ASIF RASHID
SR.PLANNING ENGINEER
E-Mail:asifrashidw@yahoo.com
Cell:+971502246592
+92-3224288109
Resume Highlights:
 ElevenYears’Experience (Eight
Years’Experience inKSA and three
yearsin PAK)
 Experience of Constructionand EPC
Project
 Engineering(B.E–Mechanical)
 PMP course
 Experience inOil &Gas Industry
 Maintenance andShut down
 Planning&Scheduling
 Sub-Contracting
 Cost Control
 Cost Estimation
 Cost andSchedule RiskAnalysis
 Contract Management
 ApprovedPlanningEngr.fromRC
CAREER PROFILE
Having12 yearsof diversifiedexperiencein constructionactivities andmaintenancemechanical invariousplants
such as petro-chemical,refinery,PowerPlants,AluminumRollingMill andRoyal CommissionProject(RC).
12 years multi-facet experience in Project planning, cost control, risk analysis, proposal costing, contract
managementandcoordination;Construction andEPCProjects of Oil & Gas, petrochemical plants;Proficientin using
project control applications and software
WORKHISTORY
Al Asab Contracting Company Abu Dhabi UAE 2016 to date
Sr.Planning Engineer
Responsibilities:
∞ Preparationof ProjectSchedule withresource loadedsuchas manpower,major material and Cost using P6-
PrimaVeraProject,Critical PathSchedulingandmonitoringof the projectsand updating every week on the
basis of progress achieved during the week.
∞ Providing next month's activities and targets to execution team in the light of master construction
schedule(Level-III Plan)
∞ Preparing and monitoring the 4-Week look-ahead plan Using Primavera Project Planner.
∞ Workout work front available with execution team to achieve the monthly targets given in the four-week
look-ahead plan based on access availability, drawing, material and consumable availability.
∞ Preparation of detail Level-4 Plan broken down to drawing/Isometric Level fixing the daily and weekly
Supervisor wise Quantities and work force.
∞ Generate andanalyze standardreportsrelatedtoprogressonweeklyandmonthly basis, Man hour analysis
reports, efficiency and cost reports on daily, weekly and monthly basis.
∞ Ensure proper implementation of PMS for proper effective planning, scheduling and monitoring.
∞ Coordinate with all departments regarding job schedules, constraints, material deliveries, Client
requirements and resource requirements for various disciplines in charges.
∞ Responsible for Coordinating with Client, s Engineering Department for the required Engineering
information for the project.
∞ Responsible for obtaining, reviewing and incorporate costs of materials and supply items such as, major
plants and equipment from vendors.
∞ Responsible for overall quantities of the project works and material take-offs or Bill of Quantities.
∞ Ensure timely collection of information on resources such as human resources, Material resources and
equipment and plant resources.
∞ Clarify queries raised internally by the execution teams or externally by the Client.
∞ Preparation and Submission of Monthly invoices along with the Supporting documents and administering
Change orders and its follow up.
∞ Resolve all the Contractual affairs with Client with the Consultation of Project Manager.
∞ Coordinates with Sub-Contractors, checking their invoices and Claim as per Contract. Monitor of Project
Budget with the Actual Data of the Project.
∞ Preparationof CostReportand Monthly Cost to Complete Reports by collection data from accounts, Store,
payroll, E&P and Subcontract.
∞ Evaluate actual cost/expense againstall directandindirect cost Centers and analyze the data in the light of
Standard Budget.
∞ Monitor, compile and cost evaluate the extra work /re-work which comes out during Execution of Job,
design change or specification, modification and directly awarded by Client.
Major Project:
IGDE-E (PHASE-1) PACKAGE-3Civil andsteel structure work –HABSHAN-5GASCO
The scope of this project includes Procurement and Construction of Civil and steel structure project.
Petroleum Chemical and Mining Company KSA 2007 to 2015
Sr.Planning Engineer
Major Project:
SeaWater CoolingSupplyandReturnPipe lineWorks – Royal CommissionKSA
The scope of thisprojectincludesProcurementandConstruction(PC)of SeaWaterCoolingSupplyandReturn
Works (SWCSR) atRas Al-KhairIndustrial City(RIC)KSA withacapacityof 75,000m3/hour. The systemwill include
parallel supplylines,single returnpipelinewithemergencydischarge toon-site industrystormwatersystems,return
and drainage channels,outfall structure,systemisolationvalves,airvacuum/release valves,associatedelectrical,
and control components.
AluminumRollingMill Project-Ma'adenKSA
Scope of workcomprisedof Constructionof AluminumRollingMill Project.
Constructionof Amine Project- SaudiKayanJubail KSA
Scope of workcomprisedof Constructionof Amine Project.
Petro-Chemical complex- Saudi KayanJubail KSA
Scope of workcomprisedof Constructionof CoolingWaterIsland.
Turnarounds / Maintenance Project:
Sharq PlantOverhaul of utilityarea2007 –Eastern PetroChemical CompanyJubail KSA
Sasref oil refinery Overhaul of utilityarea2008 –Sasref Jubail KSA
Descon Engineering, Pakistan 2006 to 2007
Engineer Subcontracting
Responsibilities:
During my stay in Descon Engineering, I got training on Prima vera project Planner (P-3) and other company
software’s. I was involved in Subcontracts in project Support team.
∞ To arrange the vendors and preparation of comparative statement.
∞ Negotiate price of sub contract projects and work orders.
∞ Preparation of Sub-contract agreement document.
∞ Prepare Plan on P-3
Major Project:
DG CementandChakwal cement PlantProject-PAK
Scope includedconstructionof cementplant.
Sitara Energy Limited Pakistan 2004 - 2006
Maintenance Engineer – Plant Maintenance
Responsibilities:
∞ Maintained Equipment maintenance record.
∞ Equipment and repair parts data entry and management.
∞ Scope the full extent of maintenance work needed to conduct the relevant preventive / predictive
maintenance of equipment / Plant.
∞ Prepared time scaled logic diagram for Major overhauling equipment which require Shut Down of Plant
∞ Assisted in Annual shutdown and routine maintenance of power Plants at various
∞ Assisted in preparation of annual budgets for maintenance activities.
∞ Maintained and Overhauled various models of engines (Niigata, Caterpillar), compressors and centrifugal
pumps
∞ Participates in plant safety, health and environmental programs.
∞ Got introduction to oil & gas exploration and Production.
Bachelorof Engineering(Mechanical), NationalUniversityof SciencesandTechnology(NUST) PakistaninJun2004.
PROFESSIONAL AFFILIATIONS
Member,Saudi EngineeringCouncil (SEC) as“Mechanical Engineer
Member,Pakistan EngineeringCouncil (PEC) as“Mechanical Engineer
Member,ProjectManagementInstitute (PMI) “MemberID4267850
PROFESSIONAL TRAININGS
∞ Fundamentalsof ProjectManagement (Contracts,ProjectPlanning,ProjectControls,Quality,HSSE&Closeout)
PCMC-Internal training
∞ P-6(PrimaveraProjectPlannerPCMCin-house)
∞ PMP Preparation Course from PMI Pakistan Lahore Chapter
SKILL SET
∞ Effective Team Player
∞ Adaptable and capable of interaction people with diverse background
∞ Eagerness and capabilities to learn new aspects in the field of work
COMPUTER SKILL
Proficient in computer software’s such as Primavera project planner P6, Primavera Risk Analysis (PRA), Microsoft
Office Package (Excel, Word, Power Point, Access), Pro-Engineering, Introduction of SAP
PERSONAL
Date of Birth : Jan15, 1980
Marital Status : Married
Passport# : BE9849582
INTERESTS
Watching TV and Sports including Badminton and Cricket
REFERENCES
Could be furnished if required
EDUCATION

