Table of Content
Vision, Mission and Value Statement …………………………………….. Page 2
Company Overview ………………………………………………………….…….. Page 3
PEW Companies ……………………………………………………………………… Page 4
Services & Fields ……………………………………………..……………………… Page 5
Work Capabilities...………………………..……………………………..……….. Page 6
Our Projects ……..…………………………………………………………………….. Page 13
Manpower ……..…………………………………………………………………….. Page 20
Contact us ………………………………………..……………………………………… Page 21
Registrations and Memberships ……………………………………………… Page 22
Partnership & Agreements………………………………..….….……………… Page 23
Certificates………………………..…………………………..………………………… Page 24
Power Engineering World | www.pew-group.com 1
Company Profile
VISION
Pursuit to become a key business as an EPC company can meet our
customers' needs in Iraq and Middle East and North Africa
MISSION
Strive to contribute in creating the future can restore confidence in the
local effort and productivity in addition to achieve the Iraqis aspirations
and to meet their needs
VALUES
• Confidence-building fairly and humility
• Ambition to set high standards and contribute to the community
• Accept the challenges of the continuing evolution
• Promote a culture of open mentality
• Strive for the development of others and ourselves to realize the full
potential
Power Engineering World | www.pew-group.com 2
Company Profile
Company Overview
PEW Group project services span a wide range of commercial and contracting strategies covered
by the sisters companies compromising EPC projects contractor, Front End Engineering Design
(FEED), Automation contractor as well as O&M “Operation & Maintenance” Services vary in scope
and size from basic consulting to complete turnkey responsibility for projects of any size. The
leadership from PEW’s Projects Management Unit (PMU) drives best practices, improvement,
service excellence and consistency around Iraq.
Power Engineering World | www.pew-group.com 3
Company Profile
PEW Companies
Power Engineering World for General
Contracts ltd. (Registered in Iraq)
ICS / Independent Consulting Service
(Registered in Jordan)
Activities & Services to provide are:
 Engineering
 Procurements
 Installation & Construction
 Commissioning & Testing
 Maintenance
 Trading, Sales & after Sales services
Activities & Services to provide are:
 Front End Engineering and Design (FEED)
 Consultant Services
 Feasibility studies Services
 Basic & Detailed Engineering and Design
 Projects Monitoring & Managements
Power Engineering World for Trading
and Contracts (Registered in Jordan)
Al-Ashar for civil construction
(Registered in Jordan)
Activities & Services to provide are:
 Trading, Sales & after Sales services
 Procurements
 Logistic & Transportation
 Project Monitoring & Managements
Activities & Services to provide are:
 Civil construction business in general
 Civil engineering foundations works
 Infrastructure contracting
Al-Mass for Engineering services.
(Registered in Iraq)
Lion of Babylon for Power projects Co.
(Registered in Jordan)
specialized in Non distractive tests performed
by a group of experienced Engineers in the
QA/ QC Field of work such as(but not limited):
 Radiographic Testing
 Dye penetrant inspection (DPI)
 Ultrasonic Testing (UT)
 Hydrostatic Testing
Is a consolidated company that can perform
high quality power, oil and electro-mechanical
projects covering infra-structure fields, LION
OF BABYLON aims to become one of the
leading companies in Iraq that can perform
EPC contracts in power generation and
transmission fields.
Power Engineering World | www.pew-group.com 4
Company Profile
Services & Fields
Services
• Construction, Installation & Commissioning
• Engineering, Design & Consultancy
• Sales, Trading & Procurement
• Operation & Maintenance
Fields
• Power Plants & Generating Sets
• Substations , Transformers & Transmission lines
• Pipeline and Storage Tanks
• Automation Electrical Solution
• Buildings & Infrastructure
• IT Networks & Secure Telecommunication Equipment
Sectors
• Power
• Oil & Gas
• Petrochemical & Refineries
• Water & Waste Water Plant
Power Engineering World | www.pew-group.com 5
Company Profile
Work Capabilities
Engineering & Design
PEW as an EPC contractor has a specialized engineering teams in design and analysis of power
plant facilities. Analysis specialties include thermal hydraulic & process flow analysis, structural
analysis, environmental analysis, computer control and automation, and equipment integration
and qualification analysis. Design specialties include conceptual evaluations, design specifications,
design modification packages, design testing and implementation, design review, and design
quality assurance.
PEW has a group of creative and experienced engineers who can provide timely and
acknowledgeable professional services. PEW engineers & technicians develop tremendous
experiences with industrial projects designs in Power, Oil, and Gas sectors in Iraq, providing all
design and analysis of industrial foundations, process, and non-process buildings, HVAC & Fire-
Fighting:
• Heavy duty machine foundations/rotary machines (Gas Turbine foundations) providing
static and dynamic analysis.
• Foundations of all electrical equipment (main transformers, cable ducts, cable trenches,
substations equipment foundation, gantries, etc.
• Huge tanks foundations for Fuel Storage Tanks (Crude Oil Storage Tanks, Light Distillate Oil
Storage Tanks) and Water Storage Tanks (Raw Water, Demineralized, and Firefighting
Storage Tanks).
• For the process buildings (control, high voltage, auxiliary boiler, water treatment, etc.)
• Non process buildings such as (administration, canteen, bachelor, etc.)
• Designs of Steel Structures for stores, shades, pipe rack, etc.
• All other plant skids foundations.
Power Engineering World | www.pew-group.com 6
Company Profile
Mechanical Engineering Experiences
PEW as a leading company in Electrical Power Generation and Transmission has a wide experience
and professional staff to perform the erection, repairing, rehabilitation & operating of steam and
gas power plants, and carrying out the general maintenance with the capability of studying the
problems that it is exposed to and find the suitable solutions that secures its return to work with
high efficiency. PEW in capable of studying problems “trouble shooting” that it is exposed to it and
find the suitable solutions that secure its return to work with high efficiency.
Furthermore, PEW is specialized in construction work to cover the installation of the GTG as well
as the mechanical balance of plant for Gas, Steam, and Hydro-Power projects.
Welding Experiences
In addition to the above mentioned capabilities, PEW has developed an excellent experience in
Welding, through a world class, skills, and specialized Engineers & Technical Staff in Welding. PEW
has shown a tremendous progress & successful steps in this field in pipe line or in storage tanks
welding.
RUMAILA Gas Turbines Power Plant
Project
Location: Basra, IRAQ
Design & Engineering, Procurement,
Installation, Testing & Commissioning of (5 x
292 MW-SGT 5-PAC 4000F Siemens)
Capacity: 1460 MW
Duration: 23 Months
Featured Ongoing Project
Power Engineering World | www.pew-group.com 7
Company Profile
Chemical Engineering Experiences
PEW has developed and excellent skills in projects require Chemical and Process Engineering
experiences, such as Chemical Washing for all capacities of Steam Boilers in addition to
Construction, Rehabilitation, and Supervision of Water and Waste Water Treatment Units of a
wide range of capacities.
Electrical Engineering Experiences
PEW Engineering and Technical staff have the experiences and skills to perform all type of
