MEGA KUNINGAN OFFICE TOWER
The Brief Investment Project
•  Property Selling Price: USD 112,800,000,-
•  Down Payment Required for the project is USD 33,840,000.-
•  The payment of remaining balance is upon the delivery of
the building (back up by Bank Guaranty)
The Property Location:
•  Location in Mega Kuningan Business District
•  Land area is 4,700 m2 (rounded)
•  Total Gross building area is 33,176 sq. meter,
•  Current land value is USD 35,720,000,-
The Brief Investment Project
Project MEGA KUNINGAN
Land area 4,700 m2 rounded
KDB 45%
KLB 6
Max Height 30
Building Usage Office Building
Assumption
KLB (Building coefficient) 6
KDB 45 % - with building footprints max 2,115 m2
Building Height 30 + 3 basement parking
Total building area
GFA
28,200 m2 Saleable Area
33,176 m2
Building Usage Office Building
THE BRIEF INVESTMENT PROJECT
Assumption
Selling Price
Ø  Office
Saleable Area Foot Print Area Heights
USD 4,000/m2 (28,200 m2) (2,115 m2) 30
Ø  Parking basement 3
Total Sales Price USD 112,800,000
The Property Location
•  Located in Business
District MEGA KUNINGAN
•  Right across the Menara Dea
•  Prestigious area in the Golden
Triangle business district
•  Close to the the Semanggi
Interchange & The Jakarta
Inner Ring Road
The Brief Investment Project 12/5/13 8:47 PMMenara dea Mega kuningan, south jakarta, indonesia - Google Maps
Map data ©2013 Google -
To see all the details that are visible on the
screen, use the "Print" link next to the map.
Location
The Nearby Attractive Places
•  Kota Casablanca
•  Epicentrum (Central Business
District)
•  Ritz Carlton Hotel
•  Oak Wood Hotel
•  Medistra Hospital
•  MMC Hospital
—  Ritz Carlton
—  Bellagio Mall
The Brief Investment Project
Time Schedule
!
!
!
!!
NO. PEKERJAAN DURASI 2014
(Month) Jan Feb March April May June July Aug Sept Oct Nov Dec
I. PRELIMINARY*WORKS 5
1.GFencing 1
2.GSoilGInvestigation 1
3.GLamdGClearing 3
II. ARCHITECTURAL*&*PLANNING* 4
.1.GConceptualGDesign 1
2.GSchematicGDesign 2
3.GDetaliGDesign 2
4.TenderGDocument 1
III. CERTIFICATION*&*PERMITS 21
1.GCertification 13
2G.BlockGPlan 3
3.GTPAK,TPKB,TPIB 3
3.IP 1
4.GAmdal 2
5.GIMB 1
6.IPB 3
IV. TENDER*PROCESS 7
1.GConstructionGManagementGTender 1
2.FondationGWorkGTender 1
3.GStructureGWorkGTender 1
4.GArchtecualGTender 2
GGGa.GConceptualG&GGSchematicGDesignGTender 1
GGGb.GWorkingGTechnicalGDesignGTender 1
5.GElectricalG&GElectricalGTender 1
6.GExternalGWorksGTender 1
V. CONSTRUCTION*WORKS 17
1.GGroundGBreaking 1
2.GFondation 3
3.GStructure 9
4.Architecrural 14
5.GMechanicalG&GE,ectrical 9
6.ExternalGWorks 6
7.Ultilities 7
8.TestingGCommisisioning 2
VI. Markerting 30
VII. Completion 25
VIII. StartGofGtheGOperation 26
!
No. Work Description Duration 2015
Time Schedule
!
!
!
!
!
!
NO.$ PEKERJAAN$ DURASI$ 2015$
(Month)$
I.$ PRELIMINARY*WORKS* 5$ Jan$ Feb$ March$ April$ May$ June$ July$ August$ Sept$ Oct$ Nov$ Dec$
1.$Fencing$ 1$
2.$Soil$InvesHgaHon$ 1$
3.$Lamd$Clearing$ 3$
II.$ ARCHITECTURAL*&*PLANNING** 4$
.1.$Conceptual$Design$ 1$
2.$SchemaHc$Design$ 2$
3.$Detail$Design$ 2$
4.Tender$Document$ 1$
III.$ CERTIFICATION*&*PERMITS* 21$
1.$CerHficaHon$ 13$ $$ $$ $$ $$ $$ $$ $$ $$ $$
2$.Block$Plan$ 3$ $$ $$ $$ $$ $$ $$ $$ $$
3.$TPAK,TPKB,TPIB$ 3$
3.IP$ 1$
4.$Amdal$ 2$
5.$IMB$ 1$
6.IPB$ 3$
IV.$ TENDER*PROCESS* 7$ $$
1.$ConstrucHon$Management$Tender$ 1$
2.FondaHon$Work$Tender$ 1$
3.$Structure$Work$Tender$ 1$
4.$Architectural$Tender$ 2$
$$$a.$Conceptual$&$$SchemaHc$Design$Tender$ 1$
$$$b.$Working$Technical$Design$Tender$ 1$
5.$Electrical$&$Electrical$Tender$ 1$
6.$External$Works$Tender$ 1$
V.$ CONSTRUCTION*WORKS* 17$
1.$Ground$Breaking$ 1$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$
2.$FondaHon$ 3$
3.$Structure$ 9$
4.Architecrural$ 14$ $$ $$ $$ $$
5.$Mechanical$&$Electrical$ 9$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$
6.External$Works$ 6$ $$ $$ $$ $$ $$ $$ $$
7.UlHliHes$ 7$ $$ $$ $$ $$ $$ $$ $$
8.TesHng$Commissioning$ 2$ $$ $$ $$ $$ $$ $$
VI.$ MarkeHng$ 30$ $$ $$ $$
VII.$ CompleHon$ 25$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$
VIII.$ Start$of$the$OperaHon$ 26$
No. Work Description Duration 2016
Time Schedule
!
!
!
!
No. Work Description Duration 2017
Time Schedule
2016	
  
