The document provides an elemental cost analysis for the construction of a proposed primary school comprising four-storey buildings and a one-storey canteen building. It includes details of the project such as location, gross floor area, contract sum, and completion dates. The analysis then breaks down costs for each construction element, including piling, framing, floors, walls, finishes, services, and site works. Charts and tables show quantities and costs for materials like concrete, reinforcement, and formwork. The total project cost was RM 7,249,424.43 based on a 4717.07 square meter gross floor area.