SlideShare a Scribd company logo
1 of 4
Download to read offline
P-1/4
TAUSEEF AHMAD BARYAR
Electrical Engineer
Gender: Male l DOB: April 05, 1978 l Marital Status: Married
Nationality: Pakistani l Current Location: Riyadh, Saudi Arabia
Mobile: +966-56-8057672 (KSA) / +92-300-6672341 (Pakistan)
Email: tbaryar@yahoo.com / tbaryar@hotmail.com 
 
CAREER SUMMARY:
KEY HIGHLIGHTS/ ACHIEVEMENTS:
 Successfully completed SAR 75 Million worth Riyadh PP#9 ext.  Project closing agreement works. 
 Successfully completed and handed over assigned zones to client SEC/SC related Installation, testing and 
commissioning of 32 no’s GE Frame ‐7 GTG units including the auxiliary power systems and BOP system 
equipment’s at Riyadh Power Plant# 9 Block‐C, D & F Saudi Arabia. 
 Successfully completed modification of 380KV GIS switchgears at Substation ‐9009 Saudi Arabia. 
 Successfully attended, rectified and closed project warranty claims raised by client SEC. 
 Designed 380KV Overhead Transmission Line “Al‐Fadhili‐Shamlul‐Sudair” for SEC Saudi Arabia. 
 Closed RPP‐9 Extension Project remaining/ outstanding issues (Electrical Snag List/ Punch List).  
 Successfully completed automation of Olympia Chemical Soda Ash Plant in Pakistan. 
 Installed, tested and commissioned Moving Hood Kiln at EMCO Industries Ltd Pakistan. 
 Successfully completed the project of “Interface Development of Digital Control System with Bay Unit” 
assigned by SIEMENS PAKISTAN ENGINEEING CO. LTD. 
 
PROFESSIONAL EXPERIENCE: 
1) Arabian BEMCO Contracting Co. Ltd, Riyadh Power Plant # 9 - K.S.A - (2007 ~ Present)
Project ‐ 3: Jazan Integrated Gasification Combined Cycle Utilities and Common Facilities (JIGCC) at  
Jazan Refinery and Terminal Project (JRTP). 
 
Contract Value: SAR 383 Million 
 
Scope:  Saudi  Aramco  is  currently  developing  a  large  world‐scale  electric  power  plant  adjacent  to  the 
400,000 BPD grassroots Jazan Refinery & Terminal Project being developed in the Jazan Economic City 
(JEC) in Saudi Arabia. The power plant will be based on Integrated Gasification Combined Cycle (JIGCC) 
technology. As part of this project, package identified by Saudi Aramco as EPC 5 comprises of various 
buildings, electrical, instrumentation, piping, metering systems, fire protection, structural steel, shelters, 
foundations, roads, parking and civil work inside the physical boundary limits of the units. 
Total Experience:   13+ Years 
Role Wise 
• Project Construction Execution  
• Project Site Management                   9 Years 
• Project Warranty Management  
• Project Planning and Control Function 1 Years 
• Process Plant Operation & Maintenance 3 Years 
Sector Wise 
• Energy Sector 10 Years 
• Process Plant / Production 3 Years 
Location Wise 
• Gulf Region 10 Years 
• Pakistan 3+ Years 
Tools & Techniques 
• Primavera_P3e 
• MS Project_2014 
• MS Office_2014 
• Auto CAD 
Specialties 
• Bachelor of Electrical Engineering graduate. 
• Project Site Management. 
• Project Construction Execution Procedure/ Strategies 
• Project Planning & Scheduling  
• Project Reporting & Monitoring 
• Coordination (internal & external) 
• Team Building and workload distribution  
• Performance Measurement Techniques 
• Project site logistics and administration 
Personal Skills 
• Well versed with project management aspects  
• Excellent problem solving and organizational skills. 
• Able to communicate and interact with individuals of all levels. 
• Proficient with technical report writing and correspondences. 
• Familiar to SEC standards and international standards. 
• Workable knowledge of English and Arabic languages. 
• Excellent user of computer programs and applications 
Location:  Jazan, Saudi Arabia      Client: Technicas‐Reunidas / Saudi ARAMCO 
 
