International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 385
Survey on Effects of Productivity of Equipment in Construction
Projects
Priyanka Methe1, Mahaboobali Nadaf2, Rashmi J.V.3, K. P. Thejaswi4
1 Student, Final year, M.Tech in Construction Technology, Civil Dept., Jain College of Engg., Belagavi-PIN-590014
2,3Assistant Professor, Civil Dept., Jain College of Engg, Machee, Belagavi, Karnataka-PIN-590014
4 Assistant Professor, Civil Dept., KLS Gogte Institute of technology, Belagavi, Karnataka–PIN-590001
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract -It is vital to note that equipment productivitymay
be a degree of adequacy of association frameworks in
utilizing work, equipment and capital to convert labour
endeavors into valuable yield, and is not a degree of the
capabilities of the labour alone. This study was made to
discover the productivity and effects influencing the output
of the construction tools. This investigate aims at
considering the effects of productivity of equipment at the
micro level of the essential exercises of progressfor building
projects. The information collected were examined utilizing
the relative importance indexstrategyto rank the effectsand
their impacts on venture. The RII for each effect was
calculated from the examination of the rating obtained by
the respondents with utilize of 5 point likert scale.
Key Words: Effects of construction equipment Productivity,
Construction equipment.
1. INTRODUCTION
1.1 BACKGROUND
Equipment management is the portion of project
management. Authentic management of assets in projects
can create noteworthy investment funds in time and cost.
However, until nowadays, construction businesses are still
confronting a number of issues with respect to the low
efficiency, destitute security and inadequate quality.
For successful equipment management, it is essential to
consider productivity of equipment. For finding out the
productivity of equipment, consider of effects influencing
behind them is necessary.
Appropriate equipment management can increment the
equipment productivity which lead to minimize the
maximum cost of the current project.
1.2 OBJECTIVE OF THE STUDY
This investigate, primarily aims to examine vital effects
influenced by equipment productivity in building
development project and their impact on projects.
The following are the actual objectives of the study.
1. To outline the productivity measurement practices
within the construction industry.
2. Analyze and calculate the Relative Important Index
(RII) of those effects affected by equipment
productivity.
3. To find the effects of construction equipment
Productivity on project using RII method.
1.3 SCOPE AND LIMITATION OF THE RESEARCH
In any case, investigation attention is only on
construction firmsandventuresduetothecircumstancethat
construction of buildings utilizes various equipment’s.
Because it is considered by distinctive investigates most of
the construction ventures fails to be finished within the
agreement time and budgeted cost.
The scope of this investigate is limited to the research of
equipment productivity on construction ventures. Low
equipment productivity influences all contractorsofvarious
class and category.
2. LITRATURE REWIEW
2.1 GENERAL
The following are the past research survey based on the
distinguishing proof of factors influencing the efficiency of
construction equipment.
A.A. Attar1, A.K. Gupta and D.B.Desai [1] conducted a study
on project directors and skilled engineers of building
ventures in pune, sangli & Kolhapur locale, where an
increment in productivity is being looked for. Respondents
were required to rate utilizing their skill how all factors
influence productivity with regard to cost, time, and quality.
The investigation was achieved by a responses and
questionnaire. The ten most important factors influencing
labour proficiency for medium, small & huge firms are
recognized.
D. Sukumar, V. Rajesh Kumar [5] have done study to
distinguish and examine the factors that influences the
productivity of labour in road development. The
questionnaire is arranged based on different literature and
information collected from the location.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 386
The most important factor that influences the proficiency is
identified through the RII (Relative importance index)
