1. Beam B2/3-4 (Ground Floor)
Ground floor plan Structural plan
Basic information
Slab thickness : 0.15m
Wall thickness: 0.15m
Wall height : 3m
Beam size : Primary beam : 0.2m x 0.4m
: Secondary beam: 0.2m x 0.3m
Column size : 0.3m x 0.4m x 3m
Brick wall : 19kN/m2
RC : 24kN/m3
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
Tan Sheau Hui 0319235
4 | P a g e
Dead Load
Slab self-weight
= 0.15m × 24kN/m3
= 3.6kN/m2
Dead load on slab B-B2/3-4
= 3.6kN/m2
× (2m/2)
= 3.6kN/m
Dead load on slab B2-c/3-4
= 3.6kN/m2
× (2.35m/2)
= 4.23kN/m
Brick wall weight
= 3m × 0.15m × 19kN/m2
Beam self-weight
= 0.2m × 0.3m × 24kN/m2
= 1.44kN/m
Total Dead Load
For 1-2
= 3.6kN/m + 4.23kN/m + 8.55kN/m + 1.44kN/m
= 17.82kN/m
Live Load
Live load on slab B-B2/3-4
= 2kN/m2
× (2m/2)
= 2kN/m
Live load on slab B2-C/3-4
= 1.5kN/m2
× (2.35m/2)
= 1.7625kN/m
Total Live Load
For 3-4
= 2kN/m + 1.7625kN/m
= 3.7625kN/m
Tan Sheau Hui 0319235
5 | P a g e
Ultimate Load
Ultimate dead load 3-4
= 17.82kN/m × 1.4
= 24.948kN/m
Ultimate live load 3-4
= 3.7625kN/m × 1.6
= 6.02kN/m
Total ultimate load 3-4
= 24.948kN/m + 6.02kN/m
= 30.968kN/m
Ultimate Load Diagram
∑ƒy=0
R3 = R4
(30.968kN/m × 3.925m)/2
= 60.7747kN/m
(Point load on beam B-C/4)
Positive area
= 1/2 (60.77) (1.9625)
= 59.63 ~ 60
Negative area
= 1/2 (60.77) (1.9625)
= 59.63 ~ 60
Tan Sheau Hui 0319235
6 | P a g e
Beam Calculation
2. Beam B-C/4 (Ground Floor)
Ground floor plan Structural plan
Basic information
Slab thickness : 0.15m
Wall thickness: 0.15m
Wall height : 3m
Beam size : Primary beam : 0.2m x 0.4m
: Secondary beam: 0.2m x 0.3m
Column size : 0.3m x 0.4m x 3m
Brick wall : 19kN/m2
RC : 24kN/m3
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
Tan Sheau Hui 0319235
7 | P a g e
Dead Load
Slab self-weight
= 0.15m × 24kN/m3
= 3.6kN/m2
Dead load on slab B-B2/3-4
= 3.6kN/m2
× (2m/2) × 2/3
= 2.4kN/m
Dead load on slab B2-C/3-4
= 3.6kN/m2
× (2.35m/2) × 2/3
= 2.82kN/m
Dead load on slab B-C/4-5
= 3.6kN/m2
× (3.925m/2)
= 7.065kN/m
Brick wall weight
= 3m × 0.15m × 19kN/m2
= 8.55kN/m
Beam self-weight
= 0.2m × 0.4m × 24kN/m2
= 1.92kN/m
Total Dead Load
For B-B2
= 2.4 + 2.82 + 7.065 + 9.55 + 1.92
= 22.755kN/m
For B2-C
= 2.4 + 2.82 + 7.065 + 1.92
= 14.205kN/m
Tan Sheau Hui 0319235
8 | P a g e
Live Load
Live load on slab B-B2/3-4
= 2kN/m2
× (2m/2) × 2/3
= 1.3333kN/m
Live load on slab B2-C/3-4
= 1.5kN/m2
× (3.925/2)
= 5.8875kN/m
Total Live Load
For B-C
= 1.3333 + 1.175 + 5.8875
= 8.3958kN/m
Ultimate Load
Ultimate dead load B-B2
= 22.755kN/m × 1.4
= 31.857kN/m
Ultimate dead load B2-C
= 14.205kN/m × 1.4
= 19.887kN/m
Ultimate live load B-B2
= 7.2208kN/m × 1.6
= 11.5533kN/m
Ultimate live load B2-C
= 7.0625kN/m × 1.6
= 11.3kN/m
Total ultimate load B-B2
= 31.857kN/m + 11.5533kN/m
= 43.4103kN/m
Total ultimate load B2-C
= 19.887kN/m + 11.3kN/m
= 31.187kN/m
Tan Sheau Hui 0319235
9 | P a g e
Ultimate Load Diagram
Point load 60.77kN/m taken from 1. Beam B2/3-4
∑mA=0
0 = RcY(4.35) – 86.8206(1) – 60.7747(2)
– 73.2895(3.175)
= 4.35RcY – 96.8206 – 121.5494
– 232.6942
RcY = 103.6929
∑ƒy=0
0 = RbY + 103.6929 – 86.8206 – 60.7747 –
73.2895
RbY = 117.1919
Positive area
1/2 (117.2 + 30.38) × 2
= 147.58
~ 150
Negative area
1/2 (30.39 + 103.7) × 2.35
= 147.56
~ 150
150 - 150 = 0
Tan Sheau Hui 0319235
10 | P a g e
Beam Calculation
3. Beam A1/2-3 (First Floor)
First floor plan Structural plan
Basic information
Slab thickness : 0.15m
Wall thickness: 0.15m
Wall height : 3m
Beam size : Primary beam : 0.2m x 0.4m
: Secondary beam: 0.2m x 0.3m
Column size : 0.3m x 0.4m x 3m
Brick wall : 19kN/m2
RC : 24kN/m3
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
Tan Sheau Hui 0319235
11 | P a g e
Dead Load
Slab self-weight
= 0.15m × 24kN/m3
= 3.6kN/m2
Dead load on slab A-A1/2.1-2.2
= 3.6kN/m2
× (1.95m/2) ×2/3
= 2.34kN/m
Dead load on slab A1-B/2-2.1
= 1.29kN/m
Dead load on slab A1-B/2.1-3
= 3.6kN/m2
× (1.5m/2)
= 2.7kN/m
Brick wall weight
= 3m × 0.15m × 19kN/m2
= 8.55kN/m
Beam self-weight
= 0.2m × 0.3m × 24kN/m2
= 1.44kN/m
Total Dead Load
For 2-2.1
= 1.29 + 8.55 +1.44
= 11.28kN/m
For 2.1-2.2
= 2.34 + 2.7 + 8.55 + 1.44
= 15.03kN/m
For 2.2-3
= 2.7 + 8.55 + 1.44
= 12.69kN/m
Tan Sheau Hui 0319235
12 | P a g e
Live Load
Live load on slab A1-B/2-2.1
= 1.5kN/m2
× (1.075m/2) × 2/3
= 0.5375kN/m
Live load on slab A-A1/2.1-2.2
= 2.0kN/m2
× (1.95m/2) × 2/3
= 1.3kN/m
Live load on slab A1-B/2.1-3
= 1.5kN/m2
× (1.5m/2)
= 1.125kN/m
Total Live Load
For 2-2.1
= 0.5375kN/m
For 2.1-2.2
= 1.3 + 1.125
= 2.425kN/m
For 2.2-3
= 1.125kN/m
Tan Sheau Hui 0319235
13 | P a g e
Ultimate Load
Ultimate dead load 2-2.1
= 11.28kN/m × 1.4
= 15.792kN/m
Ultimate dead load 2.1-2.2
= 15.03kN/m × 1.4
= 21.042kN/m
Ultimate dead load 2.2-3
= 12.69kN/m × 1.4
= 17.766kN/m
Ultimate live load 2-2.1
= 0.5375kN/m × 1.6
= 0.86kN/m
Ultimate live load 2.1-2.2
= 2.425kN/m × 1.6
= 3.88kN/m
Ultimate live load 2.2-3
= 1.125kN/m × 1.6
= 1.8kN/m
Total ultimate load 2-2.1
= 15.792 + 0.86
= 16.652kN/m
Total ultimate load 2.1-2.2
= 21.042 + 3.88
= 24.922kN/m
Total ultimate load 2.2-3
= 17.766 + 1.8
= 19.566kN/m
Tan Sheau Hui 0319235
14 | P a g e
Ultimate Load Diagram
∑mA=0
0 = R3Y(4.075) – 17.9009(0.5375)
– 48.5979(2.05) – 20.5443(3.55)
= 4.075R3Y – 9.6217 – 99.6257 – 71.905
R3Y = 44.4546 ~ 44.45
∑ƒy=0
0 = R2Y + 44.45 – 17.9009 – 48.5979
– 20.5443
R2Y = 42.5918 ~ 42.59
(Point load on beam A-B/2)
x/y = 42.59/44.45 --- 1
x + y = 1.95 --- 2
x/(1.95-x) = 42.59/44.45
44.45x = 83.0505 – 42.59x
87.04x = 83.0505
x = 0.9542
y = 1.95 – 0.942
= 0.9958
Positive area
= [1/2 (42.59 + 24.6891)] + [1/2 (24.6891) (0.9542)]
= 36.1625 + 11.7792
= 47.9417 ~ 48
Negative area
= [1/2 (23.9088) (0.9958)] + [1/2 (23.9088 + 44.45) (1.05)]
= 11.9042 + 35.8884
= 47.7926 ~ 48
Tan Sheau Hui 0319235
15 | P a g e
Beam Calculation
4. Beam A-B/2 (First Floor)
First floor plan Structural plan
Basic information
Slab thickness : 0.15m
Wall thickness: 0.15m
Wall height : 3m
Beam size : Primary beam : 0.2m x 0.4m
: Secondary beam: 0.2m x 0.3m
Column size : 0.3m x 0.4m x 3m
Brick wall : 19kN/m2
RC : 24kN/m3
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
Tan Sheau Hui 0319235
16 | P a g e
Dead Load
Slab self-weight
= 0.15m × 24kN/m3
= 3.6kN/m
Dead load on slab A-B/1-2
= 3.6kN/m2
× (3.925m/2)
= 7.065kN/m
Dead load on slab A-A1/2-2.1
= 3.6kN/m2
× (1.075m/2)
= 1.935kN/m
Dead load on slab A1-B/2-2.1
= 3.6kN/m2
× (1.075m/2)
= 1.935kN/m
Brick wall weight
= 3m × 0.15m × 19kN/m2
= 8.55kN/m
Beam self weight
= 0.2m × 0.4m × 24kN/m2
= 1.92kN/m
Total Dead Load
For A-A1
= 7.065 + 1.935 + 8.55 + 1.92
= 19.47kN/m
For A1-B
= 7.065 + 1.935 + 8.55 + 1.92
= 19.47kN/m
Live Load
Live load on slab A-B/1-2
= 1.5kN/m2
× (3.925m/2)
= 2.9438kN/m
Live load on slab A-A1/2-2.1
Tan Sheau Hui 0319235
17 | P a g e
= 1.5kN/m2
× (1.075m/2)
= 0.8063kN/m
Live load on slab A1-B/2-2.1
= 1.5kN/m2
× (1.075m/2)
= 0.8063kN/m
Total Live Load
For A-A1
= 2.9438 + 0.8063
= 3.7501kN/m
For A1-B
= 2.9438 + 0.8063
= 3.7501kN/m
Ultimate Load
Ultimate dead load A-A1
= 19.47kN/m × 1.4
= 27.258kN/m
Ultimate dead load A1-B
= 19.47kN/m × 1.4
= 27.258kN/m
Ultimate live load A-A1
= 3.7501kN/m × 1.6
= 6.0002kN/m
Ultimate live load A1-B
= 3.7501kN/m × 1.6
6.0002kN/m
Total ultimate load A-A1
= 27.258 + 6.0002
= 33.2582kN/m
Total ultimate load A1-B
= 27.258 + 6.0002