construction work to cover the Electrical Balance of Gas, Steam and Hydro-Power Plants, in
addition to the erection of substations equipment’s and repairing its components. Erection of high
voltage towers, cables and re-constructing the electrical network related to them up to 400 KV
substations. Also, PEW is able to erect and repair all the appliances and the electrical engines.
Moreover, performing all tests and commissioning of all types of protection and relays, switch
yards, cables, transformers and generators.
TAZA Gas Turbines Power Plant
Project
Location: Kirkuk, IRAQ
Design & Engineering, Procurement,
Installation, Testing & Commissioning of (1 x
292 MW-SGT 5-PAC 4000F Siemens)
Capacity: 292 MW
Duration: 17 Months
Featured Ongoing Project
Power Engineering World | www.pew-group.com 8
Company Profile
Automation, Control, Instrumentation & Telecommunications
PEW has wide experience in the design, installation, and maintenance of PLC, RTU, DAS, DCS,
SCADA, and PABX Systems. The excellent experience of PEW in installation and maintenance is
being reinforced by design activities in these fields with a growing design team and joint-ventures
with experienced companies worldwide. Furthermore, Hard working to demonstrate the
recognized role in developing Iraq’s’ Information and Communication Technology infrastructures.
Power Engineering World | www.pew-group.com 9
Company Profile
Civil Engineering Experiences
PEW Civil Engineers have tremendous field and academic experiences to perform all Civil
Engineering and Construction of Power Plants, such as machines foundations, industrial buildings,
switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds, and
administration and support buildings. All civil designs for PEW projects are now done in house.
Tanks & Structure Experiences
We are company committed to satisfy our clients & also focusing on long term relationship. PEW is
a dynamic, rapidly growing company striving to dedicate its efforts to design innovation &
functional integrity for storage tanks. PEW involves the formation of a team responsible for
working with customers to identify needs, analyze and create strategies and solutions, and
provide resources for implementation.
ALQUDUS-3 Gas Turbines Power Plant
Project
Location: Baghdad, IRAQ
Design & Engineering, Procurement, Installation,
Testing & Commissioning of 4 Units GE Frame 9E 125
MW, each with all the Auxiliaries & BOP
Capacity: 500 MW
Duration: 18 Months
Completed Project
Power Engineering World | www.pew-group.com 10
Company Profile
Engineering & In-house Design
PEW established an independent design department that can perform in-house design, design
review, technical evaluation of proposals, engineering, site supervision and complete technical
support during construction. Design capabilities include architectural, geotechnical, civil,
structural, mechanical (HVAC, piping, pumps, steel tanks, mechanical systems), electrical (high
voltage and small power), firefighting and fire alarm, control and instrumentation, and special
systems (SCADA, CCTV).
PEW design/engineering team was established to perform services for PEW projects but due its
technical capacity, currently design/engineering services are being provided to other clients as
well. PEW has established professional relationships with many highly qualified international
design firms specialized in power projects for their technical support and design input depending
on size of project and required delivery time.
Power Engineering World | www.pew-group.com 11
Company Profile
Renewable Energy (Solar & Wind Energy)
With rising fuel costs, climate change concerns, and a growing demand for electricity, renewable
energy resources such as solar power are becoming an increasingly valuable part of the world's
energy mix.
PEW is adapting a very ambitious plan through collaboration and joint-ventures with well-known
pioneer and experienced international companies to take the lead in transferring the renewable
energy technologies, especially, Solar Energy and Wind Energy to Iraq
Building on a strong power generation heritage spanning more than a century, PEW's partner’s
solar products and systems have proven performance and reliability. Utilizing partners industry
expertise and leadership in energy technologies
Smart grid technologies built by PEW`s partners help utilities improve power reliability through
smart devices and applications that adapt in real time. Utilities are able to monitor performance
and identify outages, restore power, and precisely dispatch crews. They’re even able to identify
anomalies that could lead to potential problems. The result: increased “uptime” and happier
customers. (GE Energy)
Power Engineering World | www.pew-group.com 12
Company Profile
Our Projects
On Going Extension & Brand New Projects
Gas Turbine Power Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Basra MOE
HEC - Hyundai
Engineering
Company
& PEW
RUMAILA Gas Turbines Power Plant
Project
Design & Engineering, Procurement,
Installation, Testing & Commissioning of
(5 x 292 MW-SGT 5-PAC 4000F Siemens)
Feb.
2012
23
months
1460
MW
Kirkuk MOE
HEC - Hyundai
Engineering
Company
& PEW
TAZA Gas Turbines Power Plant Project
Design & Engineering, Procurement,
Installation, Testing & Commissioning of
(1 x 292 MW-SGT 5-PAC 4000F Siemens)
Dec.
2011
17
Months
292
MW
Basrah
Basrah
Gas
Company/
Shell
ABB Process
Automation
Division Italy
Khor Al Zubair (KAZ) Power Plant
Project
Electromechanical Construction Work,
Testing, Precomissioning and Assistat
Commisioning for two Units GE Frame 5
(2X25 MW).
June 2013 6 Months 50 MW
Engineering Project
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Basrah MOE
JV
ELC-PEW
Consulting & Professional Services for
Al-Hartha Thermal Power Plant
2008 800 MW
Taji
Hilla
Karbala
MOE
JV
ELC-PEW
MOE Owner Engineer For 3 Fast Track
Projects
Preparation of EPC Documents for
BOP
4 x 40 MW GE Frame 6E GT Power Plant
2 x 125 MW GE Frame 9E GT Power Plant
2 x 125 MW GE Frame 9E GT Power Plant
2008
160 MW
250 MW
250 MW
Power Engineering World | www.pew-group.com 13
Company Profile
Baghdad MOE HEC
Al-Qudus/3 Gas Power Plant Project
4 Units F9E GE, EPC Contractor, for
the design of Arch., civil, F.F., F.A,
HVAC and small Power and lighting for
Buildings,
Procurement F.F. equipment, HVAC
Equipment and Ducts, Control and
Power Cables, Lighting Fixtures and
Electrical Panels,
Construction al Activities from Civil
Work, Electromechanical work t the
commissioning and start up.
2011
18
Months
500
MW
Basra MOE
HEC - Hyundai
Engineering
Company
& PEW
RUMAILA Gas Turbines Power Plant
Project
(5 x 292 MW-SGT 5-PAC 4000F Siemens)
EPC Contractor, for the design of Arch.,
civil, F.F., F.A, HVAC and small Power and
lighting for Buildings,
Procurement F.F. equipment, HVAC
Equipment and Ducts, Control and Power
Cables, Lighting Fixtures and Electrical
Panels, Construction al Activities from
Civil Work, Electromechanical work the
commissioning and start up.
Feb.
2012
23
months
1460
MW
Kirkuk MOE
HEC - Hyundai
Engineering
Company
& PEW
TAZA Gas Turbines Power Plant Project
(1 x 292 MW-SGT 5-PAC 4000F Siemens)
EPC Contractor, for the design of Arch.,
civil, F.F., F.A, HVAC and small Power and
lighting for Buildings,
Procurement F.F. equipment, HVAC
Equipment and Ducts, Control and Power
Cables, Lighting Fixtures and Electrical
Panels, Construction al Activities from
Civil Work, Electromechanical work the
commissioning and start up.
Dec.
2011
17
Months
292
MW
Naynava MOE CALIK
Evaporation Pond
for Naynava Power Plant
May 2013 4 Months
Karbala MOE Calik