strategy. The findings shows the best factors influencing the
Labour productivity are construction method, destitute soil
condition, work area restriction, assessment delays,
inaccessibility of experienced labours, and good quality of
required works.
Mohamed Abdelaal and Hassan Enam [8] in this paper
quantitative questionnaire study was done with industry
practitioners to find major factors which are impacting on
equipment productivity.
It includes some of the major factors like site working time,
managing site equipment, communication, work schedule,
working tasks types, safety measures, quality control,
managerial factors, skilled laborers, motivation, scope
change, availability of material, and over planning and work
methodology.
This research examines all significant factors by methodofa
structured survey managed in GCC countries. Theranking of
factors is calculated by relative importance indices that is
RII.
3. RESEARCH METHODOLOGY
3.1 GENERAL
The main objective of study is to provide basic data about
effects influenced by equipmentproductivityatconstruction
area and their impacts on venture.
Effects which influence productivity of construction are
delay (time overrun), cost overrun, disputes, Loss in
productivity of equipment, Equipment relatedaccidents and
suspension of work.
3.2 RESEARCH STAGES
This investigate, passed through the following stages in
figure:
Fig 3.1Research stages
3.2.1 Objective and scope of project
The scope of this investigate is inadequate to the study of
productivity of equipment of building construction projects.
The objective of this consider focuses on opinions from the
construction business about different effects influencing
equipment productivity.
3.2.2 Background of productivity
From the different literature studies, productivitymeaning
is clarified and significance of equipment productivity is
discussed.
3.2.3 Review of literature
In this suggested model, the identification of different
effects influence the productivity of equipment of
construction equipment and their impacts onventuresbasis
has been developed on the origin of literature review.
3.2.4 Design of questionnaire
Questionnaires were considered on the structural basis to
acquire data about the individual information of the
respondents and their contribution on problems related to
equipment productivity in construction.
As the result of pilot overview, there are 6 effects which are
recognized as major effects influencing equipment
productivity. These effects are organized in the
questionnaire format.
The effects on projects are as follows;
1. Cost overrun
2. Delay (time over run)
3. Equipment related accidents
4. Loss in productivity of equipment
5. Disputes
6. Suspension of work
3.2.5 Survey and data collection
In order to simplify the study, after the literature surveyand
the interviews, plan was framed for collecting field
information and making a valuation process and numerical
values. About twenty questionnaires were sent to the
construction industry by mail and interviews were
conducted among construction personnel specifically
consultant, client, engineer, contractor,architectandlabour.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 387
3.2.6 Data analysis and results
The information collected were examined utilizing the
relative importance index strategy to rank the effects
influencing to equipment productivity on construction
locales and their impacts on the project. The RII for each
figure was computed from the investigation of the rating
shown by the respondents.
R.I.I *100
Where,
n5= number of respondents who has chosen the effect
commitment as eminently significant.
N4= number of respondents who has chosen the effect
commitment as very significant.
N3= number of respondents who has chosen the effect
commitment as moderately significant.
N2= number of respondents who has chosen the effect
commitment as slightly significant.
N1= number of respondents who has chosen the effect
commitment as not significant.
3.2.7 Conclusions and recommendation
After positioning, conclusions can be made about the effects
which influence most and impact on project and at last
recommendations and can be given for progressing the
productivity.
4. RESULTS AND DISCUSSIONS
4.1 GENERAL
The overview evaluation was done by utilizing relative
importance index strategy and found the best effects
influencing equipment productivity.
4.2 EFFECTS ON PROJECT:
Table 4.7 Effects on project
Effect on Project R.I.I. RANK
Delay (Time over run) 92 1
Cost Over run 66 2
Disputes 54 3
Loss in productivity of equipment 51 4
Equipment related accidents 51 5
Suspension of work 42 6
Fig 4.1 RII values and Ranks of effects
Delay (Time over run) effect isranked1st.Delayiscommonly
identified, as the foremost common, expensive,complexand
hazardous issue experienced in construction projects.
Cost overrun effect is ranked 2nd. Cost in project comprises
cash and assets (equipment). The client ordinarilyneedsthe
project to be completed with the possible least cost and
should be convenient. In any case,itistheventuremanager’s
duty to formulate an execution standard to track cost
performance.
Disputes effect is ranked 3rd. In each industry where
individuals need to work together and coordinate there’s a
chance for disputes to emerge, and development industry
isn’t an exemption. Regularly there’s a need of
understanding about the reasons behind the disputes,but to
dodge disputes from happening and resolving them in case
they happen, it is crucial to notice the causes of disputes.
Loss in productivity of equipment effect is ranked 4rd.
productivity is the proportion of valuable work to the time
used up to finish that work. The productivity of modern
construction equipment has expanded with increment in
modernity and modernization, hence permitting the cost of
operations to stay moderately steady. Poor equipment
arranging and management causes wasteful aspectsandloss
of profitable time, results in an increment in cost.
Equipment related accidents effect is ranked 5th.
Construction areas are very unsafe, and construction
workers have one of the mostsignificant work-relatedinjury
rates within the field. Numerous of these injuries happen in
association to the equipment that construction work
regularly requires.
Suspension of work effect is ranked 6th. A suspension of
work beneath a construction contract may be requested by
the contracting director for a sensible period of time. In case
the suspension is absurd, worker may submit a composed
claim for increments within the cost of execution and
excluding benefits
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 388
6. Conclusion and recommendations
6.1 conclusion
This study examines all possible effects through an
organized questionnaire. The overviewresultsaresubjected
to investigation, and the positioning of effects is calculated
utilizing relative importance indices (RII).This investigate
gives study and information of construction productivity as
well as focus on effects influencing equipment productivity
in building construction projects. The strategy for consider
was a quantitative survey backed by investigativesubjective
interviews with industry professionals, and the overview
discoveries demonstrates the major effects affected by
equipment productivity is delay(time overrun).
6.2 Recommendation
Recommendationsforimprovingthe equipmentproductivity
on the building projects:
 Employ modern innovations
 Motivation of laborers towards project completion.
 Advance equipment planning.
 Commitment to productivity advancementoughtto
be there at all administration levels.
REFRENECES
[1] A .A. Attar1, A.K. Gupta and D.B.Desai, “A Study of
Various Factors Affecting Labour Productivity and Methods
to Improve It”, IOSR Journal of Mechanical and Civil
Engineering (IOSR-JMCE), ISSN: 2278-1684, PP: 11-14
[2] D.Sukumar, V.Rajesh Kumar (2016), “A Study of Various
Factors Affecting Labour Productivity In Road Construction
And Suggestions To Improve It”, International Journal of
Scientific & Engineering Research, Volume 7, Issue 4, April-
2016, pp. 98-102
[3] Mohamed Abdelaal and Hassan Emam (2016),
“Equipment Productivity in Infrastructure Projects in GCC
Countries”, Research Gate Conference Paper · May 2016
BIOGRAPHIES
Priyanka Methe
Student, Final year, M.Tech in
Construction Technology, Civil
Dept., Jain College of Engg.,
Belagavi-PIN-590014
Mahaboobali Nadaf
Assistant Professor, Civil Dept.,
Jain College of Engg., Machee,
Belagavi, Karnataka-PIN-590014
Rashmi J.V.
Assistant Professor, Civil Dept.,
Jain College of Engg., Machee,
Belagavi, Karnataka-PIN-590014
K. P. Thejaswi
Assistant Professor, Civil Dept.,
KLS Gogte Institute of technology
Belagavi, Karnataka – PIN-590001
2nd
Author
Photo
4th
Author
Photo
3rd
Author
Photo
1’st
Author
Photo