= 33.2582kN/m
Tan Sheau Hui 0319235
18 | P a g e
Ultimate Load Diagram
Point load 47.59kN/m taken from 3. Beam A1/2-3
∑mA=0
0 = RbY(5) – 116.4037(1.75) – 42.59(3.5)
– 49.8873(4.25)
= 5RbY – 203.7065 - 149.065 – 212.021
RbY = 112.9585 ~ 112.96
∑ƒy=0
0 = RaY + 112.96 – 116.4037 – 42.59
– 49.8873
RaY = 95.921 ~ 95.92
x/y = 95.92/20.4837 --- 1
x + y = 3.5 --- 2
x/(3.5-x) = 95.92/20.4837
20.4837x = 335.72 – 95.92x
x = 2.8841
y = 3.5 – 2.8841
= 0.6159
Positive area
= 1/2 (95.92) (2.8841)
= 138.3647 ~ 138
Negative area
= [1/2 (1.5) (63.0737+ 112.96)]
+ [1/2 (0.6159) (20.4837)]
= 132.0253 + 6.308
= 138.3333 ~ 138
x = 1/2 × 20.4837 × 0.6159
= 6.308
Tan Sheau Hui 0319235
19 | P a g e
Beam Calculation
5. Beam D-E1/4.1 (First Floor)
First floor plan Structural plan
Basic information
Slab thickness : 0.15m
Wall thickness: 0.15m
Wall height : 3m
Beam size : Primary beam : 0.2m × 0.4m
: Secondary beam: 0.2m × 0.3m
Column size : 0.3m x 0.4m x 3m
Brick wall : 19kN/m2
RC : 24kN/m3
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
Tan Sheau Hui 0319235
20 | P a g e
Dead Load
Slab self-weight
= 0.15m × 24kN/m2
= 3.6kN/m2
Dead load on slab D-E/4-4.1
= 3.6kN/m2
× (1.025m/2)
= 1.845kN/m
Dead load on slab E-E1/4-4.1
= 3.6kN/m2
× (0.85m/2) × 2/3
= 1.02kN/m
Brick wall weight
= 3m × 0.15m × 19kN/m2
= 8.55kN/m
Beam self-weight
= 0.2m × 0.3m × 24kN/m2
= 1.44kN/m
Total Dead Load
For D-E
= 1.845 + 8.55 + 1.44
= 11.835kN/m
For E-E1
= 1.02 + 8.55 + 1.44
= 11.01kN/m
Tan Sheau Hui 0319235
21 | P a g e
Live Load
Live load on slab D-E/4-4.1
= 1.5kN/m2
× (1.025m/2)
= 0.7688kN/m
Live load on slab E-E1/4-4.1
= 1.5kN/m2
× (0.85m/2) × 2/3
= 0.425kN/m
Total Live Load
For D-E
= 0.7688kN/m
For E-E1
= 0.425kN/m
Ultimate Load
Ultimate dead load D-E
= 11.835kN/m × 1.4
= 16.597kN/m
Ultimate dead load E-E1
= 11.01kN/m × 1.4
= 15.414kN/m
Ultimate live load D-E
= 0.7688kN/m × 1.6
= 1.23kN/m
Ultimate live load E-E1
= 0.425kN/m × 1.6
= 0.68kN/m
Total ultimate load D-E
= 16.597kN/m + 1.23kN/m
= 17.827kN/m
Total ultimate load E-E1
= 15.414kN/m + 0.68kN/m
= 16.094kN/m
Tan Sheau Hui 0319235
22 | P a g e
Ultimate Load Diagram
∑mA=0
0 = ReY(4) – 71.308(2) – 13.6799(4.425)
4ReY = 142.616 + 60.5336
ReY = 50.79
(Point load on beam E/3-4.1)
∑ƒy=0
0 = RdY + 50.79 – 71.308 – 13.6799
RdY = 34.2
x/(4 – x) = 37.108/34.2
34.2x = 148.432 – 34.2
x = 2.08
Positive area
= [1/2 (34.2) (4.208)] + [1/2 (0.85) (13.682)]
= 32.832 + 5.815
= 38.647 ~ 39
Negative area
= 1/2 (2.08) (37.108)
= 38.59 ~ 39
Tan Sheau Hui 0319235
23 | P a g e
Beam Calculation
6. Beam E/3-4.1 (First Floor)
Ground floor plan Structural plan
Basic information
Slab thickness : 0.15m
Wall thickness: 0.15m
Wall height : 3m
Beam size : Primary beam : 0.2m × 0.4m
: Secondary beam: 0.2m × 0.3m
Column size : 0.3m x 0.4m x 3m
Brick wall : 19kN/m2
RC : 24kN/m3
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
Tan Sheau Hui 0319235
24 | P a g e
Dead Load
Slab self-weight
= 0.15m × 24kN/m3
= 3.6kN/m2
Dead load on slab D-E/3-4
= 3.6kN/m2
× (3.95m/2) × 2/3
= 4.71kN/m
Dead load on slab E-E1/3-4
= 3.6kN/m2
× (0.85m/2)
= 1.53kN/m
Dead load on slab E-E1/4-4.1
= 3.6kN/m2
× (0.85m/2)
= 1.53kN/m
Beam self-weight
= 0.2m × 0.4m × 24kN/m2
= 1.92kN/m
Total Dead Load
For 3-4
= 4.71 + 1.53 + 1.92
= 8.16kN/m
For 4-4.1
= 1.53 + 1.92
= 3.45kN/m
Tan Sheau Hui 0319235
25 | P a g e
Live Load
Live load on slab D-E/3-4
= 1.5kN/m2
× (3.925m × 2) × 2/3
= 1.9625kN/m
Live load on slab E-E1/3-4
= 1.5kN/m2
× (0.85m/2)
= 0.6375kN/m
Live load on slab E-E1/4-4.1
= 1.5kN/m2
× (0.85m/2)
= 0.6375kN/m
Total Live Load
For 3-4
= 1.9625 + 0.6375
= 2.6kN/m
For 4-4.1
= 0.6375kN/m
Ultimate Load
Ultimate dead load 3-4
= 8.16kN/m × 1.4
= 11.424kN/m
Ultimate dead load 4-4.1
= 3.45kN/m × 1.4
= 4.83kN/m
Ultimate live load 3-4
= 2.6kN/m × 1.6
= 4.16kN/m
Ultimate live load 4-4.1
= 0.6375kN/m × 1.6
= 1.02kN/m
Tan Sheau Hui 0319235
26 | P a g e
Total ultimate load 3-4
= 11.424 + 4.16
= 15.584kN/m
Total ultimate load 4-4.1
= 4.83 + 1.02
= 5.85kN/m
Ultimate Load Diagram
Point load 50.79kN/m taken from 5. Beam D-E1/4.1
∑mA=0
0 = R4Y(3.925) – 61.1672(1.9625) – 5.9963(4.4375)
– 50.79(4.95)
3.925R4Y = 120.0406 + 26.6086 + 251.4105
R4Y = 101.4165
∑ƒy=0
0 = R3Y + 101.4165 – 61.1672 – 5.9963 – 50.79
R3Y = 16.537
x/(3.925 – x) = 44.6302/16.537
16.537x = 175.17 – 44.6302x
x = 2.86
Positive area
= [1/2 (16.537) (3.925 – 2.86)] +
[1/2 (56.7863 + 50.79) (1.025)]
= 8.806 + 55.1329
= 63.9 ~ 64
Negative area
= 1/2 (44.6302) (2.86)
= 63.8212 ~ 64
Tan Sheau Hui 0319235
27 | P a g e
Column
Calculation
Tan Sheau Hui 0319235
28 | P a g e
Column Calculation
1. Column B4
Ground floor plan First floor plan
Ground floor roof plan First floor roof plan
(Column B4 does not touch
ground floor roof structure)
Tan Sheau Hui 0319235
29 | P a g e
Ground floor structural plan First floor structural plan
First floor structural plan
Basic information
Height of the floors : 3m
Brick wall thickness : 150mm
Dead Load= 3m × 0.15m × 19 kN/m3
= 8.55kN/m
Beam size : Primary beam : 0.2m × 0.4m
Dead Load= 0.2 m × 0.4 m × 24 kN/m3
= 1.92kN/m
: Secondary beam: 0.2m × 0.3m
Dead Load= 0.2 m × 0.3 m × 24 kN/m3
= 1.44kN/m
Slab thickness : 150mm,
Dead Load= 0.15m × 24 kN/m3
= 3.6 kN/m2
Column size : 0.3m × 0.4m × 3m
Tan Sheau Hui 0319235
30 | P a g e
Dead Load= 0.3m × 0.4m × 3m × 24 kN/m3 = 8.64 kN
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
First Floor Roof Level
Total slab area = (1.926m + 1.025m) (2.5m + 2.175m)
= 2.9875m × 4.675m
= 13.97m2
Total beam length = 2.5m + 1.9625m + 2.175m + 1.025m
= 7.66m
Dead Load
Slab = 13.97m2
× 3.6kN/m2
= 50.292kN
Roof beam = 7.66m × 1.08kN/m
= 8.2728kN
Total dead load = 50.292kN + 8.2728kN
= 58.5648kN
First Floor
Total slab area = (1.9625m + 1.025m) (2.5m + 2.175m)
= 2.9875m × 4.675m
= 13.97m2
Total beam length
Primary = 2.5m + 1.9625m + 2.175m + 1.025m
= 7.66m
Secondary = 1.9625m + 1.025m + 2.5m + 2.175m
= 7.66m
Tan Sheau Hui 0319235
31 | P a g e
Dead Load
Walls (none)
Slabs = 13.97m2
× 3.6kN/m2
= 50.292kN
Beams
Primary = 7.66m × 1.92kN/m
= 14.7072kN
Secondary = 7.66m × 1.44kN/m
= 11.03m
Column = 8.64kN
Total dead load = 50.292kN +14.7072kN + 11.03m + 8.64kN
= 84.6692kN
Ground Floor
Total slab area = 1.9625m × 2.175m
= 4.14m2
Total beam length
Primary beam= 1.9625m + 1.9625m + 2.175m
= 6.1m
Secondary beam= 1.9625m
Total beam = 6.1m + 1.9625m
= 8.0625m
Total wall length = 8.0625m
Dead Load
Walls = 8.0625m × 8.55kN/m
= 68.934kN
Slabs = 4.14m2
× 3.6kN/m2
= 14.904kN
Beams
Primary = 6.1m × 1.92kN/m
= 11.712kN
Secondary = 1.9625m × 1.44kN/m
Tan Sheau Hui 0319235
32 | P a g e
= 2.826kN
Column = 8.64kN
Total dead load = 68.934kN + 14.904kN + 11.712kN + 2.826kN + 8.64kN
= 107.016kN
Live Load
First floor
Bedroom = (2.9875m × 4.675m) (1.5kN/m2
)
= 20.95kN
Ground Floor
Toilet = (1.9625m × 2.175m) (2kN/m2
)
= 8.54kN
Kitchen = (1.9625m × 2.175m) (3kN/m2
)
= 12.81kN
Total Dead Load
= 58.5648kN + 84.6692kN + 107.016kN
= 250.25kN
Total Live Load
= 20.59kN + 8.54kN + 12.81kN
= 42.3kN
Tan Sheau Hui 0319235
33 | P a g e
Ultimate load on column B4
Ultimate dead load = 250.25kN × 1.4
= 350.35kN
Ultimate live load = 42.3kN × 1.6
= 67.68kN
Total ultimate load = 350.35kN + 67.68kN
= 418.03kN
N = 0.4fcuAc + 0.8 fyAsc
N = capacity of concrete
Fcu = concrete strength (N/mm2)
