SCHOOL OF ARCHITECTURE, BUIDLING AND DESIGN
BACHELOR OF SCIENCE (HONS) IN ARCHITECTURE
Building Structures (ARC 2522/2523 )
Project 2: Structural Analysis Of A Bungalow
PREPARED BY:
CHONG HAO FOONG 0322343
FOO JI SUN 0323550
TEOH ZHE KHAI 0322905
TEH WEI HONG 0323743
TANG FU HONG 0323092
GROUND FLOOR PLAN SCALE 1:200
ARCHITECTURE DRAWING
FIRST FLOOR PLAN SCALE 1:200
ARCHITECTURE DRAWING
GROUND FLOOR PLAN SCALE 1:200
LIVE LOAD PLAN
FIRST FLOOR PLAN SCALE 1:200
LIVE LOAD PLAN
LOWER GROUND FLOOR PLAN SCALE 1:200
STRUCTURAL PLAN
GROUND FLOOR PLAN SCALE 1:200
STRUCTURAL PLAN
FIRST FLOOR PLAN SCALE 1:200
STRUCTURAL PLAN
ROOF PLAN SCALE 1:200
STRUCTURAL PLAN
GROUND FLOOR PLAN SCALE 1:200
LOAD DISTRIBUTION PLAN
FIRST FLOOR PLAN SCALE 1:200
LOAD DISTRIBUTION PLAN
DESIGN BRIEF
1.1 CALCULATION FORMULA
Slab System
Ly = Longer side of slab When Ly/Lx > 2 (One way slab system)
Lx = Shorter side of slab When Ly/Lx < 2 (Two way slab system)
Beam Calculation
Beam self weight = Material Density x Beam Size
= 24 kN/m3
x [ 0.3m x 0.2m ]
= 1.44 kN/m
Dead load on slab = Beam self weight x Thickness x Lx/2 One way/ Two way slab trapezoidal shape
= [ Beam self weight x Thickness x Lx/2 ] x 2/3 Two way triangular shape
+Brick wall self weight = Material Density x Thickness x Height
= 19 kN/m3
x 0.15m x 3m
= 8.55 kN/m
Live load on slab = UBBL live load factor x Lx/2 One way/ Two way slab trapezoidal shape
= [ UBBL live load factor x Lx/2 ] x 2/3 Two way triangular shape
Ultimate load = [ Total dead load x 1.4 ] + [ Total live load x 1.6 ]
Reaction force = ∑M = 0
= ∑M = Force x Perpendicular Distance
Column Calculation
Brick wall self weight = Material Density x Thickness x Total length of walls in tributary area
Slab self weight = Material Density x Thickness x Area of tributary area
Beam self weight = Material Density x Beam Size x Total length of beams in tributary area
Column self weight = Material Density x Column size x Column height
Live load on slab = UBBL live load factor x Area space within tributary area
Ultimate load = [ Total dead load x 1.4 ] + [ Total live load x 1.6 ]
INDIVIDUAL CALCULATION
BEAM ANALYSIS
CHONG HAO FOONG 0322905
Beam Calculation (C2-D2)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab C-D/1-2 :
3.6 x (3.9/2) x 2/3 = 4.68kN/m
Dead load on slab C-D/2-3 :
3.6 x (2.7/2) = 4.86kN/m
Total dead load :
4.68+4.86+1.44+11.4 = 22.38kN/m
+ +
Live load
Live load on slab C-D/1-2 :
1.5 x (3.9/2) x 2/3 = 1.95kN/m
Live load on slab C-D/2-3
3 x (2.7/2) = 4.05kN/m
Total live load :
1.95+4.05 = 6kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (22.38 x 1.4) + (6 x 1.6)
= 40.932kN/m
Reaction Force
Moment :
Force x Distance :
40.932 x 3.925 = 160.66kN
∑M = 0
0 = (160.66 x 1.9625) - Rd (3.925)
= 315.29 - Rd (3.925)
Rd = 315.29/3.925
= 80.33kN
Shear Force
Rc = 0 =∑F
0 = Rc - 160.66 + 80.33
Rc = 80.33kN
Bending Moment
(80.33 x 1.96)/2 = 78.72kN
CHONG HAO FOONG 0322905
Beam Calculation (C1-D1)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab C-D/1-2 :
3.6 x (3.9/2) x 2/3 = 4.71kN/m
Dead load on slab -:
- = -
Total dead load :
4.71+1.44+11.4 = 17.55kN/m
+ +
Live load
Live load on slab C-D/1-2 :
2 x (3.9/2) x 2/3 = 2.617 kN/m
Live load on slab -
- = -
Total live load :
2.617 = 2.617kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (17.55 x 1.4) + (2.617 x 1.6)
= 28.76kN/m
Reaction Force
Moment :
Force x Distance :
28.76 x 3.9 = 112.16 kN
∑M = 0
0 = (112.16 x 1.95) - Rd (3.9)
= 218.71- Rd (3.9)
Rd = 218.71/3.9
= 56.08kN
Shear Force
Rc = 0 =∑F
0 = Rc - 112.16 + 56.08
Rc = 56.08kN
Bending Moment
(56.08 x1.95)/2 = 54.68kN
CHONG HAO FOONG 0322905
Beam Calculation (A2-C2)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab A-C/1-2 :
3.6 x (4.63/2) x = 8.33kN/m
Dead load on slab A-C/2-3 :
3.6 x (2.7/2) = 4.86kN/m
Total dead load :
8.33+4.86+1.44+11.4 = 26.03kN/m
+ +
Live load
Live load on slab A-C/1-2 :
1.5 x (4.63/2) = 3.47kN/m
Live load on slab A-C/2-3
2 x (2.7/2) = 2.7kN/m
Total live load :
3.47+2.7 = 6.17kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (26.03 x 1.4) + (6.17 x 1.6)
= 46.312kN/m
Reaction Force
Moment :
Force x Distance :
46.312 x 4.925 = 228.1kN
∑M = 0
0 = (228.1 x 2.4625) - Rd (4.925)
= 561.7 - Rd (4.925)
Rd = 561.7/4.925
= 114.05kN
Shear Force
Rc = 0 =∑F
0 = Rc - 228.1+114.05
Rc = 114.05
Bending Moment
(114.05 x 2.46)/2 = 140.28kN
CHONG HAO FOONG 0322905
Beam Calculation (C1-C2)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab A-C/1-2 :
3.6 x (4.6/2) x 2/3 = 5.55kN/m
Dead load on slab C-D/1-2 :
3.6 x (3.9/2) = 7.065kN/m
Total dead load :
5.55+7.065+1.44+11.4 = 25.46kN/m
Live load
Live load on slab A-C/1-2 :
1.5 x (4.6/2) x 2/3 = 2.31kN/m
Live load on slab C-D/1-2
1.5 x (3.93/2) = 2.94kN/m
Total live load :
2.31+2.94 = 5.25kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (25.46 x 1.4) + (5.25 x 1.6)
= 44.04kN/m
Reaction Force
Moment :
Force x Distance :
44.04 x 4.625 = 203.69kN
∑M = 0
0 = (203.69 x 2.3125) - Rd (4.625)
= 471.02 - Rd (4.625)
Rd = 471.02/4.625
= 101.84kN
Shear Force
Rc = 0 =∑F
0 = Rc - 203.69 + 101.84
Rc = 101.84kN
Bending Moment
(101.84 x 2.31)/2 = 117.76kN
COLUMN ANALYSIS
COLUMN 2A
Roof
Dead Load
Beam = (1.35 + 2.31 + 2.46) x 0.2 x 0.3 x 24
= 8.81 kN
Live Load
Slab = (2.46 x 3.66) x 0.5
= 4.5 kN
Ultimate Load
= (8.81 x 1.4) + (4.5 x 1.6)
= 19.54kN
First Floor
Dead Load
Slab = (3.66 x 2.46) x 0.15 x 24
= 32.41
Beam = (3.66 + 2.46) x 24 x 0.2 x 0.3
= 8.81
Wall = (3.66 + 2.46) x 0.2 x 19 x 3
= 69.77
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 32.41 + 12.81 + 69.77 + 2.88
= 113.87 kN
Live Load
Slab A = 2.31 x 2.46 x 1.5
= 8.52
Slab B = 1.35 x 2.46 x 2
= 6.64
Total Live Load
= 8.52 + 6.64
= 15.16 kN
Ultimate Load
= (113.87 x 1.4) + (15.16 x 1.6)
= 159.42 + 24.26
= 183.68kN
Ground Floor
Dead Load
Slab = (3.66 x 2.46) x 0.15 x 24
= 32.41
Beam = (3.66 + 2.46) x 24 x 0.2 x 0.3
= 8.81
Wall = (3.66 + 2.46) x 0.2 x 19 x 3
= 69.77
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 32.41 + 12.81 + 69.77 + 2.88
= 113.87 kN
Live Load
Slab A = 2.31 x 2.46 x 1.5
= 8.52
Slab B = 1.35 x 2.46 x 2
= 6.64
Total Live Load
= 8.52 + 6.64
= 15.16 kN
Ultimate Load
= (113.87 x 1.4) + (15.16 x 1.6)
= 159.42 + 24.26
= 183.68kN
Total Ultimate Load
= 19.54 + 183.68 + 183.68
= 386.90kN
COLUMN C1
Roof
Dead Load
Beam = (2.31 + 4.42) x 0.2 x 0.3 x 24
= 9.69 kN
Live Load
Slab = (2.31 x 4.42) x 0.5
= 5.11 kN
Ultimate Load
= (9.69 x 1.4) + (5.11 x 1.6)
= 21.74kN
First Floor
Dead Load
Slab = (2.31 x 4.42) x 0.15 x 24
= 36.76
Beam = (2.31 + 4.42) x 24 x 0.2 x 0.3
= 9.69
Wall = (2.31 + 4.42) x 0.2 x 19 x 3
= 76.72
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 36.76 + 9.69 + 76.72 + 2.88
= 126.05 kN
Live Load
Slab A = 2.46 x 2.31 x 1.5
= 8.52
Slab B = 2.31 x 1.96 x 2
= 9.06
Total Live Load
= 8.52 + 9.06
= 17.58kN
Ultimate Load
= (126.05 x 1.4) + (17.58 x 1.6)
= 176.47 + 28.12
= 204.59kN
Ground Floor
Dead Load
Slab = (2.31 x 4.42) x 0.15 x 24
= 36.76
Beam = (2.31 + 4.42) x 24 x 0.2 x 0.3
= 9.69
Wall = (2.31 + 4.42) x 0.2 x 19 x 3
= 76.72
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 36.76 + 9.69 + 76.72 + 2.88
= 126.05 kN
Live Load
Slab A = 2.31 x 2.46 x 1.5
= 8.52
Slab B = 1.96 x 2.31 x 1.5
= 6.79
Total Live Load
= 8.52 + 6.79
= 15.31 kN
Ultimate Load
= (126.05 x 1.4) + (15.31 x 1.6)
= 176.47 + 24.49
= 200.96kN
Total Ultimate Load
= 21.74+ 204.59 + 200.96
= 427.29kN
BEAM ANALYSIS
FOO JI SUN 0323550
BEAM ANALYSIS
FOO JI SUN 0322550
Beam Calculation (D3-E3)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab 2-3/D-E :
3.6 x (2.7/2) = 4.86kN/m
Dead load on slab 3-4/D-E :
3.6 x (4/2) x (2/3) = 4.8kN/m
Total dead load :
4.86 + 4.8 + 1.44 = 11.1kN/m
+ +
Live load
Live load on slab 2-3/D-E :
3 x (2.7/2) = 4.05kN/m
Live load on slab 3-4/D-E :
3 x (4/2) x (2/3) = 4kN/m
Total live load :
4.05 + 4 = 8.05kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (11.1 x 1.4) + (8.05 x 1.6)
= 28.42kN/m
Reaction Force
Moment :
Force x Distance :
28.42 x 4 = 113.68kN
∑M = 0
0 = Rd (4) + (-113.68 x 2)
= 4Rd - 227.36
Rd = 227.36/4
= 56.84kN
Shear Force
Rc = 0 =∑F
0 = Rc - 113.68 + 56.84
Rc = 56.84kN
Bending Moment
(56.84 x 2)/2 = 56.84kN
FOO JI SUN 0322550
Beam Calculation (F3a-F4)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab 3a-4/E-F :
3.6 x (4.1/2) x (2/3) = 4.92kN/m
Total dead load :
4.92 + 1.44 + 11.4 = 14.91kN/m
Live load
Live load on slab 3a-4/E-F :
1.5 x (4.1/2) x (2/3) = 2.05kN/m
Total live load :
= 2.05kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (14.91 x 1.4) + (2.05 x 1.6)
= 24.18kN/m
Reaction Force
Moment :
Force x Distance :
24.18 x 4.1 = 99.14kN
∑M = 0
0 = Rd (4.1) + (-99.14 x 2.05)
= 4.1Rd - 203.23
Rd = 203.23/4
= 49.57kN
Shear Force
Rc = 0 =∑F
0 = Rc - 99.14 + 49.57
Rc = 49.57kN
Bending Moment
(49.57 x 2.05)/2 = 50.8kN
FOO JI SUN 0322550
Beam Calculation (E3a-F3a)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab 2-3a/E-F :
3.6 x (4.9/2) = 8.82kN/m
Dead load on slab 3a-4/E-F :
3.6 x (4.1/2) = 7.38kN/m
Total dead load :
8.82 + 7.38 + 1.44 + 11.4 = 11.1kN/m
+ +
Live load
Live load on slab 2-3a/E-F :
2 x (4.9/2) = 4.9kN/m
Live load on slab 3a-4/E-F :
1.5 x (4.1/2) = 3.08kN/m
Total live load :
4.9 + 3.08 = 8.05kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (4.9 x 1.4) + (3.08 x 1.6)
= 49.44kN/m
Reaction Force
Moment :
Force x Distance :
49.44 x 6 = 296.64kN
∑M = 0
0 = Rd (6) + (-296.64 x 3)
= 6Rd - 889.92
Rd = 889.92/6
= 148.32kN
Shear Force
Rc = 0 =∑F
0 = Rc - 296.64 + 148.32
Rc = 148.32kN
Bending Moment
(148.32 x 3)/2 = 222.48kN
Beam Calculation (E3-E4)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab 3-4/D-E :
3.6 x (4/2) = 7.2kN/m
Dead load on slab 2-3a/E-F :
3.6 x (4.9/2) x (2/3) = 5.88kN/m
Dead load on slab 3a-4/E-F :
3.6 x (4.1/2) x (2/3) = 4.92kN/m
Total dead load :
Slab 3-4/D-E & 2-3a/E-F = 7.2 + 5.88 + 1.44 + 11.4 = 23.07kN/m
Slab 3-4/D-E & 3a-4/E-F = 7.2 + 4.92 + 1.44 + 11.4 = 22.11kN/m
Live load
Live load on slab 3-4/D-E :
3 x (4/2) = 6kN/m
Live load on slab 2-3a/E-F:
2 x (4.9/2) = 4.9kN/m
Live load on slab 3a-4/E-F :
1.5 x (4.1/2) = 3.08kN/m
Total live load :
Slab 3-4/D-E & 2-3a/E-F = 6 + 4.9 = 10.9kN/m
Slab 3-4/D-E & 3a-4/E-F = 6 + 3.08 = 9.08kN/m
Ultimate load
Ultimate load 3-4/D-E & 2-3a/E-F :
(Total dead load x 1.4) + (Total live load x 1.6)
= (23.07 x 1.4) + (10.9x 1.6)
= 49.74kN/m
Ultimate load 3-4/D-E & 3a-4/E-F :
(Total dead load x 1.4) + (Total live load x 1.6)
= (22.11 x 1.4) + (9.08 x 1.6)
= 45.53kN/m
Point Load from Beam E3a-F3a
= 148.32kN
Reaction Force
∑M = 0
0 = Rd (6.3) + (-49.74 x 2.2 x 5.2) + (-148.32 x 4.1) + (-45.53 x 4.1 x 2.05)
