1. Power Engineering World
COMPANY PROFILE
[2014]
PEW believes in the significance of client satisfaction, quality-based management and a culture of progressive development
2. Company Profile
Table of Content
Vision, Mission and Value Statement …………………………………….. Page 2
Company Overview ………………………………………………………….…….. Page 3
PEW Companies ……………………………………………………………………… Page 4
Services & Fields ……………………………………………..……………………… Page 5
Work Capabilities...………………………..……………………………..……….. Page 6
Our Projects ……..…………………………………………………………………….. Page 13
Manpower ……..…………………………………………………………………….. Page 20
Contact us ………………………………………..……………………………………… Page 21
Registrations and Memberships ……………………………………………… Page 22
Partnership & Agreements………………………………..….….……………… Page 23
Certificates………………………..…………………………..………………………… Page 24
Power Engineering World | www.pew-group.com 1
3. Company Profile
VISION
Pursuit to become a key business as an EPC company can meet our
customers' needs in Iraq and Middle East and North Africa
MISSION
Strive to contribute in creating the future can restore confidence in the
local effort and productivity in addition to achieve the Iraqis aspirations
and to meet their needs
VALUES
• Confidence-building fairly and humility
• Ambition to set high standards and contribute to the community
• Accept the challenges of the continuing evolution
• Promote a culture of open mentality
• Strive for the development of others and ourselves to realize the full
potential
Power Engineering World | www.pew-group.com 2
4. Company Profile
Company Overview
PEW Group project services span a wide range of commercial and contracting strategies covered
by the sisters companies compromising EPC projects contractor, Front End Engineering Design
(FEED), Automation contractor as well as O&M “Operation & Maintenance” Services vary in scope
and size from basic consulting to complete turnkey responsibility for projects of any size. The
leadership from PEW’s Projects Management Unit (PMU) drives best practices, improvement,
service excellence and consistency around Iraq.
Power Engineering World | www.pew-group.com 3
5. Company Profile
PEW Companies
Power Engineering World for General
Contracts ltd. (Registered in Iraq)
ICS / Independent Consulting Service
(Registered in Jordan)
Activities & Services to provide are:
Engineering
Procurements
Installation & Construction
Commissioning & Testing
Maintenance
Trading, Sales & after Sales services
Activities & Services to provide are:
Front End Engineering and Design (FEED)
Consultant Services
Feasibility studies Services
Basic & Detailed Engineering and Design
Projects Monitoring & Managements
Power Engineering World for Trading
and Contracts (Registered in Jordan)
Al-Ashar for civil construction
(Registered in Jordan)
Activities & Services to provide are:
Trading, Sales & after Sales services
Procurements
Logistic & Transportation
Project Monitoring & Managements
Activities & Services to provide are:
Civil construction business in general
Civil engineering foundations works
Infrastructure contracting
Al-Mass for Engineering services.
(Registered in Iraq)
Lion of Babylon for Power projects Co.
(Registered in Jordan)
specialized in Non distractive tests performed
by a group of experienced Engineers in the
QA/ QC Field of work such as(but not limited):
Radiographic Testing
Dye penetrant inspection (DPI)
Ultrasonic Testing (UT)
Hydrostatic Testing
Is a consolidated company that can perform
high quality power, oil and electro-mechanical
projects covering infra-structure fields, LION
OF BABYLON aims to become one of the
leading companies in Iraq that can perform
EPC contracts in power generation and
transmission fields.
Power Engineering World | www.pew-group.com 4
6. Company Profile
Services & Fields
Services
• Construction, Installation & Commissioning
• Engineering, Design & Consultancy
• Sales, Trading & Procurement
• Operation & Maintenance
Fields
• Power Plants & Generating Sets
• Substations , Transformers & Transmission lines
• Pipeline and Storage Tanks
• Automation Electrical Solution
• Buildings & Infrastructure
• IT Networks & Secure Telecommunication Equipment
Sectors
• Power
• Oil & Gas
• Petrochemical & Refineries
• Water & Waste Water Plant
Power Engineering World | www.pew-group.com 5
7. Company Profile
Work Capabilities
Engineering & Design
PEW as an EPC contractor has a specialized engineering teams in design and analysis of power
plant facilities. Analysis specialties include thermal hydraulic & process flow analysis, structural
analysis, environmental analysis, computer control and automation, and equipment integration
and qualification analysis. Design specialties include conceptual evaluations, design specifications,
design modification packages, design testing and implementation, design review, and design
quality assurance.
