SlideShare a Scribd company logo
1 of 6
Download to read offline
Nemer Abuhajar
Mobile no.: +974 5586 4772
E- mail: nabuhajar@gmail.com
CV OF Mr . NEMER AKRAM K. ABUHAJAR
Position: MEP Project /Operation Manager
Name : Nemer Akram K. AbuhajarName : Nemer Akram K. Abuhajar
Nationality : Jordanian
Passport No. : I 377698
Date of Birth : July 1970
Education Qualification : B.Sc. In Electrical Engineering
Year of Graduation : 1994
Computer Literacy : Microsoft office, AutoCAD.
Overall Experience : 21 years
With LDevino as Operations Manager : with effect f rom July 2016
CV/ (Nemer Abuhajar) Page 1 of 6
Nemer Abuhajar
Mobile no.: +974 5586 4772
E- mail: nabuhajar@gmail.com
Managerial and Technical Skill s :
(Office Works )
Directing, handling and effectively controlling the project activities
(Basic, detail and construction Engineering, Procurement,
Construction/Revamping. Pre -commissioning, Commissioning, till
start-up and performance test) from inception to the start -upstart-up and performance test) from inception to the start -up
Supporting the field (site) on Technical and Contractual problems and
issues.
Surveying and reporting the technical issues related to operation and
maintenance problems
Technical and commercial evaluation, alignment and preparing the
advising report for tender commodities (Piping, Vessel tanks, Rotating
Equipment, ELV, LV, MV, and HV Systems , Instruments & Control
Systems , Fire Alarm and Fire Fighting Systems and HVAC Systems.
Follow -up the supplier technical clarifications.
Participating in formulating and issuing the contracts, same as well
monitoring and providing efficient contract management for contract
terms, coming with the purview of the company projects through
optimal strategies an d plans.
Ensuring that the enquiry documents bids summaries and contracts are
as per company policy.as per company policy.
Monitoring and review the plan, schedules, physical progress and
resource utilization.
Identifying the trends, considering implications, analyzing variance and
recommending corrective action.
Organizing the meetings and participating in negotiations related to
the project activities at each phase.
Check and controlling the invoices for the contractors and suppliers.
Following up the procurement activities (e xpediting, forwarding and
shipping)
Controlling budget and issuing the monthly reports.
Optimization of hired resources, third party agencies by timely control
and expediting.
(Site Works )
Manage projects and coordinate the works of licensors, Engineering
CV/ (Nemer Abuhajar) Page 2 of 6
Manage projects and coordinate the works of licensors, Engineering
Consultants and sub-contractors. Ensuring the timely completion of
the project as per project quality standards and budget.
Control and review of the project drawings and specifications during
engineering as well as the construction phases.
Ensuring adhe rence to the quality procedures and the safety rules of
the company.
Ensuring project execution as per the contract terms and conditions.
Nemer Abuhajar
Mobile no.: +974 5586 4772
E- mail: nabuhajar@gmail.com
Major Projects
A - With Aljaber Engineering LLC Qatar (2007 2016)
(1)
Project : EPIC for Wet Utilities Distr. Network for Supp. Serv. Area Ph. I &Project : EPIC for Wet Utilities Distr. Network for Supp. Serv. Area Ph. I &
II and Main Net. For Ongoing Dev. at West End Ras Laffan
Piping, Equipment Installation, M EP
Client : Qatar Petroleum
Position : Project Manager
Responsibilities : Management of Mechanical Electrical Instrumentation &
Controls, Testing, commissioning and startup of total Project .
(2)
Project : Reconstruction of Roads and Infrastructure in Mesaieed
Community Area
Client : Qatar Petroleum
Position : Project Manager
Responsibilities : HV and LV cabling, Street lighting
(3)
Project : Qatalum Project Installation of Above Ground Metal
Piping, Equipment Installation, M EP
Client : SNC Lavalin
Position : Project Manager
Responsibilities : Mechanical Electrical Instrumentation &
Controls, Testing, Pre -Commissioning, and commissioning of
total Project
(4)
Project : Epic for upgrading of existing Gabbro Berth Crane Facilities at
Mesaieed Port
Client : Qatar Petroleum
CV/ (Nemer Abuhajar) Page 3 of 6
Client : Qatar Petroleum
Position : Project Manager
Responsibilitie s : Mechanical Electrical Instrumentation &
Controls, Testing, Pre -Commissioning, and commissioning of
total Project
Nemer Abuhajar
Mobile no.: +974 5586 4772
E- mail: nabuhajar@gmail.com
A- With Industrial Construction Co. Ltd Jordan (1995 2007)
(1 )
Project : Rehabilitation and upgrading of the Ore beneficiation andProject : Rehabilitation and upgrading of the Ore beneficiation and
