/1
JOB NO: PREPARED BY: KENNETH TAN
JOB TITLE: BUNGALOW KELAS D
ELEMENT: INTERNAL WALL DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
INTERNAL WALL
Clay brickwork in cement mortar
( 1:6) in Stretcher Bond as described:
A Half brickwall (115mm thick) M² 158
reinforced with & including brick
reinforcement as described at every
4th course.
Approved bituminous felt damp
proof course to BS 743 Part 2 Type 5B
lapped 100mm at joints including
25mm bed of cement mortar ( 1:6)
and coated with hot bitumen
sprinkled with coarse sand as
described on :
B To half brickwall 115mm wide M 56
INTERNAL WALL
CARRIED TO SUMMARY AT THE END
OF BILL NO.1
B 1/2
JOB NO: PREPARED BY: LOH MUN TONG
JOB TITLE: BUNGALOW KELAS D
ELEMENT: EXTERNAL WALL FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
EXTERNAL WALL FINISHES
Cement and sand (1:6) as described
external plastering finished with
steel trowel
A 19mm thick to walls M² 215
Painting
Prepare and apply one coat of
"ICI" primer and two coats of "ICI"
weathershield paint
B Platered Walls M² 215
EXTERNAL WALL FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/3
JOB NO: PREPARED BY: NG SHENG ZHE
JOB TITLE: BUNGALOW KELAS D
ELEMENT: INTERNAL WALL FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
INTERNAL WALL FINISHES
Cement and sand (1:6) as described
internal plastering finished with
steel trowel:-
A 19mm thick to walls. M² 455
Cement and sand (1:3) beds and
backings; screeded finish; to
receive ceramic tiles:-
B 19mm thick to walls. M² 92
200mm x 250mm x 8mm thick
"White Horse" or approved
equivalent glazed ceramic tiles of
approved pattern and colour; and
pointed in neat white cement as
described:-
C To walls. M² 92
Painting
Prepare and apply one coat of
"Nippon" primer and two coats of
"Nippon" emulsion paint or
approved equivalent to:-
D Plastered walls. M² 455
INTERNAL WALL FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/4
JOB NO: PREPARED BY: GOH JIA JUN
JOB TITLE: BUNGALOW KELAS D
ELEMENT: INTERNAL FLOOR FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
INTERNAL FLOOR FINISHES
Cement and sand (1:6) paving;
trowelled hard and smooth:
A To floors; 50 mm thick M² 5
Cement and sand (1:3) beds and
backings; screeded finish; to receive
ceramic tiles:-
B To floors; 42 mm thick M² 120
C To drops; 19 mm thick; 25mm high M 1
D To drops; 19 mm thick; 50mm high M 3
E To skirtings; 19mm thick; 100mm high M 68
Cement and sand (1:3) beds and
backings; screeeded finished; to
receive homogenous tiles:-
F To floors; 42 mm thick M² 60
G To drops; 19 mm thick; 25mm high M 1
H To drops; 19 mm thick; 50mm high M 1
I To skirtings; 19mm thick; 100mm M 52
200mm x 200mm x 8mm Thick
approved anti-slip ceramic tiles as
described; of approved pattern and
colour; laid on cement screed
(measured separately); including
pointing:
J To floors M² 120
K To drops; 25mm high M 1
L To drops; 50mm high M 3
M To skirtings; 100mm high M 68
INTERNAL FLOOR FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/6
JOB NO: PREPARED BY: GOH JIA JUN
JOB TITLE: BUNGALOW KELAS D
ELEMENT: INTERNAL FLOOR FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
INTERNAL FLOOR FINISHES
300mm x 300mm x 8mm Thick
approved anti-slip homogenous tiles
as described; of approved pattern and
colour; laid on cement screed
(measured separately); including
pointing:
A To floors. M² 60
B To drops; 25mm high M 1
C To drops; 50mm high M 1
D To skirtings; 100mm high M 52
E
30mm x 3mm Thick approved
aluminium dividing strips bedded in
screed to different floor finishings M 4
INTERNAL FLOOR FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/7
JOB NO: PREPARED BY: LEONG LI JING
JOB TITLE: BUNGALOW KELAS D
ELEMENT: EXTERNAL FLOOR FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
EXTERNAL FLOOR FINISHES
Cement and sand (1:6) paving;
trowelled hard and smooth:
A To floors; 50mm thick M² 75
Cement and sand (1:3) beds and
backings; screeded finish; to
receive ceramic tiles:
B To floors: 42mm thick M² 58
C To drops; 19mm thick; 25mm high M 3
Cement and sand (1:3) beds and
backings; screeded finish; to
receive homogeneous tiles:
D To drops; 19mm thick; 100mm high M 7
EXTERNAL FLOOR FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/5
JOB NO: PREPARED BY: ALWIN NG
JOB TITLE: BUNGALOW KELAS D
ELEMENT: INTERNAL CEILING FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
INTERNAL CEILING FINISHES
UAC Superflex' or approved
equivalent asbestos free cement
boards to ceiling including fixing
horizantally with 50mm x 100mm
sawn pressure- treated Group B
timber joists and 50mm x 50mm
spacers across 600 mm centres:
A 1200mm x 600mm x 3.2mm M² 169
ceiling lining
Wrot pressure treated Grade C
timber as described in:
B 50mmx20mm beading to celing M 30
board
Painting
Prepare and aply one coat 'ICI'
primer sealer and two coats
Nippon' emulsion paint or
approved equivalenton:-
C Soffit of asbestos cement sheet M² 169
ceiling
INTERNAL CEILING FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/9
JOB NO: PREPARED BY: ALWIN NG
JOB TITLE: BUNGALOW KELAS D
ELEMENT: EXTERNAL CEILING FINISHES DATE:
Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen
EXTERNAL CEILING FINISHES
UAC Superflex' or approved
equivalent asbestos free cement
boards to ceiling including fixing
horizantally with 50mm x 100mm
sawn pressure- treated Group B
timber joists and 50mm x 50mm
spacers across 600 mm centres:
A 1200mm x 600mm x 3.2mm M² 135
ceiling lining
Painting
Prepare and aply one coat 'ICI'
primer sealer and two coats
Nippon' emulsion paint or
approved equivalenton:-
B Soffit of asbestos cement sheet M² 135
ceiling
EXTERNAL CEILING FINISHES
CARRIED SUMMARY AT THE END
OF BILL NO.1
B 1/8