PEW has a group of creative and experienced engineers who can provide timely and
acknowledgeable professional services. PEW engineers & technicians develop tremendous
experiences with industrial projects designs in Power, Oil, and Gas sectors in Iraq, providing all
design and analysis of industrial foundations, process, and non-process buildings, HVAC & Fire-
Fighting:
• Heavy duty machine foundations/rotary machines (Gas Turbine foundations) providing
static and dynamic analysis.
• Foundations of all electrical equipment (main transformers, cable ducts, cable trenches,
substations equipment foundation, gantries, etc.
• Huge tanks foundations for Fuel Storage Tanks (Crude Oil Storage Tanks, Light Distillate Oil
Storage Tanks) and Water Storage Tanks (Raw Water, Demineralized, and Firefighting
Storage Tanks).
• For the process buildings (control, high voltage, auxiliary boiler, water treatment, etc.)
• Non process buildings such as (administration, canteen, bachelor, etc.)
• Designs of Steel Structures for stores, shades, pipe rack, etc.
• All other plant skids foundations.
Power Engineering World | www.pew-group.com 6
8. Company Profile
Mechanical Engineering Experiences
PEW as a leading company in Electrical Power Generation and Transmission has a wide experience
and professional staff to perform the erection, repairing, rehabilitation & operating of steam and
gas power plants, and carrying out the general maintenance with the capability of studying the
problems that it is exposed to and find the suitable solutions that secures its return to work with
high efficiency. PEW in capable of studying problems “trouble shooting” that it is exposed to it and
find the suitable solutions that secure its return to work with high efficiency.
Furthermore, PEW is specialized in construction work to cover the installation of the GTG as well
as the mechanical balance of plant for Gas, Steam, and Hydro-Power projects.
Welding Experiences
In addition to the above mentioned capabilities, PEW has developed an excellent experience in
Welding, through a world class, skills, and specialized Engineers & Technical Staff in Welding. PEW
has shown a tremendous progress & successful steps in this field in pipe line or in storage tanks
welding.
RUMAILA Gas Turbines Power Plant
Project
Location: Basra, IRAQ
Design & Engineering, Procurement,
Installation, Testing & Commissioning of (5 x
292 MW-SGT 5-PAC 4000F Siemens)
Capacity: 1460 MW
Duration: 23 Months
Featured Ongoing Project
Power Engineering World | www.pew-group.com 7
9. Company Profile
Chemical Engineering Experiences
PEW has developed and excellent skills in projects require Chemical and Process Engineering
experiences, such as Chemical Washing for all capacities of Steam Boilers in addition to
Construction, Rehabilitation, and Supervision of Water and Waste Water Treatment Units of a
wide range of capacities.
Electrical Engineering Experiences
PEW Engineering and Technical staff have the experiences and skills to perform all type of
construction work to cover the Electrical Balance of Gas, Steam and Hydro-Power Plants, in
addition to the erection of substations equipment’s and repairing its components. Erection of high
voltage towers, cables and re-constructing the electrical network related to them up to 400 KV
substations. Also, PEW is able to erect and repair all the appliances and the electrical engines.
Moreover, performing all tests and commissioning of all types of protection and relays, switch
yards, cables, transformers and generators.