material handling plants including operation & maintenance.
Owner : Jordan Phosphate Mines Co.
Main Contractor : CONSORTIUM Koch/SOFREMINES .
Year : 2004 - 2007 .
Position : Project Manager
Project Type : 1- Structural Steel Mechanical Equipment
Electrical Instrumentation & Controls .
2-
and Process Plant.
(2 )
Project : Aqaba KOH Storage and Shipping Facilities (Contract No. 23).
Owner : Jordan Bromine Company (JBC).Owner : Jordan Bromine Company (JBC).
Main Contractor : Industrial Construction Company.
Year : 2004.
Position : Project Manager
Project Type : Mechanical Electrical Instrumentation & Controls.
Design and Build of two metal tanks (2133m
3
each )for the storage of potassium hydroxide
(50% KOH), associated mechanical, electrical and instrumentation works.
Supply and installation of above ground stainless steel pipeline ( 6km) from pump station to
the export je tty.
(3 )
Project : MEREN Silica Sand Project. Plant Construction Package (3A).
Owner : The Middle East Regional Development Enterprise (MEREN).
CV/ (Nemer Abuhajar) Page 4 of 6
Owner : The Middle East Regional Development Enterprise (MEREN).
Main Contractor : CODE JV Industrial Construction Company.
Year : 2003 -2004 .
Position : Project Manager
Contract Value : US$ 611582 (Electro - Mechanical).
Project Type : Structural Steel Mechanical Electrical Instrumentation &
Controls.
Nemer Abuhajar
Mobile no.: +974 5586 4772
E- mail: nabuhajar@gmail.com
(4 )
Project : Deir Alla - Zai - Amman Water Expansion Project -128/2000.
Owner : Water Authority of Jordan (WAJ).
Main Contractor : The Arab Contractors (Outhman Ahmad Outhman).
Year : 2000 - 2003 .
Position : Project Manager
Project Type : Mechanical
Installation of 22 7Km of 60" welded steel pipeline from Zai up to Dabouq
reservoir i ncluding HS testing, calibration pigging, and Cathodic protection.
(5 )
Contract :
Owner : Ministry of Water & Irrigation.
Main Contractor : Giovanola Freres S.A.
Year : 2000.
Position : Construction Manager
Project Type : Mechanical
Erection, sand blasting and painting of steel bottom outlets including hydraulically
actuated gates, motorized valves and piping at: Mujib , Wala, Tannur Irrigation Dams.actuated gates, motorized valves and piping at: Mujib , Wala, Tannur Irrigation Dams.
(6 )
Project : Salt Pans Dredging Works - Dead Sea.
Owner : Arab Potash Co.
Main Contractor : HAM Dredging and Marine.
Year : 1999.
Position : Construction Manager
Project Type : Mechanical.
Fabrication and welding of submerged Steel pipe lines 700 mm in diam eter.
(7 )
Contract : Fine Separation Plant Contract No. 155 F / 97.
CV/ (Nemer Abuhajar) Page 5 of 6
Contract : Fine Separation Plant Contract No. 155 F / 97.
Owner : Jordan Phosphate Mines Co.
Main Contractor : Industrial Construction Company.
Year : 1997.
Position : Construction Manager
Project Type : Structural Steel Mechanical Electrical Instrumentation &
Controls.
Nemer Abuhajar
Mobile no.: +974 5586 4772
E- mail: nabuhajar@gmail.com
Turn Key erection of the steel structures, mechanical and electrical equipment as follows:
Centrifugal Separator, cyclones, draught fan, de -dusting bag filter , steel duct work , belt
and screw conveyors.
(8 )
Contract : DAP Fertilizer Warehouse Reconstruction Tripper Conveyor.
Owner : Jordan Phosphate Mines Co. - Fertilizer Complex.Owner : Jordan Phosphate Mines Co. - Fertilizer Complex.
Main Contractor : Koch Transporttechnick
Year : 1996.
Position : Project Engineer
Project Type : Structural Steel Mechanical Electrical Instrumentation &
Controls.
The turnkey erection of the structural steel, elevated conveyors, traveling tripper cars,
chutes and gates .
(9 )
Contract : 59/95 F 9 E - Rehab Power Station.
Owner : Jordan Electrical Authority.
Main Contractor : Marubeni Corporation.
Year : 1997.Year : 1997.
Position : Project Engineer
Project Type : Structural Steel Mechanical Electrical Instrumentation &
Controls.
Erection of One 100 Mega Watt simple cycle gas turbine power station, Fuel oil unloading
and forwarding, cooling tower, 15 kV isolated phase bus , 15 kV - 132 kV, 150 MW step up
transformer, 132 kV underground cables and 132 kV substation .
(10 )
Contract : 32 F / 95 - Drying Plant
Owner : Jordan Phosphate Mines Co.
Main Contractor : Industrial Construction Company.
Year : 1995 - 1996 .
Position : Site Engineer
Project Type : Structural Steel Mechanical Electrical Instrumentation &
CV/ (Nemer Abuhajar) Page 6 of 6
Project Type : Structural Steel Mechanical Electrical Instrumentation &
Controls.
Erection of Two drying kilns , belt conveyor s, receiving bunker s, 4000 M3 heavy fuel steel
tank of with hea ters, pump house and insulated hot fuel delivery steel pipe line.