= 6.3Rd + (-1559.81)
Rd = 1559.81/6.3
= 247.6kN
Shear Force
Rc = 0 =∑F
0 = Rc + 247.6 + (-49.74 x 2x2) + (-148.32) + (-45.53 x 4.1)
Rc = 196.82
Bending Moment
(415.77 x 2.2)/2 = 424.35kN
(206.97 x 4.1)/2 = 424.3kN
(42)/2 = 424.3kN
COLUMN ANALYSIS
FOO JI SUN 0322550
COLUMN E5
Roof
Dead Load
Beam = 5.1 x 0.2 x 0.3 x 24kN/m3
= 7.34 kN
Live Load
Slab = 3 x 2.1 x 0.5kN/m2
= 3.15 kN
Ultimate Load
= (7.34 x 1.4) + (3.15 x 1.6)
= 15.32kN
First Floor
Dead Load
Slab = 3 x 2.1 x 0.15 x 24kN/m3
= 22.68kN
Beam = 5.1 x 0.2 x 0.3 x 24kN/m3
= 7.34kN
Wall = 3 x 3 x 0.15 x 19kN/m3
= 25.65kN
Column = 3 x 0.2 x 0.2 x 24kN/m3
= 2.88kN
∑Dead Load = 22.68 + 7.34 + 2.88 + 25.65
= 58.55kN
Live Load
Slab = 3 x 2.1 x 1.5kN/m2
= 9.45kN
Ultimate Load
= (58.55 x 1.4) + (9.45 x 1.6)
= 97.09kN
Ground Floor
Dead Load
Slab = 5 x 2.1 x 0.15 x 24kN/m3
= 37.8kN
Beam = 7.1 x 0.2 x 0.3 x 24kN/m3
= 10.22kN
Wall = 5 x 3 x 0.15 x 19kN/m3
= 42.75kN
Column = 3 x 0.2 x 0.2 x 24kN/m3
= 2.88kN
Total Dead Load
= 37.8 + 10.22 + 42.75 + 2.88
= 93.65kN
Live Load
Slab = 5 x 2.1 x 1.5kN/m2
= 15.75kN
Ultimate Load
= (93.65 x 1.4) + (15.75 x 1.6)
= 156.31kN
Total Ultimate Load
= 97.09 + 156.31 + 15.32
= 268.72kN
FOO JI SUN 0322550
COLUMN D4
Roof
Dead Load
Beam = 9.2 x 0.2 x 0.3 x 24kN/m3
= 13.25kN
Live Load
Slab = 5 x 4 x 0.5kN/m2
= 10.4kN
Ultimate Load
= (13.25 x 1.4) + (10.4 x 1.6)
= 35.2kN
First Floor
Dead Load
Slab = 14.6m2
x 0.15 x 24kN/m3
= 52.56kN
Beam = 9.2 x 0.2 x 0.3 x 24kN/m3
= 13.25kN
Wall = 6.1 x 3 x 0.15 x 19kN/m3
= 52.16kN
Column = 3 x 0.2 x 0.2 x 24kN/m3
= 2.88kN
∑Dead Load = 52.56 + 13.25 + 2.88 + 52.16
= 120.85kN
Live Load
Slab 1 = 2.1 x 2 x 2kN/m2
= 8.4kN
Slab 2 = 2.1 x 2 x 1.5kN/m2
= 6.3kN
Slab 3 = 3.1 x 2 x 3kN/m2
= 18.6kN
∑Live Load = 8.4 + 6.3 + 18.6
= 33.3kN
Ultimate Load
= (120.85 x 1.4) + (33.3 x 1.6)
= 222.47kN
Ground Floor
Dead Load
Slab = 14.6m2
x 0.15 x 24kN/m3
= 52.56kN
Beam = 9.2 x 0.2 x 0.3 x 24kN/m3
= 13.25kN
Wall = 5.1 x 3 x 0.15 x 19kN/m3
= 43.6kN
Column = 3 x 0.2 x 0.2 x 24kN/m3
= 2.88kN
Total Dead Load
= 52.56 + 13.25 + 43.6 + 2.88
= 112.29kN
Live Load
Slab 4 = 3.1 x 2 x 2kN/m2
= 12.4kN
Slab 5 = 2.1 x 4 x 3kN/m2
= 25.2kN
Total Live Load
= 12.4 + 25.2
= 37.6kN
Ultimate Load
= (12.29 x 1.4) + (37.6 x 1.6)
= 217.37kN
Total Ultimate Load
= 35.2 + 222.47 + 217.37
= 475.04kN
BEAM ANALYSIS
TEOH ZHE KHAI 0322905
TEOH ZHE KHAI 0322905
Beam Calculation (C3-D4)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab A-C/3-4 :
3.6 x (4.93/2) = 8.874kN/m
Dead load on slab C-D/3-4 :
3.6 x (3.93/2) = 7.074kN/m
Total dead load :
8.874+7.074+1.44 = 17.388kN/m
Live load
Live load on slab A-C/3-4 :
2 x (4.93/2) = 4.93kN/m
Live load on slab C-D/3-4 :
2 x (3.93/2) = 3.93kN/m
Total live load :
4.93 +3.93 = 8.86kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (17.388 x 1.4) + (8.86 x 1.6)
= 38.516kN/m
Reaction Force
Moment :
Force x Distance :
38.516 x 6.3 = 242.65kN
∑M = 0
0 = (242.65 x 3.15) - R4 (6.3)
R4 = 764.35/6.3
= 121.33kN
Shear Force
R3 = 0 =∑F
0 = R3 -242.65 + 121.33
R3 = 121.33kN
Bending Moment
(121.33 x 3.15)/2 = 191.09kN
Beam Calculation (A4-C4)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab A-C/3-4 :
3.6 x (4.93/2) X 2/3 = 5.91kN/m
Dead load on slab A-C/4-5 :
3.6 x (4.23/2) = 7.608kN/m
Total dead load :
5.91+7.608+1.44+11.4 = 26.36kN/m
Live load
Live load on slab A-C/3-4 :
2 x (4.93/2) x 2/3 = 3.28kN/m
Live load on slab A-C/4-5 :
4 x (4.23/2) = 8.45kN/m
Total live load :
3.28 + 8.45 = 11.73kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (26.36 x 1.4) + (11.73 x 1.6)
=55.665kN/m
Reaction Force
Moment :
Force x Distance :
55.665 x 4.925 = 274.15kN
∑M = 0
0 = (274.15 x 2.4625) - RC(4.925)
RC = 675.1/4.925
= 137.1kN
Shear Force
RA = 0 =∑F
0 = RA - 274.15 + 137.1
RA = 137.1kN
Bending Moment
(137.1 x 2.4625)/2 = 168.77kN
Beam Calculation (C4-5)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab A-C/4-5 :
3.6 x (4.23/2) X 2/3 = 5.07kN/m
Dead load on slab C-D/4-5 :
3.6 x (3.93/2) = 7.07kN/m
Total dead load :
5.07+7.07+1.44+11.4 = 24.98kN/m
Live load
Live load on slab A-C/4-5 :
4 x (4.23/2) x 2/3 = 5.63kN/m
Live load on slab C-D/4-5 :
3 x (3.93/2) = 5.89kN/m
Total live load :
5.63 + 5.89 = 11.52kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (24.98 x 1.4) + (11.52 x 1.6)
=53.404kN/m
Reaction Force
Moment :
Force x Distance :
53.404 x 4.225 = 225.63kN
∑M = 0
0 = (225.63 x 2.11) - R5(4.225)
R5 = 476.08/4.225
= 112.815kN
Shear Force
R4 = 0 =∑F
0 = R4 - 225.63 + 112.815
R4 = 112.815kN
Bending Moment
112.815 x 2.11 = 238.04kN
Beam Calculation (C5-D5)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.2m x 19kN/m3
= 11.4kN/m
Dead load on slab C-D/4-5 :
3.6 x (3.93/2) X 2/3 = 4.716kN/m
Total dead load :
4.716+1.44+11.4 = 17.556kN/m
Live load
Live load on slab C-D/4-5 :
3 x (3.93/2) X 2/3 = 3.93kN/m
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (17.556 x 1.4) + (3.93 x 1.6)
= 30.86kN/m
Reaction Force
Moment :
Force x Distance :
30.86 x 3.925 = 121.13kN
∑M = 0
0 = (121.13 x 1.9625) - RD(3.925)
RD = 237.72/3.925
= 60.57kN
Shear Force
RC = 0 =∑F
0 = RC - 121.13 - 60.57
RC = 60.57kN
Bending Moment
60.57 x 1.9625 = 118.86kN
COLUMN ANALYSIS
Roof
Dead Load
Beam = (4.425x5.2625) x 0.2 x 0.3 x 24
= 13.95 kN
Live Load
Slab = (4.425x5.2625) x 0.5
= 11.64 kN
Ultimate Load
= (13.95 x 1.4) + (11.64 x 1.6)
= 38.15kN/m
First Floor
Dead Load
Slab = [(5.2625x1.9625) + (2.4625 X 1.9)] x 0.15 x 24
= 54.07 kN
Beam = (4.425+5.2625) x 0.2 x 0.3 x 24
= 13.95 kN
Wall = (2.4625+2.1125+1.9625) x 0.15 x 19 x 3
= 74.53 kN
Column = 0.2 x 0.2 x 3 x 24
= 2.88 kN
∑Dead Load = 54.07 + 13.95+ 74.53 + 2.88
=145.43 kN
Live Load
Slab = 2.4625 x 1.9 x 1.5
= 7.02 kN/m
Slab = 1.9625 x 3.15 x 1.5
= 9.27 kN/m
Slab = 1.9625 x 2.1125 x 2
= 8.29 kN/m
Ultimate Load
= (145.43 x 1.4) + (24.58 x 1.6)
= 242.93 kN/m
Ground Floor
Dead Load
Slab = (4.425 x 5.2625) x 0.15 x 24
= 83.83
Beam = (4.425 + 5.2625) x 24 x 0.2 x 0.3
= 13.95
Wall = (2.4625 + 2.1125) x 0.2 x 19 x 3
= 5.2155
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 83.83 + 13.95 + 5.2155 + 2.88
= 105.87 kN/m
Live Load
Slab = 4.425 x 3.15 x 2
= 27.88
Slab = 2.1125 x 2.4625 x 4
= 208.08
Slab = 1.9625 x 2.1125 x 3
= 12.44
Total = 248.4
Ultimate Load
= (105.87 x 1.4) + (248.4 x 1.6)
= 545.66kN/m
Total Ultimate Load
= 38.15 + 242.93 + 545.66
= 826.74kN/m
TEOH ZHE KHAI 0322905
Roof
Dead Load
Beam = (3.9625+2.1125) x 0.2 x 0.3 x 24
= 8.75 kN
Live Load
Slab = (3.9625x2.1125) x 0.5
= 4.185 kN
Ultimate Load
= (8.75 x 1.4) + (4.185 x 1.6)
= 18.95kN/m
First Floor
Dead Load
Slab = (3.9625x2.1125) x 0.15 x 24
= 30.13 kN
Beam = (3.9625+2.1125) x 0.2 x 0.3 x 24
= 8.75 kN
Wall = (3.9625+2.1125) x 0.2 x 19 x 3
= 95.43 kN
Column = 0.2 x 0.2 x 3 x 24
= 2.88 kN
∑Dead Load = 30.13 + 8.75+ 95.43 + 2.88
=137.19 kN
Live Load
Slab = 1.9625 x 2.1125 x 2
= 8.29 kN/m
Slab = 2.1125 x 2 x 2
= 8.45 kN/m
Ultimate Load
= (137.19 x 1.4) + (16.74 x 1.6)
= 218.85 kN/m
Ground Floor
Dead Load
Slab = (3.9625 x 2.1125) x 0.15 x 24
= 30.13
Beam = (3.9625 + 2.1125) x 24 x 0.2 x 0.3
= 8.75
Wall = 3.9625 x 0.2 x 3 x 24
=45.17
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 30.13 + 8.75 + 45.17 + 2.88
= 86.93 kN/m
Live Load
Slab = 2.1125 x 1.9625 x 4
= 16.58
Slab = 2.1125 x 2 x 3
= 12.67
Total = 29.25
Ultimate Load
= (86.93 x 1.4) + (29.25 x 1.6)
= 168.5kN/m
Total Ultimate Load
= 18.95 + 218.85 + 168.5
= 406.3kN/m
BEAM ANALYSIS
TEH WEI HONG 0323743
Beam Calculation (C3-D3)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab C-D/1-3
3.6 x (3.9/2) x 2/3 = 4.68kN/m
Dead load on slab C-D/3-4
3.6 x (3.9/2) x 2/3 = 4.68kN/m
Total dead load :
4.68+4.68+1.44+8.55 = 19.35kN/m
Live load
Live load on slab C-D/1-3
1.5 x (3.9/2) x 2/3 = 1.95kN/m
Live load on slab C-D/3-4
2 x (3.9/2) = 2.60kN/m
Total live load:
1.95+2.60 = 4.55kN/m
Ultimate load
Ultimate load:
(Total dead load x 1.4) + (Total live load x 1.6)
= (19.35 x 1.4) + (4.55 x 1.6)
= 34.34kN/m
Reaction Force
Moment:
Force x Distance:
34.34 x 3.9 = 133.93kN
∑M = 0
0 = (133.93 x 1.95) - Rd (3.9)
= 261.16 - Rd (3.9)
Rd = 261.16/3.9
= 66.96kN
Shear Force
Rc = 0 =∑F
0 = Rd + Rc + (-34.34) (3.9)
= 66.96 + Rc + (-34.34) (3.9)
Rc = 66.96kN
Bending Moment
(66.96 x 1.95) /2 = 65.29kN
Beam Calculation (A3-C3)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab A-C/2-3
3.6 x (2.7/2) = 4.86kN/m
Dead load on slab A-C/3-4
3.6 x (4.9/2) x 2/3 = 5.88kN/m
Total dead load :
4.86+5.88+1.44+8.55 = 20.73kN/m
Live load
Live load on slab A-C/2-3
1.5 x (2.7/2) = 2.70kN/m
Live load on slab A-C/3-4
2 x (4.9/2) x 2/3 = 3.27kN/m
Total live load:
2.70+3.27 = 5.97kN/m
Ultimate load
Ultimate load:
(Total dead load x 1.4) + (Total live load x 1.6)
= (20.73 x 1.4) + (5.97 x 1.6)
= 38.57kN/m
Reaction Force
Moment:
Force x Distance:
38.57x 4.9 = 188.99kN
∑M = 0
0 = (188.99 x 2.45) - Rd (4.9)
= -463.03 - Rd (4.9)
Rd = 463.03/4.9
= 94.5kN
Shear Force
Rc = 0 =∑F
0 = Rd + Rc + (-38.57) (4.9)
= 94.5+ Rc + (-38.57) (4.9)
Rc = -94.5kN
Bending Moment
(94.5 x 2.45) /2 = 115.76kN
Beam Calculation (A2-C2)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab A-C/1-2
3.6 x (2.7/2) = 4.86kN/m
Dead load on slab A-C/2-3
3.6 x (4.6/2) = 8.28kN/m
Total dead load :
4.86+8.28+1.44+8.55 = 23.13kN/m
Live load
Live load on slab A-C/1-2
1.5 x (4.6/2) = 3.45kN/m
Live load on slab A-C/2-3
2 x (2.7/2) = 2.70kN/m
Total live load:
2.70+3.45 = 6.15kN/m
Ultimate load
Ultimate load:
(Total dead load x 1.4) + (Total live load x 1.6)
= (23.13 x 1.4) + (6.15 x 1.6)
= 36.39kN/m
Reaction Force
Moment:
Force x Distance:
36.39 x 4.9 = 178.31kN
∑M = 0
0 = (178.31 x 2.45) - Rd (4.9)
= 436.86 - Rd (4.9)
Rd = 436.86/4.9
= 89.16kN
Shear Force
Rc = 0 =∑F
0 = Rd + Rc + (-36.39) (4.9)
= 89.16 + Rc + (-36.39) (4.9)
Rc = -89.16kN
Bending Moment
(89.16 x 2.45) /2 = 109.22kN
Beam Calculation (1C-3C)
Dead load
Slab self weight:
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight:
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight:
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab A-C/1-2
3.6 x (4.6/2) x 2/3 = 5.52kN/m
Dead load on slab C-D/1-3
3.6 x (3.9/2) = 7.02kN/m
Total dead load:
7.02+5.52+1.44+8.55 = 22.53kN/m
Live load
Live load on slab A-C/1-2
1.5 x (4.6/2) x 2/3 = 2.30kN/m
Live load on slab A-C/2-3
1.5 x (3.9/2) = 2.93kN/m
Total live load:
2.30+2.93 = 5.23kN/m
Ultimate load
Dead load
22.53 x 1.4 = 31.54
17.01 x 1.4 =1.40
Live load
5.23 x 1.6 = 8.37
2.93 x 1.6 =4.69
Reaction Force
Moment:
∑M = 0
0 = Ra(7.3)+ (-39.91)(4.6)(5) + (-89.16)(2.7) + (-2.7)(1.35)
-7.3 Ra = -1262.54
Ra = 172.95kn
∑y =0