P-2/4
i) Position: Construction Manager – Electro‐Mechanical – July 2015 to present 
Responsible  for  the  execution  of  electro‐mechanical  works  related  to  Jazan  Integrated  Gasification 
Combined Cycle utilities and Common Facilities (JIGCC) at JRTP Jazan, Saudi Arabia. 
Project Responsibilities: 
 Ensures the correct termination of the electro‐mechanical construction works in accordance with 
the design specifications and the Saudi ARAMCO quality regulations and codes. 
 Responsible for the development of construction sequences and construction procedures. 
 Coordinate activities of subcontractors, verifying availability of its resources. 
 Responsible  for  the  application  of  Environment,  Safety  &  Health  regulations  during  the  works 
execution in accordance to Saudi ARAMCO standards. 
 Ensures that construction is carried out in accordance to project specifications. 
 Direct  the  follow‐up  and  planning  meeting  with  the  site  supervisors  to  coordinate  the  work  and 
ensure the availability of equipment, materials and personnel etc. 
 Ensures that no additional work is done outside the scope of the contract without having previous 
written authorization of the Client and the Project Manager. 
 
Project ‐ 1 & 2: Riyadh Power Plant # 9 Extension Block C, D and F Including 132kV substation # 8159 
 
Contract Value: USD 1.341 Billion 
 
Scope: Design, Engineering, Procurement, Supply and Deliver all Materials and Equipment to work site, 
Construct/ Install, Test & Commission 32 no’s  GE frame 7EA gas turbine  generator units having a net 
rating of 60 – 80 +10% MW base load @ 50 °C ambient temperature totaling 1866 MW (60 Hz units) and 
required Balance of Plant systems, including 132kV Sub‐Station #8159 for SEC‐COA. 
ii) Position: Site Manager /Senior Electrical Engineer – Jan 2011 to June 2015 
Overall responsible for Riyadh Power Plant # 9 site management, planning, scheduling and execution of 
all discipline works (Electrical, I&C, Mechanical and Civil) related PP‐9 project closing agreement works 
with client Saudi Electricity Company (SEC).  
Project Responsibilities: 
 Managed multiple engineering, procurement, construction, testing and commissioning activities for 
various electro‐mechanical systems, plant DCS system and low current systems.  
 Drafted official correspondences, regular & contractual letters and document transmittals to client 
(SEC) for approval signatures of Project Manager. 
 Prepared,  submitted,  followed  up  and  secured  client  (SEC)  approval  on  project  document 
transmittals, technical proposals, method statements and material submittals. 
 Forwarded requirements of design change, if any, to engineering department or vendor.  
 Reported  to  client  SEC  and  Project  Manager  formally  on  regular  basis  and  in  weekly  progress 
meetings regarding the Project status. Advised the required support and critical actions.  
 Reviewed the Project Schedules before approval and issuance internally & externally. 
 Established and implemented procedures for construction activities execution. 
 Implemented QA/QC and Safety plans at site up to the satisfaction of the client. 
 Implemented agreed corrective/preventive action for any non‐conformity raised by the client. 
 Performed required materials procurement including sending RFQs, clarifications, coordination with 
Procurement Management and follow up with suppliers & subcontractors.  
 Reviewed the contract documents, subcontractor’s invoices and release for payment requests. 
 Handled project administration, logistics activities and process SEC gate passes on daily basis. 
 Attended, rectified and closed warranty claims rose by client SEC and maintain proper log for the 
same. 
 
iii) Position: Project Engineer / Site Electrical Engineer ‐ Mar 2007 to Dec 2010. 
Responsible for execution of Electrical works related to 2700MW Power Plant extension at RPP9  which 
includes  installation  of  32  no’s  Frame‐  7  GE  make  Gas  Turbines  Generator  (83MW)  ,  18  no’s,  13.8‐
13.8/132KV  or  380KV,  220  or  110MVA  GSU    Transformers,  82  no’s,  13.8/0.48KV,  1  or  1.5MVA  Aux. 
Location:  Riyadh, Saudi Arabia      Client: Saudi Electricity Company (SEC), KSA 
 
