Identification of Constraints and There Impact on Construction Project
Pooja K. Devagiri1, Prof. Amey A. Kelkar2
1M.TECH (CCT) Student, Civil Engineering Dept, Jain College of Engineering, Belagavi, Karnataka, India.
2Assistant Professor, Civil Engineering Dept, Jain College of Engineering, Belagavi, Karnataka, India.
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - The construction industry is progressive nature
because of increasing vulnerabilities in development
innovation, Budget and advancement forms. Construction
projects especially building projects are becoming
unquestionable increasingly intricate and troublesome these
days. The construction project group can face extraordinary
deviations. The aim of this study is to identify the constraints
and preparing for questionnairesurvey. Themajorconstraints
are identified using R.I.I. method which has the highestimpact
on construction activities. It is a methodthatisappliedtorank
the constraints that outcomes in decreased project
performance and cause delay in construction projects
execution. 1 to 5 is the rating contingents upon the premise of
their effect on the project performance. Higher the value of
RII, more important is that the factor impact on project
progress. Then the impact caused by the constraints in
schedule is developed by MSP (Microsoft Project software).
Key Words: Constraints, Relative Importance Index
[R.I.I.]MSP (Microsoft Project software)
1. INTRODUCTION
Project stream is every time restricted by construction
constraints. These constraints will in time overrun, cost
overrun due to delays in the work procedureandlowquality
because of surge of work to complete the task in time. The
requirements must be reduced so as to make the task
effective one. Time and cost are the two principle factors in
the construction industry to state an undertakingiseffective
or not. It is necessary to finish an effective venture on
schedule and within the financial plan.
Each development task will have somewhere around
one requirement. “Constraints are characterized as
something that confines the moment of an organization or
element towards or fulfillment of its targets”. Constraint
designates entity-progression relationship.
Microsoft project is thesoftwareadvanced byMicrosoft
in application to plan and schedule different exercises
associated with the venture. The steps used in scheduling of
the project activities are as follows.
Activities: After describing the scope and creating the
work breakdown structure which is concerned with
deliverable to recognize which work has to be approved to
create the deliverable, thenextstageistofurtherbreakdown
the work package. In described activities, work package will
decompose as activities.
1.1 OBJECTIVES
The main objectives of this study are as follows
1. To prepare B+G+3 project Scheduling of the
activities using MSP.
2. To identify the major constraintsusingR.I.I.method
which have the highest impact on construction
activities.
3. To obtain the total duration of project execution
after considering the impact of the identified
constraints and obtain the delay caused.
1.2 LITERATURE REVIEW
Constraints are the common problem in every
construction industry. Identification of constraints and its
removal is must to achieve success of the project.
X .Regina Mary, V. Rathinakumar[1] This study has
investigated various aspects which help to reduce
constraints. Constraints will alter the undertaking
achievement. Constraintsarediminishedbyusing expanding
venture assets including labour resources appropriate
interconnecting the undertaking activities and schedule is
prepared using M.S.Project. To reducetheconstraints,actual
prepared scheduled is compared with modified schedule.
Resource management also necessary ineverydevelopment
venture since task execution will depend upon
resources/assets. Successful construction project will be
completed within the scheduled time.
Desalegn Disasa Daba and Dr. Jayeshkumar Pitroda[2]
The main target of this study was to identifythedeferfactors
in construction projects.Inanyconstructionindustryproject
life cycle (PLC) delay is greatest basic issue. When actual
duration of the project is more than the scheduled time
duration of the project, it is called time delay of the project.
The consequence of the delay will have many undesirable
effects on project such as claims and conflicts between
project stakeholders, loss of performance and labours
productivity.
2. RESEARCH METHODOLOGY
The delay in construction projects is one of the most
important construction issue which needs to be addressed.