TAZA Gas Turbines Power Plant
Project
Location: Kirkuk, IRAQ
Design & Engineering, Procurement,
Installation, Testing & Commissioning of (1 x
292 MW-SGT 5-PAC 4000F Siemens)
Capacity: 292 MW
Duration: 17 Months
Featured Ongoing Project
Power Engineering World | www.pew-group.com 8
10. Company Profile
Automation, Control, Instrumentation & Telecommunications
PEW has wide experience in the design, installation, and maintenance of PLC, RTU, DAS, DCS,
SCADA, and PABX Systems. The excellent experience of PEW in installation and maintenance is
being reinforced by design activities in these fields with a growing design team and joint-ventures
with experienced companies worldwide. Furthermore, Hard working to demonstrate the
recognized role in developing Iraq’s’ Information and Communication Technology infrastructures.
Power Engineering World | www.pew-group.com 9
11. Company Profile
Civil Engineering Experiences
PEW Civil Engineers have tremendous field and academic experiences to perform all Civil
Engineering and Construction of Power Plants, such as machines foundations, industrial buildings,
switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds, and
administration and support buildings. All civil designs for PEW projects are now done in house.
Tanks & Structure Experiences
We are company committed to satisfy our clients & also focusing on long term relationship. PEW is
a dynamic, rapidly growing company striving to dedicate its efforts to design innovation &
functional integrity for storage tanks. PEW involves the formation of a team responsible for
working with customers to identify needs, analyze and create strategies and solutions, and
provide resources for implementation.
ALQUDUS-3 Gas Turbines Power Plant
Project
Location: Baghdad, IRAQ
Design & Engineering, Procurement, Installation,
Testing & Commissioning of 4 Units GE Frame 9E 125
MW, each with all the Auxiliaries & BOP
Capacity: 500 MW
Duration: 18 Months
Completed Project
Power Engineering World | www.pew-group.com 10
12. Company Profile
Engineering & In-house Design
PEW established an independent design department that can perform in-house design, design
review, technical evaluation of proposals, engineering, site supervision and complete technical
support during construction. Design capabilities include architectural, geotechnical, civil,
structural, mechanical (HVAC, piping, pumps, steel tanks, mechanical systems), electrical (high
voltage and small power), firefighting and fire alarm, control and instrumentation, and special
systems (SCADA, CCTV).
PEW design/engineering team was established to perform services for PEW projects but due its
technical capacity, currently design/engineering services are being provided to other clients as
well. PEW has established professional relationships with many highly qualified international
design firms specialized in power projects for their technical support and design input depending
on size of project and required delivery time.
Power Engineering World | www.pew-group.com 11
13. Company Profile
Renewable Energy (Solar & Wind Energy)
With rising fuel costs, climate change concerns, and a growing demand for electricity, renewable
energy resources such as solar power are becoming an increasingly valuable part of the world's
energy mix.
PEW is adapting a very ambitious plan through collaboration and joint-ventures with well-known
pioneer and experienced international companies to take the lead in transferring the renewable
energy technologies, especially, Solar Energy and Wind Energy to Iraq
Building on a strong power generation heritage spanning more than a century, PEW's partner’s
solar products and systems have proven performance and reliability. Utilizing partners industry
expertise and leadership in energy technologies
Smart grid technologies built by PEW`s partners help utilities improve power reliability through
smart devices and applications that adapt in real time. Utilities are able to monitor performance
and identify outages, restore power, and precisely dispatch crews. They’re even able to identify
anomalies that could lead to potential problems. The result: increased “uptime” and happier
customers. (GE Energy)
Power Engineering World | www.pew-group.com 12
14. Company Profile
Our Projects
On Going Extension & Brand New Projects
Gas Turbine Power Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Basra MOE
HEC - Hyundai
Engineering
Company
& PEW
RUMAILA Gas Turbines Power Plant
Project
Design & Engineering, Procurement,
Installation, Testing & Commissioning of
(5 x 292 MW-SGT 5-PAC 4000F Siemens)
Feb.
2012
23
months
1460
MW
Kirkuk MOE
HEC - Hyundai
Engineering
Company
& PEW
TAZA Gas Turbines Power Plant Project
Design & Engineering, Procurement,
Installation, Testing & Commissioning of
(1 x 292 MW-SGT 5-PAC 4000F Siemens)
Dec.