Evaporation Pond
For Al-Khayrat Power Plant
May 2013 4 Months
Power Engineering World | www.pew-group.com 14
Company Profile
Completed Extension & Brand New Projects
Gas Turbine Power Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad MOE
HEC - Hyundai
Engineering
Company
& PEW
Al-Qudus Gas Power Plant Project
Design & Engineering, Procurement,
Installation, Testing & Commissioning of
4 Units GE Frame 9E 125 MW, each with
all the Auxiliaries & BOP
April
2011
18
months
500
MW
Baghdad MOE
JV
Vitzrosys-PEW
Al-Rasheed Gas Power Plant Project
Installation Testing & Commissioning of 2
Units Siemens SGT-800 47 MW each with
all the Auxiliaries & BOP
2009
16
Months
94 MW
Al-Najaf MOE
Int.Free Co.
(IFC)
Al-Najaf Gas Power Plant Project
Installation Testing & Commissioning of 2
Units GE Frame 9E 125 MW each with all
the Auxiliaries & BOP
2007
18
Months
250 MW
Baghdad MOE
JV
Uruk–Baghdad
Al-Qudus Expansion Project
Adding 2 Units GE Frame 9E 125 MW
each. PEW Performed all the Construction
works of 400 KV switchyard , Power
Transformers, Gen CB’s, Bus Duct, SWG’s,
Control Container, Protection & Metering,
Unit Control & DC System , and laying &
Termination of 400 KV XLPE , MV , LV
Cables.
2005
18
Months
250 MW
Power Engineering World | www.pew-group.com 15
Company Profile
Substations
Location Client
Main
Contractor
Project
Starting
Date
Duration
Voltage
Level
Baghdad MOE
Washington
International
Inc.
Installation of Agargouf 132 KV Siemens
Substation
132/33 KV , 63 MVA
2006
11
Months
132 KV
Diyala &
Wassit
MOE
Washington
International
Inc.
Commissioning of 13 ABB Distribution
Substation
33/11 KV
2006
7
Months
33/11 KV
Basrah MOE
MOE
Transmission
lines Projects
Department
Construction of Basrah Center 132 KV
Substation
Laying & Connection wiring of Control
Cables between Transformers & SWG’s
2005
4
Months
132 KV
Baghdad MOE
JV
Uruk–Baghdad
Al-Qudus-2 Project
Construction and installation of 2 Units
F9E, 123 Mw, triple Fuel (Gas, LDO,
Crude)
2007 2008 400 KV
Al-Najaf MOE
Int.Free Co.
(IFC)
Al-Najaf Gas Power Plant Project
Installation of 2 Units F9E, 123 Mw,
triple Fuel (Gas, LDO, HFO)
2008 2009 132 KV
Baghad MOE HEC
Al – Qudus 3
Installation of 2 AIS 400 KV Diameter
EX of AIS Diameter
400 KV cable laying and terminations
2011
18
Months
400 KV
Kirkuk MOE HEC
Taza Gas Turbine
Installation of extended 400 KV AIS
Diameter and installation 400 KV
internal transmission line
2011
17
Months
400 KV
Basra MOE HEC
Rumaila Gas Turbine
Installation of Siemens 400 & 132 KV GIS
S/S
132 KV cable laying and termination
2012
27
Months
1460 KV
Power Engineering World | www.pew-group.com 16
Company Profile
SCADA Systems Projects
Location Client
Main
Contractor
Project
Starting
Date
Duration
Central
of Iraq
MOE
Washington
International
Inc.
New Automated Monitoring & Control System,
Central Regional Control Center
Installation of PLC’s U Wave RTU’s
For 40 Substation 132 KV
Installation of the Siemens Dispatch
2005
19
Month
Iraq South
Region
MOE
Washington Int.
Inc.
SCADA Systems Commissioning 2007
12
Month
Engineering Projects
Location Client
Main
Contractor
Project
Starting
Date
Duration
All over
Iraq 25
locations
MOE
JICA
Japan Study
Team
Feasibility Study & Site Survey For Iraqi 132/33/11
KV Substations & Power Plants
2004
1
Month
Iraq South
Region
MOE
Washington
International
Inc.
Feasibility Study & Assessment for SCADA Systems 2008
1
Month
Completed Maintenance Projects
Gas Turbine Power Plants
Power Engineering World | www.pew-group.com 17
Company Profile
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Nassrya MOE Fluor - Amec
Rehabilitation of Nassrya Gas Power
Station Technical Logistic Support for
Turbine Inspection & Repair
2006
9
Months
40 MW
Baiji MOE
General Co.
For Electricity
Projects
Rehabilitation & Fabrication & MIG
Welding for Aluminum Bus Bar & Units
No. 1 & No. Power Modification
2002
12
Months
Steam Power Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad MOE
Mohan Export
(India)
Supply & Erection of Hydrogen Plant
Generation at Baghdad South Power
Plant
1998 55MW
Hilla MOE
Mohan Export
(India)
Supply & Erection of Nitrogen
Plant Generation in Mussaib Power
Station
1999 55MW
Baghdad MOE
General Co. for
Rehabilitation
of Power
Plants
Rehabilitation of Boilers No. 2 & No. 3 at
Baghdad South Power Station
2004
6
Months
110 MW
Basrah MOE Applitic (Italy)
HP-LP Rotor of Turbine No. 4
At Al-Martha Power Station
2004
1
Month
200 MW
Power Engineering World | www.pew-group.com 18
Company Profile
Baghdad MOE I.E.S (Russian)
Rehabilitation For Turbines & Boilers for
Units
No. 1 ,No. 2 & No. 3 at Baghdad South
Power Station And Unit No. 3 at Dura
Power Station
2004
3
Months
160 MW
Baghdad MOE I.E.S (Russian)
2 Months Guaranty & Maintenance to all
Units at Baghdad South Power Station.
2005
2
Months
160 MW
Baghdad MOE PEW
Rehabilitation of Boilers No. 5 at Baghdad
South Power Station
2005
7
Months
47 MW
Substations
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad MOE
Washington
International
Inc.
Rehabilitation of Baghdad West
Substation 400 KV
Replacing one bay of the 400 KV S/S
2006
13
Months
400 KV
Diyala MOE
Washington
International
Inc.
Rehabilitation of Baghdad East
Substation 400 KV
Replacing one bay of the 400 KV S/S
2006
13
Months
400KV
Power Engineering World | www.pew-group.com 19
Company Profile
Water Treatment Plants
Location Client
Main
Contractor
Project
Starting
Date
Duration
Plant
Capacity
Baghdad BWA UNDP
Al-Karama Water Treatment Plant
Rehabilitation of Plant, Upgrading tanks,
Pumping Systems, Chlorination &
Electrical And Increasing the Plant
Capacity 10%.
2008
18
Months
227,300
M3/Day
Power Engineering World | www.pew-group.com 20
Company Profile
Manpower
Overall manpower on sites Around 1360 Persons
26%
10%
64%
Permanet Staff ( Mid 2013 )
Engineers
Administratives
Labors & Technicians
Power Engineering World | www.pew-group.com 21
Company Profile
Contact PEW
Baghdad Office (Headquarter)
Hay Al-Wehda, Mahalla 906, St. 44, House 7
Baghdad-Iraq.
P. O. Box 2562, Al-Jadria, Baghdad–Iraq
Mob: +964 7803 263 430
Amman Office (Regional & Active HQ)
Al-Waha Circle Building 164 – 5th floor
Amman-Jordan
Tel: +962 (6) 5534 833
Fax: +962 (6) 5534 843
Mob: +962 799 080 316
P. O. Box 4845, Amman 11953, Jordan
Basra Office (South Branch)
Basra - Manaoe Basra - Hay Al-Cahera
Mob: +964 7806 845 088
Mob: +964 7709 070 258
Najaf office (Local Office)
Najaf-Hay Al-Ishtiraki
Tel: +964 (33) 362896
Mob: +964 7807296939
Power Engineering World | www.pew-group.com 22
Company Profile
Registration & Memberships
• Ministry of trade-commercial registration no.10833
• Iraqi Engineering Union-Consultant Engineer- Regis: No.17767/1978
• Iraqi Contractors Union, Regis. No. 28549
• Baghdad Chamber of Commerce, Regis. No. 45-18-A
• The Hashemite kingdom of Jordan-ministry of industry and trade Reg. N0.1037 at 5/9/2006
• Iraqi Businessmen Association Regis. No. 530
• Iraqi Tax Authority Registration no. : 11974
• Tax Identity Number “TIN” in Iraq : 900224273
Power Engineering World | www.pew-group.com 23
Company Profile
Partnership & Agreements
• General Electric Company “GE Energy” Low AC & Mid. AC Motors; “Distributor & Re-seller
Agreement No. MEIR-PO12-681”
• General Electric Company “GE Measurment & Control”.Bently Nevada; “Distributor & Re-
seller Agreement ”
• General Electric Company “GE Power & Water”.GE Chemical; “Distributor & Re-seller
Agreement ”
Power Engineering World | www.pew-group.com 24
Company Profile
Certificates
• ISO 9001:2008
• ISO 14001:2004 (in process & expected in Mid 2014)
• OHSAS 18001:2007 (in process & expected in Mid 2014)
Power Engineering World | www.pew-group.com 25