P-3/4
Transformers,  GTG  control  system  (MARK‐VI  Turbine  Control)  ,  Power  Control  Center  (PCC),  Motor 
Control Center (MCC), Non Segregated & Isolated Phase Bus Ducts, Battery Banks & Battery chargers, 
Rectifiers & Converters, GIS Substation, GIB,  BOP: normal and emergency lighting system, FA system, 
Telephone  &  Paging  system,    LV  &  MV  cable  pulling,  splicing  &  termination  and  GTG  related 
Instrumentation & Control works. 
Project Responsibilities:  
 Initiated  RFI’s  of  completed  works  and  ensured  the  acceptance  of  works  by  SEC/SC  inspection 
engineers.  
 Executed number of site activities under official permit to work (PTW) from client SEC. 
 Prepared and presented weekly/monthly progress reports, Cost, Time, Resource (CTR) reports and 
conducted in‐house periodic reviews of the engineering/ procurement deliverables for tracking and 
maintaining project schedules.  
 Maintained interface with clients SEC, subcontractors and vendors while leading and supervising site 
construction teams for successful and timely completion of projects.  
2) Saudi Technologist Consulting Engineers, Al -Khobar - K.S.A (2005 – 2006)
Project: 380kV Overhead Transmission Line among Al‐Fadhili – Shamlul – Sudair  
 
Scope: Design Engineering of 380kV Overhead Transmission Line Al‐Fadhili – Shamlul ‐ Sudair.  
 
Position: Design Engineer –2005 to 2006  
Responsibilities  Includes:  Sag  &  Tension  Calculation  using  Sag‐10  software,  Mid‐Span  Clearance  and 
other Electrical Calculation, Transmission Lines Route Optimization, Conducting Site Verifications.  
3) Work Experience in Pakistan 2002 ~ 2005
I  have  worked  as  Head  of  Department  at  below  mentioned  industrial  process,  production  and 
manufacturing plants in leading role for plant operation, maintenance and plant extension projects: 
i) SIEMENS Pakistan Engg. Co. Ltd. ‐ Karachi. [ An engineering solutions provider firm] 
ii) EMCO Industries Pvt. Ltd. – Lahore [ Ceramic wall & floor tiles and elect. insulators manufacturer] 
iii) Olympia Chemicals Pvt. Ltd. – Khushab [ Soda Ash producer] 
iv) Naubahar Bottling Co. Ltd. – Gujranwala [Pepsi Cola filling plant] 
 
Responsibilities include but not limited to the following:  
 Perform breakdown maintenance, preventive maintenance for all the plant equipment’s. Improve MTBF 
(Mean Time between Failures) and minimize MTR (Mean Time to Repair).  
 Maintain and perform inventory management of local and imports spare parts.  
 Develop and implement Preventive Maintenance Plan for Process Instruments and plant equipment’s. 
 Install, configure and commission Variable Frequency Drives (VFD). 
 I/O data for conversion of the existing Soda Ash plant to PLC/DCS type of automatic system.  
 Review Instrument Installation Sheets (IIS), Instrument Loop Diagram (ILD), Piping & Instrument Diagram 
(P&ID), instrument hook up and instrument wiring drawing.  
 Supervise and monitor instrument installation and commissioning activities. 
 “Interface  Development  of  Digital  Control  System  with  Bay  Unit”  while  working  in  PAS  (Process  and 
Automation Solutions) Department of SIEMENS Pakistan. 
PROFESSIONAL QUALIFICATION:
 B.E Electrical Electronic Engineering 
Dawood College of Engineering and Technology, Karachi, Pakistan. 
Result: 1st
 division with 80 % 
PROFESSIONAL TRAININGS / CERTIFICATIONS:
 Professional training course on PRIMAVERA P3e from PROSTAR Riyadh, Saudi Arabia. 
 Professional training course in P.L.C (SIEMENS S‐7 Controller) from IIEE Karachi, Pakistan. 
 Basic Telecommunication Knowledge Training from ZTE Telecom Pakistan Pvt. Ltd. 
 Diploma in I.T from Academy of Business Computers Karachi, Pakistan 
 
Location:  Al‐Khobar, Saudi Arabia    Client: Saudi Electricity Company (SEC), KSA 
 
P-4/4
AWARDS/ AFFILIATIONS:
 Professional Member of Saudi Council of Engineers (Reg. # 43409). 
 Professional Member of Pakistan Engineering Council (Reg. # ELECTRO/ 7836). 
 Best Employee award from Arabian BEMCO Contracting Co. Ltd. 
 Editor‐in‐Chief of CEIM 2001 magazine at Dawood College of Engg. & Tech. Karachi. 
 Member of ECHO (Engineers Common Help Organization) at DCET Karachi. 
 
References: Available upon request.