More Related Content

What's hot

What's hot (20)

Reda cv en
Reda cv enReda cv en
Reda cv en
 
reda cv EN
reda cv ENreda cv EN
reda cv EN
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CV
 
ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOC
 
CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
Qa QC SEPL NOV 2017
Qa QC SEPL NOV  2017Qa QC SEPL NOV  2017
Qa QC SEPL NOV 2017
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
jamespickering
jamespickeringjamespickering
jamespickering
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 

Viewers also liked

PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014Amir Y. Simon
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)Amer Abbas
 
Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan
 
RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. JordanSteve Jordan
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVJALAL ALASFAR
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan Gilmer
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resumeMohammed Dawood
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in JordanLXLLLP
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansalDrMani Kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cvrejith raman
 

Viewers also liked (19)

EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
Jordan CV
Jordan CVJordan CV
Jordan CV
 
Hatem aldawi CV
Hatem  aldawi CVHatem  aldawi CV
Hatem aldawi CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15
 
RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. Jordan
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CV
 
Samra
SamraSamra
Samra
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_Resume
 
Assign 1
Assign 1Assign 1
Assign 1
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resume
 
osama cv
osama cvosama cv
osama cv
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in Jordan
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 

Similar to NEMER- CV - 16

CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Toni AZAR
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updatedramy mikhail
 

Similar to NEMER- CV - 16 (20)

MCV
MCVMCV
MCV
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
hassan aly
hassan aly hassan aly
hassan aly
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
reda cv EN
reda cv ENreda cv EN
reda cv EN
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Ahmad Alfahom CV
Ahmad Alfahom CVAhmad Alfahom CV
Ahmad Alfahom CV
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
abdallah_ghonaimat_CV
abdallah_ghonaimat_CVabdallah_ghonaimat_CV
abdallah_ghonaimat_CV
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