More Related Content

What's hot

SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
Timun Loh
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
Kai Yun Pang
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
Kai Yun Pang
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-listJeanne Hoo
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
hlksd
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
Pang Khai Shuen
 
ECA form
ECA formECA form
ECA form
Arissa Loh
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
Tantish QS, UTM
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
ahmong4
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
ahmong4
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
Kai Yun Pang
 

What's hot (20)

Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
ECA form
ECA formECA form
ECA form
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Car park bq
Car park bqCar park bq
Car park bq
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 

Viewers also liked

Integrated final-pdf
Integrated final-pdfIntegrated final-pdf
Integrated final-pdf
Arissa Loh
 
Titas assignment group 53 - chinese civilization
Titas assignment   group 53 - chinese civilizationTitas assignment   group 53 - chinese civilization
Titas assignment group 53 - chinese civilization
Arissa Loh
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management Report
Arissa Loh
 
Sustainable storm water management Presentation Slides
Sustainable storm water management Presentation SlidesSustainable storm water management Presentation Slides
Sustainable storm water management Presentation Slides
Arissa Loh
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
Nabeel Joomun
 

Viewers also liked (6)

Integrated final-pdf
Integrated final-pdfIntegrated final-pdf
Integrated final-pdf
 
Titas assignment group 53 - chinese civilization
Titas assignment   group 53 - chinese civilizationTitas assignment   group 53 - chinese civilization
Titas assignment group 53 - chinese civilization
 