More Related Content

What's hot

What's hot (20)

Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
Thanzeel CV
Thanzeel CVThanzeel CV
Thanzeel CV
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
neeraj kumar - resume (1)
neeraj kumar - resume (1)neeraj kumar - resume (1)
neeraj kumar - resume (1)
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
Cv mm
Cv mmCv mm
Cv mm
 
william-first-revision
william-first-revisionwilliam-first-revision
william-first-revision
 
Jozwel cv
Jozwel cvJozwel cv
Jozwel cv
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 

Similar to Electrical Engineer Resume Summary

Similar to Electrical Engineer Resume Summary (20)

1. CAREER PROFILE
1. CAREER PROFILE1. CAREER PROFILE
1. CAREER PROFILE
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Venkat CV
Venkat CVVenkat CV
Venkat CV
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
Jawad Ali Khan ARE-2
Jawad Ali Khan  ARE-2 Jawad Ali Khan  ARE-2
Jawad Ali Khan ARE-2
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
Curriculum vitae 3.2
Curriculum vitae 3.2Curriculum vitae 3.2
Curriculum vitae 3.2
 
talhadiploma.doc
talhadiploma.doctalhadiploma.doc
talhadiploma.doc
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.
 

Electrical Engineer Resume Summary

  • 1. P-1/4 TAUSEEF AHMAD BARYAR Electrical Engineer Gender: Male l DOB: April 05, 1978 l Marital Status: Married Nationality: Pakistani l Current Location: Riyadh, Saudi Arabia Mobile: +966-56-8057672 (KSA) / +92-300-6672341 (Pakistan) Email: tbaryar@yahoo.com / tbaryar@hotmail.com    CAREER SUMMARY: KEY HIGHLIGHTS/ ACHIEVEMENTS:  Successfully completed SAR 75 Million worth Riyadh PP#9 ext.  Project closing agreement works.   Successfully completed and handed over assigned zones to client SEC/SC related Installation, testing and  commissioning of 32 no’s GE Frame ‐7 GTG units including the auxiliary power systems and BOP system  equipment’s at Riyadh Power Plant# 9 Block‐C, D & F Saudi Arabia.   Successfully completed modification of 380KV GIS switchgears at Substation ‐9009 Saudi Arabia.   Successfully attended, rectified and closed project warranty claims raised by client SEC.   Designed 380KV Overhead Transmission Line “Al‐Fadhili‐Shamlul‐Sudair” for SEC Saudi Arabia.   Closed RPP‐9 Extension Project remaining/ outstanding issues (Electrical Snag List/ Punch List).    Successfully completed automation of Olympia Chemical Soda Ash Plant in Pakistan.   Installed, tested and commissioned Moving Hood Kiln at EMCO Industries Ltd Pakistan.   Successfully completed the project of “Interface Development of Digital Control System with Bay Unit”  assigned by SIEMENS PAKISTAN ENGINEEING CO. LTD.    PROFESSIONAL EXPERIENCE:  1) Arabian BEMCO Contracting Co. Ltd, Riyadh Power Plant # 9 - K.S.A - (2007 ~ Present) Project ‐ 3: Jazan Integrated Gasification Combined Cycle Utilities and Common Facilities (JIGCC) at   Jazan Refinery and Terminal Project (JRTP).    Contract Value: SAR 383 Million    Scope:  Saudi  Aramco  is  currently  developing  a  large  world‐scale  electric  power  plant  adjacent  to  the  400,000 BPD grassroots Jazan Refinery & Terminal Project being developed in the Jazan Economic City  (JEC) in Saudi Arabia. The power plant will be based on Integrated Gasification Combined Cycle (JIGCC)  technology. As part of this project, package identified by Saudi Aramco as EPC 5 comprises of various  buildings, electrical, instrumentation, piping, metering systems, fire protection, structural steel, shelters,  foundations, roads, parking and civil work inside the physical boundary limits of the units.  Total Experience:   13+ Years  Role Wise  • Project Construction Execution   • Project Site Management                   9 Years  • Project Warranty Management   • Project Planning and Control Function 1 Years  • Process Plant Operation & Maintenance 3 Years  Sector Wise  • Energy Sector 10 Years  • Process Plant / Production 3 Years  Location Wise  • Gulf Region 10 Years  • Pakistan 3+ Years  Tools & Techniques  • Primavera_P3e  • MS Project_2014  • MS Office_2014  • Auto CAD  Specialties  • Bachelor of Electrical Engineering graduate.  • Project Site Management.  • Project Construction Execution Procedure/ Strategies  • Project Planning & Scheduling   • Project Reporting & Monitoring  • Coordination (internal & external)  • Team Building and workload distribution   • Performance Measurement Techniques  • Project site logistics and administration  Personal Skills  • Well versed with project management aspects   • Excellent problem solving and organizational skills.  • Able to communicate and interact with individuals of all levels.  • Proficient with technical report writing and correspondences.  • Familiar to SEC standards and international standards.  • Workable knowledge of English and Arabic languages.  • Excellent user of computer programs and applications  Location:  Jazan, Saudi Arabia      Client: Technicas‐Reunidas / Saudi ARAMCO   
