SlideShare a Scribd company logo
1 of 7
ANKUR SINGH
Contact: 7023455201
E-Mail: ankurs.miet@gmail.com, ankurr_s@yahoo.com
OBJECTIVE
Seeking senior level assignments in Design Engineering, Project Management, Construction, Pre-Commissioning,
Commissioning, & Start UP with an organization of high repute in Oil & Gas sector
PROFILE SUMMARY
An astute professional with around 7 years of experience in overseeing overall operations entailing Detail Engineering
Design, Project Management, Construction and Commissioning of oil and gas offshore and onshore projects. Proficient in
Detail Design Engineering and Project Execution & handling installation and commissioning of ESD/DCS and advanced
control systems. Basic awareness of fluid Mechanics / Fluid Engineering. Working Exposures in handling bigger projects
of up to USD1bn and exposure in Green field / brown field projects. An exemplary communicator with excellent
relationship of management and team supervision abilities.
Key Skills
 Contribute to the development of Pre-Commissioning & commissioning plan with safety milestone.
 Preparation / interpretation of P & ID , hook up, JB Schedule, Nest loading ,Front loading, Cause / Effect & ILD’s, data
sheets of Instrumentation / Hydraulic / Pneumatic / electrical / PLC components for procurement / approval to client.
 Coordinating with procurement activities for all type of instruments, control valves , ON-OFF valves, instrument fittings
and PLC and raising BOM and floating enquires to the vendor and vendor follow up for budgetary cost estimation.
 Conversant with ISA, NFPA, BS and IEC standards
Smart plant instrumentation (IN tools Version-7)
3D Model review in Smart plant review (SPR Version-7)
Hazardous area classification and participation (ATEX, IEC, NEC Standard)
FEED / Basic & detail engineering phase of projects
 Review of Equipment / Rotary Data sheet / Package data sheet for control system interface
 Fundamentals of Fire and Gas system, Hazardous area classification
 Experienced in cable sizing, selection of cables for various hazardous application
Preparation & approval of Material Take-off list (MTO), Level sketches, Cable block, Inst. JB schedule, Location Plan
diagram, Instrument Index, Logic diagram, IRP Panel drawings etc
Selection & Sizing of various Instruments like control valves, flow orifice, thermo well etc.
 Scheduling and co-ordinate work to tight deadlines. ( Onshore)
 Execution and site Construction management of Oil & Gas various upstream, midstream and downstream Projects
 Tie-In signal (Green Field / Brow field hook up) pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2,
PSD, APSD)
 Develop and maintain commissioning procedures.
 Participate in FAT & SAT activities in various locations
 Hands on experience in DCS and PLC based control system installation and commissioning
 Worked in DCS (Yokogawa DCS Controller (Centum VP, CS3000, and PLC (Prosafe).
 .Liaison with contractor with respect to commissioning preparation like (Commissioning Plan, Commissioning
Procedures & Commissioning Spares).
 Monitoring contractor’s commissioning preparation and executions.
 Liaison with vendor’s with respect to hook-up and commissioning for packages.
 Execute own commissioning and lead the team of commissioning engineers and technician.
 Handover, to operation and issue RFSU (Ready for Start-up) for all system.
ORGANIZATIONAL EXPERIENCE
Growth Path since Jul ’08 GET to till date.
WORK EXPERIENCE IN CAIRN ENERGY: PROJECT HANDLED (Green Field & Brown Field)
Duration: March 2014 to August-2014 on payroll of Brunel energy. August 2014 -Till Date on payroll of
ASMACS
1. BAGYAM OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION- Green Field)
 Involving in Pre-Commissioning & commissioning of Bagyam Field development project consisting of 15 Well pads for
crude oil exploration having capacity of (56 producers & 23 Injection) wells. 33000BPOD
2. MANGALA OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION-Green Field)
 Involving in Pre-Commissioning & commissioning of Mangla Field development project consisting of 18 Well pads for
crude oil exploration having capacity of (140 producer & 53 Injection) wells. 175000 BPOD
3. CENTRAL POLYMER FACILITY UNIT (UPSTREAM-OIL EXPLORATION- Green Field)
 Involving in Pre-Commissioning & commissioning of CPF unit development project consisting of 5 stream having
capacity of 1 lack barrels per day.
 Unit to prepare the polymer based on Enhance oil recovery techniques.
 Involving Instrument Pre-Comm & Commissioning (unloading arm, silo, hopper, maturation tanks)
4. AISHWAIYA OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION-Green Field)
 1. Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Aishwarya Field development project
consisting of 8 Well pads for crude oil exploration having capacity of (36 producers & 15 Injection) wells. 26000 BPOD
 2. ESP (Schlumbreger –ALF) Artificial Lift Involving (VFD & ESP) Pre-Commissioning &Commissioning & Start-Up.
5. SATELLITE OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION- Green Field)
 Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Satellite Field development project –NA4.
600 BPOD
6. SATELLITE OIL FIELD DEVELOPMENT PROJECT (UPSTREAM OIL EXPLORATION-Green Field)
 Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Satellite Field development project –NI2.
7. BARMER HILL OIL FIELD DEVELOPMENT PROJECT (Brown Field-Upstream)
 Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Barmer Hill Field development project
Aishwarya. Consists of 10 Production wells.
8. AISHWARYA IN FILL WELLS OIL FIELD DEVELOPMENT PROJECT (Brown Field-Upstream)
 Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Aishwarya INFILL Wells Field development
project Aishwarya. Consists of 72 wells.
RESPONSIBLE IN CAIRN ENERGY
 Logic Checks, Cause & Effect checks completion from central control room.
 Providing technical support and modifications in tray work, impulse piping and instrument installation as per site
condition.
 Executing the instrument pre-commissioning & Commissioning activities in well pads.
 Tie-In signal pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)
 Involved in system installation and configuration with system vendor.
 Involve field Engineering ( Additional channel assigning, ELCO Board, Terminal block, Node , IO card, Nest loading
preparation , Junction box wiring , Filed Instrument Installation Etc..
 Fully familiar with system “pre power-on” checks. Instrument Earth & System Earth segregation.
 Establishing communication of third party devices like package PLC, HVAC and Building F&G systems.
 Loop checks for DCS/ESD/package loops, Logic checks, Cause & Effect checks as per the C & E matrix.
 Participated in DCS/ESD/Package system/F&G system site acceptance test (SAT).
 After functional check supporting operation to ensure smooth and safe plant start up.
 Ensure that as-built drawings are prepared and maintained completed project files including all loop drawings, updated
interlock and logic drawings.
 Inspection of material on receipt at warehouse.