0 =Ra+ Rb + (-39.91x 4.6)+(-89.16) + (-28.5 x 2.7)
= -176.75
Shear Force
(172.95) - (39.91)(46) =-10.64
Bending Moment
(area of +ve) - (area of -ve) = 0
1/2 x 4.33 x 172.95
=374
(I/2 x 0.27 x 10.64) + ( 1/2 x 176.75 + 99.8 x 2.7)
= 373.3
Conclusion : area of positive = area of negative
4.6
172.95
10.64
X = 4.6
10.64 = 183.59
X = (4.6 x 10.64 )/183.59
X = 0.27
x
COLUMN ANALYSIS
TEH WEI HONG 0323743
Roof
Dead Load
Beam = (5x4.5) x 0.2 x 0.3 x 24
= 13.68 kN
Live Load
Slab = (5x4.5) x 0.5
= 11.25 kN
Ultimate Load
= (13.68 x 1.4) + (11.25 x 1.6)
= 37.15kN
First Floor
Dead Load
Slab = (4.5x5) x 0.15 x 24
= 81 kN
Beam = (4.5+5) x 0.2 x 0.3 x 24
= 13.68 kN
Wall = (4.5+5) x 0.15 x 19 x 3
= 81.23 kN
Column = 0.2 x 0.2 x 3 x 24
= 2.88 kN
∑Dead Load = 81 + 13.68 + 81.23 + 2.88
=178.79 kN
Live Load
Slab = 4.5x 5x 1.5
= 33.75 kN
Ultimate Load
= (178.79 x 1.4) + (33.75 x 1.6)
= 304.31kN
Ground Floor
Dead Load
Slab = (2 x 1.35) x 0.15 x 24
= 9.72
Beam = (2 + 1.35) x 24 x 0.2 x 0.3
= 4.82
Wall = (2 + 1.35) x 0.15 x 19 x 3
= 28.64
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 9.72 + 4.82 + 28.64 + 2.88
= 46.06 kN
Live Load
Slab = 2x 1.35 x 1.5
= 4.05
Ultimate Load
= (46 x 1.4) + (4.05 x 1.6)
= 70.88kN
Total Ultimate Load
= 70.88 + 304.31 + 37.15
= 412.34kN
Roof
Dead Load
Beam = (4.5+4.4) x 0.2 x 0.3 x 24
= 12.82 kN
Live Load
Slab = (4.5x4.5) x 0.5
= 9.9 kN
Ultimate Load
= (12.82 x 1.4) + (9.9 x 1.6)
= 33.79kN
First Floor
Dead Load
Slab = (4.4 x 4.5) x 0.15 x 24
= 71.28
Beam = (4.4 + 4.5) x 24 x 0.2 x 0.3
= 12.81
Wall = (4.4 + 4.5) x 0.15 x 19 x 3
= 76.10
Column = 0.2x 0.2x 3x 24
= 2.88
Total Dead Load
= 71.28 + 12.81 + 76.10 + 2.88
= 163.07 kN
Live Load
Slab A = 1.35 x 4.4 x 1.5
= 8.91
Slab B = 3.15 x 4.4 x 3
= 41.58
Total Live Load
= 8.91 + 41.58
= 50.49 kN
Ultimate Load
= (163.07 x 1.4) + (50.49 x 1.6)
= 228.30 + 80.78
= 70.88kN
Ground Floor
Dead Load
Slab = (6.8x 4.4) x 0.15 x 24
= 107.71 kN
Beam = (6.8+ 4.4+ 2.45) x 0.2 x 0.3 x 24
= 19.66 kN
Wall = (6.8+ 4.4+ 2.45) x 0.15 x 19 x 3
= 116.71 kN
Column = 0.2 x 0.2 x 3 x 24
= 2.88 kN
∑Dead Load = 107.71 + 19.66 + 166.71 + 2.88
= 246.96 kN
Live Load
Slab A = 2.45x 3.65x 1.5
= 13.41 kN
Slab B = 3.15x 2.45x 2
= 15.44 kN
Slab C = 3.65 x 1.95 x 1.5
= 10.68 kN
Slab D = 1.95 x 3.15 x 2
= 12.29 kN
Ultimate Load
= (246.96 x 1.4) + (51.82 x 1.6)
= 428.66kN
Total Ultimate Load
= 428.66 + 33.79 + 309.08
= 771.53kN
BEAM ANALYSIS
TANG FU HONG
Beam Calculation (C3-C4)
Dead Load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab A-C/4-5 :
3.6 x (4.3/2) = 7kN/m
Total dead load :
1.44+8.55+7 = 16.99kN/m
Live Load
Live load on slab A-C/4-5 :
2 x (3.9/2) = 3.9kN/m
Total live load :
3.9 = 3.9kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (16.99 x 1.4) + (3.9 x 1.6)
= 30.02kN/m
Reaction Force
Moment :
Force x Distance :
30.02 x 4.2 = 126.08kN
∑M = 0
0 = 126.08 + Rb + (-30.02)(4.2)
Ra = 126.08 - 63.04
= 63.04kN
Shear Force
Rb = 0 =∑F
0 = 63.04 + Rb + (-30.02)(4.2)
Rb = 63.04kN
Bending Moment
(63.04 x 2.1)/2 = 66kN
(63.04 x 2.1)/2 = 66kN
Dead load
Dead Load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab C-D/4-5 :
3.6 x (3.9/2) x (2/3) = 4.68kN/m
Total dead load :
1.44+8.55+4.68 = 14.67kN/m
Live Load
Live load on slab C-D/4-5 :
2 x (3.9/2) x (2/3) = 2.6kN/m
Total live load :
2.6 = 2.6kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (14.67 x 1.4) + (2.6 x 1.6)
= 24.7kN/m
Reaction Force
Moment :
Force x Distance :
24.7 x 3.9 = 96.33kN
∑M = 0
0 = Ra(3.9) + (-24.7)(3.9)(1.95)
Ra = 187.84/3.9
= 48.17kN
Shear Force
Rd = 0 =∑F
0 = 48.17 + Rb + (-24.7)(3.9)
Rd = 48.16kN
Bending Moment
(48.17 x 1.95)/2 = 47kN
(48.16 x 1.95)/2 = 47kN
Beam Calculation For Point Load (A3’-B3’)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab 3’-4/A-B :
3.6 x (1.8/2) = 3.24kN/m
Total dead load :
1.44 + 3.24 = 4.68kN/m
Live load
Live load on slab 3’-4/A-B :
2 x (1.8/2) = 3.24kN/m
Total live load :
3.24 =3.24kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (4.68 x 1.4) + (3.24 x 1.6)
= 11.8kN/m
Reaction Force
∑M = 0
0 = Ra (4.9) + (-11.8 x 4.9 x 2.45)
= 4.9Ra + (-141.659)
Ra = 141.659/4.9
= 28.9kN
Shear Force
Rb = 0 =∑F
0 = 28.9 + Rb + (-11.8)(4.9)
Rb = 28.9kN
Point Load from Beam A3’-B3’ = 28.9kN
Dead Load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab A-B/3’-4 :
3.6 x (1.8/2) = 3.24kN/m
Dead load on slab B-C/3-4 :
3.6 x (3.9/2) = 7.02kN/m
Live Load
Live load on slab A-B/3’-4 :
2 x (1.8/2) x 2/3 = 1.2kN/m
Live load on slab B-C/3-4 :
2 x (3.9/2) = 3.9kN/m
Reaction Force
∑M = 0
0 = Ra (6.3) + (-18.08)(4.5)(4.05) + (-28.9)(1.8) + (-24.54)(1.8)(0.9)
Ra = 421.281/6.3
= 66.87kN
Shear Force
Rb = 0 =∑F
0 = 66.87 + Rb + (-18.08)(4.5) + (-28.9) + (-24.54)(1.8)
Rb = 87.6kN
Bending Moment
(66.87)(45.08)/2 = 124kN
[(14.49)(0.8) + (43.39 + 87.6)(1.8)]/2 = 124kN
Beam Calculation For
Point Load (4B) = 87.6kN (From the previous calculation)
Beam Calculation For (4A-4C)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab 3’-4/A-B :
3.6 x (1.8/2) = 3.24kN/m
Brick Wall Self Weight :
0.15 x 3 x 19 = 8.55kN/m
Live load
Live load on slab 3’-4/A-B :
2 x (1.8/2) = 1.8kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Reaction Force
∑M = 0
0 = Ra (4.9 + 3.9) + (-21.4)(4.9)(6.35) + (-87.6)(3.9) +
(-13.98)(3.9)(1.95)
Ra = 1113.82/8.8
= 126.57kN
Shear Force
Rb = 0 =∑F
0 = 126.57 + Rb + (-21.4)(4.9) + (-87.6) + (-13.98)(3.9)
Rb = 120.78kN
Bending Moment
(126.57 + 21.71)(2.9)/2 = 363kN
(120.4 + 65.87)(3.9)/2 = 363kN 126.57
Beam Calculation (C3-C4)
Dead Load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab A-C/4-5 :
3.6 x (4.3/2) = 7kN/m
Total dead load :
1.44+8.55+7 = 16.99kN/m
Live Load
Live load on slab A-C/4-5 :
2 x (3.9/2) = 3.9kN/m
Total live load :
3.9 = 3.9kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (16.99 x 1.4) + (3.9 x 1.6)
= 30.02kN/m
Reaction Force
Moment :
Force x Distance :
30.02 x 4.2 = 126.08kN
∑M = 0
0 = 126.08 + Rb + (-30.02)(4.2)
Ra = 126.08 - 63.04
= 63.04kN
Shear Force
Rb = 0 =∑F
0 = 63.04 + Rb + (-30.02)(4.2)
Rb = 63.04kN
Bending Moment
(63.04 x 2.1)/2 = 66kN
(63.04 x 2.1)/2 = 66kN
Dead load
Dead Load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Brick wall self weight :
3m x 0.15m x 19kN/m3
= 8.55kN/m
Dead load on slab C-D/4-5 :
3.6 x (3.9/2) x (2/3) = 4.68kN/m
Total dead load :
1.44+8.55+4.68 = 14.67kN/m
Live Load
Live load on slab C-D/4-5 :
2 x (3.9/2) x (2/3) = 2.6kN/m
Total live load :
2.6 = 2.6kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (14.67 x 1.4) + (2.6 x 1.6)
= 24.7kN/m
Reaction Force
Moment :
Force x Distance :
24.7 x 3.9 = 96.33kN
∑M = 0
0 = Ra(3.9) + (-24.7)(3.9)(1.95)
Ra = 187.84/3.9
= 48.17kN
Shear Force
Rd = 0 =∑F
0 = 48.17 + Rb + (-24.7)(3.9)
Rd = 48.16kN
Bending Moment
(48.17 x 1.95)/2 = 47kN
(48.16 x 1.95)/2 = 47kN
Beam Calculation For Point Load (A3’-B3’)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab 3’-4/A-B :
3.6 x (1.8/2) = 3.24kN/m
Total dead load :
1.44 + 3.24 = 4.68kN/m
Live load
Live load on slab 3’-4/A-B :
2 x (1.8/2) = 3.24kN/m
Total live load :
3.24 =3.24kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Ultimate load
Ultimate load :
(Total dead load x 1.4) + (Total live load x 1.6)
= (4.68 x 1.4) + (3.24 x 1.6)
= 11.8kN/m
Reaction Force
∑M = 0
0 = Ra (4.9) + (-11.8 x 4.9 x 2.45)
= 4.9Ra + (-141.659)
Ra = 141.659/4.9
= 28.9kN
Shear Force
Rb = 0 =∑F
0 = 28.9 + Rb + (-11.8)(4.9)
Rb = 28.9kN
Point Load from Beam A3’-B3’ = 28.9kN
Dead Load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab A-B/3’-4 :
3.6 x (1.8/2) = 3.24kN/m
Dead load on slab B-C/3-4 :
3.6 x (3.9/2) = 7.02kN/m
Live Load
Live load on slab A-B/3’-4 :
2 x (1.8/2) x 2/3 = 1.2kN/m
Live load on slab B-C/3-4 :
2 x (3.9/2) = 3.9kN/m
Reaction Force
∑M = 0
0 = Ra (6.3) + (-18.08)(4.5)(4.05) + (-28.9)(1.8) + (-24.54)(1.8)(0.9)
Ra = 421.281/6.3
= 66.87kN
Shear Force
Rb = 0 =∑F
0 = 66.87 + Rb + (-18.08)(4.5) + (-28.9) + (-24.54)(1.8)
Rb = 87.6kN
Bending Moment
(66.87)(45.08)/2 = 124kN
[(14.49)(0.8) + (43.39 + 87.6)(1.8)]/2 = 124kN
Beam Calculation For
Point Load (4B) = 87.6kN (From the previous calculation)
Beam Calculation For (4A-4C)
Dead load
Slab self weight :
0.15m x 24kN/m3
= 3.6kN/m2
Beam self weight :
(0.2mx0.3m) x 24kN/m3
= 1.44kN/m
Dead load on slab 3’-4/A-B :
3.6 x (1.8/2) = 3.24kN/m
Brick Wall Self Weight :
0.15 x 3 x 19 = 8.55kN/m
Live load
Live load on slab 3’-4/A-B :
2 x (1.8/2) = 1.8kN/m
Load Distribution Plan
For First Floor Plan
Structural Plan
For First Floor Plan
Reaction Force
∑M = 0
0 = Ra (4.9 + 3.9) + (-21.4)(4.9)(6.35) + (-87.6)(3.9) +
(-13.98)(3.9)(1.95)
Ra = 1113.82/8.8
= 126.57kN
Shear Force
Rb = 0 =∑F
0 = 126.57 + Rb + (-21.4)(4.9) + (-87.6) + (-13.98)(3.9)
Rb = 120.78kN
Bending Moment
(126.57 + 21.71)(2.9)/2 = 363kN
(120.4 + 65.87)(3.9)/2 = 363kN 126.57
COLUMN ANAYLSIS
TANG FU HONG
Dead load acting on column 5C
Tributary area method load analysis on Column 5C
Roof Beams : (2 + 2.1)(0.2)(0.3)(24) = 5.9kN
First
Floor
Beams (Roof) : (2.5 + 2.1)(0.2)(0.3)(24) =
6.6kN
Beams (First Floor) : (2.1+2)(0.2)(0.3)(24) =
5.9kN
Slabs : (2.1 x 2)(0.15)(24) = 15.12 kN
Walls : (2.1 + 2)(0.15)(19)(3) = 35.06kN
Columns : (0.2)(0.2)(3)(24) = 2.88kN
Ground
Floor
Beams : (4.5+2.1)(0.2)(0.3)(24) = 9.5kN
Slabs : (4.5 x 2.1)(0.15)(24) = 45.36 kN
Walls : (2.5 + 2.1 + 2)(0.15)(19)(3) = 56.43kN
Columns : (0.2)(0.2)(3)(24) = 2.88kN
Live load acting on column 5C
Roof
First
Floor
Ground
Floor
Slab : (2 x 2.1)(0.5) = 2.1kN
Slab (Roof) : (2.5 x 2.1)(0.5) = 21.625kN
Slab (First Floor) : (2 x 2.1)(2) = 8.4kN
Slab : (4.5 x 2.1)(3) = 28.35kN
Total Dead Load = 185.63kN
Apply 1.4 Dead Load Factor = 259.88kN
Total Live Load = 41.48kN
Apply 1.6 Live Load Factor = 66.36kN
Total Ultimate Load = 326.24kN
Dead load acting on column 4A
Live load acting on column 4A
Tributary area method load analysis on Column 4A
Roof Beams : (3.2 + 2.5)(0.2)(0.3)(24) = 8.2kN
First
Floor
Beams (Roof) : (2.5 + 2.5 + 2.1)(0.2)(0.3)(24)
= 10.2kN
Beams (First Floor) : (3.2 + 2.5)(0.2)(0.3)(24)
= 8.2kN
Slabs : (2.5 x 2.5)(0.15)(24) = 22.5kN
Columns : (0.2)(0.2)(3)(24) = 2.88kN
Ground
Floor
Beams : (3.2 + 2.5+2.1)(0.2)(0.3)(24) = 11.2kN
Slabs : (5.3 x 2.5)(0.15)(24) = 47.7kN
Walls : (3.2 + 2.1 + 1.9)(0.15)(19)(3) =
61.56kN
Columns : (0.2)(0.2)(3)(24) = 2.88kN
Roof
First
Floor
Ground
Floor
Slab : (2 x 2.1)(0.5) = 2.1kN
Slab (Roof) : (2.5 x 2.1)(0.5) = 21.625kN
Slab (First Floor) : (2 x 2.1)(2) = 8.4kN
Slab : (4.5 x 2.1)(3) = 28.35kN
Total Dead Load = 175.32kN
Apply 1.4 Dead Load Factor = 245.45kN
Total Live Load = 52.88kN
Apply 1.6 Live Load Factor = 84.6kN
Total Ultimate Load = 330.05kN