More Related Content

What's hot

What's hot (20)

SABER CV
SABER CVSABER CV
SABER CV
 
cv abdul noufal
cv abdul noufalcv abdul noufal
cv abdul noufal
 
Etricals - Profile
Etricals - ProfileEtricals - Profile
Etricals - Profile
 
Company Profile - South Asian Electrical Concern.doc
Company Profile - South Asian Electrical Concern.docCompany Profile - South Asian Electrical Concern.doc
Company Profile - South Asian Electrical Concern.doc
 
Resume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan ThannirmalaiResume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan Thannirmalai
 
ashi new
ashi newashi new
ashi new
 
CV_PROCUREMENT ENGINEER_VISHAL
CV_PROCUREMENT ENGINEER_VISHALCV_PROCUREMENT ENGINEER_VISHAL
CV_PROCUREMENT ENGINEER_VISHAL
 
Curriculum Vitae-ZUHAIR SAIDU
Curriculum Vitae-ZUHAIR SAIDUCurriculum Vitae-ZUHAIR SAIDU
Curriculum Vitae-ZUHAIR SAIDU
 
CV Patrick Balmer May2016
CV Patrick Balmer May2016CV Patrick Balmer May2016
CV Patrick Balmer May2016
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
Curriculum vitea Raffie(Offshore)
Curriculum vitea Raffie(Offshore)Curriculum vitea Raffie(Offshore)
Curriculum vitea Raffie(Offshore)
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
renjith piping engineer
renjith piping engineerrenjith piping engineer
renjith piping engineer
 
RESUME FOR QA-QC ENGINEER
RESUME FOR QA-QC ENGINEERRESUME FOR QA-QC ENGINEER
RESUME FOR QA-QC ENGINEER
 
Profile Susheel 2016
Profile Susheel 2016Profile Susheel 2016
Profile Susheel 2016
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)
 
cpk
cpkcpk
cpk
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
Bhawna Narang
Bhawna NarangBhawna Narang
Bhawna Narang
 

Viewers also liked

RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. JordanSteve Jordan
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)Amer Abbas
 
Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVJALAL ALASFAR
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan Gilmer
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resumeMohammed Dawood
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in JordanLXLLLP
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansalDrMani Kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cvrejith raman
 

Viewers also liked (19)

RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. Jordan
 
Samra
SamraSamra
Samra
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
Jordan CV
Jordan CVJordan CV
Jordan CV
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CV
 