 Punch list point follow up with system vendor for completeness of the system activity before plant start-up.
 Punch list coordinating and closing CAT-A & CAT-B.
 Follow up CCC, MCC & SAC certification & Dossier handover
 During Chemical injection dossing pumps commissioning time coordinating with electrical commissioning team (Solo
run test, load test & 4 hours performance test).
 During commissioning of 33KV HT switch gear system, 415V LT switch gear system, UPS & EHT commissioning time
coordinating with electrical team to complete the activities.
 During PAGA commissioning coordinating with Telecom team to checks the door access, confirmed fire / Gas & CCTV
etc.
 Impulse tubing Hydro test 1/2", 1/4"SS316 with water Medium,. Max 120 Bar. Coordinating with piping commissioning.
 SS Impulse tubing integrity leak test 1/2”, 1/4” with air Medium Max 10 Bar, check with soap solution.
 Low 10Bar/High pressure120 bar integrity testing time coordinating with piping commissioning team.
 Hot Water Circulation & Pigging (Foam Pig, Brush Pig & Bidirectional Pig,) coordinating with piping commissioning
team, to complete the activities in Major production & Water Injection Line size (4",6”, 8",10" & 12").
 Pre-Comm. & Commissioning activities Well Head control Panel(WHCP)
 Operation Stroke checks for SDV, SSV (250 TO 350Bar),SSSV (350 TO 400 Bar) wing valve (Christmas tree valve)
 Building F & G commissioning checks (SD, MCP, MPS, HD, Beacon & Hotter annunciation).
 INNERGEN system commissioning checks
 Following the ZONE Classifications (Zone 0 & zone 20 , Zone 1 & zone 21, Zone 2 & zone 22)
WORK EXPERIENCE IN HPCL: PROJECT HANDLED (Green Field & Brown Field)
Chemtex global Ltd. & Fabtech Projects & Engineers Ltd. consortium Pune: Duration May 2012 to March
2014 Sr. Instrument Engineer
 Organization is engaged as LEPCC and turnkey projects for Oil and Gas Sectors. Sulphur recovery unit HPCL
refinery plant Vishakhapatnam capacity 300 TPD x 1 unit (Project value INR 324 crore)
 Coordinate Vendor call offs in accordance with construction and commissioning schedule ensuring vendors are mobilized
when required.
 Preparing Instruments loop folders( Index, Cover sheet, I/O list, ILD, P & ID, Hook up Drawings, Data sheet & Punch list
copy)
 Preparing and submitting all Inspection test reports (ITRs).
 Preparing loop folders and submit to the completion team.
 Respond to engineering site queries where clarification of design is required.
 Ensured adherence to the permit for work systems as per Electrical Safety Rules in Oil field.
 Tie-In signal pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)
 Punch listing of completed works and monitoring nonconformities.
 Leading & monitoring the performance of team members to ensure efficiency in Project and meeting of production targets
as on time.
 Executing the field instrument installation and pre-commissioning in Boiler, Turbine & BOP
 Handling all auxiliaries of instruments including tray work, cable lying, and impulse piping panel erections.
 Providing technical support and modifications in tray work, impulse piping and instrument installation as per site
condition.
 Impulse line pipe Hydro test carried out after installation (CS, AS,) 1/2" & 3/4” 120 TO 200 BAR.
 Preparing built drawing as per modification at site in accordance with design drawings
 Coordinating with commissioning team during the time of Light UP & Synchronization.
 Coordinating with commissioning team during the time of steam blowing 32 Bar.
Doshion Veolia water solution private ltd. Duration September 2011 to May 2012 Instrument Engineer
 Client: HPCL Refinery Visakhapatnam, Andhra Pradesh; Consultant: Toyo.
 Expansion of the HPCL refinery plant Vishakhapatnam DM plant to 270 m3/hr
(Project value INR 10 crore)
Doshion Veolia water solution private ltd. Duration January 2010 to August 2011. Instrument Engineer
 Client: HPCL Refinery Visakhapatnam, Andhra Pradesh; Consultant: EIL.
 Worked on RO Based DM Plant and CPU Unit; Capacity: 180m3/hour for DM and 120 m3/hour for CPU.
(Project value INR 30 crore)
Roles and responsibility
 Handling erection of instrument as per hook up drawings.
 Gaining an understanding of the Cable Schedule and Termination Diagrams.
 Performing a study of the layouts.
 Certifying work done.
 Working on different PLC like GE fanu, yokogawa & Schneider.
 Preparing and documenting the Instrument Index as well as Cable Schedule.
 Testing and diagnosing fault of various pneumatic and hydraulic equipments alongwith other Instrumentation System.
 Reading the electrical and instrument drawings as well as rectifying the troubleshooting.
 Checking Control Loop and Testing.
 Looking after calibration of various Process Control Instruments, Control Valves and Switches.
 Technical co-ordination with Vendors, Engineering Consultant, and PMC for problem solving related to Field
Instrumentation.
 Checking/preparation documents like Instrument Index sheet, data sheet & GA Drawings, Instrument Installation Drawing,
Schematics Drawing with Engineering Consultant.
 Checking Engineering documents with tender requirement.
 Co-ordinate with vendors for all Engineering documents submission to Consultant and PMC.
 Preparing and complying check list of deviations at all stages of the project till project completion.
 Site Co-ordination for Project Execution within a project schedule.
 Involves Quality related work, such as reviewing QAP, IRN, TC’s & MTC’s issued by third party inspection agencies.
 Supplier finalization, part in techno-commercial negotiations and placement of P.O.
 Involve in Site Execution (Field Inspection by TPI prior to Installation of Instruments).
 Involve in the coordination for the handover of the project from project department to the operation department
 Trouble shooting in DCS/SCADA/PLC Systems, Cause and Effect checking, Functional logic checking and process
control write-up, as build Loop drawing, P&IDs
WORK EXPERIENCE IN IOCL: PROJECT HANDLED (Green Field)
Doshion Veolia water solution private ltd. Duration April 2009 to December 2009. Instrument Engineer.
 Client : IOCL Refinery HALDIYA, West Bengal; Consultant : LURGI INDIA
 Worked on RO Based DM Plant and cooling water plant; Capacity: 250m3/hour for DM and 900 m3/hour for cooling tower
Roles and responsibilities
 Coordinate Vendor call offs in accordance with construction and commissioning schedule ensuring vendors are mobilized
when required
 Respond to engineering site queries where clarification of design is required.
 Ensured adherence to the permit for work systems as per Electrical Safety Rules in Oil field.
 Tie-In signal pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)
 Punch listing of completed works and monitoring nonconformities.
 Leading & monitoring the performance of team members to ensure efficiency in Project and meeting of production targets
as on time.
 Loop checks for DCS/ESD/package loops, Logic checks, Cause & Effect checks as per the C & E matrix.
 Participated in DCS/ESD/Package system/F&G system site acceptance test (SAT).
 After functional check supporting operation to ensure smooth and safe plant start up.