Ici
IciIci
Ici
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management Report
 
Sustainable storm water management Presentation Slides
Sustainable storm water management Presentation SlidesSustainable storm water management Presentation Slides
Sustainable storm water management Presentation Slides
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 

Similar to Final Bills of Quantity

Item
ItemItem
Item
lohwenjun
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
Stephen Nzima
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
SantinoDengAchuilAth
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
Arthur Wilson
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
AmokBajracharya2
 
Phase of Building
Phase of BuildingPhase of Building
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
SPECIFICATION
SPECIFICATIONSPECIFICATION
SPECIFICATION
Simran Vats
 
Design tab
Design tabDesign tab
Design tab
DanielCash16
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
Yolanda Sewpersad
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
Dr. Ninad Dhawle
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
Labour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfLabour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdf
Kothandaraman T
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1Jacob Dobson
 

Similar to Final Bills of Quantity (20)

Item
ItemItem
Item
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
 
Phase of Building
Phase of BuildingPhase of Building
Phase of Building
 
3D
3D3D
3D
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
SPECIFICATION
SPECIFICATIONSPECIFICATION
SPECIFICATION
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
Design tab
Design tabDesign tab
Design tab
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
Labour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdfLabour-and-Equipment-Productivity.pdf
Labour-and-Equipment-Productivity.pdf
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1
 

More from Arissa Loh

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
Arissa Loh
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
Arissa Loh
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
Arissa Loh
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final Report
Arissa Loh
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation Slides
Arissa Loh
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of Contract
Arissa Loh
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost Appraisal
Arissa Loh
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final Report
Arissa Loh
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation Slides
Arissa Loh
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
Arissa Loh
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentation
Arissa Loh
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
Arissa Loh
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
Arissa Loh
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
Arissa Loh
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
Arissa Loh
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
Arissa Loh
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation
Arissa Loh
 
Tender Presentation
Tender PresentationTender Presentation
Tender Presentation
Arissa Loh
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishes
Arissa Loh
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
Arissa Loh
 

More from Arissa Loh (20)

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final Report
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation Slides
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of Contract
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost Appraisal
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final Report
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation Slides
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentation
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation
 
Tender Presentation
Tender PresentationTender Presentation
Tender Presentation
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishes
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 

Recently uploaded

0x01 - Newton's Third Law: Static vs. Dynamic Abusers
0x01 - Newton's Third Law:  Static vs. Dynamic Abusers0x01 - Newton's Third Law:  Static vs. Dynamic Abusers
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
OWASP Beja
 
Acorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutesAcorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutes
IP ServerOne
 
Obesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditionsObesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditions
Faculty of Medicine And Health Sciences
 
International Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software TestingInternational Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software Testing
Sebastiano Panichella
 
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Orkestra
 
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptxsomanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
Howard Spence
 
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdfBonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
khadija278284
 
Getting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control TowerGetting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control Tower
Vladimir Samoylov
 
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Sebastiano Panichella
 
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Sebastiano Panichella
 
Eureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 PresentationEureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 Presentation
Access Innovations, Inc.
 
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
OECD Directorate for Financial and Enterprise Affairs
 
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXOBitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Matjaž Lipuš
 

Recently uploaded (13)

0x01 - Newton's Third Law: Static vs. Dynamic Abusers
0x01 - Newton's Third Law:  Static vs. Dynamic Abusers0x01 - Newton's Third Law:  Static vs. Dynamic Abusers
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
 
Acorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutesAcorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutes
 
Obesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditionsObesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditions
 
International Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software TestingInternational Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software Testing
 
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
 
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptxsomanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
 
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdfBonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
 
Getting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control TowerGetting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control Tower
 
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
 
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...
 
Eureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 PresentationEureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 Presentation
 
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
 
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXOBitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXO
 

Final Bills of Quantity

  • 1. JOB NO: PREPARED BY: JOB TITLE: ELEMENT: DATE: Item Description Unit Qty Rate Amount RM Sen GENERAL SUMMARY PAGE External Walls Internal Walls and Partitions Wall Finishes Floor Finishes Ceiling Finishes BUNGALOW KELAS D TOTAL CARRIED TO SUMMARY page /
  • 2. JOB NO: PREPARED BY: JOB TITLE: ELEMENT: DATE: Item Description Unit Qty Rate Amount RM Sen GENERAL SUMMARY PAGE External Walls Internal Walls and Partitions Wall Finishes Floor Finishes Ceiling Finishes BUNGALOW KELAS D TOTAL CARRIED TO SUMMARY page /
  • 3. JOB NO: PREPARED BY: YIP XIAOJUNG JOB TITLE: BUNGALOW KELAS D ELEMENT: EXTERNAL WALL DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen EXTERNAL WALL Clay brickwork in cement mortar (1:6) in Stretcher Bond as described:- A Half brick wall (115mm thick) M² 124 reinforced with and including brick reinforcement as decribed at every fourth course Approved bituminous felt damp proof course to BS 743 Part 2 Type 5B lapped 100mm at joints including 25mm bed of cement mortar (1:6) and coated with hot bitumen sprinkled with coarse sand as described on:- B To half brick wall 115mm wide. M 52 EXTERNAL WALL CARRIED TO SUMMARY AT THE END OF BILL NO.1 B 1/1
  • 4. JOB NO: PREPARED BY: KENNETH TAN JOB TITLE: BUNGALOW KELAS D ELEMENT: INTERNAL WALL DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen INTERNAL WALL Clay brickwork in cement mortar ( 1:6) in Stretcher Bond as described: A Half brickwall (115mm thick) M² 158 reinforced with & including brick reinforcement as described at every 4th course. Approved bituminous felt damp proof course to BS 743 Part 2 Type 5B lapped 100mm at joints including 25mm bed of cement mortar ( 1:6) and coated with hot bitumen sprinkled with coarse sand as described on : B To half brickwall 115mm wide M 56 INTERNAL WALL CARRIED TO SUMMARY AT THE END OF BILL NO.1 B 1/2
  • 5. JOB NO: PREPARED BY: LOH MUN TONG JOB TITLE: BUNGALOW KELAS D ELEMENT: EXTERNAL WALL FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen EXTERNAL WALL FINISHES Cement and sand (1:6) as described external plastering finished with steel trowel A 19mm thick to walls M² 215 Painting Prepare and apply one coat of "ICI" primer and two coats of "ICI" weathershield paint B Platered Walls M² 215 EXTERNAL WALL FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/3
  • 6. JOB NO: PREPARED BY: NG SHENG ZHE JOB TITLE: BUNGALOW KELAS D ELEMENT: INTERNAL WALL FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen INTERNAL WALL FINISHES Cement and sand (1:6) as described internal plastering finished with steel trowel:- A 19mm thick to walls. M² 455 Cement and sand (1:3) beds and backings; screeded finish; to receive ceramic tiles:- B 19mm thick to walls. M² 92 200mm x 250mm x 8mm thick "White Horse" or approved equivalent glazed ceramic tiles of approved pattern and colour; and pointed in neat white cement as described:- C To walls. M² 92 Painting Prepare and apply one coat of "Nippon" primer and two coats of "Nippon" emulsion paint or approved equivalent to:- D Plastered walls. M² 455 INTERNAL WALL FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/4