NEMER- CV - 16

  • 1. Nemer Abuhajar Mobile no.: +974 5586 4772 E- mail: nabuhajar@gmail.com CV OF Mr . NEMER AKRAM K. ABUHAJAR Position: MEP Project /Operation Manager Name : Nemer Akram K. AbuhajarName : Nemer Akram K. Abuhajar Nationality : Jordanian Passport No. : I 377698 Date of Birth : July 1970 Education Qualification : B.Sc. In Electrical Engineering Year of Graduation : 1994 Computer Literacy : Microsoft office, AutoCAD. Overall Experience : 21 years With LDevino as Operations Manager : with effect f rom July 2016 CV/ (Nemer Abuhajar) Page 1 of 6
  • 2. Nemer Abuhajar Mobile no.: +974 5586 4772 E- mail: nabuhajar@gmail.com Managerial and Technical Skill s : (Office Works ) Directing, handling and effectively controlling the project activities (Basic, detail and construction Engineering, Procurement, Construction/Revamping. Pre -commissioning, Commissioning, till start-up and performance test) from inception to the start -upstart-up and performance test) from inception to the start -up Supporting the field (site) on Technical and Contractual problems and issues. Surveying and reporting the technical issues related to operation and maintenance problems Technical and commercial evaluation, alignment and preparing the advising report for tender commodities (Piping, Vessel tanks, Rotating Equipment, ELV, LV, MV, and HV Systems , Instruments & Control Systems , Fire Alarm and Fire Fighting Systems and HVAC Systems. Follow -up the supplier technical clarifications. Participating in formulating and issuing the contracts, same as well monitoring and providing efficient contract management for contract terms, coming with the purview of the company projects through optimal strategies an d plans. Ensuring that the enquiry documents bids summaries and contracts are as per company policy.as per company policy. Monitoring and review the plan, schedules, physical progress and resource utilization. Identifying the trends, considering implications, analyzing variance and recommending corrective action. Organizing the meetings and participating in negotiations related to the project activities at each phase. Check and controlling the invoices for the contractors and suppliers. Following up the procurement activities (e xpediting, forwarding and shipping) Controlling budget and issuing the monthly reports. Optimization of hired resources, third party agencies by timely control and expediting. (Site Works ) Manage projects and coordinate the works of licensors, Engineering CV/ (Nemer Abuhajar) Page 2 of 6 Manage projects and coordinate the works of licensors, Engineering Consultants and sub-contractors. Ensuring the timely completion of the project as per project quality standards and budget. Control and review of the project drawings and specifications during engineering as well as the construction phases. Ensuring adhe rence to the quality procedures and the safety rules of the company. Ensuring project execution as per the contract terms and conditions.
  • 3. Nemer Abuhajar Mobile no.: +974 5586 4772 E- mail: nabuhajar@gmail.com Major Projects A - With Aljaber Engineering LLC Qatar (2007 2016) (1) Project : EPIC for Wet Utilities Distr. Network for Supp. Serv. Area Ph. I &Project : EPIC for Wet Utilities Distr. Network for Supp. Serv. Area Ph. I & II and Main Net. For Ongoing Dev. at West End Ras Laffan Piping, Equipment Installation, M EP Client : Qatar Petroleum Position : Project Manager Responsibilities : Management of Mechanical Electrical Instrumentation & Controls, Testing, commissioning and startup of total Project . (2) Project : Reconstruction of Roads and Infrastructure in Mesaieed Community Area Client : Qatar Petroleum Position : Project Manager Responsibilities : HV and LV cabling, Street lighting (3) Project : Qatalum Project Installation of Above Ground Metal Piping, Equipment Installation, M EP Client : SNC Lavalin Position : Project Manager Responsibilities : Mechanical Electrical Instrumentation & Controls, Testing, Pre -Commissioning, and commissioning of total Project (4) Project : Epic for upgrading of existing Gabbro Berth Crane Facilities at Mesaieed Port Client : Qatar Petroleum CV/ (Nemer Abuhajar) Page 3 of 6 Client : Qatar Petroleum Position : Project Manager Responsibilitie s : Mechanical Electrical Instrumentation & Controls, Testing, Pre -Commissioning, and commissioning of total Project