 Ensure that as-built drawings are prepared and maintained completed project files including all loop drawings, updated
interlock and logic drawings
WORK EXPERIENCE IN Adani power Plant : PROJECT HANDLED (Green Field)
Doshion Veolia water solution private ltd. Duration July 2008 to March 2009. GET
 Client: Adani Power Limited, Mundra, Kutch Gujarat; Consultant: Fishner.
 Completed DM Plant; Capacity 180m3/hour.(Project value INR 44 crore)
 Roles and responsibilities
 Handling erection of instrument as per hook up drawings.
 Gaining an understanding of the Cable Schedule and Termination Diagrams.
 Performing a study of the layouts.
 Certifying work done.
 Working on different PLC like GE fanu, yokogawa & Schneider.
 Preparing and documenting the Instrument Index as well as Cable Schedule.
 Testing and diagnosing fault of various pneumatic and hydraulic equipments alongwith other Instrumentation System.
 Reading the electrical and instrument drawings as well as rectifying the troubleshooting.
 Checking Control Loop and Testing.
 Looking after calibration of various Process Control Instruments, Control Valves and Switches.
 Technical co-ordination with Vendors, Engineering Consultant, and PMC for problem solving related to Field
Instrumentation.
 Checking Vendor documents like Instrument Index sheet, data sheet & GA Drawings, Instrument Installation Drawing,
Schematics Drawing with Engineering Consultant.
 Checking Engineering documents with tender requirement.
 Co-ordinate with vendors for all Engineering documents submission to Consultant and PMC.
 Preparing and complying check list of deviations at all stages of the project till project completion.
 Site Co-ordination for Project Execution within a project schedule.
 Involves Quality related work, such as reviewing QAP, IRN, TC’s & MTC’s issued by third party inspection agencies.
 Supplier finalization, part in techno-commercial negotiations and placement of P.O.
 Involve in Site Execution (Field Inspection by TPI prior to Installation of Instruments).
 Involve in the coordination for the handover of the project from project department to the operation department
 Trouble shooting in DCS/SCADA/PLC Systems, Cause and Effect checking, Functional logic checking and process
control write-up, as build Loop drawing, P&IDs
Significant Highlights
 Major inspections / testing:
- Worked for the total erection, termination, loop checking & commissioning activities of GE Fanu, Schneider, yokogawa
and Allen Bradley make PLC System.
- Worked on Atlas Copco compressor with Bently Nevada system installation and commissioning.
- Have installation experience on STG, Incinerator, and reaction furnace.
- Have experience over erection, installation and commissioning of Emerson/chemtols/honey well make transmitters and
analyzer(like PT,DPT,LT,PH COND,SILICA, h2s, h2 cox/co2,sox,HC ) , El-O-Matic, virgo ON-OFF valves (With
solenoid, Limit switch and without solenoid valve, limit switch),GF+ ON-OFF valves, Forbes Marshall analyzers(like
PH,COND, COND COMP, SILICA), Hach analyzer (like SILICA, HYDROCARBON),CONTINENTAL CONTROL
VALVES, MIL globe control valves, ENDRESS+HAUSER (like Ultrasonic level transmitter)etc ….
 Specific trainings undertaken / imparted:
 Conducted training programme for operational techniques for plant operators after commissioning activities.
 Technical Training Program of Instrumentation Design Engineering (Smart Plant Instrumentation- Intools & AutoCad) at Smart
Brains Engineers & Technologists Pvt. Ltd from August, 2015 to October, 2015.
It covers:
Instrument Index, I/O List, Instrument Data Sheets & specifications, Cable Schedule, Junction Box Grouping /
Schedule, Control Valve Sizing(CV calculation), Hook-Up Drawing, Loop Drawings, Level Sketches, Cable tray
Layout, Field Wiring from JB to MR & MR to DCS.
 Major installation / commissioning tasks:
- Worked for the total erection, termination, loop checking & commissioning activities of Yokogawa, GE Fanu, and
Schneider make PLC System.
- E-House, PCP, ESP,VFD,LRP and oil well head erection and commissioning
INDUSTRIAL TRAINING
 Live Project of Website Development – (Using ASP.NET) - www.doctorshelpline.com; Softpro India, Lucknow; Duration: 6
Weeks.
ACADEMIC HIGHLIGHTS
 Adjudged as the winner of the Football Tournament at School level.
 Received B Grade in the IAS Test organized by Indian Institute of Personality Development, 2000.
 Successful in securing 56% in the General Knowledge and Intelligence Test organized by Central Institute of General
Knowledge Learning.
 Attended the Seminar on Asynchronous Transfer Mode Switching.
TECHNICAL KNOWLEDGE PREVIEW
 Languages : C, C++, Data Structure, Asp.net.
 Operating Systems : Win 98, XP, Vista.
 Tools : MS office (Word, Excel, Power point)
ACADEMICS
 B.Tech. – Electronics and Instrumentation from Meerut Institute of Engineering and Technology, U.P Technical University,
2008.
 Perusing MBA through distance education from Pondicherry University.
PERSONAL DETAILS
 Address : 78-D, Bund Road, Allenganj, Allahabad, 211002.
 Languages : Hindi, English, Gujrati, Bengali.
 Date of Birth : December 10, 1984.
 Passport no : K4474191
 Skype id : ankurr_s@yahoo.com
 Conducted training programme for operational techniques for plant operators after commissioning activities.
 Technical Training Program of Instrumentation Design Engineering (Smart Plant Instrumentation- Intools & AutoCad) at Smart
Brains Engineers & Technologists Pvt. Ltd from August, 2015 to October, 2015.
It covers:
Instrument Index, I/O List, Instrument Data Sheets & specifications, Cable Schedule, Junction Box Grouping /
Schedule, Control Valve Sizing(CV calculation), Hook-Up Drawing, Loop Drawings, Level Sketches, Cable tray
Layout, Field Wiring from JB to MR & MR to DCS.
 Major installation / commissioning tasks:
- Worked for the total erection, termination, loop checking & commissioning activities of Yokogawa, GE Fanu, and
Schneider make PLC System.
- E-House, PCP, ESP,VFD,LRP and oil well head erection and commissioning
INDUSTRIAL TRAINING
 Live Project of Website Development – (Using ASP.NET) - www.doctorshelpline.com; Softpro India, Lucknow; Duration: 6
Weeks.
ACADEMIC HIGHLIGHTS
 Adjudged as the winner of the Football Tournament at School level.
 Received B Grade in the IAS Test organized by Indian Institute of Personality Development, 2000.
 Successful in securing 56% in the General Knowledge and Intelligence Test organized by Central Institute of General
Knowledge Learning.
 Attended the Seminar on Asynchronous Transfer Mode Switching.
TECHNICAL KNOWLEDGE PREVIEW
 Languages : C, C++, Data Structure, Asp.net.
 Operating Systems : Win 98, XP, Vista.
 Tools : MS office (Word, Excel, Power point)
ACADEMICS
 B.Tech. – Electronics and Instrumentation from Meerut Institute of Engineering and Technology, U.P Technical University,
2008.
 Perusing MBA through distance education from Pondicherry University.
PERSONAL DETAILS
 Address : 78-D, Bund Road, Allenganj, Allahabad, 211002.
 Languages : Hindi, English, Gujrati, Bengali.
 Date of Birth : December 10, 1984.
 Passport no : K4474191
 Skype id : ankurr_s@yahoo.com

