ELEMENTAL COST ANALYSIS - Form 1 A - 3 - 2023
JOB TITLE: Proposed 2 blocks 3 storey flat CLIENT: Private
LOCATION: Mukim Petaling. Kuala Lumpur TENDER DATE: 12th March 2002
INFORMATION ON TOTAL PROJECT
Project and Contract Information
Project Details and Site Conditions : Contract :
The project comprises of the construction and completion of 2 blocks 3 storey PAM, Private Edition 1998 (without quantities)
medium cost apartment with 24 units with associated external works.
Accessibility to site is good.
Market Conditions : Competitive
Contract Particulars: Competitive Tender List
Type of Contract : Cost fluctuation Yes RM INT(JV) / L
No 1,588,044.50 L
Basis of Tender : Open / Selected N/A
Bills of Quantities Competition Government
Bills of Approx. Quantities Negotiated Private
Schedule of Rates/ Serial Provisional Sums RM 150,000.00
Spec. & Drawings
Prime Cost Sums RM 0.00
Contract Period Stipulated
by Client : 52 weeks Preliminaries RM 79,415.22
Contract Period Offered N/A Contingencies RM 80,000.00
by Builders :
Contract Sum RM 1,588,044.50
Number of Tenders Issued : NA
Number of Tenders Received : NA
ANALYSIS OF SINGLE BUILDING
Design / Shape information
Accomodation and Design Features :
The flat is 2 blocks 3 storey high comprising 24 units medium cost apartment. Generally rectangular in shape.
Areas : Functional Unit : 1744.218 m2 Design / shape :
Lower Ground Floor 0 m2 Percentage of gross floor area :
Ground Floor 674 m2
Upper Floors 1349 m2 External Wall Area = 2070.142 m2 (a) Below Ground Floor %
Gross Floor Area 2023.000
GROSS FLOOR AREA 2023 m2 (b) Single - Storey
= 1.023 Construction %
Usable Area 1744 m2
Circulation Area 186 m2 (c) Two - Storey
Ancillary Area 0 m2 Storey Heights : Construction %
Internal Division 93 m2
Average Below Ground Floor m (d) 3 - Storey
GROSS FLOOR AREA 2023 m2 Construction 100 %
At Ground Floor 3.05 m
Floor Spaces NOT Enclosed 47 m2 (e) - storey
Above Ground Floor 6.10 m Construction %
Roof Area 886 m2
(Structural and Plant Room)
Brief Cost Information
Contract Sum RM 1,588,044.50 Functional unit cost
excluding external works : 643.80/m²
Provisional Sums RM 150,000.00
Prime Cost Sums RM 0.00
Preliminaries RM 79,415.22 being 5.26 %) of remainder
Contingencies RM 80,000.00 being 5.60 %) Contract Sum
Contract Sum less Contingencies RM 1,508,044.50
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTER
ELEMENTAL COST ANALYSIS - Form 2 8 - Residential Buildings
A - 3 - 2023
SUMMARY OF ELEMENT COSTS
GROSS FLOOR AREA : 2,023 m2 TENDER DATE : 12th March 2002
Preliminaries shown separately
Total cost Cost per m2 Element Element Element Reinforced Rein - Formwork
of element GFA unit unit rate Ratio Per Concrete forcement
(RM) (RM) quantity (RM) m2 GFA m3 kg m2
1. Substructure
1.A. Piling m
1.B. Work Below Lowest Floor Finish 117,958.91 58.30 674 m2 174.89 0.333 235 18290 1322
Group Element Total : 117,958.91 58.30 235 18290 1322
2. Superstructure
2.A. Frame 102,663.34 50.74 2023 m2 50.74 1.000 124 18178 1918
2.B. Upper Floors 55,847.37 27.60 1401 m2 39.87 0.692 1135 5640 1163
2.C. Roof 95,606.00 47.25 1389 m2 68.83 0.686 - - -
2.D. Stairs 41,622.21 20.57 - - - 36 1424 495
2.E. External Walls 22,490.39 11.12 1053 m2 21.36 0.520 - - -
2.F. Windows & External Doors 63,855.24 31.56 492 m2 129.74 0.243 - - -
2.G. Internal Walls & Partitions 34,567.86 17.08 1642 m2 21.05 0.812 - - -
2.H. Internal Doors 39,865.51 19.70 227 m2 175.59 0.112 - - -
Group Element Total : 456,517.92 225.62 1295 25242 3576
3. F i n i s h e s
3.A. Internall Wall Finishes 98,645.62 48.75 5586 m2 17.66 2.761 - - -
3.B. Internal Floor Finishes 67,054.77 33.14 2159 m2 31.06 1.067 - - -
3.C. Internal Ceiling Finishes 24,314.82 12.02 1466 m2 16.58 0.725 - - -
3.D. External Finishes 54,515.19 26.94 - - - - - -
Group Element Total : 244,530.39 120.85
4. Fit tings and Furnishings 8,970.76 4.43 P.C. Sums Tendered
Allowed Sum
5. S e r v i c e s
5.A. Sanitary Appliances 22,275.97 11.01 288 No. 77.35 0.142 - -