2011
17
Months
292
MW
Basrah
Basrah
Gas
Company/
Shell
ABB Process
Automation
Division Italy
Khor Al Zubair (KAZ) Power Plant
Project
Electromechanical Construction Work,
Testing, Precomissioning and Assistat
Commisioning for two Units GE Frame 5
(2X25 MW).
June 2013 6 Months 50 MW
Engineering Project
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Basrah MOE
JV
ELC-PEW
Consulting & Professional Services for
Al-Hartha Thermal Power Plant
2008 800 MW
Taji
Hilla
Karbala
MOE
JV
ELC-PEW
MOE Owner Engineer For 3 Fast Track
Projects
Preparation of EPC Documents for
BOP
4 x 40 MW GE Frame 6E GT Power Plant
2 x 125 MW GE Frame 9E GT Power Plant
2 x 125 MW GE Frame 9E GT Power Plant
2008
160 MW
250 MW
250 MW
Power Engineering World | www.pew-group.com 13
15. Company Profile
Baghdad MOE HEC
Al-Qudus/3 Gas Power Plant Project
4 Units F9E GE, EPC Contractor, for
the design of Arch., civil, F.F., F.A,
HVAC and small Power and lighting for
Buildings,
Procurement F.F. equipment, HVAC
Equipment and Ducts, Control and
Power Cables, Lighting Fixtures and
Electrical Panels,
Construction al Activities from Civil
Work, Electromechanical work t the
commissioning and start up.
2011
18
Months
500
MW
Basra MOE
HEC - Hyundai
Engineering
Company
& PEW
RUMAILA Gas Turbines Power Plant
Project
(5 x 292 MW-SGT 5-PAC 4000F Siemens)
EPC Contractor, for the design of Arch.,
civil, F.F., F.A, HVAC and small Power and
lighting for Buildings,
Procurement F.F. equipment, HVAC
Equipment and Ducts, Control and Power
Cables, Lighting Fixtures and Electrical
Panels, Construction al Activities from
Civil Work, Electromechanical work the
commissioning and start up.
Feb.
2012
23
months
1460
MW
Kirkuk MOE
HEC - Hyundai
Engineering
Company
& PEW
TAZA Gas Turbines Power Plant Project
(1 x 292 MW-SGT 5-PAC 4000F Siemens)
EPC Contractor, for the design of Arch.,
civil, F.F., F.A, HVAC and small Power and
lighting for Buildings,
Procurement F.F. equipment, HVAC
Equipment and Ducts, Control and Power
Cables, Lighting Fixtures and Electrical
Panels, Construction al Activities from
Civil Work, Electromechanical work the
commissioning and start up.
Dec.
2011
17
Months
292
MW
Naynava MOE CALIK
Evaporation Pond
for Naynava Power Plant
May 2013 4 Months
Karbala MOE Calik
Evaporation Pond
For Al-Khayrat Power Plant
May 2013 4 Months
Power Engineering World | www.pew-group.com 14
16. Company Profile
Completed Extension & Brand New Projects
Gas Turbine Power Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad MOE
HEC - Hyundai
Engineering
Company
& PEW
Al-Qudus Gas Power Plant Project
Design & Engineering, Procurement,
Installation, Testing & Commissioning of
4 Units GE Frame 9E 125 MW, each with
all the Auxiliaries & BOP
April
2011
18
months
500
MW
Baghdad MOE
JV
Vitzrosys-PEW
Al-Rasheed Gas Power Plant Project
Installation Testing & Commissioning of 2
Units Siemens SGT-800 47 MW each with
all the Auxiliaries & BOP
2009
16
Months
94 MW
Al-Najaf MOE
Int.Free Co.
(IFC)
Al-Najaf Gas Power Plant Project
Installation Testing & Commissioning of 2
Units GE Frame 9E 125 MW each with all
the Auxiliaries & BOP
2007
18
Months
250 MW
Baghdad MOE
JV
Uruk–Baghdad
Al-Qudus Expansion Project
Adding 2 Units GE Frame 9E 125 MW
each. PEW Performed all the Construction
works of 400 KV switchyard , Power
Transformers, Gen CB’s, Bus Duct, SWG’s,
Control Container, Protection & Metering,
Unit Control & DC System , and laying &
Termination of 400 KV XLPE , MV , LV
Cables.