More Related Content

What's hot

Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteRameshchandra Prajapati
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSIslam Nassef
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesNuberg Engineering
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017Peter Fitzpatrick
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 

What's hot (20)

Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
RESUME2.doc
RESUME2.docRESUME2.doc
RESUME2.doc
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
 
Rahulvikram2016
Rahulvikram2016Rahulvikram2016
Rahulvikram2016
 
Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & Services
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 

Viewers also liked

Kääpa kooli pargiprojekt esitlus
Kääpa kooli pargiprojekt esitlusKääpa kooli pargiprojekt esitlus
Kääpa kooli pargiprojekt esitlusAnita Kikas
 
Fraking românia. varianta 2. madalina gheta
Fraking românia. varianta 2. madalina ghetaFraking românia. varianta 2. madalina gheta
Fraking românia. varianta 2. madalina ghetaMadalina Elena
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743losangelesaep
 
Fisiología del Medio Interno
Fisiología del Medio InternoFisiología del Medio Interno
Fisiología del Medio InternoMINSA
 
Aditya High Street Call@ 8800227454
Aditya High Street Call@ 8800227454Aditya High Street Call@ 8800227454
Aditya High Street Call@ 8800227454palakfinlace
 
Study skills success
Study skills success   Study skills success
Study skills success dgaryw4
 