There are various constraints which are responsible for
causing delays in construction. This study is an attempt to
identify such constraints. In this work a constructionproject
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1153
which is planned is scheduledfor327daysisconsidered. The
methodology obtained is described in this chapter
 Identification of constraints and preparation of
questionnaires.
 Conducting questionnaire survey, analysing it using
R.I.I. method and identifying the governing
constraints using R.I.I. method.
 Identifying the impact caused by the constraints in
schedule developed using MSP.
 Identifying the constraints which can be resolved by
proper planning and engineering knowledge.
2.1. QUESTIONNAIRE SURVEY
A flow chart illustrates the methodology improved for this
study
Fig-1: Flow chart of methodology of questionnaire survey
Step 1: Questionnaire survey is a method of gathering
maximum people data. This survey brings multiplicity of
practices and can be done in multiplicity of ways.
Questionnaire survey can be accompanied to gather
information by means of a printed questionnaire and mail.
The current circumstance of construction project has been
considered in this work. The core objective of this is to
improve certain tools andtechniquesthatcanbe exploitedto
accomplish the project within scheduled time, within
estimated cost and with appropriate quality.
Step 2: The first step incorporates the fundamental learning
of the subject documents required for the analysis is
gathered through literature review. The review was co-
ordinated through several references. Several issues
contributing diminished undertaking execution in
construction industry are recorded down based on review.
Step 3: These factors were expanded under 8 distinct
classifications which are as per the following:
1. Land/property
2. Planning/drawing
3. Government work
4. Finance
5. Labours
6. Material execution
7. Others
Step 4: The second step incorporates questionnaire survey
preparation dependent on the above depicted aspect.
Step 5: The questionnaire was distributed to different
project stakeholders such as engineer, contractor,Clients by
mail and in person and valuable feedbacks are gathered.
Step 6: The application of Relative Importance Indexisused
in this method. It is a method that is applied to rank the
constraints that outcomes in decreasedprojectperformance
and cause delay in construction projects execution.
Step 7: The R.I.I. rank is achieved by means of following
equation.
R.I.I. = 5(n5) + 4(n4) + 3(n3) + 2(n2) + 1(n1)
5(n5+n4+n3+n2+n1)
Where,
1 to 5 is the rating contingents upon the premise of their
effect on the project performance
1= NIL. 2=LOW. 3= MODERATE. 4= HIGH. 5= VERY HIGH nx
is the number of respondents
2.2. SCHEDULING OF ACTIVITIES USING MSP
Step 1: Schedule planning involves activities which will the
project scheduling such as documentation, procedures,
Stakeholders and resources.
Step 2: This step involves different activities required to
complete the project it is also called as work break own
structure.
Step 3: After work break down structure relations between
the activities are determined. This logical sequence of
activities helps to obtain work efficiency.
Step 4: Estimating the resources required to complete each
and every activity such as labours, materials, equipment’s
and tools.
Step 5: Estimating the duration required to complete each
and every activities.
Step 6: This involves development of most efficient project
schedule by entering the start and finish date for each and
every activity. It also includes identification of critical tasks
which will directly effects on project completion time using
critical path method.
LITERATURE SURVEY
IDENTIFYING CONSTRAINTS IN
CONSTRUCTION PROJECT
QUESTIONNAIRE PREPARATION
QUESTINNAIRE SURVEY
ANALYSIS AND DISCUSSION
CONCLUSION
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1154
Fig-2: Flow chart indicating the process of scheduling
using MSP
2.3 ANALYSIS AND RESULTS
This Phase includes identification of constriants based on
literature review, conducting questionnaire survey,
analysing constraints using R.I.I. method, identification of
governing factors and rescheduling of activities using MSP.
1. Conducting questionnnaire survey based on literature
review is as shown inTable 1.
Table -1: Questionnairies prepared based on literature
review
SI.NO CATEGORY FACTORS
1 LAND/PROPERTY
Delay in approval of permission
drawing
Changes in permission drawing
Site inspection
Demands/corruption
2
PLAN NING/
DRAWING
Delay in drawing