2005
18
Months
250 MW
Power Engineering World | www.pew-group.com 15
17. Company Profile
Substations
Location Client
Main
Contractor
Project
Starting
Date
Duration
Voltage
Level
Baghdad MOE
Washington
International
Inc.
Installation of Agargouf 132 KV Siemens
Substation
132/33 KV , 63 MVA
2006
11
Months
132 KV
Diyala &
Wassit
MOE
Washington
International
Inc.
Commissioning of 13 ABB Distribution
Substation
33/11 KV
2006
7
Months
33/11 KV
Basrah MOE
MOE
Transmission
lines Projects
Department
Construction of Basrah Center 132 KV
Substation
Laying & Connection wiring of Control
Cables between Transformers & SWG’s
2005
4
Months
132 KV
Baghdad MOE
JV
Uruk–Baghdad
Al-Qudus-2 Project
Construction and installation of 2 Units
F9E, 123 Mw, triple Fuel (Gas, LDO,
Crude)
2007 2008 400 KV
Al-Najaf MOE
Int.Free Co.
(IFC)
Al-Najaf Gas Power Plant Project
Installation of 2 Units F9E, 123 Mw,
triple Fuel (Gas, LDO, HFO)
2008 2009 132 KV
Baghad MOE HEC
Al – Qudus 3
Installation of 2 AIS 400 KV Diameter
EX of AIS Diameter
400 KV cable laying and terminations
2011
18
Months
400 KV
Kirkuk MOE HEC
Taza Gas Turbine
Installation of extended 400 KV AIS
Diameter and installation 400 KV
internal transmission line
2011
17
Months
400 KV
Basra MOE HEC
Rumaila Gas Turbine
Installation of Siemens 400 & 132 KV GIS
S/S
132 KV cable laying and termination
2012
27
Months
1460 KV
Power Engineering World | www.pew-group.com 16
18. Company Profile
SCADA Systems Projects
Location Client
Main
Contractor
Project
Starting
Date
Duration
Central
of Iraq
MOE
Washington
International
Inc.
New Automated Monitoring & Control System,
Central Regional Control Center
Installation of PLC’s U Wave RTU’s
For 40 Substation 132 KV
Installation of the Siemens Dispatch
2005
19
Month
Iraq South
Region
MOE
Washington Int.
Inc.
SCADA Systems Commissioning 2007
12
Month
Engineering Projects
Location Client
Main
Contractor
Project
Starting
Date
Duration
All over
Iraq 25
locations
MOE
JICA
Japan Study
Team
Feasibility Study & Site Survey For Iraqi 132/33/11
KV Substations & Power Plants
2004
1
Month
Iraq South
Region
MOE
Washington
International
Inc.
Feasibility Study & Assessment for SCADA Systems 2008
1
Month
Completed Maintenance Projects
Gas Turbine Power Plants
Power Engineering World | www.pew-group.com 17
19. Company Profile
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Nassrya MOE Fluor - Amec
Rehabilitation of Nassrya Gas Power
Station Technical Logistic Support for
Turbine Inspection & Repair
2006
9
Months
40 MW
Baiji MOE
General Co.
For Electricity
Projects
Rehabilitation & Fabrication & MIG
Welding for Aluminum Bus Bar & Units
No. 1 & No. Power Modification
2002
12
Months
Steam Power Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad MOE
Mohan Export
(India)
Supply & Erection of Hydrogen Plant
Generation at Baghdad South Power
Plant
1998 55MW
Hilla MOE
Mohan Export
(India)
Supply & Erection of Nitrogen
Plant Generation in Mussaib Power
Station
1999 55MW
Baghdad MOE
General Co. for
Rehabilitation
of Power
Plants
Rehabilitation of Boilers No. 2 & No. 3 at
Baghdad South Power Station
2004
6
Months
110 MW
Basrah MOE Applitic (Italy)
HP-LP Rotor of Turbine No. 4
At Al-Martha Power Station
2004
1
Month
200 MW
Power Engineering World | www.pew-group.com 18
20. Company Profile
Baghdad MOE I.E.S (Russian)
Rehabilitation For Turbines & Boilers for
Units
No. 1 ,No. 2 & No. 3 at Baghdad South
Power Station And Unit No. 3 at Dura
Power Station
2004
3
Months
160 MW
Baghdad MOE I.E.S (Russian)
2 Months Guaranty & Maintenance to all
Units at Baghdad South Power Station.