Ac = cross section of concrete column
fcu = yield strength of steel (N/mm2)
Asc = steel content in a column
Given that fcu = 30N/mm2 and fy = 460N/mm2.
Assuming percentage of steel reinforcement in a rectangular concrete column is 2%,
determine the capacity of the column.
Ac = 300 × 400 = 120,000
Asc = 2 % × 120,000 = 2,400
N = 0.4fcuAc + 0.8 fyAsc
= 0.4(30)(120000) + 0.8(460)(2400)
= 1440,000 + 883,200
= 2323200 N = 2323.2kN
Thus, this column can sustain any ultimate load below 2323.2 kN.
Tan Sheau Hui 0319235
34 | P a g e
Column Calculation
2. Column E3
Ground floor plan First floor plan
Ground floor roof plan First floor roof plan
Tan Sheau Hui 0319235
35 | P a g e
Ground floor structural plan First floor structural plan
Ground floor structural plan First floor structural plan
Basic information
Height of the floors : 3m
Brick wall thickness : 150mm
Dead Load= 3m x 0.15m x 19 kN/m3
= 8.55kN/m
Beam size : Primary beam : 0.2m x 0.4m
Dead Load= 0.2 m x 0.4 m x 24 kN/m3
= 1.92kN/m
: Secondary beam: 0.2m x 0.3m
Dead Load= 0.2 m x 0.3 m x 24 kN/m3
= 1.44kN/m
Slab thickness : 150mm,
Dead Load= 0.15m x 24 kN/m3
= 3.6 kN/m2
Column size : 0.3m x 0.4m x 3m
Tan Sheau Hui 0319235
36 | P a g e
Dead Load= 0.3m x 0.4m x 3m x 24 kN/m3 = 8.64 kN
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
First Floor Roof Level
Total slab area = (2.0375m + 1.9625m) (2m + 0.85m)
= 4m × 2.85m
= 11.4m2
Total beam length = 2.0375m + 1.9625m + 2m + 0.85m
= 6.85m
Dead Load
Slab = 11.4m2
× 3.6kN/m2
= 41.04kN
Roof beam = 6.85m × 1.92kN/m
= 13.152kN
Total dead load = 41.04kN + 13.152kN
= 54.192kN
First Floor
Total slab area = (2.0375m + 1.9625m) (2m + 0.85m)
= 4m × 2.85m
= 11.4m2
Total beam length
Primary = 2.0375m + 1.9625m + 2m + 0.85m
= 6.85m
Secondary = 2.02375m + 1.9625m
= 4m
Total wall length = 2m + 0.85m
= 2.85m
Tan Sheau Hui 0319235
37 | P a g e
Dead Load
Walls = 2.85m × 8.55kN/m
= 24.3675kN
Slabs = 11.4m2
× 3.6kN/m2
= 41.04kN
Beams
Primary = 6.85m × 1.92kN/m
= 13.152kN
Secondary = 4m × 1.44kN/m
= 5.76kN
Column = 8.64kN
Total dead load = 24.3675kN + 41.04kN + 13.152kN + 5.76kN + 8.64kN
= 92.96kN
Ground Floor Roof Level
Total slab area = (2.0375m × 5.075m) + (1.9625m × 3.075m)
= 10.3403m2
+ 6.0347m2
= 16.375m2
Total beam length = 2.0375m + 1.9625m + 2m + 3.075m
= 9.075m
Dead Load
Slab = 16.375m2
× 3.6kN/m2
= 58.95kN
Roof beam = 9.075m × 1.92kN/m
= 17.424kN
Total dead load = 58.95kN + 17.424kN
= 76.374kN
Ground Floor
Total slab area = (1.9625m) (2m + 1.5375m)
= 1.9625m × 3.5375m
= 6.9423m2
Tan Sheau Hui 0319235
38 | P a g e
Total beam length = 1.9625m + 2m + 1.5375m
= 5.5m
Total wall length = 2m + 1.5375m
= 3.5375m
Dead Load
Walls = 3.5375m × 8.55kN/m
= 30.2456kN
Slabs = 6.9423m2
× 3.6kN/m2
= 24.9923kN
Beams = 5.5m × 1.92kN/m
= 10.56kN
Column = 8.64kN
Total dead load = 30.2456kN + 24.9923kN + 10.56kN + 8.64kN
= 74.4379kN
Live Load
First floor
Toilet = (2.85m × 2.0375m) × 2kN/m2
= 11.6138kN
Bedroom = (2.85m × 1.9625m) × 1.5kN/m2
= 8.3897kN
Ground Floor
Living & dining = (1.9625m × 3.5375m) × 1.5kN/m2
= 10.4135kN
Total Dead Load
= 54.192kN + 92.96kN + 76.374kN + 74.4379kN
= 297.905kN
Total Live Load
= 11.6138kN + 8.3897kN + 10.4135kN
= 30.417kN
Tan Sheau Hui 0319235
39 | P a g e
Ultimate load on column E3
Ultimate dead load = 297.905kN × 1.4
= 417.067kN
Ultimate live load = 30.417kN × 1.6
= 48.6672kN
Total ultimate load = 417.067kN + 48.6672kN
= 465.7342kN
N = 0.4fcuAc + 0.8 fyAsc
N = capacity of concrete
Fcu = concrete strength (N/mm2)
Ac = cross section of concrete column
fcu = yield strength of steel (N/mm2)
Asc = steel content in a column
Given that fcu = 30N/mm2 and fy = 460N/mm2.
Assuming percentage of steel reinforcement in a rectangular concrete column is 2%,
determine the capacity of the column.
Ac = 300 x 400 = 120,000
Asc = 2 % x 120,000 = 2,400
N = 0.4fcuAc + 0.8 fyAsc
= 0.4(30)(120000) + 0.8(460)(2400)
= 1440,000 + 883,200
= 2323200 N = 2323.2kN
Thus, this column can sustain any ultimate load below 2323.2 kN.
Tan Sheau Hui 0319235
40 | P a g e
Column Calculation
3. Column E4
Ground floor plan First floor plan
Ground floor roof plan First floor roof plan
Tan Sheau Hui 0319235
41 | P a g e
Ground floor structural plan First floor structural plan
Ground floor structural plan First floor structural plan
Basic information
Height of the floors : 3m
Brick wall thickness : 150mm
Dead Load= 3m x 0.15m x 19 kN/m3
= 8.55kN/m
Beam size : Primary beam : 0.2m x 0.4m
Dead Load= 0.2 m x 0.4 m x 24 kN/m3
= 1.92kN/m
: Secondary beam: 0.2m x 0.3m
Dead Load= 0.2 m x 0.3 m x 24 kN/m3
= 1.44kN/m
Slab thickness : 150mm,
Dead Load= 0.15m x 24 kN/m3
= 3.6 kN/m2
Tan Sheau Hui 0319235
42 | P a g e
Column size : 0.3m x 0.4m x 3m
Dead Load= 0.3m x 0.4m x 3m x 24 kN/m3 = 8.64 kN
Live Load : Living area : 1.5kN/m2
: Bedroom : 1.5kN/m2
: Bathroom : 2.0kN/m2
: Kitchen : 3.0kN/m2
First Floor Roof Level
Total slab area = (2m + 0.85m) (1.9625m + 1.025m)
= 2.85m × 2.9875m
= 8.51m2
Total beam length = 2m + 0.85m + 1.9625m + 1.025m + 1.9625m
= 7.8m
Dead Load
Slab = 8.51m2
× 3.6kN/m2
= 30.636kN
Roof beam = 7.8m × 1.92kN/m
= 14.976kN
Total dead load = 30.636kN + 14.976kN
= 45.612kN
First Floor
Total slab area = (2m + 0.85m) (1.9625m + 1.025m)
= 2.85m × 2.9875m
= 8.5144m2
͌ 8.51m2
Total beam length
Primary = 1.9625m + 1.025m + 2m + 0.85m
= 5.84m
Secondary = 2m + 0.85m + 1.025m + 1.9625m
= 5.84m
Tan Sheau Hui 0319235
43 | P a g e
Dead Load
Walls (none)
Slabs = 8.51m2
× 3.6kN/m2
= 30.636kN
Beams
Primary = 5.84m × 1.92kN/m
= 11.2128kN
Secondary = 5.84m × 1.44kN/m
= 8.41kN
Column = 8.64kN
Total dead load = 30.636kN + 11.2128kN + 8.64kN + 8.41kN
= 58.9kN
Ground Floor Roof Level
Total slab area = 3.925m × 1.5375m
= 6.0347m2
Total beam length = 3.925m + 1.5375m
= 5.4625m
Dead Load
Slab = 6.0347m2
× 3.6kN/m2
= 21.7249kN
Roof beam = 5.4625m × 1.92kN/m
= 10.488kN
Total dead load = 21.7249kN + 10.488kN
= 32.2129kN
Ground Floor
Total slab area = (3.925m) (2m + 3.075m)
= 3.925m × 5.075m
= 19.9194m2
Total beam length = 3.925m + 5.075m
= 9m
Tan Sheau Hui 0319235
44 | P a g e
Dead Load
Walls (none)
Slabs = 19.9194m2
× 3.6kN/m2
= 71.7098kN
Beams = 9m × 1.92kN/m
= 17.28kN
Column = 8.64kN
Total dead load = 71.7098kN + 17.28kN + 8.64kN
= 97.6298kN
Live Load
First floor
Bedroom = 8.51m2
× 1.5kN/m2
= 12.765kN
Ground Floor
Living & dining = 19.9194m2
× 1.5kN/m2
= 29.8791kN
Total Dead Load
= 41.8488kN + 32.2129kN + 58.9kN + 97.6298kN
= 230.59kN
Total Live Load
= 12.765kN + 28.8791kN
= 42.6441kN
Tan Sheau Hui 0319235
45 | P a g e
Ultimate load on column E4
Ultimate dead load = 230.59kN × 1.4
= 322.83kN
Ultimate live load = 42.6441kN × 1.6
= 68.2306kN
Total ultimate load = 322.83kN + 68.2306kN
= 391.06kN
N = 0.4fcuAc + 0.8 fyAsc
N = capacity of concrete
Fcu = concrete strength (N/mm2)
Ac = cross section of concrete column
fcu = yield strength of steel (N/mm2)
Asc = steel content in a column
Given that fcu = 30N/mm2 and fy = 460N/mm2.
Assuming percentage of steel reinforcement in a rectangular concrete column is 2%,
determine the capacity of the column.
Ac = 300 x 400 = 120,000
Asc = 2 % x 120,000 = 2,400
N = 0.4fcuAc + 0.8 fyAsc
= 0.4(30)(120000) + 0.8(460)(2400)
= 1440,000 + 883,200
= 2323200 N = 2323.2kN
Thus, this column can sustain any ultimate load below 2323.2 kN.