5.B. Plumbing Installation 67,145.57 33.18 - - - -
5.C. Refuse Disposal - - - - - -
5.D. Air conditioning and - - - Tm3 - - - -
Ventilation System
5.E. Electrical Installation 83,185.46 41.11 - - - -
5.F. Fire Protection Installation - - - - - -
5.G. Lift and Conveyor Installation - - - - - -
5.H. Communication Installation 42,923.93 21.21 - - - -
5.J Special Installation - - - - - -
5.K. Builder's Profit and Attendance - - - - - -
on Services
5.L. Builder's Work in Connection - - - - - -
with Services
Group Element Total : 215,530.93 106.52
Sub - total excluding External Works, 1,043,508.91 515.72
Preliminaries and Contingencies
6. External Works
6.A. Site Work 260,815.69 128.90
6.B. Drainage 84,378.68 41.70
6.C. External Services 26,822.49 13.26
6.D. Ancillary Buildings 13,103.51 6.48
6.E. Recreational Facilities - -
Group Element Total : 385,120.37 190.33
Preliminaries 79,415.22 39.25
TOTAL ( less Contingencies ) 1,508,044.50 745.30
INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTER
ELEMENTAL COST ANALYSIS - Form 3 8 - Residential Buildings
A - 3 - 2023
BRIEF SPECIFICATION
Gross Floor Area : 2023 m2 Tender date : 12th March 2002
ELEMENT SPECIFICATION
1 Substructure
1A Piling Nil
1B Work Below Lowest Floor Finishes
2 Superstructure
2A Frame Reinforced concrete column, beam and roof beam.
2B Upper Floor Reinforced concrete suspended floor slab
2C Roof
2D Stairs
2E External Walls Half brick thick cement and sand brickwall.
2F Windows & External Doors
2G Internal Walls & Partitions Half brick thick cement and sand brickwall.
2H Internals Doors Metal frame plywood flush doors.
3 Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes Cement and sand paving, and ceramic tiles.
3C Internal Ceiling Finishes
3D External Finishes
4 Fittings and Furnishings Letter boxes, and signage (Provisional Sum of RM 5,000).
5 Services
5A Sanitary appliances
5B Plumbing Installation
5C Refuse Disposal Nil
5D Air-Conditioning & Ventilation Nil
System
5E Electrical Installation
5F Fire Protection Installation Nil
5G Lift & Conveyor Installation Nil
5H Communication Installation Telephone installation.
5J Special Installation Nil
5K Builder's Profit & Attendance on Nil
Services
5L Builder's Work in Connection Nil
with Services
6 External Works
6A Site Works
6B Drainage
6C External Services External water reticulation and hydrant.
6D Ancillary Buildings 3600mm x 2500mm x 2700mm refuse chamber and garbage bin.
6E Recreational Facilities Nil
Interlocking concrete paving blocks to road and cement and sand brick retaining wall.
Landscaping works (Provisional sum of RM 50,000.00), and covered car park
(Provisional sum of RM 95,000.00). Spot turfing.
Reinforced concrete pad footing, ground beam, stump, and ground floor slab.
Cement and sand plaster and emulsion paint to walls and columns. Ceramic glazed
tiles to bathroom and kitchen
Surface water drainage comprising sump, cascade drain, and weephole. Sewerage
manhole, V.C. pipe, wire globe, and connection to existing.
Reinforced concrete staircase with cement and sand render,mild steel handrail and
balustrades.
Pitched roof comprising prefabricated timber roof trusses, concrete interlocking roof
Comprising of PE pipes, polytank, and fibre glass tank.
"Inno" washdown pedestal water closet and wall hung wash basin. "Premtex" chrome
plated pillar tap, chrome concealed stop cockless wall flange and rough brass chrome
bib tap. PVC floor trap and aluminium kitchen sink.
Electric installation and lightning protection/ earthling & etc.
"J-Plasta" skim coating, "UAC Superflex" abestos free ceiling board,"Primaflex"
abestos free ceiling lining set, "Jotun" emulsion paint, and alkali primer sealer.
Cement and sand plaster and weather resistant paint to plastered surfaces. Ceramic
tiles to balcony, yard and foyer. Cement and sand paving to staircase and corridor.
Aluminium frame sliding doors, fire-rated doors and metal frame plywood flush door.

