SlideShare a Scribd company logo
1 of 4
UMAR AKBAR
Date of Birth: September, 20th, 1988
Residential Address:c1/2 May mar Court, Block 13-B, Gulshan-e-Iqbal,Karachi
Contact No: +966-535170122 (SAUDI ARABIA), Pak Cell No:+92 3452470784
Email: umarbajwa99.ub@gmail.com NIC: 42201-3962105-7
Passport: KV1331051
CAREER OBJECTIVE:
To work in an organization where I use my skills and knowledge to deliver value added results
as well as further enhance my learning and develop my career in the field of electrical
engineering.
ACADEMIC QUALIFICATION:
Education Majors
Year of
completion
Institution
BE Electronics Engineering 2011
Sir Syed University Of Engineering &
Technology.
intermediate Pre-Engineering 2007
Bahria College Karsaz
Matric Science 2005
National High School
WORK EXPERIENCE :
AL-SHARIF
GROUP.
Jeddah
(Kingdom Of
Saudi Arabia)
Electrical
Engineer
Project
Engineer
QC/QA
Engineer
Acting
Site
Manager
110 KV Transmission line D/C BSP AL-KAMEL Project [71 km] ,
KSA. AL-LIETH PROJECT . KAEC PROJECT.
Over all responsibilities.
 Dealing with comments compliance and design/manufacturer
equipment/material proposals and approvals.
 Civil work [Access road, ROW, foundation structure & pad, soil
investigation].
 Maintain and update the design features of Plan & Profile.
 Material calculation and ensure shipment.
 Follow-up of ITP & Type tests of 2500mm* & all types of angle towers.
 Tower erection and Grounding as per standards/specifications.
 Insulator & 120KN OPGW installation and hard ware assembly.
 Conductor string and damping study to set spacer & dampers.
 GENTRY design, NMFOC & Cable sealing end arrangement.
 QA/Safety SOP and implementation.
 Budgeting & invoicing.
 Contact with client person.
 Route drawing & as built drawing.
 Hand over to client.
 Project Planning and Coordination
 Cost estimation Tendering of the various ongoing projects
 Installation of Overhead transmission line
 Invoicing, placing purchase orders in liaison with various vendors
 Preparing contract documents for various subcontracts like soil
investigation, excavations , access road , erection and stringing of
Transmission line
 Coordinate between the Consultants, clients and main contractor
 Check compliance, issue required information to the consultants the
same day.
 Maintain the site progress report.
 Assisting the Purchase Department for selection of Suppliers and
 Manufacturers.
 Monitor the availability of types and materialsat site.
 Prepare bill of materialsand assist purchase department to
 Purchase for project requirements. Prepare method statement.
 Coordination with Design Team for all on site changes in design.
 Submit all the material submittals as per project requirements for
consultant’s approval.
 Ensure the works comply with the Contract specification
requirements.
 Tracking material items are on site to meet the schedule needs.
 Planning, directing and managing resources to complete the project
as per target dates according to specification & standards.
Organization
United Mobiles
Position
& Depart
Student,
PCB Labs
Work profile
Worked on mobiles PCB’s as well as spent some time in every department of the
company, such as quality assurance, delivery center, and logistics.
Pakistan
international
container
terminal
(PICT)
Electrical
Engineer
Field Responsibilities:-
Recently worked as a Team Leader in successful installation and conversion of
diesel generator crane to electrical power crane along with the engineering team
of China.
 Troubleshooting & Maintenance of PLC’s Simatic-7 416-2DP &Fuji
(Micrex-F70S).Involving hardware & Software troubleshooting.
 Troubleshooting & Maintenance of Stamford Diesel Generator
(680kva, 440V).
 Worked as a team member for erection, assembling and
commissioning of E-RTG & STS.
 Maintaining & planning of inventory of all electrical spares.
 Check the items of R.O.L. related to electrical department.
 Inspection, preventive and break down maintenance of equipment.
 Documentation regarding the execution of above mentioned jobs
including report writing and preparation of maintenance of checklist.
 Daily activity report and preparing plans and schedules of the
equipment.
 Making duty schedule and arrange work force for holidays.
 Co-ordinate with the BVQI team for the monthly inspection and
checking of equipment safeties and interlocking.
 Co-ordinate without source suppliers for timely availability of
material.
Field/Equipment’s of working: -
 Container Handling Ship to shore 45 Ton (Shore Powered) twin box lifting
cranes with BROMMA and ZPMC spreaders. (ZPMC make) with Siemens
System.
 Rubber tires Gantries 41 Ton (Yard container Handling cranes) with Fuji
System.
PROJECTS:
FINAL YEAR PROJECT:
Wireless weather monitoring system, that sense all the major metrological conditions and Transmit
their parameters wireless to the indoor unit that continuously displays them in Visual form on single
color LED screen. Solar energy helps it to become electricity Independent.
OTHER PROJECTS:
 Power supply
Designed a 24V Variable power supply using LM-337 and LM-317 ICs.
 Implementation of traffic signal control system
Designed Traffic Control system Using Micro Controller
SKILLS:
 Effective Management abilities
 Refined written and spoken communications
 Well versed in MS Office
 Auto CAD
 QA/QC Training awareness certificate
 PMP training certificate
References to be furnished upon request