More Related Content

What's hot

What's hot (20)

Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
Comparison of Bricks
Comparison of BricksComparison of Bricks
Comparison of Bricks
 
Doubly reinforced beam design
Doubly reinforced beam   designDoubly reinforced beam   design
Doubly reinforced beam design
 
Design of Doubly Reinforced Beam
Design of Doubly Reinforced BeamDesign of Doubly Reinforced Beam
Design of Doubly Reinforced Beam
 
Presentation PPT.pdf
Presentation PPT.pdfPresentation PPT.pdf
Presentation PPT.pdf
 
Peb ppt 3
Peb ppt 3Peb ppt 3
Peb ppt 3
 
STONES AND TIMBER AS BUILDING MATERIAL
STONES AND TIMBER AS BUILDING MATERIAL STONES AND TIMBER AS BUILDING MATERIAL
STONES AND TIMBER AS BUILDING MATERIAL
 
Ppt ggbs
Ppt ggbsPpt ggbs
Ppt ggbs
 
Column design: as per bs code
Column design: as per bs codeColumn design: as per bs code
Column design: as per bs code
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss
 
FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
 
Design calculations of raft foundation
Design calculations of raft foundationDesign calculations of raft foundation
Design calculations of raft foundation
 
precast driven pile 450x450-350x350
precast driven pile 450x450-350x350precast driven pile 450x450-350x350
precast driven pile 450x450-350x350
 
Composite slab
Composite slabComposite slab
Composite slab
 
DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5
 
Building Structures: Column & Beam analysis
Building Structures: Column & Beam analysisBuilding Structures: Column & Beam analysis
Building Structures: Column & Beam analysis
 
Structural Design
Structural DesignStructural Design
Structural Design
 

Viewers also liked

History, Future and Issues
History, Future and IssuesHistory, Future and Issues
History, Future and Issues
Sheau Hui Tan
 

Viewers also liked (20)

Bstructure calculation
Bstructure calculationBstructure calculation
Bstructure calculation
 
The Journal 3
The Journal 3The Journal 3
The Journal 3
 
ICI Magazine
ICI MagazineICI Magazine
ICI Magazine
 
CTS Final Project Report
CTS Final Project ReportCTS Final Project Report
CTS Final Project Report
 
History, Future and Issues
History, Future and IssuesHistory, Future and Issues
History, Future and Issues
 
Group documentation
Group documentationGroup documentation
Group documentation
 
intro to biz final project
intro to biz final projectintro to biz final project
intro to biz final project
 
intro to biz assignment business plan
intro to biz assignment  business plan intro to biz assignment  business plan
intro to biz assignment business plan
 
Culture
CultureCulture
Culture
 
CL Final Report
CL Final ReportCL Final Report
CL Final Report
 
Sketches
SketchesSketches
Sketches
 
Building Service final report
Building Service final reportBuilding Service final report
Building Service final report
 