Viewers also liked (6)

Kääpa kooli pargiprojekt esitlus
Kääpa kooli pargiprojekt esitlusKääpa kooli pargiprojekt esitlus
Kääpa kooli pargiprojekt esitlus
 
Fraking românia. varianta 2. madalina gheta
Fraking românia. varianta 2. madalina ghetaFraking românia. varianta 2. madalina gheta
Fraking românia. varianta 2. madalina gheta
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743
 
Fisiología del Medio Interno
Fisiología del Medio InternoFisiología del Medio Interno
Fisiología del Medio Interno
 
Aditya High Street Call@ 8800227454
Aditya High Street Call@ 8800227454Aditya High Street Call@ 8800227454
Aditya High Street Call@ 8800227454
 
Study skills success
Study skills success   Study skills success
Study skills success
 

Similar to Ankur Singh 7 years exp. oil & gas

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15jim matthews
 
Senior Process Engineer, Sep
Senior Process  Engineer, SepSenior Process  Engineer, Sep
Senior Process Engineer, Sepsayed ammar
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_gobinath gobinath
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016Ekp Reddy
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerSatish Tumbare
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 

Similar to Ankur Singh 7 years exp. oil & gas (20)

Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
Senior Process Engineer, Sep
Senior Process  Engineer, SepSenior Process  Engineer, Sep
Senior Process Engineer, Sep
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
ElanCVdocx
ElanCVdocxElanCVdocx
ElanCVdocx
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
Gopa 16 Aug 2016
Gopa 16 Aug 2016Gopa 16 Aug 2016
Gopa 16 Aug 2016
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
NS Resume S
NS  Resume SNS  Resume S
NS Resume S
 