More Related Content

What's hot

A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryIRJET Journal
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET Journal
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...IRJET Journal
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for ConstructionIRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Publishing House
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Dr. Amarjeet Singh
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSIAEME Publication
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Factors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India regionFactors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India regionAyush khandelwal
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET Journal
 
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...IRJET Journal
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
D0365030036
D0365030036D0365030036
D0365030036theijes
 

What's hot (20)

A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for Construction
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Factors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India regionFactors affecting Quality of construction projects in India region
Factors affecting Quality of construction projects in India region
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
 
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
D0365030036
D0365030036D0365030036
D0365030036
 

Similar to EFFECTS OF EQUIPMENT PRODUCTIVITY

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...eSAT Journals
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET Journal
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
Risk Management Technique of Ready Mix Concrete Plants
Risk Management Technique of Ready Mix Concrete PlantsRisk Management Technique of Ready Mix Concrete Plants
Risk Management Technique of Ready Mix Concrete PlantsIRJET Journal
 
IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...IRJET Journal
 
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONREWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONIRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxKaushalKumar522651
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET Journal
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayIRJET Journal
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...IRJET Journal
 

Similar to EFFECTS OF EQUIPMENT PRODUCTIVITY (20)

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
Risk Management Technique of Ready Mix Concrete Plants
Risk Management Technique of Ready Mix Concrete PlantsRisk Management Technique of Ready Mix Concrete Plants
Risk Management Technique of Ready Mix Concrete Plants
 
IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...
 
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONREWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- Review
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction Delay
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