Bcon report
Bcon reportBcon report
Bcon report
 
Dpj 2
Dpj 2Dpj 2
Dpj 2
 
DPJ 1
DPJ 1DPJ 1
DPJ 1
 
Ideal Journal 2
Ideal Journal 2Ideal Journal 2
Ideal Journal 2
 
James bond films essay
James bond films essayJames bond films essay
James bond films essay
 
Measured Drawings Report
Measured Drawings ReportMeasured Drawings Report
Measured Drawings Report
 
Scamper
ScamperScamper
Scamper
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 

Similar to BStructure calculation

Building structures final
Building structures finalBuilding structures final
Building structures final
Jamie Lee
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension jun
Ah Jun
 

Similar to BStructure calculation (20)

Final structure report
Final structure reportFinal structure report
Final structure report
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
individual part
individual part individual part
individual part
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension jun
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final report
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
B structure
B structure B structure
B structure
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Building structure
Building structure Building structure
Building structure
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 e
 
Structural Analysis of SIRI House
Structural Analysis of SIRI HouseStructural Analysis of SIRI House
Structural Analysis of SIRI House
 
Building Structure
Building Structure Building Structure
Building Structure
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
 

More from Sheau Hui Tan

More from Sheau Hui Tan (20)

Student Project Management Report
Student Project Management ReportStudent Project Management Report
Student Project Management Report
 
Meeting Minute Exercise
Meeting Minute ExerciseMeeting Minute Exercise
Meeting Minute Exercise
 
Project Management- Documenting a Project
Project Management- Documenting a ProjectProject Management- Documenting a Project
Project Management- Documenting a Project
 
Titiwangsa Lake Garden, Kuala Lumpur Site Analysis
Titiwangsa Lake Garden, Kuala Lumpur Site AnalysisTitiwangsa Lake Garden, Kuala Lumpur Site Analysis
Titiwangsa Lake Garden, Kuala Lumpur Site Analysis
 
Building Science PSALI report
Building Science PSALI reportBuilding Science PSALI report
Building Science PSALI report
 
Btech final report
Btech final reportBtech final report
Btech final report
 
Building Science final report
Building Science final report Building Science final report
Building Science final report
 
Theories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essayTheories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essay
 
Synopsis Writing
Synopsis WritingSynopsis Writing
Synopsis Writing
 
Bim final documentation
Bim final documentation Bim final documentation
Bim final documentation
 
Csi proposal vivacity
Csi proposal  vivacityCsi proposal  vivacity
Csi proposal vivacity
 
Internship report
Internship reportInternship report
Internship report
 
Nishinoyama House Architectural Analysis
Nishinoyama House Architectural AnalysisNishinoyama House Architectural Analysis
Nishinoyama House Architectural Analysis
 
Conservation slides
Conservation slidesConservation slides
Conservation slides
 
Proposal of Adaptive Reuse
Proposal of Adaptive ReuseProposal of Adaptive Reuse
Proposal of Adaptive Reuse
 
Seminar Talk on Georgetown Conservation
Seminar Talk on Georgetown ConservationSeminar Talk on Georgetown Conservation
Seminar Talk on Georgetown Conservation
 
Progress
ProgressProgress
Progress
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Timeline on Buildings in Bukit Bintang, Kuala Lumpur
Timeline on Buildings in Bukit Bintang, Kuala LumpurTimeline on Buildings in Bukit Bintang, Kuala Lumpur
Timeline on Buildings in Bukit Bintang, Kuala Lumpur
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 

Recently uploaded

Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 

Recently uploaded (20)

Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 

BStructure calculation

  • 1. Tan Sheau Hui 0319235 1 | P a g e Tan Sheau Hui 0319235
  • 2. Tan Sheau Hui 0319235 2 | P a g e Beam Calculation
  • 3. Tan Sheau Hui 0319235 3 | P a g e Beam Calculation 1. Beam B2/3-4 (Ground Floor) Ground floor plan Structural plan Basic information Slab thickness : 0.15m Wall thickness: 0.15m Wall height : 3m Beam size : Primary beam : 0.2m x 0.4m : Secondary beam: 0.2m x 0.3m Column size : 0.3m x 0.4m x 3m Brick wall : 19kN/m2 RC : 24kN/m3 Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2
  • 4. Tan Sheau Hui 0319235 4 | P a g e Dead Load Slab self-weight = 0.15m × 24kN/m3 = 3.6kN/m2 Dead load on slab B-B2/3-4 = 3.6kN/m2 × (2m/2) = 3.6kN/m Dead load on slab B2-c/3-4 = 3.6kN/m2 × (2.35m/2) = 4.23kN/m Brick wall weight = 3m × 0.15m × 19kN/m2 Beam self-weight = 0.2m × 0.3m × 24kN/m2 = 1.44kN/m Total Dead Load For 1-2 = 3.6kN/m + 4.23kN/m + 8.55kN/m + 1.44kN/m = 17.82kN/m Live Load Live load on slab B-B2/3-4 = 2kN/m2 × (2m/2) = 2kN/m Live load on slab B2-C/3-4 = 1.5kN/m2 × (2.35m/2) = 1.7625kN/m Total Live Load For 3-4 = 2kN/m + 1.7625kN/m = 3.7625kN/m
  • 5. Tan Sheau Hui 0319235 5 | P a g e Ultimate Load Ultimate dead load 3-4 = 17.82kN/m × 1.4 = 24.948kN/m Ultimate live load 3-4 = 3.7625kN/m × 1.6 = 6.02kN/m Total ultimate load 3-4 = 24.948kN/m + 6.02kN/m = 30.968kN/m Ultimate Load Diagram ∑ƒy=0 R3 = R4 (30.968kN/m × 3.925m)/2 = 60.7747kN/m (Point load on beam B-C/4) Positive area = 1/2 (60.77) (1.9625) = 59.63 ~ 60 Negative area = 1/2 (60.77) (1.9625) = 59.63 ~ 60
  • 6. Tan Sheau Hui 0319235 6 | P a g e Beam Calculation 2. Beam B-C/4 (Ground Floor) Ground floor plan Structural plan Basic information Slab thickness : 0.15m Wall thickness: 0.15m Wall height : 3m Beam size : Primary beam : 0.2m x 0.4m : Secondary beam: 0.2m x 0.3m Column size : 0.3m x 0.4m x 3m Brick wall : 19kN/m2 RC : 24kN/m3 Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2
  • 7. Tan Sheau Hui 0319235 7 | P a g e Dead Load Slab self-weight = 0.15m × 24kN/m3 = 3.6kN/m2 Dead load on slab B-B2/3-4 = 3.6kN/m2 × (2m/2) × 2/3 = 2.4kN/m Dead load on slab B2-C/3-4 = 3.6kN/m2 × (2.35m/2) × 2/3 = 2.82kN/m Dead load on slab B-C/4-5 = 3.6kN/m2 × (3.925m/2) = 7.065kN/m Brick wall weight = 3m × 0.15m × 19kN/m2 = 8.55kN/m Beam self-weight = 0.2m × 0.4m × 24kN/m2 = 1.92kN/m Total Dead Load For B-B2 = 2.4 + 2.82 + 7.065 + 9.55 + 1.92 = 22.755kN/m For B2-C = 2.4 + 2.82 + 7.065 + 1.92 = 14.205kN/m
  • 8. Tan Sheau Hui 0319235 8 | P a g e Live Load Live load on slab B-B2/3-4 = 2kN/m2 × (2m/2) × 2/3 = 1.3333kN/m Live load on slab B2-C/3-4 = 1.5kN/m2 × (3.925/2) = 5.8875kN/m Total Live Load For B-C = 1.3333 + 1.175 + 5.8875 = 8.3958kN/m Ultimate Load Ultimate dead load B-B2 = 22.755kN/m × 1.4 = 31.857kN/m Ultimate dead load B2-C = 14.205kN/m × 1.4 = 19.887kN/m Ultimate live load B-B2 = 7.2208kN/m × 1.6 = 11.5533kN/m Ultimate live load B2-C = 7.0625kN/m × 1.6 = 11.3kN/m Total ultimate load B-B2 = 31.857kN/m + 11.5533kN/m = 43.4103kN/m Total ultimate load B2-C = 19.887kN/m + 11.3kN/m = 31.187kN/m
  • 9. Tan Sheau Hui 0319235 9 | P a g e Ultimate Load Diagram Point load 60.77kN/m taken from 1. Beam B2/3-4 ∑mA=0 0 = RcY(4.35) – 86.8206(1) – 60.7747(2) – 73.2895(3.175) = 4.35RcY – 96.8206 – 121.5494 – 232.6942 RcY = 103.6929 ∑ƒy=0 0 = RbY + 103.6929 – 86.8206 – 60.7747 – 73.2895 RbY = 117.1919 Positive area 1/2 (117.2 + 30.38) × 2 = 147.58 ~ 150 Negative area 1/2 (30.39 + 103.7) × 2.35 = 147.56 ~ 150 150 - 150 = 0
  • 10. Tan Sheau Hui 0319235 10 | P a g e Beam Calculation 3. Beam A1/2-3 (First Floor) First floor plan Structural plan Basic information Slab thickness : 0.15m Wall thickness: 0.15m Wall height : 3m Beam size : Primary beam : 0.2m x 0.4m : Secondary beam: 0.2m x 0.3m Column size : 0.3m x 0.4m x 3m Brick wall : 19kN/m2 RC : 24kN/m3 Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2
  • 11. Tan Sheau Hui 0319235 11 | P a g e Dead Load Slab self-weight = 0.15m × 24kN/m3 = 3.6kN/m2 Dead load on slab A-A1/2.1-2.2 = 3.6kN/m2 × (1.95m/2) ×2/3 = 2.34kN/m Dead load on slab A1-B/2-2.1 = 1.29kN/m Dead load on slab A1-B/2.1-3 = 3.6kN/m2 × (1.5m/2) = 2.7kN/m Brick wall weight = 3m × 0.15m × 19kN/m2 = 8.55kN/m Beam self-weight = 0.2m × 0.3m × 24kN/m2 = 1.44kN/m Total Dead Load For 2-2.1 = 1.29 + 8.55 +1.44 = 11.28kN/m For 2.1-2.2 = 2.34 + 2.7 + 8.55 + 1.44 = 15.03kN/m For 2.2-3 = 2.7 + 8.55 + 1.44 = 12.69kN/m
  • 12. Tan Sheau Hui 0319235 12 | P a g e Live Load Live load on slab A1-B/2-2.1 = 1.5kN/m2 × (1.075m/2) × 2/3 = 0.5375kN/m Live load on slab A-A1/2.1-2.2 = 2.0kN/m2 × (1.95m/2) × 2/3 = 1.3kN/m Live load on slab A1-B/2.1-3 = 1.5kN/m2 × (1.5m/2) = 1.125kN/m Total Live Load For 2-2.1 = 0.5375kN/m For 2.1-2.2 = 1.3 + 1.125 = 2.425kN/m For 2.2-3 = 1.125kN/m
  • 13. Tan Sheau Hui 0319235 13 | P a g e Ultimate Load Ultimate dead load 2-2.1 = 11.28kN/m × 1.4 = 15.792kN/m Ultimate dead load 2.1-2.2 = 15.03kN/m × 1.4 = 21.042kN/m Ultimate dead load 2.2-3 = 12.69kN/m × 1.4 = 17.766kN/m Ultimate live load 2-2.1 = 0.5375kN/m × 1.6 = 0.86kN/m Ultimate live load 2.1-2.2 = 2.425kN/m × 1.6 = 3.88kN/m Ultimate live load 2.2-3 = 1.125kN/m × 1.6 = 1.8kN/m Total ultimate load 2-2.1 = 15.792 + 0.86 = 16.652kN/m Total ultimate load 2.1-2.2 = 21.042 + 3.88 = 24.922kN/m Total ultimate load 2.2-3 = 17.766 + 1.8 = 19.566kN/m
  • 14. Tan Sheau Hui 0319235 14 | P a g e Ultimate Load Diagram ∑mA=0 0 = R3Y(4.075) – 17.9009(0.5375) – 48.5979(2.05) – 20.5443(3.55) = 4.075R3Y – 9.6217 – 99.6257 – 71.905 R3Y = 44.4546 ~ 44.45 ∑ƒy=0 0 = R2Y + 44.45 – 17.9009 – 48.5979 – 20.5443 R2Y = 42.5918 ~ 42.59 (Point load on beam A-B/2) x/y = 42.59/44.45 --- 1 x + y = 1.95 --- 2 x/(1.95-x) = 42.59/44.45 44.45x = 83.0505 – 42.59x 87.04x = 83.0505 x = 0.9542 y = 1.95 – 0.942 = 0.9958 Positive area = [1/2 (42.59 + 24.6891)] + [1/2 (24.6891) (0.9542)] = 36.1625 + 11.7792 = 47.9417 ~ 48 Negative area = [1/2 (23.9088) (0.9958)] + [1/2 (23.9088 + 44.45) (1.05)] = 11.9042 + 35.8884 = 47.7926 ~ 48
  • 15. Tan Sheau Hui 0319235 15 | P a g e Beam Calculation 4. Beam A-B/2 (First Floor) First floor plan Structural plan Basic information Slab thickness : 0.15m Wall thickness: 0.15m Wall height : 3m Beam size : Primary beam : 0.2m x 0.4m : Secondary beam: 0.2m x 0.3m Column size : 0.3m x 0.4m x 3m Brick wall : 19kN/m2 RC : 24kN/m3 Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2
  • 16. Tan Sheau Hui 0319235 16 | P a g e Dead Load Slab self-weight = 0.15m × 24kN/m3 = 3.6kN/m Dead load on slab A-B/1-2 = 3.6kN/m2 × (3.925m/2) = 7.065kN/m Dead load on slab A-A1/2-2.1 = 3.6kN/m2 × (1.075m/2) = 1.935kN/m Dead load on slab A1-B/2-2.1 = 3.6kN/m2 × (1.075m/2) = 1.935kN/m Brick wall weight = 3m × 0.15m × 19kN/m2 = 8.55kN/m Beam self weight = 0.2m × 0.4m × 24kN/m2 = 1.92kN/m Total Dead Load For A-A1 = 7.065 + 1.935 + 8.55 + 1.92 = 19.47kN/m For A1-B = 7.065 + 1.935 + 8.55 + 1.92 = 19.47kN/m Live Load Live load on slab A-B/1-2 = 1.5kN/m2 × (3.925m/2) = 2.9438kN/m Live load on slab A-A1/2-2.1
  • 17. Tan Sheau Hui 0319235 17 | P a g e = 1.5kN/m2 × (1.075m/2) = 0.8063kN/m Live load on slab A1-B/2-2.1 = 1.5kN/m2 × (1.075m/2) = 0.8063kN/m Total Live Load For A-A1 = 2.9438 + 0.8063 = 3.7501kN/m For A1-B = 2.9438 + 0.8063 = 3.7501kN/m Ultimate Load Ultimate dead load A-A1 = 19.47kN/m × 1.4 = 27.258kN/m Ultimate dead load A1-B = 19.47kN/m × 1.4 = 27.258kN/m Ultimate live load A-A1 = 3.7501kN/m × 1.6 = 6.0002kN/m Ultimate live load A1-B = 3.7501kN/m × 1.6 6.0002kN/m Total ultimate load A-A1 = 27.258 + 6.0002 = 33.2582kN/m Total ultimate load A1-B = 27.258 + 6.0002 = 33.2582kN/m