More Related Content

What's hot

Elemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesElemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesArissa Loh
 
Eca presentation
Eca presentationEca presentation
Eca presentationwendyteosy
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - PresentationKai Yun Pang
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedureayushida
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)ahmong4
 
ECA Presentation
ECA PresentationECA Presentation
ECA PresentationLee Pei Gie
 
Bq preamble
Bq preambleBq preamble
Bq preambleaizat76
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document xingxin_GOh
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityPang Khai Shuen
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0ahmong4
 

What's hot (20)

ECA presentation
ECA presentationECA presentation
ECA presentation
 
Elemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesElemental cost analysis Presentation Slides
Elemental cost analysis Presentation Slides
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - Presentation
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
Bq floor
Bq floorBq floor
Bq floor
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's University
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
 

Similar to ECA form

cost appraisal
cost appraisalcost appraisal
cost appraisalahmong4
 
Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slideslohwenjun
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Priyanka Singh
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGAnjneya Srivastava
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportNgo Quan
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009Leo Lastimosa
 
Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PVj NiroSh
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2Syafiq Zariful
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)Herbin Sinaga
 
DProfiler Software
DProfiler SoftwareDProfiler Software
DProfiler Softwareandyonan
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocationPang Khai Shuen
 

Similar to ECA form (20)

Eca form2
Eca  form2Eca  form2
Eca form2
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY report
 
element
elementelement
element
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
 
Drawing_ R0.pdf
Drawing_ R0.pdfDrawing_ R0.pdf
Drawing_ R0.pdf
 
Span water guideline
Span water guidelineSpan water guideline
Span water guideline
 
Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.P
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)
 
DProfiler Software
DProfiler SoftwareDProfiler Software
DProfiler Software
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocation
 

More from Arissa Loh

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final ReportArissa Loh
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual AssignmentArissa Loh
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final ReportArissa Loh
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation SlidesArissa Loh
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of ContractArissa Loh
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost AppraisalArissa Loh
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final ReportArissa Loh
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation SlidesArissa Loh
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Arissa Loh
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentationArissa Loh
 
PP2 final report
PP2 final reportPP2 final report
PP2 final reportArissa Loh
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808Arissa Loh
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesArissa Loh
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slidesArissa Loh
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation Arissa Loh
 
Tender Presentation
Tender PresentationTender Presentation
Tender PresentationArissa Loh
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishesArissa Loh
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesArissa Loh
 

More from Arissa Loh (20)

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final Report
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation Slides
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of Contract
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost Appraisal
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final Report
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation Slides
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentation
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation
 
Tender Presentation
Tender PresentationTender Presentation
Tender Presentation
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishes
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 

Recently uploaded

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...marjmae69
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 

Recently uploaded (20)