More Related Content

What's hot

individual part
individual part individual part
individual part KC Wong
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures ReportJoe Onn Lim
 
Building structure
Building structure Building structure
Building structure yenweizheng
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Final structure report
Final structure reportFinal structure report
Final structure reportTay Jit Ying
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2 Ryan Kerry Jy
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final reportCanisius Bong
 
Individual calculation
Individual calculation Individual calculation
Individual calculation Jamie Lee
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan strukturKomang Satriawan
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2Lam Yu
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Patch Yuen
 
Hb structure
Hb structureHb structure
Hb structurehongbinng
 
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)premkumar mk
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual CaluculationPengeneee Peng
 
4444444444
44444444444444444444
4444444444mrstore
 
Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...
Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...
Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...Alaa Metwally
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculationSheau Hui Tan
 

What's hot (20)

individual part
individual part individual part
individual part
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
Building structure
Building structure Building structure
Building structure
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Final structure report
Final structure reportFinal structure report
Final structure report
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final report
 
Individual calculation
Individual calculation Individual calculation
Individual calculation
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan struktur
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
Baja kuda kuda
Baja kuda kudaBaja kuda kuda
Baja kuda kuda
 
Hb structure
Hb structureHb structure
Hb structure
 
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual Caluculation
 
4444444444
44444444444444444444
4444444444
 
Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...
Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...
Reinforced Concrete Elevated tank Analysis and Design (Wind & Seismic) Accord...
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
 

Similar to Building Structures Final Compilation

Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Ong Seng Peng Jeff
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentJoyce Wee
 
Assignement 2: Structural Analysis
Assignement 2: Structural AnalysisAssignement 2: Structural Analysis
Assignement 2: Structural AnalysisDavidJPCChai
 
Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculationkimberlywjs
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Wen Yee
 
Hazelscolumn (1)
Hazelscolumn (1)Hazelscolumn (1)
Hazelscolumn (1)Ong Shi Hui
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02Winnie Ang
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowYee Len Wan
 
Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indiChong Yu Xuan
 
Column analysis
Column analysisColumn analysis
Column analysisPenny3688
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 eLam Yu
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structureKen Wong
 
Building structure real
Building structure realBuilding structure real
Building structure realong93
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Dr.Costas Sachpazis
 
Structure report final
Structure report finalStructure report final
Structure report finaltristan yu
 

Similar to Building Structures Final Compilation (18)

Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
Assignement 2: Structural Analysis
Assignement 2: Structural AnalysisAssignement 2: Structural Analysis
Assignement 2: Structural Analysis
 
Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculation
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Hazelscolumn (1)
Hazelscolumn (1)Hazelscolumn (1)
Hazelscolumn (1)
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
Structures
StructuresStructures
Structures
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
 
Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indi
 
Column analysis
Column analysisColumn analysis
Column analysis
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 e
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
 
Building structure real
Building structure realBuilding structure real
Building structure real
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
 
Structure report final
Structure report finalStructure report final
Structure report final
 

More from jisunfoo

Reaction paper
Reaction paperReaction paper
Reaction paperjisunfoo
 
Comparative Analysis Essay
Comparative Analysis EssayComparative Analysis Essay
Comparative Analysis Essayjisunfoo
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Lighting Integration Project
Lighting Integration ProjectLighting Integration Project
Lighting Integration Projectjisunfoo
 
Auditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design PresentationAuditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design Presentationjisunfoo
 
Auditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design ReportAuditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design Reportjisunfoo
 
Building Services Project 1 Final Report
Building Services Project 1 Final ReportBuilding Services Project 1 Final Report
Building Services Project 1 Final Reportjisunfoo
 