  • 18. Tan Sheau Hui 0319235 18 | P a g e Ultimate Load Diagram Point load 47.59kN/m taken from 3. Beam A1/2-3 ∑mA=0 0 = RbY(5) – 116.4037(1.75) – 42.59(3.5) – 49.8873(4.25) = 5RbY – 203.7065 - 149.065 – 212.021 RbY = 112.9585 ~ 112.96 ∑ƒy=0 0 = RaY + 112.96 – 116.4037 – 42.59 – 49.8873 RaY = 95.921 ~ 95.92 x/y = 95.92/20.4837 --- 1 x + y = 3.5 --- 2 x/(3.5-x) = 95.92/20.4837 20.4837x = 335.72 – 95.92x x = 2.8841 y = 3.5 – 2.8841 = 0.6159 Positive area = 1/2 (95.92) (2.8841) = 138.3647 ~ 138 Negative area = [1/2 (1.5) (63.0737+ 112.96)] + [1/2 (0.6159) (20.4837)] = 132.0253 + 6.308 = 138.3333 ~ 138 x = 1/2 × 20.4837 × 0.6159 = 6.308
  • 19. Tan Sheau Hui 0319235 19 | P a g e Beam Calculation 5. Beam D-E1/4.1 (First Floor) First floor plan Structural plan Basic information Slab thickness : 0.15m Wall thickness: 0.15m Wall height : 3m Beam size : Primary beam : 0.2m × 0.4m : Secondary beam: 0.2m × 0.3m Column size : 0.3m x 0.4m x 3m Brick wall : 19kN/m2 RC : 24kN/m3 Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2
  • 20. Tan Sheau Hui 0319235 20 | P a g e Dead Load Slab self-weight = 0.15m × 24kN/m2 = 3.6kN/m2 Dead load on slab D-E/4-4.1 = 3.6kN/m2 × (1.025m/2) = 1.845kN/m Dead load on slab E-E1/4-4.1 = 3.6kN/m2 × (0.85m/2) × 2/3 = 1.02kN/m Brick wall weight = 3m × 0.15m × 19kN/m2 = 8.55kN/m Beam self-weight = 0.2m × 0.3m × 24kN/m2 = 1.44kN/m Total Dead Load For D-E = 1.845 + 8.55 + 1.44 = 11.835kN/m For E-E1 = 1.02 + 8.55 + 1.44 = 11.01kN/m
  • 21. Tan Sheau Hui 0319235 21 | P a g e Live Load Live load on slab D-E/4-4.1 = 1.5kN/m2 × (1.025m/2) = 0.7688kN/m Live load on slab E-E1/4-4.1 = 1.5kN/m2 × (0.85m/2) × 2/3 = 0.425kN/m Total Live Load For D-E = 0.7688kN/m For E-E1 = 0.425kN/m Ultimate Load Ultimate dead load D-E = 11.835kN/m × 1.4 = 16.597kN/m Ultimate dead load E-E1 = 11.01kN/m × 1.4 = 15.414kN/m Ultimate live load D-E = 0.7688kN/m × 1.6 = 1.23kN/m Ultimate live load E-E1 = 0.425kN/m × 1.6 = 0.68kN/m Total ultimate load D-E = 16.597kN/m + 1.23kN/m = 17.827kN/m Total ultimate load E-E1 = 15.414kN/m + 0.68kN/m = 16.094kN/m
  • 22. Tan Sheau Hui 0319235 22 | P a g e Ultimate Load Diagram ∑mA=0 0 = ReY(4) – 71.308(2) – 13.6799(4.425) 4ReY = 142.616 + 60.5336 ReY = 50.79 (Point load on beam E/3-4.1) ∑ƒy=0 0 = RdY + 50.79 – 71.308 – 13.6799 RdY = 34.2 x/(4 – x) = 37.108/34.2 34.2x = 148.432 – 34.2 x = 2.08 Positive area = [1/2 (34.2) (4.208)] + [1/2 (0.85) (13.682)] = 32.832 + 5.815 = 38.647 ~ 39 Negative area = 1/2 (2.08) (37.108) = 38.59 ~ 39
  • 23. Tan Sheau Hui 0319235 23 | P a g e Beam Calculation 6. Beam E/3-4.1 (First Floor) Ground floor plan Structural plan Basic information Slab thickness : 0.15m Wall thickness: 0.15m Wall height : 3m Beam size : Primary beam : 0.2m × 0.4m : Secondary beam: 0.2m × 0.3m Column size : 0.3m x 0.4m x 3m Brick wall : 19kN/m2 RC : 24kN/m3 Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2
  • 24. Tan Sheau Hui 0319235 24 | P a g e Dead Load Slab self-weight = 0.15m × 24kN/m3 = 3.6kN/m2 Dead load on slab D-E/3-4 = 3.6kN/m2 × (3.95m/2) × 2/3 = 4.71kN/m Dead load on slab E-E1/3-4 = 3.6kN/m2 × (0.85m/2) = 1.53kN/m Dead load on slab E-E1/4-4.1 = 3.6kN/m2 × (0.85m/2) = 1.53kN/m Beam self-weight = 0.2m × 0.4m × 24kN/m2 = 1.92kN/m Total Dead Load For 3-4 = 4.71 + 1.53 + 1.92 = 8.16kN/m For 4-4.1 = 1.53 + 1.92 = 3.45kN/m
  • 25. Tan Sheau Hui 0319235 25 | P a g e Live Load Live load on slab D-E/3-4 = 1.5kN/m2 × (3.925m × 2) × 2/3 = 1.9625kN/m Live load on slab E-E1/3-4 = 1.5kN/m2 × (0.85m/2) = 0.6375kN/m Live load on slab E-E1/4-4.1 = 1.5kN/m2 × (0.85m/2) = 0.6375kN/m Total Live Load For 3-4 = 1.9625 + 0.6375 = 2.6kN/m For 4-4.1 = 0.6375kN/m Ultimate Load Ultimate dead load 3-4 = 8.16kN/m × 1.4 = 11.424kN/m Ultimate dead load 4-4.1 = 3.45kN/m × 1.4 = 4.83kN/m Ultimate live load 3-4 = 2.6kN/m × 1.6 = 4.16kN/m Ultimate live load 4-4.1 = 0.6375kN/m × 1.6 = 1.02kN/m
  • 26. Tan Sheau Hui 0319235 26 | P a g e Total ultimate load 3-4 = 11.424 + 4.16 = 15.584kN/m Total ultimate load 4-4.1 = 4.83 + 1.02 = 5.85kN/m Ultimate Load Diagram Point load 50.79kN/m taken from 5. Beam D-E1/4.1 ∑mA=0 0 = R4Y(3.925) – 61.1672(1.9625) – 5.9963(4.4375) – 50.79(4.95) 3.925R4Y = 120.0406 + 26.6086 + 251.4105 R4Y = 101.4165 ∑ƒy=0 0 = R3Y + 101.4165 – 61.1672 – 5.9963 – 50.79 R3Y = 16.537 x/(3.925 – x) = 44.6302/16.537 16.537x = 175.17 – 44.6302x x = 2.86 Positive area = [1/2 (16.537) (3.925 – 2.86)] + [1/2 (56.7863 + 50.79) (1.025)] = 8.806 + 55.1329 = 63.9 ~ 64 Negative area = 1/2 (44.6302) (2.86) = 63.8212 ~ 64
  • 27. Tan Sheau Hui 0319235 27 | P a g e Column Calculation
  • 28. Tan Sheau Hui 0319235 28 | P a g e Column Calculation 1. Column B4 Ground floor plan First floor plan Ground floor roof plan First floor roof plan (Column B4 does not touch ground floor roof structure)
  • 29. Tan Sheau Hui 0319235 29 | P a g e Ground floor structural plan First floor structural plan First floor structural plan Basic information Height of the floors : 3m Brick wall thickness : 150mm Dead Load= 3m × 0.15m × 19 kN/m3 = 8.55kN/m Beam size : Primary beam : 0.2m × 0.4m Dead Load= 0.2 m × 0.4 m × 24 kN/m3 = 1.92kN/m : Secondary beam: 0.2m × 0.3m Dead Load= 0.2 m × 0.3 m × 24 kN/m3 = 1.44kN/m Slab thickness : 150mm, Dead Load= 0.15m × 24 kN/m3 = 3.6 kN/m2 Column size : 0.3m × 0.4m × 3m
  • 30. Tan Sheau Hui 0319235 30 | P a g e Dead Load= 0.3m × 0.4m × 3m × 24 kN/m3 = 8.64 kN Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2 First Floor Roof Level Total slab area = (1.926m + 1.025m) (2.5m + 2.175m) = 2.9875m × 4.675m = 13.97m2 Total beam length = 2.5m + 1.9625m + 2.175m + 1.025m = 7.66m Dead Load Slab = 13.97m2 × 3.6kN/m2 = 50.292kN Roof beam = 7.66m × 1.08kN/m = 8.2728kN Total dead load = 50.292kN + 8.2728kN = 58.5648kN First Floor Total slab area = (1.9625m + 1.025m) (2.5m + 2.175m) = 2.9875m × 4.675m = 13.97m2 Total beam length Primary = 2.5m + 1.9625m + 2.175m + 1.025m = 7.66m Secondary = 1.9625m + 1.025m + 2.5m + 2.175m = 7.66m
  • 31. Tan Sheau Hui 0319235 31 | P a g e Dead Load Walls (none) Slabs = 13.97m2 × 3.6kN/m2 = 50.292kN Beams Primary = 7.66m × 1.92kN/m = 14.7072kN Secondary = 7.66m × 1.44kN/m = 11.03m Column = 8.64kN Total dead load = 50.292kN +14.7072kN + 11.03m + 8.64kN = 84.6692kN Ground Floor Total slab area = 1.9625m × 2.175m = 4.14m2 Total beam length Primary beam= 1.9625m + 1.9625m + 2.175m = 6.1m Secondary beam= 1.9625m Total beam = 6.1m + 1.9625m = 8.0625m Total wall length = 8.0625m Dead Load Walls = 8.0625m × 8.55kN/m = 68.934kN Slabs = 4.14m2 × 3.6kN/m2 = 14.904kN Beams Primary = 6.1m × 1.92kN/m = 11.712kN Secondary = 1.9625m × 1.44kN/m
  • 32. Tan Sheau Hui 0319235 32 | P a g e = 2.826kN Column = 8.64kN Total dead load = 68.934kN + 14.904kN + 11.712kN + 2.826kN + 8.64kN = 107.016kN Live Load First floor Bedroom = (2.9875m × 4.675m) (1.5kN/m2 ) = 20.95kN Ground Floor Toilet = (1.9625m × 2.175m) (2kN/m2 ) = 8.54kN Kitchen = (1.9625m × 2.175m) (3kN/m2 ) = 12.81kN Total Dead Load = 58.5648kN + 84.6692kN + 107.016kN = 250.25kN Total Live Load = 20.59kN + 8.54kN + 12.81kN = 42.3kN