More Related Content

What's hot (19)

Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Ali Raza CV(Final)
Ali Raza CV(Final)Ali Raza CV(Final)
Ali Raza CV(Final)
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
selva-cv
selva-cvselva-cv
selva-cv
 
res-16
res-16res-16
res-16
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Ravi shankar behar_resume
Ravi shankar behar_resumeRavi shankar behar_resume
Ravi shankar behar_resume
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
 
Resume3
Resume3Resume3
Resume3
 
Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievements
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 

Viewers also liked

sendcampaign_email_services
sendcampaign_email_servicessendcampaign_email_services
sendcampaign_email_servicesRio Lecatompessy
 
Punto mas confuso taller 1
Punto mas confuso taller 1Punto mas confuso taller 1
Punto mas confuso taller 1Isamalia Muniz
 
Persi Team Award 1
Persi Team Award 1Persi Team Award 1
Persi Team Award 1Ashish Jain
 
Angel Jet Network Introduction
Angel Jet Network IntroductionAngel Jet Network Introduction
Angel Jet Network IntroductionAbigail McBride
 
SQL_database_skills_survey
SQL_database_skills_surveySQL_database_skills_survey
SQL_database_skills_surveyRay Schautt
 
Cv Asa May 2008 Compl
Cv Asa May 2008 ComplCv Asa May 2008 Compl
Cv Asa May 2008 Complanwarsansari
 
Pulau yang bersengketa
Pulau yang bersengketaPulau yang bersengketa
Pulau yang bersengketaWarnet Raha
 
PENGARUH MOTIVASI DAN KEPUASAN KERJA TERHADAP KUALITAS PELAYANAN INTERNAL ...
PENGARUH MOTIVASI DAN KEPUASAN KERJA  TERHADAP   KUALITAS PELAYANAN INTERNAL ...PENGARUH MOTIVASI DAN KEPUASAN KERJA  TERHADAP   KUALITAS PELAYANAN INTERNAL ...
PENGARUH MOTIVASI DAN KEPUASAN KERJA TERHADAP KUALITAS PELAYANAN INTERNAL ...Eni Cahyani
 
James Moody Resume
James Moody ResumeJames Moody Resume
James Moody ResumeGary Moody
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016Faraz Yasin
 