CSI proposal
CSI proposalCSI proposal
CSI proposaljisunfoo
 
Royal Selangor Club Documentation
Royal Selangor Club DocumentationRoyal Selangor Club Documentation
Royal Selangor Club Documentationjisunfoo
 
Dewan Tunku Canselor Final Report
Dewan Tunku Canselor Final ReportDewan Tunku Canselor Final Report
Dewan Tunku Canselor Final Reportjisunfoo
 
Building Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing ConstructionBuilding Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing Constructionjisunfoo
 
Epc oral presentation 2 script
Epc oral presentation 2 scriptEpc oral presentation 2 script
Epc oral presentation 2 scriptjisunfoo
 
Epc oral presentation 1 script
Epc oral presentation 1 scriptEpc oral presentation 1 script
Epc oral presentation 1 scriptjisunfoo
 
Epc oral presentation 2
Epc oral presentation 2Epc oral presentation 2
Epc oral presentation 2jisunfoo
 
Epc oral presentation 1
Epc oral presentation 1Epc oral presentation 1
Epc oral presentation 1jisunfoo
 
Social Psychology Comic
Social Psychology ComicSocial Psychology Comic
Social Psychology Comicjisunfoo
 
Social Psychology Video
Social Psychology VideoSocial Psychology Video
Social Psychology Videojisunfoo
 
Economics Comparative Analysis Report
Economics Comparative Analysis ReportEconomics Comparative Analysis Report
Economics Comparative Analysis Reportjisunfoo
 
English 2 Comparison Essay
English 2 Comparison EssayEnglish 2 Comparison Essay
English 2 Comparison Essayjisunfoo
 
BUSINESS PRESENTATION FNBE MAR 2015 SEM2
BUSINESS PRESENTATION FNBE MAR 2015 SEM2BUSINESS PRESENTATION FNBE MAR 2015 SEM2
BUSINESS PRESENTATION FNBE MAR 2015 SEM2jisunfoo
 

More from jisunfoo (20)

Reaction paper
Reaction paperReaction paper
Reaction paper
 
Comparative Analysis Essay
Comparative Analysis EssayComparative Analysis Essay
Comparative Analysis Essay
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Lighting Integration Project
Lighting Integration ProjectLighting Integration Project
Lighting Integration Project
 
Auditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design PresentationAuditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design Presentation
 
Auditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design ReportAuditorium: A Case Study on Acoustic Design Report
Auditorium: A Case Study on Acoustic Design Report
 
Building Services Project 1 Final Report
Building Services Project 1 Final ReportBuilding Services Project 1 Final Report
Building Services Project 1 Final Report
 
CSI proposal
CSI proposalCSI proposal
CSI proposal
 
Royal Selangor Club Documentation
Royal Selangor Club DocumentationRoyal Selangor Club Documentation
Royal Selangor Club Documentation
 
Dewan Tunku Canselor Final Report
Dewan Tunku Canselor Final ReportDewan Tunku Canselor Final Report
Dewan Tunku Canselor Final Report
 
Building Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing ConstructionBuilding Construction 1 - Experiencing Construction
Building Construction 1 - Experiencing Construction
 
Epc oral presentation 2 script
Epc oral presentation 2 scriptEpc oral presentation 2 script
Epc oral presentation 2 script
 
Epc oral presentation 1 script
Epc oral presentation 1 scriptEpc oral presentation 1 script
Epc oral presentation 1 script
 
Epc oral presentation 2
Epc oral presentation 2Epc oral presentation 2
Epc oral presentation 2
 
Epc oral presentation 1
Epc oral presentation 1Epc oral presentation 1
Epc oral presentation 1
 
Social Psychology Comic
Social Psychology ComicSocial Psychology Comic
Social Psychology Comic
 
Social Psychology Video
Social Psychology VideoSocial Psychology Video
Social Psychology Video
 
Economics Comparative Analysis Report
Economics Comparative Analysis ReportEconomics Comparative Analysis Report
Economics Comparative Analysis Report
 
English 2 Comparison Essay
English 2 Comparison EssayEnglish 2 Comparison Essay
English 2 Comparison Essay
 
BUSINESS PRESENTATION FNBE MAR 2015 SEM2
BUSINESS PRESENTATION FNBE MAR 2015 SEM2BUSINESS PRESENTATION FNBE MAR 2015 SEM2
BUSINESS PRESENTATION FNBE MAR 2015 SEM2
 

Recently uploaded

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Recently uploaded (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 