Ankur Singh 7 years exp. oil & gas

  • 1. ANKUR SINGH Contact: 7023455201 E-Mail: ankurs.miet@gmail.com, ankurr_s@yahoo.com OBJECTIVE Seeking senior level assignments in Design Engineering, Project Management, Construction, Pre-Commissioning, Commissioning, & Start UP with an organization of high repute in Oil & Gas sector PROFILE SUMMARY An astute professional with around 7 years of experience in overseeing overall operations entailing Detail Engineering Design, Project Management, Construction and Commissioning of oil and gas offshore and onshore projects. Proficient in Detail Design Engineering and Project Execution & handling installation and commissioning of ESD/DCS and advanced control systems. Basic awareness of fluid Mechanics / Fluid Engineering. Working Exposures in handling bigger projects of up to USD1bn and exposure in Green field / brown field projects. An exemplary communicator with excellent relationship of management and team supervision abilities. Key Skills  Contribute to the development of Pre-Commissioning & commissioning plan with safety milestone.  Preparation / interpretation of P & ID , hook up, JB Schedule, Nest loading ,Front loading, Cause / Effect & ILD’s, data sheets of Instrumentation / Hydraulic / Pneumatic / electrical / PLC components for procurement / approval to client.  Coordinating with procurement activities for all type of instruments, control valves , ON-OFF valves, instrument fittings and PLC and raising BOM and floating enquires to the vendor and vendor follow up for budgetary cost estimation.  Conversant with ISA, NFPA, BS and IEC standards Smart plant instrumentation (IN tools Version-7) 3D Model review in Smart plant review (SPR Version-7) Hazardous area classification and participation (ATEX, IEC, NEC Standard) FEED / Basic & detail engineering phase of projects  Review of Equipment / Rotary Data sheet / Package data sheet for control system interface  Fundamentals of Fire and Gas system, Hazardous area classification  Experienced in cable sizing, selection of cables for various hazardous application Preparation & approval of Material Take-off list (MTO), Level sketches, Cable block, Inst. JB schedule, Location Plan diagram, Instrument Index, Logic diagram, IRP Panel drawings etc Selection & Sizing of various Instruments like control valves, flow orifice, thermo well etc.  Scheduling and co-ordinate work to tight deadlines. ( Onshore)  Execution and site Construction management of Oil & Gas various upstream, midstream and downstream Projects  Tie-In signal (Green Field / Brow field hook up) pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)  Develop and maintain commissioning procedures.  Participate in FAT & SAT activities in various locations  Hands on experience in DCS and PLC based control system installation and commissioning  Worked in DCS (Yokogawa DCS Controller (Centum VP, CS3000, and PLC (Prosafe).  .Liaison with contractor with respect to commissioning preparation like (Commissioning Plan, Commissioning Procedures & Commissioning Spares).  Monitoring contractor’s commissioning preparation and executions.  Liaison with vendor’s with respect to hook-up and commissioning for packages.  Execute own commissioning and lead the team of commissioning engineers and technician.  Handover, to operation and issue RFSU (Ready for Start-up) for all system.
  • 2. ORGANIZATIONAL EXPERIENCE Growth Path since Jul ’08 GET to till date. WORK EXPERIENCE IN CAIRN ENERGY: PROJECT HANDLED (Green Field & Brown Field) Duration: March 2014 to August-2014 on payroll of Brunel energy. August 2014 -Till Date on payroll of ASMACS 1. BAGYAM OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION- Green Field)  Involving in Pre-Commissioning & commissioning of Bagyam Field development project consisting of 15 Well pads for crude oil exploration having capacity of (56 producers & 23 Injection) wells. 33000BPOD 2. MANGALA OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION-Green Field)  Involving in Pre-Commissioning & commissioning of Mangla Field development project consisting of 18 Well pads for crude oil exploration having capacity of (140 producer & 53 Injection) wells. 175000 BPOD 3. CENTRAL POLYMER FACILITY UNIT (UPSTREAM-OIL EXPLORATION- Green Field)  Involving in Pre-Commissioning & commissioning of CPF unit development project consisting of 5 stream having capacity of 1 lack barrels per day.  Unit to prepare the polymer based on Enhance oil recovery techniques.  Involving Instrument Pre-Comm & Commissioning (unloading arm, silo, hopper, maturation tanks) 4. AISHWAIYA OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION-Green Field)  1. Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Aishwarya Field development project consisting of 8 Well pads for crude oil exploration having capacity of (36 producers & 15 Injection) wells. 26000 BPOD  2. ESP (Schlumbreger –ALF) Artificial Lift Involving (VFD & ESP) Pre-Commissioning &Commissioning & Start-Up. 5. SATELLITE OIL FIELD DEVELOPMENT PROJECT (UPSTREAM-OIL EXPLORATION- Green Field)  Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Satellite Field development project –NA4. 600 BPOD 6. SATELLITE OIL FIELD DEVELOPMENT PROJECT (UPSTREAM OIL EXPLORATION-Green Field)  Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Satellite Field development project –NI2. 7. BARMER HILL OIL FIELD DEVELOPMENT PROJECT (Brown Field-Upstream)  Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Barmer Hill Field development project Aishwarya. Consists of 10 Production wells. 8. AISHWARYA IN FILL WELLS OIL FIELD DEVELOPMENT PROJECT (Brown Field-Upstream)  Involving in Pre-commissioning, Commissioning, Completion & Start-Up of Aishwarya INFILL Wells Field development project Aishwarya. Consists of 72 wells. RESPONSIBLE IN CAIRN ENERGY  Logic Checks, Cause & Effect checks completion from central control room.  Providing technical support and modifications in tray work, impulse piping and instrument installation as per site condition.  Executing the instrument pre-commissioning & Commissioning activities in well pads.  Tie-In signal pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)  Involved in system installation and configuration with system vendor.  Involve field Engineering ( Additional channel assigning, ELCO Board, Terminal block, Node , IO card, Nest loading preparation , Junction box wiring , Filed Instrument Installation Etc..  Fully familiar with system “pre power-on” checks. Instrument Earth & System Earth segregation.  Establishing communication of third party devices like package PLC, HVAC and Building F&G systems.  Loop checks for DCS/ESD/package loops, Logic checks, Cause & Effect checks as per the C & E matrix.  Participated in DCS/ESD/Package system/F&G system site acceptance test (SAT).