More Related Content

What's hot (20)

CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 
Abdallah Planning
Abdallah Planning Abdallah Planning
Abdallah Planning
 
NIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEERNIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEER
 
Ashok resume till Date
Ashok resume till DateAshok resume till Date
Ashok resume till Date
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander_Pace_Resume2016
Alexander_Pace_Resume2016
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
LATEST CV
LATEST CVLATEST CV
LATEST CV
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
Resume
ResumeResume
Resume
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CV
 
Project Incharge -
Project Incharge -Project Incharge -
Project Incharge -
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 

Viewers also liked

Viewers also liked (12)

Christmas in Italy
Christmas in Italy Christmas in Italy
Christmas in Italy
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
The British isles
The British isles The British isles
The British isles
 
cloud computing
cloud computingcloud computing
cloud computing
 
Nivells tròfics Biologia i Geologia 4t ESO (Ecosistemes)
Nivells tròfics Biologia i Geologia 4t ESO (Ecosistemes)Nivells tròfics Biologia i Geologia 4t ESO (Ecosistemes)
Nivells tròfics Biologia i Geologia 4t ESO (Ecosistemes)
 
TENANCY AGREEMENT AGNES
TENANCY AGREEMENT AGNESTENANCY AGREEMENT AGNES
TENANCY AGREEMENT AGNES
 
KPI Corporate Profile
KPI Corporate ProfileKPI Corporate Profile
KPI Corporate Profile
 
PERSONAL BRANDING
PERSONAL BRANDINGPERSONAL BRANDING
PERSONAL BRANDING
 
Mental health
Mental healthMental health
Mental health
 
My christmas
My christmasMy christmas
My christmas
 
Akeda bagus
Akeda bagusAkeda bagus
Akeda bagus
 
WordCamp Nashville 2016 "Imposter Syndrome'
WordCamp Nashville 2016   "Imposter Syndrome'WordCamp Nashville 2016   "Imposter Syndrome'
WordCamp Nashville 2016 "Imposter Syndrome'
 

Similar to Resume (Umar AKbar) (20)

nabi
nabinabi
nabi
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Bill resume
Bill resumeBill resume
Bill resume
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
G_123
G_123G_123
G_123
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
CV Power Plant
CV Power PlantCV Power Plant
CV Power Plant
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 

Resume (Umar AKbar)