Building Structures Final Compilation

  • 1. SCHOOL OF ARCHITECTURE, BUIDLING AND DESIGN BACHELOR OF SCIENCE (HONS) IN ARCHITECTURE Building Structures (ARC 2522/2523 ) Project 2: Structural Analysis Of A Bungalow PREPARED BY: CHONG HAO FOONG 0322343 FOO JI SUN 0323550 TEOH ZHE KHAI 0322905 TEH WEI HONG 0323743 TANG FU HONG 0323092
  • 2. GROUND FLOOR PLAN SCALE 1:200 ARCHITECTURE DRAWING
  • 3. FIRST FLOOR PLAN SCALE 1:200 ARCHITECTURE DRAWING
  • 4. GROUND FLOOR PLAN SCALE 1:200 LIVE LOAD PLAN
  • 5. FIRST FLOOR PLAN SCALE 1:200 LIVE LOAD PLAN
  • 6. LOWER GROUND FLOOR PLAN SCALE 1:200 STRUCTURAL PLAN
  • 7. GROUND FLOOR PLAN SCALE 1:200 STRUCTURAL PLAN
  • 8. FIRST FLOOR PLAN SCALE 1:200 STRUCTURAL PLAN
  • 9. ROOF PLAN SCALE 1:200 STRUCTURAL PLAN
  • 10. GROUND FLOOR PLAN SCALE 1:200 LOAD DISTRIBUTION PLAN FIRST FLOOR PLAN SCALE 1:200 LOAD DISTRIBUTION PLAN
  • 11. DESIGN BRIEF 1.1 CALCULATION FORMULA Slab System Ly = Longer side of slab When Ly/Lx > 2 (One way slab system) Lx = Shorter side of slab When Ly/Lx < 2 (Two way slab system) Beam Calculation Beam self weight = Material Density x Beam Size = 24 kN/m3 x [ 0.3m x 0.2m ] = 1.44 kN/m Dead load on slab = Beam self weight x Thickness x Lx/2 One way/ Two way slab trapezoidal shape = [ Beam self weight x Thickness x Lx/2 ] x 2/3 Two way triangular shape +Brick wall self weight = Material Density x Thickness x Height = 19 kN/m3 x 0.15m x 3m = 8.55 kN/m Live load on slab = UBBL live load factor x Lx/2 One way/ Two way slab trapezoidal shape = [ UBBL live load factor x Lx/2 ] x 2/3 Two way triangular shape Ultimate load = [ Total dead load x 1.4 ] + [ Total live load x 1.6 ] Reaction force = ∑M = 0 = ∑M = Force x Perpendicular Distance Column Calculation Brick wall self weight = Material Density x Thickness x Total length of walls in tributary area Slab self weight = Material Density x Thickness x Area of tributary area Beam self weight = Material Density x Beam Size x Total length of beams in tributary area Column self weight = Material Density x Column size x Column height Live load on slab = UBBL live load factor x Area space within tributary area Ultimate load = [ Total dead load x 1.4 ] + [ Total live load x 1.6 ]
  • 13. BEAM ANALYSIS CHONG HAO FOONG 0322905
  • 14. Beam Calculation (C2-D2) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab C-D/1-2 : 3.6 x (3.9/2) x 2/3 = 4.68kN/m Dead load on slab C-D/2-3 : 3.6 x (2.7/2) = 4.86kN/m Total dead load : 4.68+4.86+1.44+11.4 = 22.38kN/m + +
  • 15. Live load Live load on slab C-D/1-2 : 1.5 x (3.9/2) x 2/3 = 1.95kN/m Live load on slab C-D/2-3 3 x (2.7/2) = 4.05kN/m Total live load : 1.95+4.05 = 6kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (22.38 x 1.4) + (6 x 1.6) = 40.932kN/m Reaction Force Moment : Force x Distance : 40.932 x 3.925 = 160.66kN ∑M = 0 0 = (160.66 x 1.9625) - Rd (3.925) = 315.29 - Rd (3.925) Rd = 315.29/3.925 = 80.33kN Shear Force Rc = 0 =∑F 0 = Rc - 160.66 + 80.33 Rc = 80.33kN Bending Moment (80.33 x 1.96)/2 = 78.72kN
  • 16. CHONG HAO FOONG 0322905 Beam Calculation (C1-D1) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab C-D/1-2 : 3.6 x (3.9/2) x 2/3 = 4.71kN/m Dead load on slab -: - = - Total dead load : 4.71+1.44+11.4 = 17.55kN/m + +
  • 17. Live load Live load on slab C-D/1-2 : 2 x (3.9/2) x 2/3 = 2.617 kN/m Live load on slab - - = - Total live load : 2.617 = 2.617kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (17.55 x 1.4) + (2.617 x 1.6) = 28.76kN/m Reaction Force Moment : Force x Distance : 28.76 x 3.9 = 112.16 kN ∑M = 0 0 = (112.16 x 1.95) - Rd (3.9) = 218.71- Rd (3.9) Rd = 218.71/3.9 = 56.08kN Shear Force Rc = 0 =∑F 0 = Rc - 112.16 + 56.08 Rc = 56.08kN Bending Moment (56.08 x1.95)/2 = 54.68kN
  • 18. CHONG HAO FOONG 0322905 Beam Calculation (A2-C2) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab A-C/1-2 : 3.6 x (4.63/2) x = 8.33kN/m Dead load on slab A-C/2-3 : 3.6 x (2.7/2) = 4.86kN/m Total dead load : 8.33+4.86+1.44+11.4 = 26.03kN/m + +
  • 19. Live load Live load on slab A-C/1-2 : 1.5 x (4.63/2) = 3.47kN/m Live load on slab A-C/2-3 2 x (2.7/2) = 2.7kN/m Total live load : 3.47+2.7 = 6.17kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (26.03 x 1.4) + (6.17 x 1.6) = 46.312kN/m Reaction Force Moment : Force x Distance : 46.312 x 4.925 = 228.1kN ∑M = 0 0 = (228.1 x 2.4625) - Rd (4.925) = 561.7 - Rd (4.925) Rd = 561.7/4.925 = 114.05kN Shear Force Rc = 0 =∑F 0 = Rc - 228.1+114.05 Rc = 114.05 Bending Moment (114.05 x 2.46)/2 = 140.28kN
  • 20. CHONG HAO FOONG 0322905 Beam Calculation (C1-C2) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab A-C/1-2 : 3.6 x (4.6/2) x 2/3 = 5.55kN/m Dead load on slab C-D/1-2 : 3.6 x (3.9/2) = 7.065kN/m Total dead load : 5.55+7.065+1.44+11.4 = 25.46kN/m
  • 21. Live load Live load on slab A-C/1-2 : 1.5 x (4.6/2) x 2/3 = 2.31kN/m Live load on slab C-D/1-2 1.5 x (3.93/2) = 2.94kN/m Total live load : 2.31+2.94 = 5.25kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (25.46 x 1.4) + (5.25 x 1.6) = 44.04kN/m Reaction Force Moment : Force x Distance : 44.04 x 4.625 = 203.69kN ∑M = 0 0 = (203.69 x 2.3125) - Rd (4.625) = 471.02 - Rd (4.625) Rd = 471.02/4.625 = 101.84kN Shear Force Rc = 0 =∑F 0 = Rc - 203.69 + 101.84 Rc = 101.84kN Bending Moment (101.84 x 2.31)/2 = 117.76kN
  • 22. COLUMN ANALYSIS COLUMN 2A Roof Dead Load Beam = (1.35 + 2.31 + 2.46) x 0.2 x 0.3 x 24 = 8.81 kN Live Load Slab = (2.46 x 3.66) x 0.5 = 4.5 kN Ultimate Load = (8.81 x 1.4) + (4.5 x 1.6) = 19.54kN First Floor Dead Load Slab = (3.66 x 2.46) x 0.15 x 24 = 32.41 Beam = (3.66 + 2.46) x 24 x 0.2 x 0.3 = 8.81 Wall = (3.66 + 2.46) x 0.2 x 19 x 3 = 69.77 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 32.41 + 12.81 + 69.77 + 2.88 = 113.87 kN Live Load Slab A = 2.31 x 2.46 x 1.5 = 8.52 Slab B = 1.35 x 2.46 x 2 = 6.64 Total Live Load = 8.52 + 6.64 = 15.16 kN Ultimate Load = (113.87 x 1.4) + (15.16 x 1.6) = 159.42 + 24.26 = 183.68kN
  • 23. Ground Floor Dead Load Slab = (3.66 x 2.46) x 0.15 x 24 = 32.41 Beam = (3.66 + 2.46) x 24 x 0.2 x 0.3 = 8.81 Wall = (3.66 + 2.46) x 0.2 x 19 x 3 = 69.77 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 32.41 + 12.81 + 69.77 + 2.88 = 113.87 kN Live Load Slab A = 2.31 x 2.46 x 1.5 = 8.52 Slab B = 1.35 x 2.46 x 2 = 6.64 Total Live Load = 8.52 + 6.64 = 15.16 kN Ultimate Load = (113.87 x 1.4) + (15.16 x 1.6) = 159.42 + 24.26 = 183.68kN Total Ultimate Load = 19.54 + 183.68 + 183.68 = 386.90kN
  • 24. COLUMN C1 Roof Dead Load Beam = (2.31 + 4.42) x 0.2 x 0.3 x 24 = 9.69 kN Live Load Slab = (2.31 x 4.42) x 0.5 = 5.11 kN Ultimate Load = (9.69 x 1.4) + (5.11 x 1.6) = 21.74kN First Floor Dead Load Slab = (2.31 x 4.42) x 0.15 x 24 = 36.76 Beam = (2.31 + 4.42) x 24 x 0.2 x 0.3 = 9.69 Wall = (2.31 + 4.42) x 0.2 x 19 x 3 = 76.72 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 36.76 + 9.69 + 76.72 + 2.88 = 126.05 kN Live Load Slab A = 2.46 x 2.31 x 1.5 = 8.52 Slab B = 2.31 x 1.96 x 2 = 9.06 Total Live Load = 8.52 + 9.06 = 17.58kN Ultimate Load = (126.05 x 1.4) + (17.58 x 1.6) = 176.47 + 28.12 = 204.59kN
  • 25. Ground Floor Dead Load Slab = (2.31 x 4.42) x 0.15 x 24 = 36.76 Beam = (2.31 + 4.42) x 24 x 0.2 x 0.3 = 9.69 Wall = (2.31 + 4.42) x 0.2 x 19 x 3 = 76.72 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 36.76 + 9.69 + 76.72 + 2.88 = 126.05 kN Live Load Slab A = 2.31 x 2.46 x 1.5 = 8.52 Slab B = 1.96 x 2.31 x 1.5 = 6.79 Total Live Load = 8.52 + 6.79 = 15.31 kN Ultimate Load = (126.05 x 1.4) + (15.31 x 1.6) = 176.47 + 24.49 = 200.96kN Total Ultimate Load = 21.74+ 204.59 + 200.96 = 427.29kN
  • 26. BEAM ANALYSIS FOO JI SUN 0323550
  • 27. BEAM ANALYSIS FOO JI SUN 0322550 Beam Calculation (D3-E3) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab 2-3/D-E : 3.6 x (2.7/2) = 4.86kN/m Dead load on slab 3-4/D-E : 3.6 x (4/2) x (2/3) = 4.8kN/m Total dead load : 4.86 + 4.8 + 1.44 = 11.1kN/m + +
  • 28. Live load Live load on slab 2-3/D-E : 3 x (2.7/2) = 4.05kN/m Live load on slab 3-4/D-E : 3 x (4/2) x (2/3) = 4kN/m Total live load : 4.05 + 4 = 8.05kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (11.1 x 1.4) + (8.05 x 1.6) = 28.42kN/m Reaction Force Moment : Force x Distance : 28.42 x 4 = 113.68kN ∑M = 0 0 = Rd (4) + (-113.68 x 2) = 4Rd - 227.36 Rd = 227.36/4 = 56.84kN Shear Force Rc = 0 =∑F 0 = Rc - 113.68 + 56.84 Rc = 56.84kN Bending Moment (56.84 x 2)/2 = 56.84kN
  • 29. FOO JI SUN 0322550 Beam Calculation (F3a-F4) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab 3a-4/E-F : 3.6 x (4.1/2) x (2/3) = 4.92kN/m Total dead load : 4.92 + 1.44 + 11.4 = 14.91kN/m
  • 30. Live load Live load on slab 3a-4/E-F : 1.5 x (4.1/2) x (2/3) = 2.05kN/m Total live load : = 2.05kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (14.91 x 1.4) + (2.05 x 1.6) = 24.18kN/m Reaction Force Moment : Force x Distance : 24.18 x 4.1 = 99.14kN ∑M = 0 0 = Rd (4.1) + (-99.14 x 2.05) = 4.1Rd - 203.23 Rd = 203.23/4 = 49.57kN Shear Force Rc = 0 =∑F 0 = Rc - 99.14 + 49.57 Rc = 49.57kN Bending Moment (49.57 x 2.05)/2 = 50.8kN
  • 31. FOO JI SUN 0322550 Beam Calculation (E3a-F3a) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab 2-3a/E-F : 3.6 x (4.9/2) = 8.82kN/m Dead load on slab 3a-4/E-F : 3.6 x (4.1/2) = 7.38kN/m Total dead load : 8.82 + 7.38 + 1.44 + 11.4 = 11.1kN/m + +
  • 32. Live load Live load on slab 2-3a/E-F : 2 x (4.9/2) = 4.9kN/m Live load on slab 3a-4/E-F : 1.5 x (4.1/2) = 3.08kN/m Total live load : 4.9 + 3.08 = 8.05kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (4.9 x 1.4) + (3.08 x 1.6) = 49.44kN/m Reaction Force Moment : Force x Distance : 49.44 x 6 = 296.64kN ∑M = 0 0 = Rd (6) + (-296.64 x 3) = 6Rd - 889.92 Rd = 889.92/6 = 148.32kN Shear Force Rc = 0 =∑F 0 = Rc - 296.64 + 148.32 Rc = 148.32kN Bending Moment (148.32 x 3)/2 = 222.48kN
  • 33. Beam Calculation (E3-E4) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab 3-4/D-E : 3.6 x (4/2) = 7.2kN/m Dead load on slab 2-3a/E-F : 3.6 x (4.9/2) x (2/3) = 5.88kN/m Dead load on slab 3a-4/E-F : 3.6 x (4.1/2) x (2/3) = 4.92kN/m Total dead load : Slab 3-4/D-E & 2-3a/E-F = 7.2 + 5.88 + 1.44 + 11.4 = 23.07kN/m Slab 3-4/D-E & 3a-4/E-F = 7.2 + 4.92 + 1.44 + 11.4 = 22.11kN/m
  • 34. Live load Live load on slab 3-4/D-E : 3 x (4/2) = 6kN/m Live load on slab 2-3a/E-F: 2 x (4.9/2) = 4.9kN/m Live load on slab 3a-4/E-F : 1.5 x (4.1/2) = 3.08kN/m Total live load : Slab 3-4/D-E & 2-3a/E-F = 6 + 4.9 = 10.9kN/m Slab 3-4/D-E & 3a-4/E-F = 6 + 3.08 = 9.08kN/m Ultimate load Ultimate load 3-4/D-E & 2-3a/E-F : (Total dead load x 1.4) + (Total live load x 1.6) = (23.07 x 1.4) + (10.9x 1.6) = 49.74kN/m Ultimate load 3-4/D-E & 3a-4/E-F : (Total dead load x 1.4) + (Total live load x 1.6) = (22.11 x 1.4) + (9.08 x 1.6) = 45.53kN/m