Drawing errors
Improper planning
Change/rework due to some reasons
Method of construction adopted
3
GOVERNMENT
WORK
Availability of concerned approval
authority
Water supply and power lines
connections
Preservation of ecology
4 FINANCE
Budget limit
Cash flow problem during construction
Escalation of resource price
5 LABOURS
Wages
Poor co-ordination
Health
Improper work schedule
Lack of safety measures
Shortage of labours
6 MATERIAL
procurement
Quality
Storage
Wastage
Local availability
Transportation facility to supply
7 EXECUTION
Weather condition
Lack of experience
Poor resource allocation
Lack of construction knowledge
Lack of supervision
8 OTHER Conflicts
2. Summary of questionnaire survey results of different
categories is as shown in Table 2.
Table-2: Questionnaire survey results using R.I.I. method
SI.NO CATEGORY FACTORS R.I.I.
1 LAND/PROPERTY
Delay in approval of
permission drawing
0.59
Changes in permission
0.56
SCHEDULE PLANNING
DEFINING THE ACTIVITIES
SEQUESNCE ACTIVITIES INVOLVED
IN PROJECT
ESTIMATION OF ACTIVITY
RESOURCES
ESTIMATING DURATION OF
THE ACTIVITIES
DEVELOP SCHEDULE
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1155
drawing
Site inspection 0.58
Demands/corruption 0.68
2
PLANNING/
DRAWING
Delay in drawing 0.61
Drawing errors 0.49
Improper planning 0.58
Change/rework due to
some reasons
0.53
Method of construction
adopted
0.68
3 GOVERNMENT WORK
Availability of concerned
approval authority
0.68
Water supply and power
lines connections
0.53
4 FINANCE
Preservation of ecology 0.52
Budget limit 0.73
Cash flow problem during
construction
0.70
Escalation of resource price 0.73
5 LABOURS
Wages 0.65
Poor co-ordination 0.65
Health 0.56
Improper work schedule 0.57
Lack of safety measures 0.73
Shortage of labours 0.82
6 MATERIAL
procurement 0.61
Quality 0.60
Storage 0.56
Wastage 0.59
Local availability 0.57
Transportation facility to
supply
0.61
7 EXECUTION
Weather condition 0.82
Lack of experience 0.77
Poor resource allocation 0.67
Lack of construction
knowledge
0.77
Lack of supervision 0.73
8 OTHER Conflicts 0.72
3. Identification of governing factores which will have high
level of impact on construction project from
questionnaire survey results is as shown in Table 3.
Table-3: Governing factors
SI.NO CATEGORIES GOVERNING FACTOR R.I.I.
1 Planning/drawing Method of construction adopted 0.68
2 Government work
Availability of concerned approval
authority
0.68
3 Finance Budget limit 0.73
4 Labours Shortage of labours 0.82
5 Labours Lack of safety measures 0.73
6 Execution Lack of construction knowledge 0.77
7 Execution Weather condition 0.82
8 Other Conflicts 0.72
4. Identification of impact of constraints by updating the
project which is taken for this study has initial duration
327days.
5. Duration of the project after considering the impact of
constraints on project is 374days, which is 47days more
than initial schduled duration.Details of scheduling and
resource sheet is as shown in Fig 3, Fig 4 and Fig 5
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1156
Fig 3. Updated scheduling
Fig 4. Updated scheduling resource sheet
Fig 5. Updated scheduling resource sheet
3. CONCLUSIONS
1. The major constraints which cause delay in construction
activities are identified by using R.I.I. methodisasshown
in Table 4.
Table 4.Governing factors
SI.NO CATEGORIES GOVERNING FACTOR R.I.I.
1 Planning/drawing Method of construction adopted 0.68
2 Government work
Availability of concerned
approval authority
0.68
3 Finance Budget limit 0.73
4 Labours Shortage of labours 0.82
5 Labours Lack of safety measures 0.73
6 Execution Lack of construction knowledge 0.77
7 Execution Weather condition 0.82
8 Other Conflicts 0.72
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1157
2. The total duration of the project execution after
considering the impact of the identified constraints was
374 days, which was 47 days more than initial scheduled
duration.
REFERENCES
[1] X. Regina Mary and V. Rathinakumar-[2015] “Reducing
Construction Constraints using Primavera” Indian
Journal of Science and Technology,Vol.8(14),ISSN:0974-
6846.
[2] Desalegn Disasa Daba and Dr. Jayeshkumar Pitroda-
[2018] “A Critical Literature Review on Main Cause of
Delay in Construction Projects” International Research
Journal of Engineering and Technology, Volume: 05,
Issue: 01.Jan-2018.
BIOGRAPHIES
Pooja K. Devagiri
M.TECH(CCT)student,Civil
Engineering Dept, Jain College of
Engineering, Belagavi.
Karnataka, India
Prof. Amey A. Kelkar
Assistant Professor, Civil
Engineering Dept, Jain College of
Engineering, Belagavi.
Karnataka, India.