  • 1. UMAR AKBAR Date of Birth: September, 20th, 1988 Residential Address:c1/2 May mar Court, Block 13-B, Gulshan-e-Iqbal,Karachi Contact No: +966-535170122 (SAUDI ARABIA), Pak Cell No:+92 3452470784 Email: umarbajwa99.ub@gmail.com NIC: 42201-3962105-7 Passport: KV1331051 CAREER OBJECTIVE: To work in an organization where I use my skills and knowledge to deliver value added results as well as further enhance my learning and develop my career in the field of electrical engineering. ACADEMIC QUALIFICATION: Education Majors Year of completion Institution BE Electronics Engineering 2011 Sir Syed University Of Engineering & Technology. intermediate Pre-Engineering 2007 Bahria College Karsaz Matric Science 2005 National High School
  • 2. WORK EXPERIENCE : AL-SHARIF GROUP. Jeddah (Kingdom Of Saudi Arabia) Electrical Engineer Project Engineer QC/QA Engineer Acting Site Manager 110 KV Transmission line D/C BSP AL-KAMEL Project [71 km] , KSA. AL-LIETH PROJECT . KAEC PROJECT. Over all responsibilities.  Dealing with comments compliance and design/manufacturer equipment/material proposals and approvals.  Civil work [Access road, ROW, foundation structure & pad, soil investigation].  Maintain and update the design features of Plan & Profile.  Material calculation and ensure shipment.  Follow-up of ITP & Type tests of 2500mm* & all types of angle towers.  Tower erection and Grounding as per standards/specifications.  Insulator & 120KN OPGW installation and hard ware assembly.  Conductor string and damping study to set spacer & dampers.  GENTRY design, NMFOC & Cable sealing end arrangement.  QA/Safety SOP and implementation.  Budgeting & invoicing.  Contact with client person.  Route drawing & as built drawing.  Hand over to client.  Project Planning and Coordination  Cost estimation Tendering of the various ongoing projects  Installation of Overhead transmission line  Invoicing, placing purchase orders in liaison with various vendors  Preparing contract documents for various subcontracts like soil investigation, excavations , access road , erection and stringing of Transmission line  Coordinate between the Consultants, clients and main contractor  Check compliance, issue required information to the consultants the same day.  Maintain the site progress report.  Assisting the Purchase Department for selection of Suppliers and  Manufacturers.  Monitor the availability of types and materialsat site.  Prepare bill of materialsand assist purchase department to  Purchase for project requirements. Prepare method statement.  Coordination with Design Team for all on site changes in design.  Submit all the material submittals as per project requirements for consultant’s approval.  Ensure the works comply with the Contract specification requirements.  Tracking material items are on site to meet the schedule needs.  Planning, directing and managing resources to complete the project as per target dates according to specification & standards.
  • 3. Organization United Mobiles Position & Depart Student, PCB Labs Work profile Worked on mobiles PCB’s as well as spent some time in every department of the company, such as quality assurance, delivery center, and logistics. Pakistan international container terminal (PICT) Electrical Engineer Field Responsibilities:- Recently worked as a Team Leader in successful installation and conversion of diesel generator crane to electrical power crane along with the engineering team of China.  Troubleshooting & Maintenance of PLC’s Simatic-7 416-2DP &Fuji (Micrex-F70S).Involving hardware & Software troubleshooting.  Troubleshooting & Maintenance of Stamford Diesel Generator (680kva, 440V).  Worked as a team member for erection, assembling and commissioning of E-RTG & STS.  Maintaining & planning of inventory of all electrical spares.  Check the items of R.O.L. related to electrical department.  Inspection, preventive and break down maintenance of equipment.  Documentation regarding the execution of above mentioned jobs including report writing and preparation of maintenance of checklist.  Daily activity report and preparing plans and schedules of the equipment.  Making duty schedule and arrange work force for holidays.  Co-ordinate with the BVQI team for the monthly inspection and checking of equipment safeties and interlocking.  Co-ordinate without source suppliers for timely availability of material. Field/Equipment’s of working: -  Container Handling Ship to shore 45 Ton (Shore Powered) twin box lifting cranes with BROMMA and ZPMC spreaders. (ZPMC make) with Siemens System.  Rubber tires Gantries 41 Ton (Yard container Handling cranes) with Fuji System.
  • 4. PROJECTS: FINAL YEAR PROJECT: Wireless weather monitoring system, that sense all the major metrological conditions and Transmit their parameters wireless to the indoor unit that continuously displays them in Visual form on single color LED screen. Solar energy helps it to become electricity Independent. OTHER PROJECTS:  Power supply Designed a 24V Variable power supply using LM-337 and LM-317 ICs.  Implementation of traffic signal control system Designed Traffic Control system Using Micro Controller SKILLS:  Effective Management abilities  Refined written and spoken communications  Well versed in MS Office  Auto CAD  QA/QC Training awareness certificate  PMP training certificate References to be furnished upon request