  • 35. Point Load from Beam E3a-F3a = 148.32kN Reaction Force ∑M = 0 0 = Rd (6.3) + (-49.74 x 2.2 x 5.2) + (-148.32 x 4.1) + (-45.53 x 4.1 x 2.05) = 6.3Rd + (-1559.81) Rd = 1559.81/6.3 = 247.6kN Shear Force Rc = 0 =∑F 0 = Rc + 247.6 + (-49.74 x 2x2) + (-148.32) + (-45.53 x 4.1) Rc = 196.82 Bending Moment (415.77 x 2.2)/2 = 424.35kN (206.97 x 4.1)/2 = 424.3kN (42)/2 = 424.3kN
  • 36. COLUMN ANALYSIS FOO JI SUN 0322550 COLUMN E5 Roof Dead Load Beam = 5.1 x 0.2 x 0.3 x 24kN/m3 = 7.34 kN Live Load Slab = 3 x 2.1 x 0.5kN/m2 = 3.15 kN Ultimate Load = (7.34 x 1.4) + (3.15 x 1.6) = 15.32kN First Floor Dead Load Slab = 3 x 2.1 x 0.15 x 24kN/m3 = 22.68kN Beam = 5.1 x 0.2 x 0.3 x 24kN/m3 = 7.34kN Wall = 3 x 3 x 0.15 x 19kN/m3 = 25.65kN Column = 3 x 0.2 x 0.2 x 24kN/m3 = 2.88kN ∑Dead Load = 22.68 + 7.34 + 2.88 + 25.65 = 58.55kN Live Load Slab = 3 x 2.1 x 1.5kN/m2 = 9.45kN Ultimate Load = (58.55 x 1.4) + (9.45 x 1.6) = 97.09kN
  • 37. Ground Floor Dead Load Slab = 5 x 2.1 x 0.15 x 24kN/m3 = 37.8kN Beam = 7.1 x 0.2 x 0.3 x 24kN/m3 = 10.22kN Wall = 5 x 3 x 0.15 x 19kN/m3 = 42.75kN Column = 3 x 0.2 x 0.2 x 24kN/m3 = 2.88kN Total Dead Load = 37.8 + 10.22 + 42.75 + 2.88 = 93.65kN Live Load Slab = 5 x 2.1 x 1.5kN/m2 = 15.75kN Ultimate Load = (93.65 x 1.4) + (15.75 x 1.6) = 156.31kN Total Ultimate Load = 97.09 + 156.31 + 15.32 = 268.72kN
  • 38. FOO JI SUN 0322550 COLUMN D4 Roof Dead Load Beam = 9.2 x 0.2 x 0.3 x 24kN/m3 = 13.25kN Live Load Slab = 5 x 4 x 0.5kN/m2 = 10.4kN Ultimate Load = (13.25 x 1.4) + (10.4 x 1.6) = 35.2kN First Floor Dead Load Slab = 14.6m2 x 0.15 x 24kN/m3 = 52.56kN Beam = 9.2 x 0.2 x 0.3 x 24kN/m3 = 13.25kN Wall = 6.1 x 3 x 0.15 x 19kN/m3 = 52.16kN Column = 3 x 0.2 x 0.2 x 24kN/m3 = 2.88kN ∑Dead Load = 52.56 + 13.25 + 2.88 + 52.16 = 120.85kN Live Load Slab 1 = 2.1 x 2 x 2kN/m2 = 8.4kN Slab 2 = 2.1 x 2 x 1.5kN/m2 = 6.3kN Slab 3 = 3.1 x 2 x 3kN/m2 = 18.6kN ∑Live Load = 8.4 + 6.3 + 18.6 = 33.3kN
  • 39. Ultimate Load = (120.85 x 1.4) + (33.3 x 1.6) = 222.47kN Ground Floor Dead Load Slab = 14.6m2 x 0.15 x 24kN/m3 = 52.56kN Beam = 9.2 x 0.2 x 0.3 x 24kN/m3 = 13.25kN Wall = 5.1 x 3 x 0.15 x 19kN/m3 = 43.6kN Column = 3 x 0.2 x 0.2 x 24kN/m3 = 2.88kN Total Dead Load = 52.56 + 13.25 + 43.6 + 2.88 = 112.29kN Live Load Slab 4 = 3.1 x 2 x 2kN/m2 = 12.4kN Slab 5 = 2.1 x 4 x 3kN/m2 = 25.2kN Total Live Load = 12.4 + 25.2 = 37.6kN Ultimate Load = (12.29 x 1.4) + (37.6 x 1.6) = 217.37kN Total Ultimate Load = 35.2 + 222.47 + 217.37 = 475.04kN
  • 40. BEAM ANALYSIS TEOH ZHE KHAI 0322905
  • 41. TEOH ZHE KHAI 0322905 Beam Calculation (C3-D4) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab A-C/3-4 : 3.6 x (4.93/2) = 8.874kN/m Dead load on slab C-D/3-4 : 3.6 x (3.93/2) = 7.074kN/m Total dead load : 8.874+7.074+1.44 = 17.388kN/m
  • 42. Live load Live load on slab A-C/3-4 : 2 x (4.93/2) = 4.93kN/m Live load on slab C-D/3-4 : 2 x (3.93/2) = 3.93kN/m Total live load : 4.93 +3.93 = 8.86kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (17.388 x 1.4) + (8.86 x 1.6) = 38.516kN/m Reaction Force Moment : Force x Distance : 38.516 x 6.3 = 242.65kN ∑M = 0 0 = (242.65 x 3.15) - R4 (6.3) R4 = 764.35/6.3 = 121.33kN Shear Force R3 = 0 =∑F 0 = R3 -242.65 + 121.33 R3 = 121.33kN Bending Moment (121.33 x 3.15)/2 = 191.09kN
  • 43. Beam Calculation (A4-C4) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab A-C/3-4 : 3.6 x (4.93/2) X 2/3 = 5.91kN/m Dead load on slab A-C/4-5 : 3.6 x (4.23/2) = 7.608kN/m Total dead load : 5.91+7.608+1.44+11.4 = 26.36kN/m
  • 44. Live load Live load on slab A-C/3-4 : 2 x (4.93/2) x 2/3 = 3.28kN/m Live load on slab A-C/4-5 : 4 x (4.23/2) = 8.45kN/m Total live load : 3.28 + 8.45 = 11.73kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (26.36 x 1.4) + (11.73 x 1.6) =55.665kN/m Reaction Force Moment : Force x Distance : 55.665 x 4.925 = 274.15kN ∑M = 0 0 = (274.15 x 2.4625) - RC(4.925) RC = 675.1/4.925 = 137.1kN Shear Force RA = 0 =∑F 0 = RA - 274.15 + 137.1 RA = 137.1kN Bending Moment (137.1 x 2.4625)/2 = 168.77kN
  • 45. Beam Calculation (C4-5) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab A-C/4-5 : 3.6 x (4.23/2) X 2/3 = 5.07kN/m Dead load on slab C-D/4-5 : 3.6 x (3.93/2) = 7.07kN/m Total dead load : 5.07+7.07+1.44+11.4 = 24.98kN/m
  • 46. Live load Live load on slab A-C/4-5 : 4 x (4.23/2) x 2/3 = 5.63kN/m Live load on slab C-D/4-5 : 3 x (3.93/2) = 5.89kN/m Total live load : 5.63 + 5.89 = 11.52kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (24.98 x 1.4) + (11.52 x 1.6) =53.404kN/m Reaction Force Moment : Force x Distance : 53.404 x 4.225 = 225.63kN ∑M = 0 0 = (225.63 x 2.11) - R5(4.225) R5 = 476.08/4.225 = 112.815kN Shear Force R4 = 0 =∑F 0 = R4 - 225.63 + 112.815 R4 = 112.815kN Bending Moment 112.815 x 2.11 = 238.04kN
  • 47. Beam Calculation (C5-D5) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.2m x 19kN/m3 = 11.4kN/m Dead load on slab C-D/4-5 : 3.6 x (3.93/2) X 2/3 = 4.716kN/m Total dead load : 4.716+1.44+11.4 = 17.556kN/m
  • 48. Live load Live load on slab C-D/4-5 : 3 x (3.93/2) X 2/3 = 3.93kN/m Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (17.556 x 1.4) + (3.93 x 1.6) = 30.86kN/m Reaction Force Moment : Force x Distance : 30.86 x 3.925 = 121.13kN ∑M = 0 0 = (121.13 x 1.9625) - RD(3.925) RD = 237.72/3.925 = 60.57kN Shear Force RC = 0 =∑F 0 = RC - 121.13 - 60.57 RC = 60.57kN Bending Moment 60.57 x 1.9625 = 118.86kN
  • 49. COLUMN ANALYSIS Roof Dead Load Beam = (4.425x5.2625) x 0.2 x 0.3 x 24 = 13.95 kN Live Load Slab = (4.425x5.2625) x 0.5 = 11.64 kN Ultimate Load = (13.95 x 1.4) + (11.64 x 1.6) = 38.15kN/m First Floor Dead Load Slab = [(5.2625x1.9625) + (2.4625 X 1.9)] x 0.15 x 24 = 54.07 kN Beam = (4.425+5.2625) x 0.2 x 0.3 x 24 = 13.95 kN Wall = (2.4625+2.1125+1.9625) x 0.15 x 19 x 3 = 74.53 kN Column = 0.2 x 0.2 x 3 x 24 = 2.88 kN ∑Dead Load = 54.07 + 13.95+ 74.53 + 2.88 =145.43 kN Live Load Slab = 2.4625 x 1.9 x 1.5 = 7.02 kN/m Slab = 1.9625 x 3.15 x 1.5 = 9.27 kN/m Slab = 1.9625 x 2.1125 x 2 = 8.29 kN/m
  • 50. Ultimate Load = (145.43 x 1.4) + (24.58 x 1.6) = 242.93 kN/m Ground Floor Dead Load Slab = (4.425 x 5.2625) x 0.15 x 24 = 83.83 Beam = (4.425 + 5.2625) x 24 x 0.2 x 0.3 = 13.95 Wall = (2.4625 + 2.1125) x 0.2 x 19 x 3 = 5.2155 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 83.83 + 13.95 + 5.2155 + 2.88 = 105.87 kN/m Live Load Slab = 4.425 x 3.15 x 2 = 27.88 Slab = 2.1125 x 2.4625 x 4 = 208.08 Slab = 1.9625 x 2.1125 x 3 = 12.44 Total = 248.4 Ultimate Load = (105.87 x 1.4) + (248.4 x 1.6) = 545.66kN/m Total Ultimate Load = 38.15 + 242.93 + 545.66 = 826.74kN/m
  • 51. TEOH ZHE KHAI 0322905 Roof Dead Load Beam = (3.9625+2.1125) x 0.2 x 0.3 x 24 = 8.75 kN Live Load Slab = (3.9625x2.1125) x 0.5 = 4.185 kN Ultimate Load = (8.75 x 1.4) + (4.185 x 1.6) = 18.95kN/m First Floor Dead Load Slab = (3.9625x2.1125) x 0.15 x 24 = 30.13 kN Beam = (3.9625+2.1125) x 0.2 x 0.3 x 24 = 8.75 kN Wall = (3.9625+2.1125) x 0.2 x 19 x 3 = 95.43 kN Column = 0.2 x 0.2 x 3 x 24 = 2.88 kN ∑Dead Load = 30.13 + 8.75+ 95.43 + 2.88 =137.19 kN Live Load Slab = 1.9625 x 2.1125 x 2 = 8.29 kN/m Slab = 2.1125 x 2 x 2 = 8.45 kN/m Ultimate Load = (137.19 x 1.4) + (16.74 x 1.6) = 218.85 kN/m Ground Floor Dead Load Slab = (3.9625 x 2.1125) x 0.15 x 24 = 30.13 Beam = (3.9625 + 2.1125) x 24 x 0.2 x 0.3 = 8.75
  • 52. Wall = 3.9625 x 0.2 x 3 x 24 =45.17 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 30.13 + 8.75 + 45.17 + 2.88 = 86.93 kN/m Live Load Slab = 2.1125 x 1.9625 x 4 = 16.58 Slab = 2.1125 x 2 x 3 = 12.67 Total = 29.25 Ultimate Load = (86.93 x 1.4) + (29.25 x 1.6) = 168.5kN/m Total Ultimate Load = 18.95 + 218.85 + 168.5 = 406.3kN/m
  • 53. BEAM ANALYSIS TEH WEI HONG 0323743 Beam Calculation (C3-D3) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab C-D/1-3 3.6 x (3.9/2) x 2/3 = 4.68kN/m Dead load on slab C-D/3-4 3.6 x (3.9/2) x 2/3 = 4.68kN/m Total dead load : 4.68+4.68+1.44+8.55 = 19.35kN/m
  • 54. Live load Live load on slab C-D/1-3 1.5 x (3.9/2) x 2/3 = 1.95kN/m Live load on slab C-D/3-4 2 x (3.9/2) = 2.60kN/m Total live load: 1.95+2.60 = 4.55kN/m Ultimate load Ultimate load: (Total dead load x 1.4) + (Total live load x 1.6) = (19.35 x 1.4) + (4.55 x 1.6) = 34.34kN/m Reaction Force Moment: Force x Distance: 34.34 x 3.9 = 133.93kN ∑M = 0 0 = (133.93 x 1.95) - Rd (3.9) = 261.16 - Rd (3.9) Rd = 261.16/3.9 = 66.96kN Shear Force Rc = 0 =∑F 0 = Rd + Rc + (-34.34) (3.9) = 66.96 + Rc + (-34.34) (3.9) Rc = 66.96kN Bending Moment (66.96 x 1.95) /2 = 65.29kN
  • 55. Beam Calculation (A3-C3) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab A-C/2-3 3.6 x (2.7/2) = 4.86kN/m Dead load on slab A-C/3-4 3.6 x (4.9/2) x 2/3 = 5.88kN/m Total dead load : 4.86+5.88+1.44+8.55 = 20.73kN/m
  • 56. Live load Live load on slab A-C/2-3 1.5 x (2.7/2) = 2.70kN/m Live load on slab A-C/3-4 2 x (4.9/2) x 2/3 = 3.27kN/m Total live load: 2.70+3.27 = 5.97kN/m Ultimate load Ultimate load: (Total dead load x 1.4) + (Total live load x 1.6) = (20.73 x 1.4) + (5.97 x 1.6) = 38.57kN/m Reaction Force Moment: Force x Distance: 38.57x 4.9 = 188.99kN ∑M = 0 0 = (188.99 x 2.45) - Rd (4.9) = -463.03 - Rd (4.9) Rd = 463.03/4.9 = 94.5kN Shear Force Rc = 0 =∑F 0 = Rd + Rc + (-38.57) (4.9) = 94.5+ Rc + (-38.57) (4.9) Rc = -94.5kN Bending Moment (94.5 x 2.45) /2 = 115.76kN
  • 57. Beam Calculation (A2-C2) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab A-C/1-2 3.6 x (2.7/2) = 4.86kN/m Dead load on slab A-C/2-3 3.6 x (4.6/2) = 8.28kN/m Total dead load : 4.86+8.28+1.44+8.55 = 23.13kN/m
  • 58. Live load Live load on slab A-C/1-2 1.5 x (4.6/2) = 3.45kN/m Live load on slab A-C/2-3 2 x (2.7/2) = 2.70kN/m Total live load: 2.70+3.45 = 6.15kN/m Ultimate load Ultimate load: (Total dead load x 1.4) + (Total live load x 1.6) = (23.13 x 1.4) + (6.15 x 1.6) = 36.39kN/m Reaction Force Moment: Force x Distance: 36.39 x 4.9 = 178.31kN ∑M = 0 0 = (178.31 x 2.45) - Rd (4.9) = 436.86 - Rd (4.9) Rd = 436.86/4.9 = 89.16kN Shear Force Rc = 0 =∑F 0 = Rd + Rc + (-36.39) (4.9) = 89.16 + Rc + (-36.39) (4.9) Rc = -89.16kN Bending Moment (89.16 x 2.45) /2 = 109.22kN
  • 59. Beam Calculation (1C-3C) Dead load Slab self weight: 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight: (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight: 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab A-C/1-2 3.6 x (4.6/2) x 2/3 = 5.52kN/m Dead load on slab C-D/1-3 3.6 x (3.9/2) = 7.02kN/m Total dead load: 7.02+5.52+1.44+8.55 = 22.53kN/m
  • 60. Live load Live load on slab A-C/1-2 1.5 x (4.6/2) x 2/3 = 2.30kN/m Live load on slab A-C/2-3 1.5 x (3.9/2) = 2.93kN/m Total live load: 2.30+2.93 = 5.23kN/m Ultimate load Dead load 22.53 x 1.4 = 31.54 17.01 x 1.4 =1.40 Live load 5.23 x 1.6 = 8.37 2.93 x 1.6 =4.69 Reaction Force Moment: ∑M = 0 0 = Ra(7.3)+ (-39.91)(4.6)(5) + (-89.16)(2.7) + (-2.7)(1.35) -7.3 Ra = -1262.54 Ra = 172.95kn ∑y =0 0 =Ra+ Rb + (-39.91x 4.6)+(-89.16) + (-28.5 x 2.7) = -176.75