  • 33. Tan Sheau Hui 0319235 33 | P a g e Ultimate load on column B4 Ultimate dead load = 250.25kN × 1.4 = 350.35kN Ultimate live load = 42.3kN × 1.6 = 67.68kN Total ultimate load = 350.35kN + 67.68kN = 418.03kN N = 0.4fcuAc + 0.8 fyAsc N = capacity of concrete Fcu = concrete strength (N/mm2) Ac = cross section of concrete column fcu = yield strength of steel (N/mm2) Asc = steel content in a column Given that fcu = 30N/mm2 and fy = 460N/mm2. Assuming percentage of steel reinforcement in a rectangular concrete column is 2%, determine the capacity of the column. Ac = 300 × 400 = 120,000 Asc = 2 % × 120,000 = 2,400 N = 0.4fcuAc + 0.8 fyAsc = 0.4(30)(120000) + 0.8(460)(2400) = 1440,000 + 883,200 = 2323200 N = 2323.2kN Thus, this column can sustain any ultimate load below 2323.2 kN.
  • 34. Tan Sheau Hui 0319235 34 | P a g e Column Calculation 2. Column E3 Ground floor plan First floor plan Ground floor roof plan First floor roof plan
  • 35. Tan Sheau Hui 0319235 35 | P a g e Ground floor structural plan First floor structural plan Ground floor structural plan First floor structural plan Basic information Height of the floors : 3m Brick wall thickness : 150mm Dead Load= 3m x 0.15m x 19 kN/m3 = 8.55kN/m Beam size : Primary beam : 0.2m x 0.4m Dead Load= 0.2 m x 0.4 m x 24 kN/m3 = 1.92kN/m : Secondary beam: 0.2m x 0.3m Dead Load= 0.2 m x 0.3 m x 24 kN/m3 = 1.44kN/m Slab thickness : 150mm, Dead Load= 0.15m x 24 kN/m3 = 3.6 kN/m2 Column size : 0.3m x 0.4m x 3m
  • 36. Tan Sheau Hui 0319235 36 | P a g e Dead Load= 0.3m x 0.4m x 3m x 24 kN/m3 = 8.64 kN Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2 First Floor Roof Level Total slab area = (2.0375m + 1.9625m) (2m + 0.85m) = 4m × 2.85m = 11.4m2 Total beam length = 2.0375m + 1.9625m + 2m + 0.85m = 6.85m Dead Load Slab = 11.4m2 × 3.6kN/m2 = 41.04kN Roof beam = 6.85m × 1.92kN/m = 13.152kN Total dead load = 41.04kN + 13.152kN = 54.192kN First Floor Total slab area = (2.0375m + 1.9625m) (2m + 0.85m) = 4m × 2.85m = 11.4m2 Total beam length Primary = 2.0375m + 1.9625m + 2m + 0.85m = 6.85m Secondary = 2.02375m + 1.9625m = 4m Total wall length = 2m + 0.85m = 2.85m
  • 37. Tan Sheau Hui 0319235 37 | P a g e Dead Load Walls = 2.85m × 8.55kN/m = 24.3675kN Slabs = 11.4m2 × 3.6kN/m2 = 41.04kN Beams Primary = 6.85m × 1.92kN/m = 13.152kN Secondary = 4m × 1.44kN/m = 5.76kN Column = 8.64kN Total dead load = 24.3675kN + 41.04kN + 13.152kN + 5.76kN + 8.64kN = 92.96kN Ground Floor Roof Level Total slab area = (2.0375m × 5.075m) + (1.9625m × 3.075m) = 10.3403m2 + 6.0347m2 = 16.375m2 Total beam length = 2.0375m + 1.9625m + 2m + 3.075m = 9.075m Dead Load Slab = 16.375m2 × 3.6kN/m2 = 58.95kN Roof beam = 9.075m × 1.92kN/m = 17.424kN Total dead load = 58.95kN + 17.424kN = 76.374kN Ground Floor Total slab area = (1.9625m) (2m + 1.5375m) = 1.9625m × 3.5375m = 6.9423m2
  • 38. Tan Sheau Hui 0319235 38 | P a g e Total beam length = 1.9625m + 2m + 1.5375m = 5.5m Total wall length = 2m + 1.5375m = 3.5375m Dead Load Walls = 3.5375m × 8.55kN/m = 30.2456kN Slabs = 6.9423m2 × 3.6kN/m2 = 24.9923kN Beams = 5.5m × 1.92kN/m = 10.56kN Column = 8.64kN Total dead load = 30.2456kN + 24.9923kN + 10.56kN + 8.64kN = 74.4379kN Live Load First floor Toilet = (2.85m × 2.0375m) × 2kN/m2 = 11.6138kN Bedroom = (2.85m × 1.9625m) × 1.5kN/m2 = 8.3897kN Ground Floor Living & dining = (1.9625m × 3.5375m) × 1.5kN/m2 = 10.4135kN Total Dead Load = 54.192kN + 92.96kN + 76.374kN + 74.4379kN = 297.905kN Total Live Load = 11.6138kN + 8.3897kN + 10.4135kN = 30.417kN
  • 39. Tan Sheau Hui 0319235 39 | P a g e Ultimate load on column E3 Ultimate dead load = 297.905kN × 1.4 = 417.067kN Ultimate live load = 30.417kN × 1.6 = 48.6672kN Total ultimate load = 417.067kN + 48.6672kN = 465.7342kN N = 0.4fcuAc + 0.8 fyAsc N = capacity of concrete Fcu = concrete strength (N/mm2) Ac = cross section of concrete column fcu = yield strength of steel (N/mm2) Asc = steel content in a column Given that fcu = 30N/mm2 and fy = 460N/mm2. Assuming percentage of steel reinforcement in a rectangular concrete column is 2%, determine the capacity of the column. Ac = 300 x 400 = 120,000 Asc = 2 % x 120,000 = 2,400 N = 0.4fcuAc + 0.8 fyAsc = 0.4(30)(120000) + 0.8(460)(2400) = 1440,000 + 883,200 = 2323200 N = 2323.2kN Thus, this column can sustain any ultimate load below 2323.2 kN.
  • 40. Tan Sheau Hui 0319235 40 | P a g e Column Calculation 3. Column E4 Ground floor plan First floor plan Ground floor roof plan First floor roof plan
  • 41. Tan Sheau Hui 0319235 41 | P a g e Ground floor structural plan First floor structural plan Ground floor structural plan First floor structural plan Basic information Height of the floors : 3m Brick wall thickness : 150mm Dead Load= 3m x 0.15m x 19 kN/m3 = 8.55kN/m Beam size : Primary beam : 0.2m x 0.4m Dead Load= 0.2 m x 0.4 m x 24 kN/m3 = 1.92kN/m : Secondary beam: 0.2m x 0.3m Dead Load= 0.2 m x 0.3 m x 24 kN/m3 = 1.44kN/m Slab thickness : 150mm, Dead Load= 0.15m x 24 kN/m3 = 3.6 kN/m2
  • 42. Tan Sheau Hui 0319235 42 | P a g e Column size : 0.3m x 0.4m x 3m Dead Load= 0.3m x 0.4m x 3m x 24 kN/m3 = 8.64 kN Live Load : Living area : 1.5kN/m2 : Bedroom : 1.5kN/m2 : Bathroom : 2.0kN/m2 : Kitchen : 3.0kN/m2 First Floor Roof Level Total slab area = (2m + 0.85m) (1.9625m + 1.025m) = 2.85m × 2.9875m = 8.51m2 Total beam length = 2m + 0.85m + 1.9625m + 1.025m + 1.9625m = 7.8m Dead Load Slab = 8.51m2 × 3.6kN/m2 = 30.636kN Roof beam = 7.8m × 1.92kN/m = 14.976kN Total dead load = 30.636kN + 14.976kN = 45.612kN First Floor Total slab area = (2m + 0.85m) (1.9625m + 1.025m) = 2.85m × 2.9875m = 8.5144m2 ͌ 8.51m2 Total beam length Primary = 1.9625m + 1.025m + 2m + 0.85m = 5.84m Secondary = 2m + 0.85m + 1.025m + 1.9625m = 5.84m
  • 43. Tan Sheau Hui 0319235 43 | P a g e Dead Load Walls (none) Slabs = 8.51m2 × 3.6kN/m2 = 30.636kN Beams Primary = 5.84m × 1.92kN/m = 11.2128kN Secondary = 5.84m × 1.44kN/m = 8.41kN Column = 8.64kN Total dead load = 30.636kN + 11.2128kN + 8.64kN + 8.41kN = 58.9kN Ground Floor Roof Level Total slab area = 3.925m × 1.5375m = 6.0347m2 Total beam length = 3.925m + 1.5375m = 5.4625m Dead Load Slab = 6.0347m2 × 3.6kN/m2 = 21.7249kN Roof beam = 5.4625m × 1.92kN/m = 10.488kN Total dead load = 21.7249kN + 10.488kN = 32.2129kN Ground Floor Total slab area = (3.925m) (2m + 3.075m) = 3.925m × 5.075m = 19.9194m2 Total beam length = 3.925m + 5.075m = 9m
  • 44. Tan Sheau Hui 0319235 44 | P a g e Dead Load Walls (none) Slabs = 19.9194m2 × 3.6kN/m2 = 71.7098kN Beams = 9m × 1.92kN/m = 17.28kN Column = 8.64kN Total dead load = 71.7098kN + 17.28kN + 8.64kN = 97.6298kN Live Load First floor Bedroom = 8.51m2 × 1.5kN/m2 = 12.765kN Ground Floor Living & dining = 19.9194m2 × 1.5kN/m2 = 29.8791kN Total Dead Load = 41.8488kN + 32.2129kN + 58.9kN + 97.6298kN = 230.59kN Total Live Load = 12.765kN + 28.8791kN = 42.6441kN
  • 45. Tan Sheau Hui 0319235 45 | P a g e Ultimate load on column E4 Ultimate dead load = 230.59kN × 1.4 = 322.83kN Ultimate live load = 42.6441kN × 1.6 = 68.2306kN Total ultimate load = 322.83kN + 68.2306kN = 391.06kN N = 0.4fcuAc + 0.8 fyAsc N = capacity of concrete Fcu = concrete strength (N/mm2) Ac = cross section of concrete column fcu = yield strength of steel (N/mm2) Asc = steel content in a column Given that fcu = 30N/mm2 and fy = 460N/mm2. Assuming percentage of steel reinforcement in a rectangular concrete column is 2%, determine the capacity of the column. Ac = 300 x 400 = 120,000 Asc = 2 % x 120,000 = 2,400 N = 0.4fcuAc + 0.8 fyAsc = 0.4(30)(120000) + 0.8(460)(2400) = 1440,000 + 883,200 = 2323200 N = 2323.2kN Thus, this column can sustain any ultimate load below 2323.2 kN.