  • 3.  After functional check supporting operation to ensure smooth and safe plant start up.  Ensure that as-built drawings are prepared and maintained completed project files including all loop drawings, updated interlock and logic drawings.  Inspection of material on receipt at warehouse.  Punch list point follow up with system vendor for completeness of the system activity before plant start-up.  Punch list coordinating and closing CAT-A & CAT-B.  Follow up CCC, MCC & SAC certification & Dossier handover  During Chemical injection dossing pumps commissioning time coordinating with electrical commissioning team (Solo run test, load test & 4 hours performance test).  During commissioning of 33KV HT switch gear system, 415V LT switch gear system, UPS & EHT commissioning time coordinating with electrical team to complete the activities.  During PAGA commissioning coordinating with Telecom team to checks the door access, confirmed fire / Gas & CCTV etc.  Impulse tubing Hydro test 1/2", 1/4"SS316 with water Medium,. Max 120 Bar. Coordinating with piping commissioning.  SS Impulse tubing integrity leak test 1/2”, 1/4” with air Medium Max 10 Bar, check with soap solution.  Low 10Bar/High pressure120 bar integrity testing time coordinating with piping commissioning team.  Hot Water Circulation & Pigging (Foam Pig, Brush Pig & Bidirectional Pig,) coordinating with piping commissioning team, to complete the activities in Major production & Water Injection Line size (4",6”, 8",10" & 12").  Pre-Comm. & Commissioning activities Well Head control Panel(WHCP)  Operation Stroke checks for SDV, SSV (250 TO 350Bar),SSSV (350 TO 400 Bar) wing valve (Christmas tree valve)  Building F & G commissioning checks (SD, MCP, MPS, HD, Beacon & Hotter annunciation).  INNERGEN system commissioning checks  Following the ZONE Classifications (Zone 0 & zone 20 , Zone 1 & zone 21, Zone 2 & zone 22) WORK EXPERIENCE IN HPCL: PROJECT HANDLED (Green Field & Brown Field) Chemtex global Ltd. & Fabtech Projects & Engineers Ltd. consortium Pune: Duration May 2012 to March 2014 Sr. Instrument Engineer  Organization is engaged as LEPCC and turnkey projects for Oil and Gas Sectors. Sulphur recovery unit HPCL refinery plant Vishakhapatnam capacity 300 TPD x 1 unit (Project value INR 324 crore)  Coordinate Vendor call offs in accordance with construction and commissioning schedule ensuring vendors are mobilized when required.  Preparing Instruments loop folders( Index, Cover sheet, I/O list, ILD, P & ID, Hook up Drawings, Data sheet & Punch list copy)  Preparing and submitting all Inspection test reports (ITRs).  Preparing loop folders and submit to the completion team.  Respond to engineering site queries where clarification of design is required.  Ensured adherence to the permit for work systems as per Electrical Safety Rules in Oil field.  Tie-In signal pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)  Punch listing of completed works and monitoring nonconformities.  Leading & monitoring the performance of team members to ensure efficiency in Project and meeting of production targets as on time.  Executing the field instrument installation and pre-commissioning in Boiler, Turbine & BOP  Handling all auxiliaries of instruments including tray work, cable lying, and impulse piping panel erections.  Providing technical support and modifications in tray work, impulse piping and instrument installation as per site condition.  Impulse line pipe Hydro test carried out after installation (CS, AS,) 1/2" & 3/4” 120 TO 200 BAR.  Preparing built drawing as per modification at site in accordance with design drawings  Coordinating with commissioning team during the time of Light UP & Synchronization.  Coordinating with commissioning team during the time of steam blowing 32 Bar.
  • 4. Doshion Veolia water solution private ltd. Duration September 2011 to May 2012 Instrument Engineer  Client: HPCL Refinery Visakhapatnam, Andhra Pradesh; Consultant: Toyo.  Expansion of the HPCL refinery plant Vishakhapatnam DM plant to 270 m3/hr (Project value INR 10 crore) Doshion Veolia water solution private ltd. Duration January 2010 to August 2011. Instrument Engineer  Client: HPCL Refinery Visakhapatnam, Andhra Pradesh; Consultant: EIL.  Worked on RO Based DM Plant and CPU Unit; Capacity: 180m3/hour for DM and 120 m3/hour for CPU. (Project value INR 30 crore) Roles and responsibility  Handling erection of instrument as per hook up drawings.  Gaining an understanding of the Cable Schedule and Termination Diagrams.  Performing a study of the layouts.  Certifying work done.  Working on different PLC like GE fanu, yokogawa & Schneider.  Preparing and documenting the Instrument Index as well as Cable Schedule.  Testing and diagnosing fault of various pneumatic and hydraulic equipments alongwith other Instrumentation System.  Reading the electrical and instrument drawings as well as rectifying the troubleshooting.  Checking Control Loop and Testing.  Looking after calibration of various Process Control Instruments, Control Valves and Switches.  Technical co-ordination with Vendors, Engineering Consultant, and PMC for problem solving related to Field Instrumentation.  Checking/preparation documents like Instrument Index sheet, data sheet & GA Drawings, Instrument Installation Drawing, Schematics Drawing with Engineering Consultant.  Checking Engineering documents with tender requirement.  Co-ordinate with vendors for all Engineering documents submission to Consultant and PMC.  Preparing and complying check list of deviations at all stages of the project till project completion.  Site Co-ordination for Project Execution within a project schedule.  Involves Quality related work, such as reviewing QAP, IRN, TC’s & MTC’s issued by third party inspection agencies.  Supplier finalization, part in techno-commercial negotiations and placement of P.O.  Involve in Site Execution (Field Inspection by TPI prior to Installation of Instruments).  Involve in the coordination for the handover of the project from project department to the operation department  Trouble shooting in DCS/SCADA/PLC Systems, Cause and Effect checking, Functional logic checking and process control write-up, as build Loop drawing, P&IDs WORK EXPERIENCE IN IOCL: PROJECT HANDLED (Green Field) Doshion Veolia water solution private ltd. Duration April 2009 to December 2009. Instrument Engineer.  Client : IOCL Refinery HALDIYA, West Bengal; Consultant : LURGI INDIA  Worked on RO Based DM Plant and cooling water plant; Capacity: 250m3/hour for DM and 900 m3/hour for cooling tower Roles and responsibilities  Coordinate Vendor call offs in accordance with construction and commissioning schedule ensuring vendors are mobilized when required  Respond to engineering site queries where clarification of design is required.  Ensured adherence to the permit for work systems as per Electrical Safety Rules in Oil field.  Tie-In signal pre-Commissioning & Commissioning. like ( F & G, ESD-1, ESD-2, PSD, APSD)  Punch listing of completed works and monitoring nonconformities.  Leading & monitoring the performance of team members to ensure efficiency in Project and meeting of production targets as on time.