More Related Content

What's hot

IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
 
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity.  November 30th 2015.1% AIMS Improving Construction productivity.  November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.kiebut
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libreUTHM
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple ProjectsIRJET Journal
 
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...Associate Professor in VSB Coimbatore
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...IRJET Journal
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectIJERA Editor
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Schedulingijtsrd
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsIRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Project Management Notes 3
Project Management Notes 3Project Management Notes 3
Project Management Notes 3Golam Bitonsir
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...IRJET Journal
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 

What's hot (20)

IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity.  November 30th 2015.1% AIMS Improving Construction productivity.  November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
 
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction Projects
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Project Management Notes 3
Project Management Notes 3Project Management Notes 3
Project Management Notes 3
 
Planning
PlanningPlanning
Planning
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 

Similar to IRJET- Identification of Constraints and there Impact on Construction Project

Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey BuildingIRJET Journal
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...IRJET Journal
 
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6IRJET Journal
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...IRJET Journal
 
Delay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectDelay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectIRJET Journal
 
Delay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectDelay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectIRJET Journal
 
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...IRJET Journal
 
Project Management, Perspective, Planning And Implementation
Project Management, Perspective, Planning And ImplementationProject Management, Perspective, Planning And Implementation
Project Management, Perspective, Planning And ImplementationCamella Taylor
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSIAEME Publication
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...IRJET Journal
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...IRJET Journal
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based projecteSAT Journals
 

Similar to IRJET- Identification of Constraints and there Impact on Construction Project (20)

Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
 
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
Delay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectDelay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential Project
 
Delay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectDelay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential Project
 
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
 
Project Management, Perspective, Planning And Implementation
Project Management, Perspective, Planning And ImplementationProject Management, Perspective, Planning And Implementation
Project Management, Perspective, Planning And Implementation
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 