Hatem aldawi CV
Hatem  aldawi CVHatem  aldawi CV
Hatem aldawi CV
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_Resume
 
Assign 1
Assign 1Assign 1
Assign 1
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resume
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in Jordan
 
osama cv
osama cvosama cv
osama cv
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 

Similar to PEW Company Profile-Rev.12-2014

Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Waqas Farooq, PMP®
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedSetu Goyal
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER
 
ASSOCIATE ENGINEER ELECTRICAL
ASSOCIATE ENGINEER ELECTRICALASSOCIATE ENGINEER ELECTRICAL
ASSOCIATE ENGINEER ELECTRICALzahid anwar
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles fRAVICHANDER
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
Final pla presentation
Final pla presentationFinal pla presentation
Final pla presentationdanish143
 
Electromechanical Contractors in Egypt
Electromechanical Contractors in EgyptElectromechanical Contractors in Egypt
Electromechanical Contractors in EgyptDailyBlog1
 
apbava new
apbava newapbava new
apbava newVC SHAFI
 
An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.Sadegh Yazdani
 
WEnCo - COMPANY PROFILE
WEnCo - COMPANY PROFILEWEnCo - COMPANY PROFILE
WEnCo - COMPANY PROFILEOlga Baranova
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationJohn Kingsley
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Hegab
 
chiranjeevi technovation india ppt
chiranjeevi technovation india pptchiranjeevi technovation india ppt
chiranjeevi technovation india pptKanishkaRaju
 

Similar to PEW Company Profile-Rev.12-2014 (20)

k4_Engg_profile_New
k4_Engg_profile_Newk4_Engg_profile_New
k4_Engg_profile_New
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
ASSOCIATE ENGINEER ELECTRICAL
ASSOCIATE ENGINEER ELECTRICALASSOCIATE ENGINEER ELECTRICAL
ASSOCIATE ENGINEER ELECTRICAL
 
MEC Engineers Company Profiles f
MEC Engineers Company Profiles fMEC Engineers Company Profiles f
MEC Engineers Company Profiles f
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
Final pla presentation
Final pla presentationFinal pla presentation
Final pla presentation
 
amit2
amit2amit2
amit2
 
Electromechanical Contractors in Egypt
Electromechanical Contractors in EgyptElectromechanical Contractors in Egypt
Electromechanical Contractors in Egypt
 
apbava new
apbava newapbava new
apbava new
 
An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.
 
WEnCo - COMPANY PROFILE
WEnCo - COMPANY PROFILEWEnCo - COMPANY PROFILE
WEnCo - COMPANY PROFILE
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability Presentation
 
Capability overview
Capability overview Capability overview
Capability overview
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
2015 Company Profile
2015 Company Profile2015 Company Profile
2015 Company Profile
 
chiranjeevi technovation india ppt
chiranjeevi technovation india pptchiranjeevi technovation india ppt
chiranjeevi technovation india ppt
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 