NO.	
   PEKERJAAN	
   DURASI	
  
(Month)	
   Jan	
   Feb	
   March	
   April	
   May	
   June	
   July	
  
I.	
   PRELIMINARY	
  WORKS	
   5	
  
1.	
  Fencing	
   1	
  
2.	
  Soil	
  InvesIgaIon	
   1	
  
3.	
  Lamd	
  Clearing	
   3	
  
II.	
   ARCHITECTURAL	
  &	
  PLANNING	
  	
   4	
  
.1.	
  Conceptual	
  Design	
   1	
  
2.	
  SchemaIc	
  Design	
   2	
  
3.	
  Detail	
  Design	
   2	
  
4.Tender	
  Document	
   1	
  
III.	
   CERTIFICATION	
  &	
  PERMITS	
   21	
  
1.	
  CerIficaIon	
   13	
  
2	
  .Block	
  Plan	
   3	
  
3.	
  TPAK,TPKB,TPIB	
   3	
  
3.IP	
   1	
  
4.	
  Amdal	
   2	
  
5.	
  IMB	
   1	
  
6.IPB	
   3	
   	
  	
   	
  	
  
IV.	
   TENDER	
  PROCESS	
   7	
  
1.	
  ConstrucIon	
  Management	
  Tender	
   1	
  
2.FondaIon	
  Work	
  Tender	
   1	
  
3.	
  Structure	
  Work	
  Tender	
   1	
  
4.	
  Architectural	
  Tender	
   2	
  
	
  	
  	
  a.	
  Conceptual	
  &	
  	
  SchemaIc	
  Design	
  Tender	
   1	
  
	
  	