IRJET- Identification of Constraints and there Impact on Construction Project

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1152 Identification of Constraints and There Impact on Construction Project Pooja K. Devagiri1, Prof. Amey A. Kelkar2 1M.TECH (CCT) Student, Civil Engineering Dept, Jain College of Engineering, Belagavi, Karnataka, India. 2Assistant Professor, Civil Engineering Dept, Jain College of Engineering, Belagavi, Karnataka, India. ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - The construction industry is progressive nature because of increasing vulnerabilities in development innovation, Budget and advancement forms. Construction projects especially building projects are becoming unquestionable increasingly intricate and troublesome these days. The construction project group can face extraordinary deviations. The aim of this study is to identify the constraints and preparing for questionnairesurvey. Themajorconstraints are identified using R.I.I. method which has the highestimpact on construction activities. It is a methodthatisappliedtorank the constraints that outcomes in decreased project performance and cause delay in construction projects execution. 1 to 5 is the rating contingents upon the premise of their effect on the project performance. Higher the value of RII, more important is that the factor impact on project progress. Then the impact caused by the constraints in schedule is developed by MSP (Microsoft Project software). Key Words: Constraints, Relative Importance Index [R.I.I.]MSP (Microsoft Project software) 1. INTRODUCTION Project stream is every time restricted by construction constraints. These constraints will in time overrun, cost overrun due to delays in the work procedureandlowquality because of surge of work to complete the task in time. The requirements must be reduced so as to make the task effective one. Time and cost are the two principle factors in the construction industry to state an undertakingiseffective or not. It is necessary to finish an effective venture on schedule and within the financial plan. Each development task will have somewhere around one requirement. “Constraints are characterized as something that confines the moment of an organization or element towards or fulfillment of its targets”. Constraint designates entity-progression relationship. Microsoft project is thesoftwareadvanced byMicrosoft in application to plan and schedule different exercises associated with the venture. The steps used in scheduling of the project activities are as follows. Activities: After describing the scope and creating the work breakdown structure which is concerned with deliverable to recognize which work has to be approved to create the deliverable, thenextstageistofurtherbreakdown the work package. In described activities, work package will decompose as activities. 1.1 OBJECTIVES The main objectives of this study are as follows 1. To prepare B+G+3 project Scheduling of the activities using MSP. 2. To identify the major constraintsusingR.I.I.method which have the highest impact on construction activities. 3. To obtain the total duration of project execution after considering the impact of the identified constraints and obtain the delay caused. 1.2 LITERATURE REVIEW Constraints are the common problem in every construction industry. Identification of constraints and its removal is must to achieve success of the project. X .Regina Mary, V. Rathinakumar[1] This study has investigated various aspects which help to reduce constraints. Constraints will alter the undertaking achievement. Constraintsarediminishedbyusing expanding venture assets including labour resources appropriate interconnecting the undertaking activities and schedule is prepared using M.S.Project. To reducetheconstraints,actual prepared scheduled is compared with modified schedule. Resource management also necessary ineverydevelopment venture since task execution will depend upon resources/assets. Successful construction project will be completed within the scheduled time. Desalegn Disasa Daba and Dr. Jayeshkumar Pitroda[2] The main target of this study was to identifythedeferfactors in construction projects.Inanyconstructionindustryproject life cycle (PLC) delay is greatest basic issue. When actual duration of the project is more than the scheduled time duration of the project, it is called time delay of the project. The consequence of the delay will have many undesirable effects on project such as claims and conflicts between project stakeholders, loss of performance and labours productivity. 2. RESEARCH METHODOLOGY The delay in construction projects is one of the most important construction issue which needs to be addressed. There are various constraints which are responsible for causing delays in construction. This study is an attempt to identify such constraints. In this work a constructionproject
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1153 which is planned is scheduledfor327daysisconsidered. The methodology obtained is described in this chapter  Identification of constraints and preparation of questionnaires.  Conducting questionnaire survey, analysing it using R.I.I. method and identifying the governing constraints using R.I.I. method.  Identifying the impact caused by the constraints in schedule developed using MSP.  Identifying the constraints which can be resolved by proper planning and engineering knowledge. 2.1. QUESTIONNAIRE SURVEY A flow chart illustrates the methodology improved for this study Fig-1: Flow chart of methodology of questionnaire survey Step 1: Questionnaire survey is a method of gathering maximum people data. This survey brings multiplicity of practices and can be done in multiplicity of ways. Questionnaire survey can be accompanied to gather information by means of a printed questionnaire and mail. The current circumstance of construction project has been considered in this work. The core objective of this is to improve certain tools andtechniquesthatcanbe exploitedto accomplish the project within scheduled time, within estimated cost and with appropriate quality. Step 2: The first step incorporates the fundamental learning of the subject documents required for the analysis is gathered through literature review. The review was co- ordinated through several references. Several issues contributing diminished undertaking execution in construction industry are recorded down based on review. Step 3: These factors were expanded under 8 distinct classifications which are as per the following: 1. Land/property 2. Planning/drawing 3. Government work 4. Finance 5. Labours 6. Material execution 7. Others Step 4: The second step incorporates questionnaire survey preparation dependent on the above depicted aspect. Step 5: The questionnaire was distributed to different project stakeholders such as engineer, contractor,Clients by mail and in person and valuable feedbacks are gathered. Step 6: The application of Relative Importance Indexisused in this method. It is a method that is applied to rank the constraints that outcomes in decreasedprojectperformance and cause delay in construction projects execution. Step 7: The R.I.I. rank is achieved by means of following equation. R.I.I. = 5(n5) + 4(n4) + 3(n3) + 2(n2) + 1(n1) 5(n5+n4+n3+n2+n1) Where, 1 to 5 is the rating contingents upon the premise of their effect on the project performance 1= NIL. 2=LOW. 3= MODERATE. 