  • 7. JOB NO: PREPARED BY: GOH JIA JUN JOB TITLE: BUNGALOW KELAS D ELEMENT: INTERNAL FLOOR FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen INTERNAL FLOOR FINISHES Cement and sand (1:6) paving; trowelled hard and smooth: A To floors; 50 mm thick M² 5 Cement and sand (1:3) beds and backings; screeded finish; to receive ceramic tiles:- B To floors; 42 mm thick M² 120 C To drops; 19 mm thick; 25mm high M 1 D To drops; 19 mm thick; 50mm high M 3 E To skirtings; 19mm thick; 100mm high M 68 Cement and sand (1:3) beds and backings; screeeded finished; to receive homogenous tiles:- F To floors; 42 mm thick M² 60 G To drops; 19 mm thick; 25mm high M 1 H To drops; 19 mm thick; 50mm high M 1 I To skirtings; 19mm thick; 100mm M 52 200mm x 200mm x 8mm Thick approved anti-slip ceramic tiles as described; of approved pattern and colour; laid on cement screed (measured separately); including pointing: J To floors M² 120 K To drops; 25mm high M 1 L To drops; 50mm high M 3 M To skirtings; 100mm high M 68 INTERNAL FLOOR FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/6
  • 8. JOB NO: PREPARED BY: GOH JIA JUN JOB TITLE: BUNGALOW KELAS D ELEMENT: INTERNAL FLOOR FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen INTERNAL FLOOR FINISHES 300mm x 300mm x 8mm Thick approved anti-slip homogenous tiles as described; of approved pattern and colour; laid on cement screed (measured separately); including pointing: A To floors. M² 60 B To drops; 25mm high M 1 C To drops; 50mm high M 1 D To skirtings; 100mm high M 52 E 30mm x 3mm Thick approved aluminium dividing strips bedded in screed to different floor finishings M 4 INTERNAL FLOOR FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/7
  • 9. JOB NO: PREPARED BY: LEONG LI JING JOB TITLE: BUNGALOW KELAS D ELEMENT: EXTERNAL FLOOR FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen EXTERNAL FLOOR FINISHES Cement and sand (1:6) paving; trowelled hard and smooth: A To floors; 50mm thick M² 75 Cement and sand (1:3) beds and backings; screeded finish; to receive ceramic tiles: B To floors: 42mm thick M² 58 C To drops; 19mm thick; 25mm high M 3 Cement and sand (1:3) beds and backings; screeded finish; to receive homogeneous tiles: D To drops; 19mm thick; 100mm high M 7 EXTERNAL FLOOR FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/5
  • 10. JOB NO: PREPARED BY: ALWIN NG JOB TITLE: BUNGALOW KELAS D ELEMENT: INTERNAL CEILING FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen INTERNAL CEILING FINISHES UAC Superflex' or approved equivalent asbestos free cement boards to ceiling including fixing horizantally with 50mm x 100mm sawn pressure- treated Group B timber joists and 50mm x 50mm spacers across 600 mm centres: A 1200mm x 600mm x 3.2mm M² 169 ceiling lining Wrot pressure treated Grade C timber as described in: B 50mmx20mm beading to celing M 30 board Painting Prepare and aply one coat 'ICI' primer sealer and two coats Nippon' emulsion paint or approved equivalenton:- C Soffit of asbestos cement sheet M² 169 ceiling INTERNAL CEILING FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/9
  • 11. JOB NO: PREPARED BY: ALWIN NG JOB TITLE: BUNGALOW KELAS D ELEMENT: EXTERNAL CEILING FINISHES DATE: Item Bill No.1 BUNGALOW KELAS D Unit Qty Rate Amount RM Sen EXTERNAL CEILING FINISHES UAC Superflex' or approved equivalent asbestos free cement boards to ceiling including fixing horizantally with 50mm x 100mm sawn pressure- treated Group B timber joists and 50mm x 50mm spacers across 600 mm centres: A 1200mm x 600mm x 3.2mm M² 135 ceiling lining Painting Prepare and aply one coat 'ICI' primer sealer and two coats Nippon' emulsion paint or approved equivalenton:- B Soffit of asbestos cement sheet M² 135 ceiling EXTERNAL CEILING FINISHES CARRIED SUMMARY AT THE END OF BILL NO.1 B 1/8