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 

ECA form

  • 1. INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTER 8 - Residential Buildings ELEMENTAL COST ANALYSIS - Form 1 A - 3 - 2023 JOB TITLE: Proposed 2 blocks 3 storey flat CLIENT: Private LOCATION: Mukim Petaling. Kuala Lumpur TENDER DATE: 12th March 2002 INFORMATION ON TOTAL PROJECT Project and Contract Information Project Details and Site Conditions : Contract : The project comprises of the construction and completion of 2 blocks 3 storey PAM, Private Edition 1998 (without quantities) medium cost apartment with 24 units with associated external works. Accessibility to site is good. Market Conditions : Competitive Contract Particulars: Competitive Tender List Type of Contract : Cost fluctuation Yes RM INT(JV) / L No 1,588,044.50 L Basis of Tender : Open / Selected N/A Bills of Quantities Competition Government Bills of Approx. Quantities Negotiated Private Schedule of Rates/ Serial Provisional Sums RM 150,000.00 Spec. & Drawings Prime Cost Sums RM 0.00 Contract Period Stipulated by Client : 52 weeks Preliminaries RM 79,415.22 Contract Period Offered N/A Contingencies RM 80,000.00 by Builders : Contract Sum RM 1,588,044.50 Number of Tenders Issued : NA Number of Tenders Received : NA ANALYSIS OF SINGLE BUILDING Design / Shape information Accomodation and Design Features : The flat is 2 blocks 3 storey high comprising 24 units medium cost apartment. Generally rectangular in shape. Areas : Functional Unit : 1744.218 m2 Design / shape : Lower Ground Floor 0 m2 Percentage of gross floor area : Ground Floor 674 m2 Upper Floors 1349 m2 External Wall Area = 2070.142 m2 (a) Below Ground Floor % Gross Floor Area 2023.000 GROSS FLOOR AREA 2023 m2 (b) Single - Storey = 1.023 Construction % Usable Area 1744 m2 Circulation Area 186 m2 (c) Two - Storey Ancillary Area 0 m2 Storey Heights : Construction % Internal Division 93 m2 Average Below Ground Floor m (d) 3 - Storey GROSS FLOOR AREA 2023 m2 Construction 100 % At Ground Floor 3.05 m Floor Spaces NOT Enclosed 47 m2 (e) - storey Above Ground Floor 6.10 m Construction % Roof Area 886 m2 (Structural and Plant Room) Brief Cost Information Contract Sum RM 1,588,044.50 Functional unit cost excluding external works : 643.80/m² Provisional Sums RM 150,000.00 Prime Cost Sums RM 0.00 Preliminaries RM 79,415.22 being 5.26 %) of remainder Contingencies RM 80,000.00 being 5.60 %) Contract Sum Contract Sum less Contingencies RM 1,508,044.50
  • 2. INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTER ELEMENTAL COST ANALYSIS - Form 2 8 - Residential Buildings A - 3 - 2023 SUMMARY OF ELEMENT COSTS GROSS FLOOR AREA : 2,023 m2 TENDER DATE : 12th March 2002 Preliminaries shown separately Total cost Cost per m2 Element Element Element Reinforced Rein - Formwork of element GFA unit unit rate Ratio Per Concrete forcement (RM) (RM) quantity (RM) m2 GFA m3 kg m2 1. Substructure 1.A. Piling m 1.B. Work Below Lowest Floor Finish 117,958.91 58.30 674 m2 174.89 0.333 235 18290 1322 Group Element Total : 117,958.91 58.30 235 18290 1322 2. Superstructure 2.A. Frame 102,663.34 50.74 2023 m2 50.74 1.000 124 18178 1918 2.B. Upper Floors 55,847.37 27.60 1401 m2 39.87 0.692 1135 5640 1163 2.C. Roof 95,606.00 47.25 1389 m2 68.83 0.686 - - - 2.D. Stairs 41,622.21 20.57 - - - 36 1424 495 2.E. External Walls 22,490.39 11.12 1053 m2 21.36 0.520 - - - 2.F. Windows & External Doors 63,855.24 31.56 492 m2 129.74 0.243 - - - 2.G. Internal Walls & Partitions 34,567.86 17.08 1642 m2 21.05 0.812 - - - 2.H. Internal Doors 39,865.51 19.70 227 m2 175.59 0.112 - - - Group Element Total : 456,517.92 225.62 1295 25242 3576 3. F i n i s h e s 3.A. Internall Wall Finishes 98,645.62 48.75 5586 m2 17.66 2.761 - - - 3.B. Internal Floor Finishes 67,054.77 33.14 2159 m2 31.06 1.067 - - - 3.C. Internal Ceiling Finishes 24,314.82 12.02 1466 m2 16.58 0.725 - - - 3.D. External Finishes 54,515.19 26.94 - - - - - - Group Element Total : 244,530.39 120.85 4. Fit tings and Furnishings 8,970.76 4.43 P.C. Sums Tendered