  	
  b.	
  Working	
  Technical	
  Design	
  Tender	
   1	
  
5.	
  Electrical	
  &	
  Electrical	
  Tender	
   1	
  
6.	
  External	
  Works	
  Tender	
   1	
  
V.	
   CONSTRUCTION	
  WORKS	
   17	
  
1.	
  Ground	
  Breaking	
   1	
  
2.	
  FondaIon	
   3	
  
3.	
  Structure	
   9	
  
4.Architecrural	
   14	
  
5.	
  Mechanical	
  &	
  Electrical	
   9	
  
6.External	
  Works	
   6	
  
7.UlIliIes	
   7	
  
8.TesIng	
  Commissioning	
   2	
   	
  	
  
VI.	
   MarkeIng	
   30	
   	
  	
   	
  	
   	
  	
   	
  	
   	
  	
   	
  	
   	
  	
  
VII.	
   CompleIon	
   25	
   	
  	
  
VIII.	
   Start	
  of	
  the	
  OperaIon	
   26	
   	
  	
  
CONCEPTUAL DESIGN
OFFICE FLOOR PLAN
!!Premium!Office!Space!
!
Typical!floor!plate!1,900!2!2,000!sq.m.!
!
!
Core!to!window!depths!:!15.21!m.!
!
!
Column2free!
!
!
27,000!sq.m.!of!grade!A!specification!!
offices!
!
!
Knock!out!panel!enabling!tenants!to!!
install!private!interfl3oor!staircase!
!
!
2.9!m.!ceiling!height!
!
!
Slide: 13
Thank You	
  

More Related Content

Similar to Mega kuningan office tower for investor

2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx
ssuser98d50d
 
Glovapp Presentation140709
Glovapp Presentation140709Glovapp Presentation140709
Glovapp Presentation140709
ehiosa
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
ahmong4
 
Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3
Panji Krisnamurti
 
Project assign 2
Project assign 2Project assign 2
Project assign 2
Moses Seriki
 
SN ASSOCIATES PROFILE
SN ASSOCIATES PROFILESN ASSOCIATES PROFILE
SN ASSOCIATES PROFILE
Sachin Chandane
 
ECA form
ECA formECA form
ECA form
Arissa Loh
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
Hamza Waheed
 
Delhi high court construction
Delhi high court constructionDelhi high court construction
Delhi high court construction
Shubham Singh [NITK]
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
Al-Amin Ahmed Nabin
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
Kapugantikapuganti Gupta
 
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET Journal
 
f7
f7f7
IJSRED-V2I2P21
IJSRED-V2I2P21IJSRED-V2I2P21
IJSRED-V2I2P21
IJSRED
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - Presentation
Kai Yun Pang
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
BaharAnjum
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
PAYALINAMDAR
 
Building Construction 1 - Report
Building Construction 1 - Report Building Construction 1 - Report
Building Construction 1 - Report
Jannah Jailani
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
Soh Shing
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
Leo Lastimosa
 

Similar to Mega kuningan office tower for investor (20)

2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx
 
Glovapp Presentation140709
Glovapp Presentation140709Glovapp Presentation140709
Glovapp Presentation140709
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3
 
Project assign 2
Project assign 2Project assign 2
Project assign 2
 
SN ASSOCIATES PROFILE
SN ASSOCIATES PROFILESN ASSOCIATES PROFILE
SN ASSOCIATES PROFILE
 
ECA form
ECA formECA form
ECA form
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
Delhi high court construction
Delhi high court constructionDelhi high court construction
Delhi high court construction
 
Method statement of temporary office and fa
Method statement of temporary office and faMethod statement of temporary office and fa
Method statement of temporary office and fa
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
IRJET- Comparative Study of Top down & Bottom up Method Construction Schedule...
 
f7
f7f7
f7
 
IJSRED-V2I2P21
IJSRED-V2I2P21IJSRED-V2I2P21
IJSRED-V2I2P21
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - Presentation
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
 
Building Construction 1 - Report
Building Construction 1 - Report Building Construction 1 - Report
Building Construction 1 - Report
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
 