PEW Company Profile-Rev.12-2014

  • 1. Power Engineering World COMPANY PROFILE [2014] PEW believes in the significance of client satisfaction, quality-based management and a culture of progressive development
  • 2. Company Profile Table of Content Vision, Mission and Value Statement …………………………………….. Page 2 Company Overview ………………………………………………………….…….. Page 3 PEW Companies ……………………………………………………………………… Page 4 Services & Fields ……………………………………………..……………………… Page 5 Work Capabilities...………………………..……………………………..……….. Page 6 Our Projects ……..…………………………………………………………………….. Page 13 Manpower ……..…………………………………………………………………….. Page 20 Contact us ………………………………………..……………………………………… Page 21 Registrations and Memberships ……………………………………………… Page 22 Partnership & Agreements………………………………..….….……………… Page 23 Certificates………………………..…………………………..………………………… Page 24 Power Engineering World | www.pew-group.com 1
  • 3. Company Profile VISION Pursuit to become a key business as an EPC company can meet our customers' needs in Iraq and Middle East and North Africa MISSION Strive to contribute in creating the future can restore confidence in the local effort and productivity in addition to achieve the Iraqis aspirations and to meet their needs VALUES • Confidence-building fairly and humility • Ambition to set high standards and contribute to the community • Accept the challenges of the continuing evolution • Promote a culture of open mentality • Strive for the development of others and ourselves to realize the full potential Power Engineering World | www.pew-group.com 2
  • 4. Company Profile Company Overview PEW Group project services span a wide range of commercial and contracting strategies covered by the sisters companies compromising EPC projects contractor, Front End Engineering Design (FEED), Automation contractor as well as O&M “Operation & Maintenance” Services vary in scope and size from basic consulting to complete turnkey responsibility for projects of any size. The leadership from PEW’s Projects Management Unit (PMU) drives best practices, improvement, service excellence and consistency around Iraq. Power Engineering World | www.pew-group.com 3
  • 5. Company Profile PEW Companies Power Engineering World for General Contracts ltd. (Registered in Iraq) ICS / Independent Consulting Service (Registered in Jordan) Activities & Services to provide are:  Engineering  Procurements  Installation & Construction  Commissioning & Testing  Maintenance  Trading, Sales & after Sales services Activities & Services to provide are:  Front End Engineering and Design (FEED)  Consultant Services  Feasibility studies Services  Basic & Detailed Engineering and Design  Projects Monitoring & Managements Power Engineering World for Trading and Contracts (Registered in Jordan) Al-Ashar for civil construction (Registered in Jordan) Activities & Services to provide are:  Trading, Sales & after Sales services  Procurements  Logistic & Transportation  Project Monitoring & Managements Activities & Services to provide are:  Civil construction business in general  Civil engineering foundations works  Infrastructure contracting Al-Mass for Engineering services. (Registered in Iraq) Lion of Babylon for Power projects Co. (Registered in Jordan) specialized in Non distractive tests performed by a group of experienced Engineers in the QA/ QC Field of work such as(but not limited):  Radiographic Testing  Dye penetrant inspection (DPI)  Ultrasonic Testing (UT)  Hydrostatic Testing Is a consolidated company that can perform high quality power, oil and electro-mechanical projects covering infra-structure fields, LION OF BABYLON aims to become one of the leading companies in Iraq that can perform EPC contracts in power generation and transmission fields. Power Engineering World | www.pew-group.com 4
  • 6. Company Profile Services & Fields Services • Construction, Installation & Commissioning • Engineering, Design & Consultancy • Sales, Trading & Procurement • Operation & Maintenance Fields • Power Plants & Generating Sets • Substations , Transformers & Transmission lines • Pipeline and Storage Tanks • Automation Electrical Solution • Buildings & Infrastructure • IT Networks & Secure Telecommunication Equipment Sectors • Power • Oil & Gas • Petrochemical & Refineries • Water & Waste Water Plant Power Engineering World | www.pew-group.com 5
  • 7. Company Profile Work Capabilities Engineering & Design PEW as an EPC contractor has a specialized engineering teams in design and analysis of power plant facilities. Analysis specialties include thermal hydraulic & process flow analysis, structural analysis, environmental analysis, computer control and automation, and equipment integration and qualification analysis. Design specialties include conceptual evaluations, design specifications, design modification packages, design testing and implementation, design review, and design quality assurance. PEW has a group of creative and experienced engineers who can provide timely and acknowledgeable professional services. PEW engineers & technicians develop tremendous experiences with industrial projects designs in Power, Oil, and Gas sectors in Iraq, providing all design and analysis of industrial foundations, process, and non-process buildings, HVAC & Fire- Fighting: • Heavy duty machine foundations/rotary machines (Gas Turbine foundations) providing static and dynamic analysis. • Foundations of all electrical equipment (main transformers, cable ducts, cable trenches, substations equipment foundation, gantries, etc. • Huge tanks foundations for Fuel Storage Tanks (Crude Oil Storage Tanks, Light Distillate Oil Storage Tanks) and Water Storage Tanks (Raw Water, Demineralized, and Firefighting Storage Tanks). • For the process buildings (control, high voltage, auxiliary boiler, water treatment, etc.) • Non process buildings such as (administration, canteen, bachelor, etc.) • Designs of Steel Structures for stores, shades, pipe rack, etc. • All other plant skids foundations. Power Engineering World | www.pew-group.com 6
  • 8. Company Profile Mechanical Engineering Experiences PEW as a leading company in Electrical Power Generation and Transmission has a wide experience and professional staff to perform the erection, repairing, rehabilitation & operating of steam and gas power plants, and carrying out the general maintenance with the capability of studying the problems that it is exposed to and find the suitable solutions that secures its return to work with high efficiency. PEW in capable of studying problems “trouble shooting” that it is exposed to it and find the suitable solutions that secure its return to work with high efficiency. Furthermore, PEW is specialized in construction work to cover the installation of the GTG as well as the mechanical balance of plant for Gas, Steam, and Hydro-Power projects. Welding Experiences In addition to the above mentioned capabilities, PEW has developed an excellent experience in Welding, through a world class, skills, and specialized Engineers & Technical Staff in Welding. PEW has shown a tremendous progress & successful steps in this field in pipe line or in storage tanks welding. RUMAILA Gas Turbines Power Plant Project Location: Basra, IRAQ Design & Engineering, Procurement, Installation, Testing & Commissioning of (5 x 292 MW-SGT 5-PAC 4000F Siemens) Capacity: 1460 MW Duration: 23 Months Featured Ongoing Project Power Engineering World | www.pew-group.com 7