  • 5.  Loop checks for DCS/ESD/package loops, Logic checks, Cause & Effect checks as per the C & E matrix.  Participated in DCS/ESD/Package system/F&G system site acceptance test (SAT).  After functional check supporting operation to ensure smooth and safe plant start up.  Ensure that as-built drawings are prepared and maintained completed project files including all loop drawings, updated interlock and logic drawings WORK EXPERIENCE IN Adani power Plant : PROJECT HANDLED (Green Field) Doshion Veolia water solution private ltd. Duration July 2008 to March 2009. GET  Client: Adani Power Limited, Mundra, Kutch Gujarat; Consultant: Fishner.  Completed DM Plant; Capacity 180m3/hour.(Project value INR 44 crore)  Roles and responsibilities  Handling erection of instrument as per hook up drawings.  Gaining an understanding of the Cable Schedule and Termination Diagrams.  Performing a study of the layouts.  Certifying work done.  Working on different PLC like GE fanu, yokogawa & Schneider.  Preparing and documenting the Instrument Index as well as Cable Schedule.  Testing and diagnosing fault of various pneumatic and hydraulic equipments alongwith other Instrumentation System.  Reading the electrical and instrument drawings as well as rectifying the troubleshooting.  Checking Control Loop and Testing.  Looking after calibration of various Process Control Instruments, Control Valves and Switches.  Technical co-ordination with Vendors, Engineering Consultant, and PMC for problem solving related to Field Instrumentation.  Checking Vendor documents like Instrument Index sheet, data sheet & GA Drawings, Instrument Installation Drawing, Schematics Drawing with Engineering Consultant.  Checking Engineering documents with tender requirement.  Co-ordinate with vendors for all Engineering documents submission to Consultant and PMC.  Preparing and complying check list of deviations at all stages of the project till project completion.  Site Co-ordination for Project Execution within a project schedule.  Involves Quality related work, such as reviewing QAP, IRN, TC’s & MTC’s issued by third party inspection agencies.  Supplier finalization, part in techno-commercial negotiations and placement of P.O.  Involve in Site Execution (Field Inspection by TPI prior to Installation of Instruments).  Involve in the coordination for the handover of the project from project department to the operation department  Trouble shooting in DCS/SCADA/PLC Systems, Cause and Effect checking, Functional logic checking and process control write-up, as build Loop drawing, P&IDs Significant Highlights  Major inspections / testing: - Worked for the total erection, termination, loop checking & commissioning activities of GE Fanu, Schneider, yokogawa and Allen Bradley make PLC System. - Worked on Atlas Copco compressor with Bently Nevada system installation and commissioning. - Have installation experience on STG, Incinerator, and reaction furnace. - Have experience over erection, installation and commissioning of Emerson/chemtols/honey well make transmitters and analyzer(like PT,DPT,LT,PH COND,SILICA, h2s, h2 cox/co2,sox,HC ) , El-O-Matic, virgo ON-OFF valves (With solenoid, Limit switch and without solenoid valve, limit switch),GF+ ON-OFF valves, Forbes Marshall analyzers(like PH,COND, COND COMP, SILICA), Hach analyzer (like SILICA, HYDROCARBON),CONTINENTAL CONTROL VALVES, MIL globe control valves, ENDRESS+HAUSER (like Ultrasonic level transmitter)etc ….  Specific trainings undertaken / imparted:
  • 6.  Conducted training programme for operational techniques for plant operators after commissioning activities.  Technical Training Program of Instrumentation Design Engineering (Smart Plant Instrumentation- Intools & AutoCad) at Smart Brains Engineers & Technologists Pvt. Ltd from August, 2015 to October, 2015. It covers: Instrument Index, I/O List, Instrument Data Sheets & specifications, Cable Schedule, Junction Box Grouping / Schedule, Control Valve Sizing(CV calculation), Hook-Up Drawing, Loop Drawings, Level Sketches, Cable tray Layout, Field Wiring from JB to MR & MR to DCS.  Major installation / commissioning tasks: - Worked for the total erection, termination, loop checking & commissioning activities of Yokogawa, GE Fanu, and Schneider make PLC System. - E-House, PCP, ESP,VFD,LRP and oil well head erection and commissioning INDUSTRIAL TRAINING  Live Project of Website Development – (Using ASP.NET) - www.doctorshelpline.com; Softpro India, Lucknow; Duration: 6 Weeks. ACADEMIC HIGHLIGHTS  Adjudged as the winner of the Football Tournament at School level.  Received B Grade in the IAS Test organized by Indian Institute of Personality Development, 2000.  Successful in securing 56% in the General Knowledge and Intelligence Test organized by Central Institute of General Knowledge Learning.  Attended the Seminar on Asynchronous Transfer Mode Switching. TECHNICAL KNOWLEDGE PREVIEW  Languages : C, C++, Data Structure, Asp.net.  Operating Systems : Win 98, XP, Vista.  Tools : MS office (Word, Excel, Power point) ACADEMICS  B.Tech. – Electronics and Instrumentation from Meerut Institute of Engineering and Technology, U.P Technical University, 2008.  Perusing MBA through distance education from Pondicherry University. PERSONAL DETAILS  Address : 78-D, Bund Road, Allenganj, Allahabad, 211002.  Languages : Hindi, English, Gujrati, Bengali.  Date of Birth : December 10, 1984.  Passport no : K4474191  Skype id : ankurr_s@yahoo.com
  • 7.  Conducted training programme for operational techniques for plant operators after commissioning activities.  Technical Training Program of Instrumentation Design Engineering (Smart Plant Instrumentation- Intools & AutoCad) at Smart Brains Engineers & Technologists Pvt. Ltd from August, 2015 to October, 2015. It covers: Instrument Index, I/O List, Instrument Data Sheets & specifications, Cable Schedule, Junction Box Grouping / Schedule, Control Valve Sizing(CV calculation), Hook-Up Drawing, Loop Drawings, Level Sketches, Cable tray Layout, Field Wiring from JB to MR & MR to DCS.  Major installation / commissioning tasks: - Worked for the total erection, termination, loop checking & commissioning activities of Yokogawa, GE Fanu, and Schneider make PLC System. - E-House, PCP, ESP,VFD,LRP and oil well head erection and commissioning INDUSTRIAL TRAINING  Live Project of Website Development – (Using ASP.NET) - www.doctorshelpline.com; Softpro India, Lucknow; Duration: 6 Weeks. ACADEMIC HIGHLIGHTS  Adjudged as the winner of the Football Tournament at School level.  Received B Grade in the IAS Test organized by Indian Institute of Personality Development, 2000.  Successful in securing 56% in the General Knowledge and Intelligence Test organized by Central Institute of General Knowledge Learning.  Attended the Seminar on Asynchronous Transfer Mode Switching. TECHNICAL KNOWLEDGE PREVIEW  Languages : C, C++, Data Structure, Asp.net.  Operating Systems : Win 98, XP, Vista.  Tools : MS office (Word, Excel, Power point) ACADEMICS  B.Tech. – Electronics and Instrumentation from Meerut Institute of Engineering and Technology, U.P Technical University, 2008.  Perusing MBA through distance education from Pondicherry University. PERSONAL DETAILS  Address : 78-D, Bund Road, Allenganj, Allahabad, 211002.  Languages : Hindi, English, Gujrati, Bengali.  Date of Birth : December 10, 1984.  Passport no : K4474191  Skype id : ankurr_s@yahoo.com