  • 2. P-2/4 i) Position: Construction Manager – Electro‐Mechanical – July 2015 to present  Responsible  for  the  execution  of  electro‐mechanical  works  related  to  Jazan  Integrated  Gasification  Combined Cycle utilities and Common Facilities (JIGCC) at JRTP Jazan, Saudi Arabia.  Project Responsibilities:   Ensures the correct termination of the electro‐mechanical construction works in accordance with  the design specifications and the Saudi ARAMCO quality regulations and codes.   Responsible for the development of construction sequences and construction procedures.   Coordinate activities of subcontractors, verifying availability of its resources.   Responsible  for  the  application  of  Environment,  Safety  &  Health  regulations  during  the  works  execution in accordance to Saudi ARAMCO standards.   Ensures that construction is carried out in accordance to project specifications.   Direct  the  follow‐up  and  planning  meeting  with  the  site  supervisors  to  coordinate  the  work  and  ensure the availability of equipment, materials and personnel etc.   Ensures that no additional work is done outside the scope of the contract without having previous  written authorization of the Client and the Project Manager.    Project ‐ 1 & 2: Riyadh Power Plant # 9 Extension Block C, D and F Including 132kV substation # 8159    Contract Value: USD 1.341 Billion    Scope: Design, Engineering, Procurement, Supply and Deliver all Materials and Equipment to work site,  Construct/ Install, Test & Commission 32 no’s  GE frame 7EA gas turbine  generator units having a net  rating of 60 – 80 +10% MW base load @ 50 °C ambient temperature totaling 1866 MW (60 Hz units) and  required Balance of Plant systems, including 132kV Sub‐Station #8159 for SEC‐COA.  ii) Position: Site Manager /Senior Electrical Engineer – Jan 2011 to June 2015  Overall responsible for Riyadh Power Plant # 9 site management, planning, scheduling and execution of  all discipline works (Electrical, I&C, Mechanical and Civil) related PP‐9 project closing agreement works  with client Saudi Electricity Company (SEC).   Project Responsibilities:   Managed multiple engineering, procurement, construction, testing and commissioning activities for  various electro‐mechanical systems, plant DCS system and low current systems.    Drafted official correspondences, regular & contractual letters and document transmittals to client  (SEC) for approval signatures of Project Manager.   Prepared,  submitted,  followed  up  and  secured  client  (SEC)  approval  on  project  document  transmittals, technical proposals, method statements and material submittals.   Forwarded requirements of design change, if any, to engineering department or vendor.    Reported  to  client  SEC  and  Project  Manager  formally  on  regular  basis  and  in  weekly  progress  meetings regarding the Project status. Advised the required support and critical actions.    Reviewed the Project Schedules before approval and issuance internally & externally.   Established and implemented procedures for construction activities execution.   Implemented QA/QC and Safety plans at site up to the satisfaction of the client.   Implemented agreed corrective/preventive action for any non‐conformity raised by the client.   Performed required materials procurement including sending RFQs, clarifications, coordination with  Procurement Management and follow up with suppliers & subcontractors.    Reviewed the contract documents, subcontractor’s invoices and release for payment requests.   Handled project administration, logistics activities and process SEC gate passes on daily basis.   Attended, rectified and closed warranty claims rose by client SEC and maintain proper log for the  same.    iii) Position: Project Engineer / Site Electrical Engineer ‐ Mar 2007 to Dec 2010.  Responsible for execution of Electrical works related to 2700MW Power Plant extension at RPP9  which  includes  installation  of  32  no’s  Frame‐  7  GE  make  Gas  Turbines  Generator  (83MW)  ,  18  no’s,  13.8‐ 13.8/132KV  or  380KV,  220  or  110MVA  GSU    Transformers,  82  no’s,  13.8/0.48KV,  1  or  1.5MVA  Aux.  Location:  Riyadh, Saudi Arabia      Client: Saudi Electricity Company (SEC), KSA   