  • 9. Company Profile Chemical Engineering Experiences PEW has developed and excellent skills in projects require Chemical and Process Engineering experiences, such as Chemical Washing for all capacities of Steam Boilers in addition to Construction, Rehabilitation, and Supervision of Water and Waste Water Treatment Units of a wide range of capacities. Electrical Engineering Experiences PEW Engineering and Technical staff have the experiences and skills to perform all type of construction work to cover the Electrical Balance of Gas, Steam and Hydro-Power Plants, in addition to the erection of substations equipment’s and repairing its components. Erection of high voltage towers, cables and re-constructing the electrical network related to them up to 400 KV substations. Also, PEW is able to erect and repair all the appliances and the electrical engines. Moreover, performing all tests and commissioning of all types of protection and relays, switch yards, cables, transformers and generators. TAZA Gas Turbines Power Plant Project Location: Kirkuk, IRAQ Design & Engineering, Procurement, Installation, Testing & Commissioning of (1 x 292 MW-SGT 5-PAC 4000F Siemens) Capacity: 292 MW Duration: 17 Months Featured Ongoing Project Power Engineering World | www.pew-group.com 8
  • 10. Company Profile Automation, Control, Instrumentation & Telecommunications PEW has wide experience in the design, installation, and maintenance of PLC, RTU, DAS, DCS, SCADA, and PABX Systems. The excellent experience of PEW in installation and maintenance is being reinforced by design activities in these fields with a growing design team and joint-ventures with experienced companies worldwide. Furthermore, Hard working to demonstrate the recognized role in developing Iraq’s’ Information and Communication Technology infrastructures. Power Engineering World | www.pew-group.com 9
  • 11. Company Profile Civil Engineering Experiences PEW Civil Engineers have tremendous field and academic experiences to perform all Civil Engineering and Construction of Power Plants, such as machines foundations, industrial buildings, switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds, and administration and support buildings. All civil designs for PEW projects are now done in house. Tanks & Structure Experiences We are company committed to satisfy our clients & also focusing on long term relationship. PEW is a dynamic, rapidly growing company striving to dedicate its efforts to design innovation & functional integrity for storage tanks. PEW involves the formation of a team responsible for working with customers to identify needs, analyze and create strategies and solutions, and provide resources for implementation. ALQUDUS-3 Gas Turbines Power Plant Project Location: Baghdad, IRAQ Design & Engineering, Procurement, Installation, Testing & Commissioning of 4 Units GE Frame 9E 125 MW, each with all the Auxiliaries & BOP Capacity: 500 MW Duration: 18 Months Completed Project Power Engineering World | www.pew-group.com 10
  • 12. Company Profile Engineering & In-house Design PEW established an independent design department that can perform in-house design, design review, technical evaluation of proposals, engineering, site supervision and complete technical support during construction. Design capabilities include architectural, geotechnical, civil, structural, mechanical (HVAC, piping, pumps, steel tanks, mechanical systems), electrical (high voltage and small power), firefighting and fire alarm, control and instrumentation, and special systems (SCADA, CCTV). PEW design/engineering team was established to perform services for PEW projects but due its technical capacity, currently design/engineering services are being provided to other clients as well. PEW has established professional relationships with many highly qualified international design firms specialized in power projects for their technical support and design input depending on size of project and required delivery time. Power Engineering World | www.pew-group.com 11
  • 13. Company Profile Renewable Energy (Solar & Wind Energy) With rising fuel costs, climate change concerns, and a growing demand for electricity, renewable energy resources such as solar power are becoming an increasingly valuable part of the world's energy mix. PEW is adapting a very ambitious plan through collaboration and joint-ventures with well-known pioneer and experienced international companies to take the lead in transferring the renewable energy technologies, especially, Solar Energy and Wind Energy to Iraq Building on a strong power generation heritage spanning more than a century, PEW's partner’s solar products and systems have proven performance and reliability. Utilizing partners industry expertise and leadership in energy technologies Smart grid technologies built by PEW`s partners help utilities improve power reliability through smart devices and applications that adapt in real time. Utilities are able to monitor performance and identify outages, restore power, and precisely dispatch crews. They’re even able to identify anomalies that could lead to potential problems. The result: increased “uptime” and happier customers. (GE Energy) Power Engineering World | www.pew-group.com 12
  • 14. Company Profile Our Projects On Going Extension & Brand New Projects Gas Turbine Power Plants Location Client Main Contractor Project Starting Date Duration Plant Capacity Basra MOE HEC - Hyundai Engineering Company & PEW RUMAILA Gas Turbines Power Plant Project Design & Engineering, Procurement, Installation, Testing & Commissioning of (5 x 292 MW-SGT 5-PAC 4000F Siemens) Feb. 2012 23 months 1460 MW Kirkuk MOE HEC - Hyundai Engineering Company & PEW TAZA Gas Turbines Power Plant Project Design & Engineering, Procurement, Installation, Testing & Commissioning of (1 x 292 MW-SGT 5-PAC 4000F Siemens) Dec. 2011 17 Months 292 MW Basrah Basrah Gas Company/ Shell ABB Process Automation Division Italy Khor Al Zubair (KAZ) Power Plant Project Electromechanical Construction Work, Testing, Precomissioning and Assistat Commisioning for two Units GE Frame 5 (2X25 MW). June 2013 6 Months 50 MW Engineering Project Location Client Main Contractor Project Starting Date Duration Plant Capacity Basrah MOE JV ELC-PEW Consulting & Professional Services for Al-Hartha Thermal Power Plant 2008 800 MW Taji Hilla Karbala MOE JV ELC-PEW MOE Owner Engineer For 3 Fast Track Projects Preparation of EPC Documents for BOP 4 x 40 MW GE Frame 6E GT Power Plant 2 x 125 MW GE Frame 9E GT Power Plant 2 x 125 MW GE Frame 9E GT Power Plant 2008 160 MW 250 MW 250 MW Power Engineering World | www.pew-group.com 13
  • 15. Company Profile Baghdad MOE HEC Al-Qudus/3 Gas Power Plant Project 4 Units F9E GE, EPC Contractor, for the design of Arch., civil, F.F., F.A, HVAC and small Power and lighting for Buildings, Procurement F.F. equipment, HVAC Equipment and Ducts, Control and Power Cables, Lighting Fixtures and Electrical Panels, Construction al Activities from Civil Work, Electromechanical work t the commissioning and start up. 2011 18 Months 500 MW Basra MOE HEC - Hyundai Engineering Company & PEW RUMAILA Gas Turbines Power Plant Project (5 x 292 MW-SGT 5-PAC 4000F Siemens) EPC Contractor, for the design of Arch., civil, F.F., F.A, HVAC and small Power and lighting for Buildings, Procurement F.F. equipment, HVAC Equipment and Ducts, Control and Power Cables, Lighting Fixtures and Electrical Panels, Construction al Activities from Civil Work, Electromechanical work the commissioning and start up. Feb. 2012 23 months 1460 MW Kirkuk MOE HEC - Hyundai Engineering Company & PEW TAZA Gas Turbines Power Plant Project (1 x 292 MW-SGT 5-PAC 4000F Siemens) EPC Contractor, for the design of Arch., civil, F.F., F.A, HVAC and small Power and lighting for Buildings, Procurement F.F. equipment, HVAC Equipment and Ducts, Control and Power Cables, Lighting Fixtures and Electrical Panels, Construction al Activities from Civil Work, Electromechanical work the commissioning and start up. Dec. 2011 17 Months 292 MW Naynava MOE CALIK Evaporation Pond for Naynava Power Plant May 2013 4 Months Karbala MOE Calik Evaporation Pond For Al-Khayrat Power Plant May 2013 4 Months Power Engineering World | www.pew-group.com 14