EFFECTS OF EQUIPMENT PRODUCTIVITY

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 385 Survey on Effects of Productivity of Equipment in Construction Projects Priyanka Methe1, Mahaboobali Nadaf2, Rashmi J.V.3, K. P. Thejaswi4 1 Student, Final year, M.Tech in Construction Technology, Civil Dept., Jain College of Engg., Belagavi-PIN-590014 2,3Assistant Professor, Civil Dept., Jain College of Engg, Machee, Belagavi, Karnataka-PIN-590014 4 Assistant Professor, Civil Dept., KLS Gogte Institute of technology, Belagavi, Karnataka–PIN-590001 ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract -It is vital to note that equipment productivitymay be a degree of adequacy of association frameworks in utilizing work, equipment and capital to convert labour endeavors into valuable yield, and is not a degree of the capabilities of the labour alone. This study was made to discover the productivity and effects influencing the output of the construction tools. This investigate aims at considering the effects of productivity of equipment at the micro level of the essential exercises of progressfor building projects. The information collected were examined utilizing the relative importance indexstrategyto rank the effectsand their impacts on venture. The RII for each effect was calculated from the examination of the rating obtained by the respondents with utilize of 5 point likert scale. Key Words: Effects of construction equipment Productivity, Construction equipment. 1. INTRODUCTION 1.1 BACKGROUND Equipment management is the portion of project management. Authentic management of assets in projects can create noteworthy investment funds in time and cost. However, until nowadays, construction businesses are still confronting a number of issues with respect to the low efficiency, destitute security and inadequate quality. For successful equipment management, it is essential to consider productivity of equipment. For finding out the productivity of equipment, consider of effects influencing behind them is necessary. Appropriate equipment management can increment the equipment productivity which lead to minimize the maximum cost of the current project. 1.2 OBJECTIVE OF THE STUDY This investigate, primarily aims to examine vital effects influenced by equipment productivity in building development project and their impact on projects. The following are the actual objectives of the study. 1. To outline the productivity measurement practices within the construction industry. 2. Analyze and calculate the Relative Important Index (RII) of those effects affected by equipment productivity. 3. To find the effects of construction equipment Productivity on project using RII method. 1.3 SCOPE AND LIMITATION OF THE RESEARCH In any case, investigation attention is only on construction firmsandventuresduetothecircumstancethat construction of buildings utilizes various equipment’s. Because it is considered by distinctive investigates most of the construction ventures fails to be finished within the agreement time and budgeted cost. The scope of this investigate is limited to the research of equipment productivity on construction ventures. Low equipment productivity influences all contractorsofvarious class and category. 2. LITRATURE REWIEW 2.1 GENERAL The following are the past research survey based on the distinguishing proof of factors influencing the efficiency of construction equipment. A.A. Attar1, A.K. Gupta and D.B.Desai [1] conducted a study on project directors and skilled engineers of building ventures in pune, sangli & Kolhapur locale, where an increment in productivity is being looked for. Respondents were required to rate utilizing their skill how all factors influence productivity with regard to cost, time, and quality. The investigation was achieved by a responses and questionnaire. The ten most important factors influencing labour proficiency for medium, small & huge firms are recognized. D. Sukumar, V. Rajesh Kumar [5] have done study to distinguish and examine the factors that influences the productivity of labour in road development. The questionnaire is arranged based on different literature and information collected from the location.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 386 The most important factor that influences the proficiency is identified through the RII (Relative importance index) strategy. The findings shows the best factors influencing the Labour productivity are construction method, destitute soil condition, work area restriction, assessment delays, inaccessibility of experienced labours, and good quality of required works. Mohamed Abdelaal and Hassan Enam [8] in this paper quantitative questionnaire study was done with industry practitioners to find major factors which are impacting on equipment productivity. It includes some of the major factors like site working time, managing site equipment, communication, work schedule, working tasks types, safety measures, quality control, managerial factors, skilled laborers, motivation, scope change, availability of material, and over planning and work methodology. This research examines all significant factors by methodofa structured survey managed in GCC countries. Theranking of factors is calculated by relative importance indices that is RII. 3. RESEARCH METHODOLOGY 3.1 GENERAL The main objective of study is to provide basic data about effects influenced by equipmentproductivityatconstruction area and their impacts on venture. Effects which influence productivity of construction are delay (time overrun), cost overrun, disputes, Loss in productivity of equipment, Equipment relatedaccidents and suspension of work. 3.2 RESEARCH STAGES This investigate, passed through the following stages in figure: Fig 3.1Research stages 3.2.1 Objective and scope of project The scope of this investigate is inadequate to the study of productivity of equipment of building construction projects. The objective of this consider focuses on opinions from the construction business about different effects influencing equipment productivity. 3.2.2 Background of productivity From the different literature studies, productivitymeaning is clarified and significance of equipment productivity is discussed. 3.2.3 Review of literature In this suggested model, the identification of different effects influence the productivity of equipment of construction equipment and their impacts onventuresbasis has been developed on the origin of literature review. 