Recently uploaded

AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
Shivgan Infratech
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
shuilykhatunnil
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 

Recently uploaded (11)

AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 

Mega kuningan office tower for investor

  • 2. The Brief Investment Project •  Property Selling Price: USD 112,800,000,- •  Down Payment Required for the project is USD 33,840,000.- •  The payment of remaining balance is upon the delivery of the building (back up by Bank Guaranty) The Property Location: •  Location in Mega Kuningan Business District •  Land area is 4,700 m2 (rounded) •  Total Gross building area is 33,176 sq. meter, •  Current land value is USD 35,720,000,-
  • 3. The Brief Investment Project Project MEGA KUNINGAN Land area 4,700 m2 rounded KDB 45% KLB 6 Max Height 30 Building Usage Office Building Assumption KLB (Building coefficient) 6 KDB 45 % - with building footprints max 2,115 m2 Building Height 30 + 3 basement parking Total building area GFA 28,200 m2 Saleable Area 33,176 m2 Building Usage Office Building
  • 4. THE BRIEF INVESTMENT PROJECT Assumption Selling Price Ø  Office Saleable Area Foot Print Area Heights USD 4,000/m2 (28,200 m2) (2,115 m2) 30 Ø  Parking basement 3 Total Sales Price USD 112,800,000
  • 5. The Property Location •  Located in Business District MEGA KUNINGAN •  Right across the Menara Dea •  Prestigious area in the Golden Triangle business district •  Close to the the Semanggi Interchange & The Jakarta Inner Ring Road The Brief Investment Project 12/5/13 8:47 PMMenara dea Mega kuningan, south jakarta, indonesia - Google Maps Map data ©2013 Google - To see all the details that are visible on the screen, use the "Print" link next to the map. Location
  • 6. The Nearby Attractive Places •  Kota Casablanca •  Epicentrum (Central Business District) •  Ritz Carlton Hotel •  Oak Wood Hotel •  Medistra Hospital •  MMC Hospital —  Ritz Carlton —  Bellagio Mall The Brief Investment Project
  • 7. Time Schedule ! ! ! !! NO. PEKERJAAN DURASI 2014 (Month) Jan Feb March April May June July Aug Sept Oct Nov Dec I. PRELIMINARY*WORKS 5 1.GFencing 1 2.GSoilGInvestigation 1 3.GLamdGClearing 3 II. ARCHITECTURAL*&*PLANNING* 4 .1.GConceptualGDesign 1 2.GSchematicGDesign 2 3.GDetaliGDesign 2 4.TenderGDocument 1 III. CERTIFICATION*&*PERMITS 21 1.GCertification 13 2G.BlockGPlan 3 3.GTPAK,TPKB,TPIB 3 3.IP 1 4.GAmdal 2 5.GIMB 1 6.IPB 3 IV. TENDER*PROCESS 7 1.GConstructionGManagementGTender 1 2.FondationGWorkGTender 1 3.GStructureGWorkGTender 1 4.GArchtecualGTender 2 GGGa.GConceptualG&GGSchematicGDesignGTender 1 GGGb.GWorkingGTechnicalGDesignGTender 1 5.GElectricalG&GElectricalGTender 1 6.GExternalGWorksGTender 1 V. CONSTRUCTION*WORKS 17 1.GGroundGBreaking 1 2.GFondation 3 3.GStructure 9 4.Architecrural 14 5.GMechanicalG&GE,ectrical 9 6.ExternalGWorks 6 7.Ultilities 7 8.TestingGCommisisioning 2 VI. Markerting 30 VII. Completion 25 VIII. StartGofGtheGOperation 26 ! No. Work Description Duration 2015