4= HIGH. 5= VERY HIGH nx is the number of respondents 2.2. SCHEDULING OF ACTIVITIES USING MSP Step 1: Schedule planning involves activities which will the project scheduling such as documentation, procedures, Stakeholders and resources. Step 2: This step involves different activities required to complete the project it is also called as work break own structure. Step 3: After work break down structure relations between the activities are determined. This logical sequence of activities helps to obtain work efficiency. Step 4: Estimating the resources required to complete each and every activity such as labours, materials, equipment’s and tools. Step 5: Estimating the duration required to complete each and every activities. Step 6: This involves development of most efficient project schedule by entering the start and finish date for each and every activity. It also includes identification of critical tasks which will directly effects on project completion time using critical path method. LITERATURE SURVEY IDENTIFYING CONSTRAINTS IN CONSTRUCTION PROJECT QUESTIONNAIRE PREPARATION QUESTINNAIRE SURVEY ANALYSIS AND DISCUSSION CONCLUSION
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1154 Fig-2: Flow chart indicating the process of scheduling using MSP 2.3 ANALYSIS AND RESULTS This Phase includes identification of constriants based on literature review, conducting questionnaire survey, analysing constraints using R.I.I. method, identification of governing factors and rescheduling of activities using MSP. 1. Conducting questionnnaire survey based on literature review is as shown inTable 1. Table -1: Questionnairies prepared based on literature review SI.NO CATEGORY FACTORS 1 LAND/PROPERTY Delay in approval of permission drawing Changes in permission drawing Site inspection Demands/corruption 2 PLAN NING/ DRAWING Delay in drawing Drawing errors Improper planning Change/rework due to some reasons Method of construction adopted 3 GOVERNMENT WORK Availability of concerned approval authority Water supply and power lines connections Preservation of ecology 4 FINANCE Budget limit Cash flow problem during construction Escalation of resource price 5 LABOURS Wages Poor co-ordination Health Improper work schedule Lack of safety measures Shortage of labours 6 MATERIAL procurement Quality Storage Wastage Local availability Transportation facility to supply 7 EXECUTION Weather condition Lack of experience Poor resource allocation Lack of construction knowledge Lack of supervision 8 OTHER Conflicts 2. Summary of questionnaire survey results of different categories is as shown in Table 2. Table-2: Questionnaire survey results using R.I.I. method SI.NO CATEGORY FACTORS R.I.I. 1 LAND/PROPERTY Delay in approval of permission drawing 0.59 Changes in permission 0.56 SCHEDULE PLANNING DEFINING THE ACTIVITIES SEQUESNCE ACTIVITIES INVOLVED IN PROJECT ESTIMATION OF ACTIVITY RESOURCES ESTIMATING DURATION OF THE ACTIVITIES DEVELOP SCHEDULE
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1155 drawing Site inspection 0.58 Demands/corruption 0.68 2 PLANNING/ DRAWING Delay in drawing 0.61 Drawing errors 0.49 Improper planning 0.58 Change/rework due to some reasons 0.53 Method of construction adopted 0.68 3 GOVERNMENT WORK Availability of concerned approval authority 0.68 Water supply and power lines connections 0.53 4 FINANCE Preservation of ecology 0.52 Budget limit 0.73 Cash flow problem during construction 0.70 Escalation of resource price 0.73 5 LABOURS Wages 0.65 Poor co-ordination 0.65 Health 0.56 Improper work schedule 0.57 Lack of safety measures 0.73 Shortage of labours 0.82 6 MATERIAL procurement 0.61 Quality 0.60 Storage 0.56 Wastage 0.59 Local availability 0.57 Transportation facility to supply 0.61 7 EXECUTION Weather condition 0.82 Lack of experience 0.77 Poor resource allocation 0.67 Lack of construction knowledge 0.77 Lack of supervision 0.73 8 OTHER Conflicts 0.72 3. Identification of governing factores which will have high level of impact on construction project from questionnaire survey results is as shown in Table 3. Table-3: Governing factors SI.NO CATEGORIES GOVERNING FACTOR R.I.I. 1 Planning/drawing Method of construction adopted 0.68 2 Government work Availability of concerned approval authority 0.68 3 Finance Budget limit 0.73 4 Labours Shortage of labours 0.82 5 Labours Lack of safety measures 0.73 6 Execution Lack of construction knowledge 0.77 7 Execution Weather condition 0.82 8 Other Conflicts 0.72 4. Identification of impact of constraints by updating the project which is taken for this study has initial duration 327days. 5. Duration of the project after considering the impact of constraints on project is 374days, which is 47days more than initial schduled duration.Details of scheduling and resource sheet is as shown in Fig 3, Fig 4 and Fig 5
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1156 Fig 3. Updated scheduling Fig 4. Updated scheduling resource sheet Fig 5. Updated scheduling resource sheet 3. CONCLUSIONS 1. The major constraints which cause delay in construction activities are identified by using R.I.I. methodisasshown in Table 4. Table 4.Governing factors SI.NO CATEGORIES GOVERNING FACTOR R.I.I. 1 Planning/drawing Method of construction adopted 0.68 2 Government work Availability of concerned approval authority 0.68 3 Finance Budget limit 0.73 4 Labours Shortage of labours 0.82 5 Labours Lack of safety measures 0.73 6 Execution Lack of construction knowledge 0.77 7 Execution Weather condition 0.82 8 Other Conflicts 0.72
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1157 2. The total duration of the project execution after considering the impact of the identified constraints was 374 days, which was 47 days more than initial scheduled duration. REFERENCES [1] X. Regina Mary and V. Rathinakumar-[2015] “Reducing Construction Constraints using Primavera” Indian Journal of Science and Technology,Vol.8(14),ISSN:0974- 6846. [2] Desalegn Disasa Daba and Dr. Jayeshkumar Pitroda- [2018] “A Critical Literature Review on Main Cause of Delay in Construction Projects” International Research Journal of Engineering and Technology, Volume: 05, Issue: 01.Jan-2018. BIOGRAPHIES Pooja K. Devagiri M.TECH(CCT)student,Civil Engineering Dept, Jain College of Engineering, Belagavi. Karnataka, India Prof. Amey A. Kelkar Assistant Professor, Civil Engineering Dept, Jain College of Engineering, Belagavi. Karnataka, India.