3.2.4 Design of questionnaire Questionnaires were considered on the structural basis to acquire data about the individual information of the respondents and their contribution on problems related to equipment productivity in construction. As the result of pilot overview, there are 6 effects which are recognized as major effects influencing equipment productivity. These effects are organized in the questionnaire format. The effects on projects are as follows; 1. Cost overrun 2. Delay (time over run) 3. Equipment related accidents 4. Loss in productivity of equipment 5. Disputes 6. Suspension of work 3.2.5 Survey and data collection In order to simplify the study, after the literature surveyand the interviews, plan was framed for collecting field information and making a valuation process and numerical values. About twenty questionnaires were sent to the construction industry by mail and interviews were conducted among construction personnel specifically consultant, client, engineer, contractor,architectandlabour.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 387 3.2.6 Data analysis and results The information collected were examined utilizing the relative importance index strategy to rank the effects influencing to equipment productivity on construction locales and their impacts on the project. The RII for each figure was computed from the investigation of the rating shown by the respondents. R.I.I *100 Where, n5= number of respondents who has chosen the effect commitment as eminently significant. N4= number of respondents who has chosen the effect commitment as very significant. N3= number of respondents who has chosen the effect commitment as moderately significant. N2= number of respondents who has chosen the effect commitment as slightly significant. N1= number of respondents who has chosen the effect commitment as not significant. 3.2.7 Conclusions and recommendation After positioning, conclusions can be made about the effects which influence most and impact on project and at last recommendations and can be given for progressing the productivity. 4. RESULTS AND DISCUSSIONS 4.1 GENERAL The overview evaluation was done by utilizing relative importance index strategy and found the best effects influencing equipment productivity. 4.2 EFFECTS ON PROJECT: Table 4.7 Effects on project Effect on Project R.I.I. RANK Delay (Time over run) 92 1 Cost Over run 66 2 Disputes 54 3 Loss in productivity of equipment 51 4 Equipment related accidents 51 5 Suspension of work 42 6 Fig 4.1 RII values and Ranks of effects Delay (Time over run) effect isranked1st.Delayiscommonly identified, as the foremost common, expensive,complexand hazardous issue experienced in construction projects. Cost overrun effect is ranked 2nd. Cost in project comprises cash and assets (equipment). The client ordinarilyneedsthe project to be completed with the possible least cost and should be convenient. In any case,itistheventuremanager’s duty to formulate an execution standard to track cost performance. Disputes effect is ranked 3rd. In each industry where individuals need to work together and coordinate there’s a chance for disputes to emerge, and development industry isn’t an exemption. Regularly there’s a need of understanding about the reasons behind the disputes,but to dodge disputes from happening and resolving them in case they happen, it is crucial to notice the causes of disputes. Loss in productivity of equipment effect is ranked 4rd. productivity is the proportion of valuable work to the time used up to finish that work. The productivity of modern construction equipment has expanded with increment in modernity and modernization, hence permitting the cost of operations to stay moderately steady. Poor equipment arranging and management causes wasteful aspectsandloss of profitable time, results in an increment in cost. Equipment related accidents effect is ranked 5th. Construction areas are very unsafe, and construction workers have one of the mostsignificant work-relatedinjury rates within the field. Numerous of these injuries happen in association to the equipment that construction work regularly requires. Suspension of work effect is ranked 6th. A suspension of work beneath a construction contract may be requested by the contracting director for a sensible period of time. In case the suspension is absurd, worker may submit a composed claim for increments within the cost of execution and excluding benefits
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 06 | June-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Effect value: 6.171 | ISO 9001:2008 Certified Journal | Page 388 6. Conclusion and recommendations 6.1 conclusion This study examines all possible effects through an organized questionnaire. The overviewresultsaresubjected to investigation, and the positioning of effects is calculated utilizing relative importance indices (RII).This investigate gives study and information of construction productivity as well as focus on effects influencing equipment productivity in building construction projects. The strategy for consider was a quantitative survey backed by investigativesubjective interviews with industry professionals, and the overview discoveries demonstrates the major effects affected by equipment productivity is delay(time overrun). 6.2 Recommendation Recommendationsforimprovingthe equipmentproductivity on the building projects:  Employ modern innovations  Motivation of laborers towards project completion.  Advance equipment planning.  Commitment to productivity advancementoughtto be there at all administration levels. REFRENECES [1] A .A. Attar1, A.K. Gupta and D.B.Desai, “A Study of Various Factors Affecting Labour Productivity and Methods to Improve It”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), ISSN: 2278-1684, PP: 11-14 [2] D.Sukumar, V.Rajesh Kumar (2016), “A Study of Various Factors Affecting Labour Productivity In Road Construction And Suggestions To Improve It”, International Journal of Scientific & Engineering Research, Volume 7, Issue 4, April- 2016, pp. 98-102 [3] Mohamed Abdelaal and Hassan Emam (2016), “Equipment Productivity in Infrastructure Projects in GCC Countries”, Research Gate Conference Paper · May 2016 BIOGRAPHIES Priyanka Methe Student, Final year, M.Tech in Construction Technology, Civil Dept., Jain College of Engg., Belagavi-PIN-590014 Mahaboobali Nadaf Assistant Professor, Civil Dept., Jain College of Engg., Machee, Belagavi, Karnataka-PIN-590014 Rashmi J.V. Assistant Professor, Civil Dept., Jain College of Engg., Machee, Belagavi, Karnataka-PIN-590014 K. P. Thejaswi Assistant Professor, Civil Dept., KLS Gogte Institute of technology Belagavi, Karnataka – PIN-590001 2nd Author Photo 4th Author Photo 3rd Author Photo 1’st Author Photo