  • 3. P-3/4 Transformers,  GTG  control  system  (MARK‐VI  Turbine  Control)  ,  Power  Control  Center  (PCC),  Motor  Control Center (MCC), Non Segregated & Isolated Phase Bus Ducts, Battery Banks & Battery chargers,  Rectifiers & Converters, GIS Substation, GIB,  BOP: normal and emergency lighting system, FA system,  Telephone  &  Paging  system,    LV  &  MV  cable  pulling,  splicing  &  termination  and  GTG  related  Instrumentation & Control works.  Project Responsibilities:    Initiated  RFI’s  of  completed  works  and  ensured  the  acceptance  of  works  by  SEC/SC  inspection  engineers.    Executed number of site activities under official permit to work (PTW) from client SEC.   Prepared and presented weekly/monthly progress reports, Cost, Time, Resource (CTR) reports and  conducted in‐house periodic reviews of the engineering/ procurement deliverables for tracking and  maintaining project schedules.    Maintained interface with clients SEC, subcontractors and vendors while leading and supervising site  construction teams for successful and timely completion of projects.   2) Saudi Technologist Consulting Engineers, Al -Khobar - K.S.A (2005 – 2006) Project: 380kV Overhead Transmission Line among Al‐Fadhili – Shamlul – Sudair     Scope: Design Engineering of 380kV Overhead Transmission Line Al‐Fadhili – Shamlul ‐ Sudair.     Position: Design Engineer –2005 to 2006   Responsibilities  Includes:  Sag  &  Tension  Calculation  using  Sag‐10  software,  Mid‐Span  Clearance  and  other Electrical Calculation, Transmission Lines Route Optimization, Conducting Site Verifications.   3) Work Experience in Pakistan 2002 ~ 2005 I  have  worked  as  Head  of  Department  at  below  mentioned  industrial  process,  production  and  manufacturing plants in leading role for plant operation, maintenance and plant extension projects:  i) SIEMENS Pakistan Engg. Co. Ltd. ‐ Karachi. [ An engineering solutions provider firm]  ii) EMCO Industries Pvt. Ltd. – Lahore [ Ceramic wall & floor tiles and elect. insulators manufacturer]  iii) Olympia Chemicals Pvt. Ltd. – Khushab [ Soda Ash producer]  iv) Naubahar Bottling Co. Ltd. – Gujranwala [Pepsi Cola filling plant]    Responsibilities include but not limited to the following:    Perform breakdown maintenance, preventive maintenance for all the plant equipment’s. Improve MTBF  (Mean Time between Failures) and minimize MTR (Mean Time to Repair).    Maintain and perform inventory management of local and imports spare parts.    Develop and implement Preventive Maintenance Plan for Process Instruments and plant equipment’s.   Install, configure and commission Variable Frequency Drives (VFD).   I/O data for conversion of the existing Soda Ash plant to PLC/DCS type of automatic system.    Review Instrument Installation Sheets (IIS), Instrument Loop Diagram (ILD), Piping & Instrument Diagram  (P&ID), instrument hook up and instrument wiring drawing.    Supervise and monitor instrument installation and commissioning activities.   “Interface  Development  of  Digital  Control  System  with  Bay  Unit”  while  working  in  PAS  (Process  and  Automation Solutions) Department of SIEMENS Pakistan.  PROFESSIONAL QUALIFICATION:  B.E Electrical Electronic Engineering  Dawood College of Engineering and Technology, Karachi, Pakistan.  Result: 1st  division with 80 %  PROFESSIONAL TRAININGS / CERTIFICATIONS:  Professional training course on PRIMAVERA P3e from PROSTAR Riyadh, Saudi Arabia.   Professional training course in P.L.C (SIEMENS S‐7 Controller) from IIEE Karachi, Pakistan.   Basic Telecommunication Knowledge Training from ZTE Telecom Pakistan Pvt. Ltd.   Diploma in I.T from Academy of Business Computers Karachi, Pakistan    Location:  Al‐Khobar, Saudi Arabia    Client: Saudi Electricity Company (SEC), KSA   
  • 4. P-4/4 AWARDS/ AFFILIATIONS:  Professional Member of Saudi Council of Engineers (Reg. # 43409).   Professional Member of Pakistan Engineering Council (Reg. # ELECTRO/ 7836).   Best Employee award from Arabian BEMCO Contracting Co. Ltd.   Editor‐in‐Chief of CEIM 2001 magazine at Dawood College of Engg. & Tech. Karachi.   Member of ECHO (Engineers Common Help Organization) at DCET Karachi.    References: Available upon request.