  • 8. Time Schedule ! ! ! ! ! ! NO.$ PEKERJAAN$ DURASI$ 2015$ (Month)$ I.$ PRELIMINARY*WORKS* 5$ Jan$ Feb$ March$ April$ May$ June$ July$ August$ Sept$ Oct$ Nov$ Dec$ 1.$Fencing$ 1$ 2.$Soil$InvesHgaHon$ 1$ 3.$Lamd$Clearing$ 3$ II.$ ARCHITECTURAL*&*PLANNING** 4$ .1.$Conceptual$Design$ 1$ 2.$SchemaHc$Design$ 2$ 3.$Detail$Design$ 2$ 4.Tender$Document$ 1$ III.$ CERTIFICATION*&*PERMITS* 21$ 1.$CerHficaHon$ 13$ $$ $$ $$ $$ $$ $$ $$ $$ $$ 2$.Block$Plan$ 3$ $$ $$ $$ $$ $$ $$ $$ $$ 3.$TPAK,TPKB,TPIB$ 3$ 3.IP$ 1$ 4.$Amdal$ 2$ 5.$IMB$ 1$ 6.IPB$ 3$ IV.$ TENDER*PROCESS* 7$ $$ 1.$ConstrucHon$Management$Tender$ 1$ 2.FondaHon$Work$Tender$ 1$ 3.$Structure$Work$Tender$ 1$ 4.$Architectural$Tender$ 2$ $$$a.$Conceptual$&$$SchemaHc$Design$Tender$ 1$ $$$b.$Working$Technical$Design$Tender$ 1$ 5.$Electrical$&$Electrical$Tender$ 1$ 6.$External$Works$Tender$ 1$ V.$ CONSTRUCTION*WORKS* 17$ 1.$Ground$Breaking$ 1$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ 2.$FondaHon$ 3$ 3.$Structure$ 9$ 4.Architecrural$ 14$ $$ $$ $$ $$ 5.$Mechanical$&$Electrical$ 9$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ 6.External$Works$ 6$ $$ $$ $$ $$ $$ $$ $$ 7.UlHliHes$ 7$ $$ $$ $$ $$ $$ $$ $$ 8.TesHng$Commissioning$ 2$ $$ $$ $$ $$ $$ $$ VI.$ MarkeHng$ 30$ $$ $$ $$ VII.$ CompleHon$ 25$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ $$ VIII.$ Start$of$the$OperaHon$ 26$ No. Work Description Duration 2016
  • 9. Time Schedule ! ! ! ! No. Work Description Duration 2017
  • 10. Time Schedule 2016   NO.   PEKERJAAN   DURASI   (Month)   Jan   Feb   March   April   May   June   July   I.   PRELIMINARY  WORKS   5   1.  Fencing   1   2.  Soil  InvesIgaIon   1   3.  Lamd  Clearing   3   II.   ARCHITECTURAL  &  PLANNING     4   .1.  Conceptual  Design   1   2.  SchemaIc  Design   2   3.  Detail  Design   2   4.Tender  Document   1   III.   CERTIFICATION  &  PERMITS   21   1.  CerIficaIon   13   2  .Block  Plan   3   3.  TPAK,TPKB,TPIB   3   3.IP   1   4.  Amdal   2   5.  IMB   1   6.IPB   3           IV.   TENDER  PROCESS   7   1.  ConstrucIon  Management  Tender   1   2.FondaIon  Work  Tender   1   3.  Structure  Work  Tender   1   4.  Architectural  Tender   2        a.  Conceptual  &    SchemaIc  Design  Tender   1        b.  Working  Technical  Design  Tender   1   5.  Electrical  &  Electrical  Tender   1   6.  External  Works  Tender   1   V.   CONSTRUCTION  WORKS   17   1.  Ground  Breaking   1   2.  FondaIon   3   3.  Structure   9   4.Architecrural   14   5.  Mechanical  &  Electrical   9   6.External  Works   6   7.UlIliIes   7   8.TesIng  Commissioning   2       VI.   MarkeIng   30                               VII.   CompleIon   25       VIII.   Start  of  the  OperaIon   26