2005
2
Months
160 MW
Baghdad MOE PEW
Rehabilitation of Boilers No. 5 at Baghdad
South Power Station
2005
7
Months
47 MW
Substations
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad MOE
Washington
International
Inc.
Rehabilitation of Baghdad West
Substation 400 KV
Replacing one bay of the 400 KV S/S
2006
13
Months
400 KV
Diyala MOE
Washington
International
Inc.
Rehabilitation of Baghdad East
Substation 400 KV
Replacing one bay of the 400 KV S/S
2006
13
Months
400KV
Power Engineering World | www.pew-group.com 19
21. Company Profile
Water Treatment Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad BWA UNDP
Al-Karama Water Treatment Plant
Rehabilitation of Plant, Upgrading tanks,
Pumping Systems, Chlorination &
Electrical And Increasing the Plant
Capacity 10%.
2008
18
Months
227,300
M3/Day
Power Engineering World | www.pew-group.com 20
22. Company Profile
Manpower
Overall manpower on sites Around 1360 Persons
26%
10%
64%
Permanet Staff ( Mid 2013 )
Engineers
Administratives
Labors & Technicians
Power Engineering World | www.pew-group.com 21
23. Company Profile
Contact PEW
Baghdad Office (Headquarter)
Hay Al-Wehda, Mahalla 906, St. 44, House 7
Baghdad-Iraq.
P. O. Box 2562, Al-Jadria, Baghdad–Iraq
Mob: +964 7803 263 430
Amman Office (Regional & Active HQ)
Al-Waha Circle Building 164 – 5th floor
Amman-Jordan
Tel: +962 (6) 5534 833
Fax: +962 (6) 5534 843
Mob: +962 799 080 316
P. O. Box 4845, Amman 11953, Jordan
Basra Office (South Branch)
Basra - Manaoe Basra - Hay Al-Cahera
Mob: +964 7806 845 088
Mob: +964 7709 070 258
Najaf office (Local Office)
Najaf-Hay Al-Ishtiraki
Tel: +964 (33) 362896
Mob: +964 7807296939
Power Engineering World | www.pew-group.com 22
24. Company Profile
Registration & Memberships
• Ministry of trade-commercial registration no.10833
• Iraqi Engineering Union-Consultant Engineer- Regis: No.17767/1978
• Iraqi Contractors Union, Regis. No. 28549
• Baghdad Chamber of Commerce, Regis. No. 45-18-A
• The Hashemite kingdom of Jordan-ministry of industry and trade Reg. N0.1037 at 5/9/2006
• Iraqi Businessmen Association Regis. No. 530
• Iraqi Tax Authority Registration no. : 11974
• Tax Identity Number “TIN” in Iraq : 900224273
Power Engineering World | www.pew-group.com 23
25. Company Profile
Partnership & Agreements
• General Electric Company “GE Energy” Low AC & Mid. AC Motors; “Distributor & Re-seller
Agreement No. MEIR-PO12-681”
• General Electric Company “GE Measurment & Control”.Bently Nevada; “Distributor & Re-
seller Agreement ”
• General Electric Company “GE Power & Water”.GE Chemical; “Distributor & Re-seller
Agreement ”
Power Engineering World | www.pew-group.com 24
26. Company Profile
Certificates
• ISO 9001:2008
• ISO 14001:2004 (in process & expected in Mid 2014)
• OHSAS 18001:2007 (in process & expected in Mid 2014)
Power Engineering World | www.pew-group.com 25