  • 16. Company Profile Completed Extension & Brand New Projects Gas Turbine Power Plants Location Client Main Contractor Project Starting Date Duration Plant Capacity Baghdad MOE HEC - Hyundai Engineering Company & PEW Al-Qudus Gas Power Plant Project Design & Engineering, Procurement, Installation, Testing & Commissioning of 4 Units GE Frame 9E 125 MW, each with all the Auxiliaries & BOP April 2011 18 months 500 MW Baghdad MOE JV Vitzrosys-PEW Al-Rasheed Gas Power Plant Project Installation Testing & Commissioning of 2 Units Siemens SGT-800 47 MW each with all the Auxiliaries & BOP 2009 16 Months 94 MW Al-Najaf MOE Int.Free Co. (IFC) Al-Najaf Gas Power Plant Project Installation Testing & Commissioning of 2 Units GE Frame 9E 125 MW each with all the Auxiliaries & BOP 2007 18 Months 250 MW Baghdad MOE JV Uruk–Baghdad Al-Qudus Expansion Project Adding 2 Units GE Frame 9E 125 MW each. PEW Performed all the Construction works of 400 KV switchyard , Power Transformers, Gen CB’s, Bus Duct, SWG’s, Control Container, Protection & Metering, Unit Control & DC System , and laying & Termination of 400 KV XLPE , MV , LV Cables. 2005 18 Months 250 MW Power Engineering World | www.pew-group.com 15
  • 17. Company Profile Substations Location Client Main Contractor Project Starting Date Duration Voltage Level Baghdad MOE Washington International Inc. Installation of Agargouf 132 KV Siemens Substation 132/33 KV , 63 MVA 2006 11 Months 132 KV Diyala & Wassit MOE Washington International Inc. Commissioning of 13 ABB Distribution Substation 33/11 KV 2006 7 Months 33/11 KV Basrah MOE MOE Transmission lines Projects Department Construction of Basrah Center 132 KV Substation Laying & Connection wiring of Control Cables between Transformers & SWG’s 2005 4 Months 132 KV Baghdad MOE JV Uruk–Baghdad Al-Qudus-2 Project Construction and installation of 2 Units F9E, 123 Mw, triple Fuel (Gas, LDO, Crude) 2007 2008 400 KV Al-Najaf MOE Int.Free Co. (IFC) Al-Najaf Gas Power Plant Project Installation of 2 Units F9E, 123 Mw, triple Fuel (Gas, LDO, HFO) 2008 2009 132 KV Baghad MOE HEC Al – Qudus 3 Installation of 2 AIS 400 KV Diameter EX of AIS Diameter 400 KV cable laying and terminations 2011 18 Months 400 KV Kirkuk MOE HEC Taza Gas Turbine Installation of extended 400 KV AIS Diameter and installation 400 KV internal transmission line 2011 17 Months 400 KV Basra MOE HEC Rumaila Gas Turbine Installation of Siemens 400 & 132 KV GIS S/S 132 KV cable laying and termination 2012 27 Months 1460 KV Power Engineering World | www.pew-group.com 16
  • 18. Company Profile SCADA Systems Projects Location Client Main Contractor Project Starting Date Duration Central of Iraq MOE Washington International Inc. New Automated Monitoring & Control System, Central Regional Control Center Installation of PLC’s U Wave RTU’s For 40 Substation 132 KV Installation of the Siemens Dispatch 2005 19 Month Iraq South Region MOE Washington Int. Inc. SCADA Systems Commissioning 2007 12 Month Engineering Projects Location Client Main Contractor Project Starting Date Duration All over Iraq 25 locations MOE JICA Japan Study Team Feasibility Study & Site Survey For Iraqi 132/33/11 KV Substations & Power Plants 2004 1 Month Iraq South Region MOE Washington International Inc. Feasibility Study & Assessment for SCADA Systems 2008 1 Month Completed Maintenance Projects Gas Turbine Power Plants Power Engineering World | www.pew-group.com 17
  • 19. Company Profile Location Client Main Contractor Project Starting Date Duration Plant Capacity Nassrya MOE Fluor - Amec Rehabilitation of Nassrya Gas Power Station Technical Logistic Support for Turbine Inspection & Repair 2006 9 Months 40 MW Baiji MOE General Co. For Electricity Projects Rehabilitation & Fabrication & MIG Welding for Aluminum Bus Bar & Units No. 1 & No. Power Modification 2002 12 Months Steam Power Plants Location Client Main Contractor Project Starting Date Duration Plant Capacity Baghdad MOE Mohan Export (India) Supply & Erection of Hydrogen Plant Generation at Baghdad South Power Plant 1998 55MW Hilla MOE Mohan Export (India) Supply & Erection of Nitrogen Plant Generation in Mussaib Power Station 1999 55MW Baghdad MOE General Co. for Rehabilitation of Power Plants Rehabilitation of Boilers No. 2 & No. 3 at Baghdad South Power Station 2004 6 Months 110 MW Basrah MOE Applitic (Italy) HP-LP Rotor of Turbine No. 4 At Al-Martha Power Station 2004 1 Month 200 MW Power Engineering World | www.pew-group.com 18
  • 20. Company Profile Baghdad MOE I.E.S (Russian) Rehabilitation For Turbines & Boilers for Units No. 1 ,No. 2 & No. 3 at Baghdad South Power Station And Unit No. 3 at Dura Power Station 2004 3 Months 160 MW Baghdad MOE I.E.S (Russian) 2 Months Guaranty & Maintenance to all Units at Baghdad South Power Station. 2005 2 Months 160 MW Baghdad MOE PEW Rehabilitation of Boilers No. 5 at Baghdad South Power Station 2005 7 Months 47 MW Substations Location Client Main Contractor Project Starting Date Duration Plant Capacity Baghdad MOE Washington International Inc. Rehabilitation of Baghdad West Substation 400 KV Replacing one bay of the 400 KV S/S 2006 13 Months 400 KV Diyala MOE Washington International Inc. Rehabilitation of Baghdad East Substation 400 KV Replacing one bay of the 400 KV S/S 2006 13 Months 400KV Power Engineering World | www.pew-group.com 19
  • 21. Company Profile Water Treatment Plants Location Client Main Contractor Project Starting Date Duration Plant Capacity Baghdad BWA UNDP Al-Karama Water Treatment Plant Rehabilitation of Plant, Upgrading tanks, Pumping Systems, Chlorination & Electrical And Increasing the Plant Capacity 10%. 2008 18 Months 227,300 M3/Day Power Engineering World | www.pew-group.com 20
  • 22. Company Profile Manpower Overall manpower on sites Around 1360 Persons 26% 10% 64% Permanet Staff ( Mid 2013 ) Engineers Administratives Labors & Technicians Power Engineering World | www.pew-group.com 21
  • 23. Company Profile Contact PEW Baghdad Office (Headquarter) Hay Al-Wehda, Mahalla 906, St. 44, House 7 Baghdad-Iraq. P. O. Box 2562, Al-Jadria, Baghdad–Iraq Mob: +964 7803 263 430 Amman Office (Regional & Active HQ) Al-Waha Circle Building 164 – 5th floor Amman-Jordan Tel: +962 (6) 5534 833 Fax: +962 (6) 5534 843 Mob: +962 799 080 316 P. O. Box 4845, Amman 11953, Jordan Basra Office (South Branch) Basra - Manaoe Basra - Hay Al-Cahera Mob: +964 7806 845 088 Mob: +964 7709 070 258 Najaf office (Local Office) Najaf-Hay Al-Ishtiraki Tel: +964 (33) 362896 Mob: +964 7807296939 Power Engineering World | www.pew-group.com 22
  • 24. Company Profile Registration & Memberships • Ministry of trade-commercial registration no.10833 • Iraqi Engineering Union-Consultant Engineer- Regis: No.17767/1978 • Iraqi Contractors Union, Regis. No. 28549 • Baghdad Chamber of Commerce, Regis. No. 45-18-A • The Hashemite kingdom of Jordan-ministry of industry and trade Reg. N0.1037 at 5/9/2006 • Iraqi Businessmen Association Regis. No. 530 • Iraqi Tax Authority Registration no. : 11974 • Tax Identity Number “TIN” in Iraq : 900224273 Power Engineering World | www.pew-group.com 23
  • 25. Company Profile Partnership & Agreements • General Electric Company “GE Energy” Low AC & Mid. AC Motors; “Distributor & Re-seller Agreement No. MEIR-PO12-681” • General Electric Company “GE Measurment & Control”.Bently Nevada; “Distributor & Re- seller Agreement ” • General Electric Company “GE Power & Water”.GE Chemical; “Distributor & Re-seller Agreement ” Power Engineering World | www.pew-group.com 24
  • 26. Company Profile Certificates • ISO 9001:2008 • ISO 14001:2004 (in process & expected in Mid 2014) • OHSAS 18001:2007 (in process & expected in Mid 2014) Power Engineering World | www.pew-group.com 25