Allowed Sum 5. S e r v i c e s 5.A. Sanitary Appliances 22,275.97 11.01 288 No. 77.35 0.142 - - 5.B. Plumbing Installation 67,145.57 33.18 - - - - 5.C. Refuse Disposal - - - - - - 5.D. Air conditioning and - - - Tm3 - - - - Ventilation System 5.E. Electrical Installation 83,185.46 41.11 - - - - 5.F. Fire Protection Installation - - - - - - 5.G. Lift and Conveyor Installation - - - - - - 5.H. Communication Installation 42,923.93 21.21 - - - - 5.J Special Installation - - - - - - 5.K. Builder's Profit and Attendance - - - - - - on Services 5.L. Builder's Work in Connection - - - - - - with Services Group Element Total : 215,530.93 106.52 Sub - total excluding External Works, 1,043,508.91 515.72 Preliminaries and Contingencies 6. External Works 6.A. Site Work 260,815.69 128.90 6.B. Drainage 84,378.68 41.70 6.C. External Services 26,822.49 13.26 6.D. Ancillary Buildings 13,103.51 6.48 6.E. Recreational Facilities - - Group Element Total : 385,120.37 190.33 Preliminaries 79,415.22 39.25 TOTAL ( less Contingencies ) 1,508,044.50 745.30
  • 3. INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTER ELEMENTAL COST ANALYSIS - Form 3 8 - Residential Buildings A - 3 - 2023 BRIEF SPECIFICATION Gross Floor Area : 2023 m2 Tender date : 12th March 2002 ELEMENT SPECIFICATION 1 Substructure 1A Piling Nil 1B Work Below Lowest Floor Finishes 2 Superstructure 2A Frame Reinforced concrete column, beam and roof beam. 2B Upper Floor Reinforced concrete suspended floor slab 2C Roof 2D Stairs 2E External Walls Half brick thick cement and sand brickwall. 2F Windows & External Doors 2G Internal Walls & Partitions Half brick thick cement and sand brickwall. 2H Internals Doors Metal frame plywood flush doors. 3 Finishes 3A Internal Wall Finishes 3B Internal Floor Finishes Cement and sand paving, and ceramic tiles. 3C Internal Ceiling Finishes 3D External Finishes 4 Fittings and Furnishings Letter boxes, and signage (Provisional Sum of RM 5,000). 5 Services 5A Sanitary appliances 5B Plumbing Installation 5C Refuse Disposal Nil 5D Air-Conditioning & Ventilation Nil System 5E Electrical Installation 5F Fire Protection Installation Nil 5G Lift & Conveyor Installation Nil 5H Communication Installation Telephone installation. 5J Special Installation Nil 5K Builder's Profit & Attendance on Nil Services 5L Builder's Work in Connection Nil with Services 6 External Works 6A Site Works 6B Drainage 6C External Services External water reticulation and hydrant. 6D Ancillary Buildings 3600mm x 2500mm x 2700mm refuse chamber and garbage bin. 6E Recreational Facilities Nil Interlocking concrete paving blocks to road and cement and sand brick retaining wall. Landscaping works (Provisional sum of RM 50,000.00), and covered car park (Provisional sum of RM 95,000.00). Spot turfing. Reinforced concrete pad footing, ground beam, stump, and ground floor slab. Cement and sand plaster and emulsion paint to walls and columns. Ceramic glazed tiles to bathroom and kitchen Surface water drainage comprising sump, cascade drain, and weephole. Sewerage manhole, V.C. pipe, wire globe, and connection to existing. Reinforced concrete staircase with cement and sand render,mild steel handrail and balustrades. Pitched roof comprising prefabricated timber roof trusses, concrete interlocking roof Comprising of PE pipes, polytank, and fibre glass tank. "Inno" washdown pedestal water closet and wall hung wash basin. "Premtex" chrome plated pillar tap, chrome concealed stop cockless wall flange and rough brass chrome bib tap. PVC floor trap and aluminium kitchen sink. Electric installation and lightning protection/ earthling & etc. "J-Plasta" skim coating, "UAC Superflex" abestos free ceiling board,"Primaflex" abestos free ceiling lining set, "Jotun" emulsion paint, and alkali primer sealer. Cement and sand plaster and weather resistant paint to plastered surfaces. Ceramic tiles to balcony, yard and foyer. Cement and sand paving to staircase and corridor. Aluminium frame sliding doors, fire-rated doors and metal frame plywood flush door.