  • 61. Shear Force (172.95) - (39.91)(46) =-10.64 Bending Moment (area of +ve) - (area of -ve) = 0 1/2 x 4.33 x 172.95 =374 (I/2 x 0.27 x 10.64) + ( 1/2 x 176.75 + 99.8 x 2.7) = 373.3 Conclusion : area of positive = area of negative 4.6 172.95 10.64 X = 4.6 10.64 = 183.59 X = (4.6 x 10.64 )/183.59 X = 0.27 x
  • 62. COLUMN ANALYSIS TEH WEI HONG 0323743 Roof Dead Load Beam = (5x4.5) x 0.2 x 0.3 x 24 = 13.68 kN Live Load Slab = (5x4.5) x 0.5 = 11.25 kN Ultimate Load = (13.68 x 1.4) + (11.25 x 1.6) = 37.15kN First Floor Dead Load Slab = (4.5x5) x 0.15 x 24 = 81 kN Beam = (4.5+5) x 0.2 x 0.3 x 24 = 13.68 kN Wall = (4.5+5) x 0.15 x 19 x 3 = 81.23 kN Column = 0.2 x 0.2 x 3 x 24 = 2.88 kN ∑Dead Load = 81 + 13.68 + 81.23 + 2.88 =178.79 kN Live Load Slab = 4.5x 5x 1.5 = 33.75 kN Ultimate Load = (178.79 x 1.4) + (33.75 x 1.6) = 304.31kN
  • 63. Ground Floor Dead Load Slab = (2 x 1.35) x 0.15 x 24 = 9.72 Beam = (2 + 1.35) x 24 x 0.2 x 0.3 = 4.82 Wall = (2 + 1.35) x 0.15 x 19 x 3 = 28.64 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 9.72 + 4.82 + 28.64 + 2.88 = 46.06 kN Live Load Slab = 2x 1.35 x 1.5 = 4.05 Ultimate Load = (46 x 1.4) + (4.05 x 1.6) = 70.88kN Total Ultimate Load = 70.88 + 304.31 + 37.15 = 412.34kN
  • 64. Roof Dead Load Beam = (4.5+4.4) x 0.2 x 0.3 x 24 = 12.82 kN Live Load Slab = (4.5x4.5) x 0.5 = 9.9 kN Ultimate Load = (12.82 x 1.4) + (9.9 x 1.6) = 33.79kN First Floor Dead Load Slab = (4.4 x 4.5) x 0.15 x 24 = 71.28 Beam = (4.4 + 4.5) x 24 x 0.2 x 0.3 = 12.81 Wall = (4.4 + 4.5) x 0.15 x 19 x 3 = 76.10 Column = 0.2x 0.2x 3x 24 = 2.88 Total Dead Load = 71.28 + 12.81 + 76.10 + 2.88 = 163.07 kN Live Load Slab A = 1.35 x 4.4 x 1.5 = 8.91 Slab B = 3.15 x 4.4 x 3 = 41.58 Total Live Load = 8.91 + 41.58 = 50.49 kN Ultimate Load = (163.07 x 1.4) + (50.49 x 1.6) = 228.30 + 80.78 = 70.88kN
  • 65. Ground Floor Dead Load Slab = (6.8x 4.4) x 0.15 x 24 = 107.71 kN Beam = (6.8+ 4.4+ 2.45) x 0.2 x 0.3 x 24 = 19.66 kN Wall = (6.8+ 4.4+ 2.45) x 0.15 x 19 x 3 = 116.71 kN Column = 0.2 x 0.2 x 3 x 24 = 2.88 kN ∑Dead Load = 107.71 + 19.66 + 166.71 + 2.88 = 246.96 kN Live Load Slab A = 2.45x 3.65x 1.5 = 13.41 kN Slab B = 3.15x 2.45x 2 = 15.44 kN Slab C = 3.65 x 1.95 x 1.5 = 10.68 kN Slab D = 1.95 x 3.15 x 2 = 12.29 kN Ultimate Load = (246.96 x 1.4) + (51.82 x 1.6) = 428.66kN Total Ultimate Load = 428.66 + 33.79 + 309.08 = 771.53kN
  • 67. Beam Calculation (C3-C4) Dead Load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab A-C/4-5 : 3.6 x (4.3/2) = 7kN/m Total dead load : 1.44+8.55+7 = 16.99kN/m Live Load Live load on slab A-C/4-5 : 2 x (3.9/2) = 3.9kN/m Total live load : 3.9 = 3.9kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 68. Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (16.99 x 1.4) + (3.9 x 1.6) = 30.02kN/m Reaction Force Moment : Force x Distance : 30.02 x 4.2 = 126.08kN ∑M = 0 0 = 126.08 + Rb + (-30.02)(4.2) Ra = 126.08 - 63.04 = 63.04kN Shear Force Rb = 0 =∑F 0 = 63.04 + Rb + (-30.02)(4.2) Rb = 63.04kN Bending Moment (63.04 x 2.1)/2 = 66kN (63.04 x 2.1)/2 = 66kN
  • 69. Dead load Dead Load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab C-D/4-5 : 3.6 x (3.9/2) x (2/3) = 4.68kN/m Total dead load : 1.44+8.55+4.68 = 14.67kN/m Live Load Live load on slab C-D/4-5 : 2 x (3.9/2) x (2/3) = 2.6kN/m Total live load : 2.6 = 2.6kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 70. Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (14.67 x 1.4) + (2.6 x 1.6) = 24.7kN/m Reaction Force Moment : Force x Distance : 24.7 x 3.9 = 96.33kN ∑M = 0 0 = Ra(3.9) + (-24.7)(3.9)(1.95) Ra = 187.84/3.9 = 48.17kN Shear Force Rd = 0 =∑F 0 = 48.17 + Rb + (-24.7)(3.9) Rd = 48.16kN Bending Moment (48.17 x 1.95)/2 = 47kN (48.16 x 1.95)/2 = 47kN
  • 71. Beam Calculation For Point Load (A3’-B3’) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab 3’-4/A-B : 3.6 x (1.8/2) = 3.24kN/m Total dead load : 1.44 + 3.24 = 4.68kN/m Live load Live load on slab 3’-4/A-B : 2 x (1.8/2) = 3.24kN/m Total live load : 3.24 =3.24kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 72. Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (4.68 x 1.4) + (3.24 x 1.6) = 11.8kN/m Reaction Force ∑M = 0 0 = Ra (4.9) + (-11.8 x 4.9 x 2.45) = 4.9Ra + (-141.659) Ra = 141.659/4.9 = 28.9kN Shear Force Rb = 0 =∑F 0 = 28.9 + Rb + (-11.8)(4.9) Rb = 28.9kN Point Load from Beam A3’-B3’ = 28.9kN Dead Load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab A-B/3’-4 : 3.6 x (1.8/2) = 3.24kN/m Dead load on slab B-C/3-4 : 3.6 x (3.9/2) = 7.02kN/m
  • 73. Live Load Live load on slab A-B/3’-4 : 2 x (1.8/2) x 2/3 = 1.2kN/m Live load on slab B-C/3-4 : 2 x (3.9/2) = 3.9kN/m Reaction Force ∑M = 0 0 = Ra (6.3) + (-18.08)(4.5)(4.05) + (-28.9)(1.8) + (-24.54)(1.8)(0.9) Ra = 421.281/6.3 = 66.87kN Shear Force Rb = 0 =∑F 0 = 66.87 + Rb + (-18.08)(4.5) + (-28.9) + (-24.54)(1.8) Rb = 87.6kN Bending Moment (66.87)(45.08)/2 = 124kN [(14.49)(0.8) + (43.39 + 87.6)(1.8)]/2 = 124kN
  • 74. Beam Calculation For Point Load (4B) = 87.6kN (From the previous calculation) Beam Calculation For (4A-4C) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab 3’-4/A-B : 3.6 x (1.8/2) = 3.24kN/m Brick Wall Self Weight : 0.15 x 3 x 19 = 8.55kN/m Live load Live load on slab 3’-4/A-B : 2 x (1.8/2) = 1.8kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 75. Reaction Force ∑M = 0 0 = Ra (4.9 + 3.9) + (-21.4)(4.9)(6.35) + (-87.6)(3.9) + (-13.98)(3.9)(1.95) Ra = 1113.82/8.8 = 126.57kN Shear Force Rb = 0 =∑F 0 = 126.57 + Rb + (-21.4)(4.9) + (-87.6) + (-13.98)(3.9) Rb = 120.78kN Bending Moment (126.57 + 21.71)(2.9)/2 = 363kN (120.4 + 65.87)(3.9)/2 = 363kN 126.57
  • 76. Beam Calculation (C3-C4) Dead Load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab A-C/4-5 : 3.6 x (4.3/2) = 7kN/m Total dead load : 1.44+8.55+7 = 16.99kN/m Live Load Live load on slab A-C/4-5 : 2 x (3.9/2) = 3.9kN/m Total live load : 3.9 = 3.9kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 77. Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (16.99 x 1.4) + (3.9 x 1.6) = 30.02kN/m Reaction Force Moment : Force x Distance : 30.02 x 4.2 = 126.08kN ∑M = 0 0 = 126.08 + Rb + (-30.02)(4.2) Ra = 126.08 - 63.04 = 63.04kN Shear Force Rb = 0 =∑F 0 = 63.04 + Rb + (-30.02)(4.2) Rb = 63.04kN Bending Moment (63.04 x 2.1)/2 = 66kN (63.04 x 2.1)/2 = 66kN
  • 78. Dead load Dead Load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Brick wall self weight : 3m x 0.15m x 19kN/m3 = 8.55kN/m Dead load on slab C-D/4-5 : 3.6 x (3.9/2) x (2/3) = 4.68kN/m Total dead load : 1.44+8.55+4.68 = 14.67kN/m Live Load Live load on slab C-D/4-5 : 2 x (3.9/2) x (2/3) = 2.6kN/m Total live load : 2.6 = 2.6kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 79. Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (14.67 x 1.4) + (2.6 x 1.6) = 24.7kN/m Reaction Force Moment : Force x Distance : 24.7 x 3.9 = 96.33kN ∑M = 0 0 = Ra(3.9) + (-24.7)(3.9)(1.95) Ra = 187.84/3.9 = 48.17kN Shear Force Rd = 0 =∑F 0 = 48.17 + Rb + (-24.7)(3.9) Rd = 48.16kN Bending Moment (48.17 x 1.95)/2 = 47kN (48.16 x 1.95)/2 = 47kN
  • 80. Beam Calculation For Point Load (A3’-B3’) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab 3’-4/A-B : 3.6 x (1.8/2) = 3.24kN/m Total dead load : 1.44 + 3.24 = 4.68kN/m Live load Live load on slab 3’-4/A-B : 2 x (1.8/2) = 3.24kN/m Total live load : 3.24 =3.24kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 81. Ultimate load Ultimate load : (Total dead load x 1.4) + (Total live load x 1.6) = (4.68 x 1.4) + (3.24 x 1.6) = 11.8kN/m Reaction Force ∑M = 0 0 = Ra (4.9) + (-11.8 x 4.9 x 2.45) = 4.9Ra + (-141.659) Ra = 141.659/4.9 = 28.9kN Shear Force Rb = 0 =∑F 0 = 28.9 + Rb + (-11.8)(4.9) Rb = 28.9kN Point Load from Beam A3’-B3’ = 28.9kN Dead Load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab A-B/3’-4 : 3.6 x (1.8/2) = 3.24kN/m Dead load on slab B-C/3-4 : 3.6 x (3.9/2) = 7.02kN/m
  • 82. Live Load Live load on slab A-B/3’-4 : 2 x (1.8/2) x 2/3 = 1.2kN/m Live load on slab B-C/3-4 : 2 x (3.9/2) = 3.9kN/m Reaction Force ∑M = 0 0 = Ra (6.3) + (-18.08)(4.5)(4.05) + (-28.9)(1.8) + (-24.54)(1.8)(0.9) Ra = 421.281/6.3 = 66.87kN Shear Force Rb = 0 =∑F 0 = 66.87 + Rb + (-18.08)(4.5) + (-28.9) + (-24.54)(1.8) Rb = 87.6kN Bending Moment (66.87)(45.08)/2 = 124kN [(14.49)(0.8) + (43.39 + 87.6)(1.8)]/2 = 124kN
  • 83. Beam Calculation For Point Load (4B) = 87.6kN (From the previous calculation) Beam Calculation For (4A-4C) Dead load Slab self weight : 0.15m x 24kN/m3 = 3.6kN/m2 Beam self weight : (0.2mx0.3m) x 24kN/m3 = 1.44kN/m Dead load on slab 3’-4/A-B : 3.6 x (1.8/2) = 3.24kN/m Brick Wall Self Weight : 0.15 x 3 x 19 = 8.55kN/m Live load Live load on slab 3’-4/A-B : 2 x (1.8/2) = 1.8kN/m Load Distribution Plan For First Floor Plan Structural Plan For First Floor Plan
  • 84. Reaction Force ∑M = 0 0 = Ra (4.9 + 3.9) + (-21.4)(4.9)(6.35) + (-87.6)(3.9) + (-13.98)(3.9)(1.95) Ra = 1113.82/8.8 = 126.57kN Shear Force Rb = 0 =∑F 0 = 126.57 + Rb + (-21.4)(4.9) + (-87.6) + (-13.98)(3.9) Rb = 120.78kN Bending Moment (126.57 + 21.71)(2.9)/2 = 363kN (120.4 + 65.87)(3.9)/2 = 363kN 126.57
  • 85. COLUMN ANAYLSIS TANG FU HONG Dead load acting on column 5C Tributary area method load analysis on Column 5C Roof Beams : (2 + 2.1)(0.2)(0.3)(24) = 5.9kN First Floor Beams (Roof) : (2.5 + 2.1)(0.2)(0.3)(24) = 6.6kN Beams (First Floor) : (2.1+2)(0.2)(0.3)(24) = 5.9kN Slabs : (2.1 x 2)(0.15)(24) = 15.12 kN Walls : (2.1 + 2)(0.15)(19)(3) = 35.06kN Columns : (0.2)(0.2)(3)(24) = 2.88kN Ground Floor Beams : (4.5+2.1)(0.2)(0.3)(24) = 9.5kN Slabs : (4.5 x 2.1)(0.15)(24) = 45.36 kN Walls : (2.5 + 2.1 + 2)(0.15)(19)(3) = 56.43kN Columns : (0.2)(0.2)(3)(24) = 2.88kN Live load acting on column 5C Roof First Floor Ground Floor Slab : (2 x 2.1)(0.5) = 2.1kN Slab (Roof) : (2.5 x 2.1)(0.5) = 21.625kN Slab (First Floor) : (2 x 2.1)(2) = 8.4kN Slab : (4.5 x 2.1)(3) = 28.35kN Total Dead Load = 185.63kN Apply 1.4 Dead Load Factor = 259.88kN Total Live Load = 41.48kN Apply 1.6 Live Load Factor = 66.36kN Total Ultimate Load = 326.24kN
  • 86. Dead load acting on column 4A Live load acting on column 4A Tributary area method load analysis on Column 4A Roof Beams : (3.2 + 2.5)(0.2)(0.3)(24) = 8.2kN First Floor Beams (Roof) : (2.5 + 2.5 + 2.1)(0.2)(0.3)(24) = 10.2kN Beams (First Floor) : (3.2 + 2.5)(0.2)(0.3)(24) = 8.2kN Slabs : (2.5 x 2.5)(0.15)(24) = 22.5kN Columns : (0.2)(0.2)(3)(24) = 2.88kN Ground Floor Beams : (3.2 + 2.5+2.1)(0.2)(0.3)(24) = 11.2kN Slabs : (5.3 x 2.5)(0.15)(24) = 47.7kN Walls : (3.2 + 2.1 + 1.9)(0.15)(19)(3) = 61.56kN Columns : (0.2)(0.2)(3)(24) = 2.88kN Roof First Floor Ground Floor Slab : (2 x 2.1)(0.5) = 2.1kN Slab (Roof) : (2.5 x 2.1)(0.5) = 21.625kN Slab (First Floor) : (2 x 2.1)(2) = 8.4kN Slab : (4.5 x 2.1)(3) = 28.35kN Total Dead Load = 175.32kN Apply 1.4 Dead Load Factor = 245.45kN Total Live Load = 52.88kN Apply 1.6 Live Load Factor = 84.6kN Total Ultimate Load = 330.05kN