  • 4. Nemer Abuhajar Mobile no.: +974 5586 4772 E- mail: nabuhajar@gmail.com A- With Industrial Construction Co. Ltd Jordan (1995 2007) (1 ) Project : Rehabilitation and upgrading of the Ore beneficiation andProject : Rehabilitation and upgrading of the Ore beneficiation and material handling plants including operation & maintenance. Owner : Jordan Phosphate Mines Co. Main Contractor : CONSORTIUM Koch/SOFREMINES . Year : 2004 - 2007 . Position : Project Manager Project Type : 1- Structural Steel Mechanical Equipment Electrical Instrumentation & Controls . 2- and Process Plant. (2 ) Project : Aqaba KOH Storage and Shipping Facilities (Contract No. 23). Owner : Jordan Bromine Company (JBC).Owner : Jordan Bromine Company (JBC). Main Contractor : Industrial Construction Company. Year : 2004. Position : Project Manager Project Type : Mechanical Electrical Instrumentation & Controls. Design and Build of two metal tanks (2133m 3 each )for the storage of potassium hydroxide (50% KOH), associated mechanical, electrical and instrumentation works. Supply and installation of above ground stainless steel pipeline ( 6km) from pump station to the export je tty. (3 ) Project : MEREN Silica Sand Project. Plant Construction Package (3A). Owner : The Middle East Regional Development Enterprise (MEREN). CV/ (Nemer Abuhajar) Page 4 of 6 Owner : The Middle East Regional Development Enterprise (MEREN). Main Contractor : CODE JV Industrial Construction Company. Year : 2003 -2004 . Position : Project Manager Contract Value : US$ 611582 (Electro - Mechanical). Project Type : Structural Steel Mechanical Electrical Instrumentation & Controls.
  • 5. Nemer Abuhajar Mobile no.: +974 5586 4772 E- mail: nabuhajar@gmail.com (4 ) Project : Deir Alla - Zai - Amman Water Expansion Project -128/2000. Owner : Water Authority of Jordan (WAJ). Main Contractor : The Arab Contractors (Outhman Ahmad Outhman). Year : 2000 - 2003 . Position : Project Manager Project Type : Mechanical Installation of 22 7Km of 60" welded steel pipeline from Zai up to Dabouq reservoir i ncluding HS testing, calibration pigging, and Cathodic protection. (5 ) Contract : Owner : Ministry of Water & Irrigation. Main Contractor : Giovanola Freres S.A. Year : 2000. Position : Construction Manager Project Type : Mechanical Erection, sand blasting and painting of steel bottom outlets including hydraulically actuated gates, motorized valves and piping at: Mujib , Wala, Tannur Irrigation Dams.actuated gates, motorized valves and piping at: Mujib , Wala, Tannur Irrigation Dams. (6 ) Project : Salt Pans Dredging Works - Dead Sea. Owner : Arab Potash Co. Main Contractor : HAM Dredging and Marine. Year : 1999. Position : Construction Manager Project Type : Mechanical. Fabrication and welding of submerged Steel pipe lines 700 mm in diam eter. (7 ) Contract : Fine Separation Plant Contract No. 155 F / 97. CV/ (Nemer Abuhajar) Page 5 of 6 Contract : Fine Separation Plant Contract No. 155 F / 97. Owner : Jordan Phosphate Mines Co. Main Contractor : Industrial Construction Company. Year : 1997. Position : Construction Manager Project Type : Structural Steel Mechanical Electrical Instrumentation & Controls.
  • 6. Nemer Abuhajar Mobile no.: +974 5586 4772 E- mail: nabuhajar@gmail.com Turn Key erection of the steel structures, mechanical and electrical equipment as follows: Centrifugal Separator, cyclones, draught fan, de -dusting bag filter , steel duct work , belt and screw conveyors. (8 ) Contract : DAP Fertilizer Warehouse Reconstruction Tripper Conveyor. Owner : Jordan Phosphate Mines Co. - Fertilizer Complex.Owner : Jordan Phosphate Mines Co. - Fertilizer Complex. Main Contractor : Koch Transporttechnick Year : 1996. Position : Project Engineer Project Type : Structural Steel Mechanical Electrical Instrumentation & Controls. The turnkey erection of the structural steel, elevated conveyors, traveling tripper cars, chutes and gates . (9 ) Contract : 59/95 F 9 E - Rehab Power Station. Owner : Jordan Electrical Authority. Main Contractor : Marubeni Corporation. Year : 1997.Year : 1997. Position : Project Engineer Project Type : Structural Steel Mechanical Electrical Instrumentation & Controls. Erection of One 100 Mega Watt simple cycle gas turbine power station, Fuel oil unloading and forwarding, cooling tower, 15 kV isolated phase bus , 15 kV - 132 kV, 150 MW step up transformer, 132 kV underground cables and 132 kV substation . (10 ) Contract : 32 F / 95 - Drying Plant Owner : Jordan Phosphate Mines Co. Main Contractor : Industrial Construction Company. Year : 1995 - 1996 . Position : Site Engineer Project Type : Structural Steel Mechanical Electrical Instrumentation & CV/ (Nemer Abuhajar) Page 6 of 6 Project Type : Structural Steel Mechanical Electrical Instrumentation & Controls. Erection of Two drying kilns , belt conveyor s, receiving bunker s, 4000 M3 heavy fuel steel tank of with hea ters, pump house and insulated hot fuel delivery steel pipe line.