Refrensi
RefrensiRefrensi
Refrensiisti18
 
Maintenance Mangmant Skills
Maintenance Mangmant SkillsMaintenance Mangmant Skills
Maintenance Mangmant SkillsIbrahim Ateya
 
Cv -sabtain haider new. fresh
Cv -sabtain haider new. freshCv -sabtain haider new. fresh
Cv -sabtain haider new. freshSabtain Haider
 
kashif Nazeer Updated CV
kashif Nazeer Updated CVkashif Nazeer Updated CV
kashif Nazeer Updated CVkashif nazeer
 

Viewers also liked (20)

Taller 2 tarea 2
Taller 2 tarea 2Taller 2 tarea 2
Taller 2 tarea 2
 
EPLO Logo
EPLO LogoEPLO Logo
EPLO Logo
 
sendcampaign_email_services
sendcampaign_email_servicessendcampaign_email_services
sendcampaign_email_services
 
Punto mas confuso taller 1
Punto mas confuso taller 1Punto mas confuso taller 1
Punto mas confuso taller 1
 
Persi Team Award 1
Persi Team Award 1Persi Team Award 1
Persi Team Award 1
 
Bachelor Thesis - Abstact
Bachelor Thesis - AbstactBachelor Thesis - Abstact
Bachelor Thesis - Abstact
 
Angel Jet Network Introduction
Angel Jet Network IntroductionAngel Jet Network Introduction
Angel Jet Network Introduction
 
SQL_database_skills_survey
SQL_database_skills_surveySQL_database_skills_survey
SQL_database_skills_survey
 
Cv Asa May 2008 Compl
Cv Asa May 2008 ComplCv Asa May 2008 Compl
Cv Asa May 2008 Compl
 
KHURRAM ASHFAQ KHAN CV updated
KHURRAM ASHFAQ KHAN  CV updatedKHURRAM ASHFAQ KHAN  CV updated
KHURRAM ASHFAQ KHAN CV updated
 
Pulau yang bersengketa
Pulau yang bersengketaPulau yang bersengketa
Pulau yang bersengketa
 
PENGARUH MOTIVASI DAN KEPUASAN KERJA TERHADAP KUALITAS PELAYANAN INTERNAL ...
PENGARUH MOTIVASI DAN KEPUASAN KERJA  TERHADAP   KUALITAS PELAYANAN INTERNAL ...PENGARUH MOTIVASI DAN KEPUASAN KERJA  TERHADAP   KUALITAS PELAYANAN INTERNAL ...
PENGARUH MOTIVASI DAN KEPUASAN KERJA TERHADAP KUALITAS PELAYANAN INTERNAL ...
 
James Moody Resume
James Moody ResumeJames Moody Resume
James Moody Resume
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
Refrensi
RefrensiRefrensi
Refrensi
 
Maintenance Mangmant Skills
Maintenance Mangmant SkillsMaintenance Mangmant Skills
Maintenance Mangmant Skills
 
Cv -sabtain haider new. fresh
Cv -sabtain haider new. freshCv -sabtain haider new. fresh
Cv -sabtain haider new. fresh
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
kashif Nazeer Updated CV
kashif Nazeer Updated CVkashif Nazeer Updated CV
kashif Nazeer Updated CV
 

Similar to Asif Rashid's Planning Engineer Resume

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineerHashim Vayalilakath
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updatedMOHAMED ILYAS
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_originalNeeladri varma
 

Similar to Asif Rashid's Planning Engineer Resume (20)

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
adrian cv
adrian cvadrian cv
adrian cv
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 

Asif Rashid's Planning Engineer Resume

  • 1. ASIF RASHID SR.PLANNING ENGINEER E-Mail:asifrashidw@yahoo.com Cell:+971502246592 +92-3224288109 Resume Highlights:  ElevenYears’Experience (Eight Years’Experience inKSA and three yearsin PAK)  Experience of Constructionand EPC Project  Engineering(B.E–Mechanical)  PMP course  Experience inOil &Gas Industry  Maintenance andShut down  Planning&Scheduling  Sub-Contracting  Cost Control  Cost Estimation  Cost andSchedule RiskAnalysis  Contract Management  ApprovedPlanningEngr.fromRC CAREER PROFILE Having12 yearsof diversifiedexperiencein constructionactivities andmaintenancemechanical invariousplants such as petro-chemical,refinery,PowerPlants,AluminumRollingMill andRoyal CommissionProject(RC). 12 years multi-facet experience in Project planning, cost control, risk analysis, proposal costing, contract managementandcoordination;Construction andEPCProjects of Oil & Gas, petrochemical plants;Proficientin using project control applications and software WORKHISTORY Al Asab Contracting Company Abu Dhabi UAE 2016 to date Sr.Planning Engineer Responsibilities: ∞ Preparationof ProjectSchedule withresource loadedsuchas manpower,major material and Cost using P6- PrimaVeraProject,Critical PathSchedulingandmonitoringof the projectsand updating every week on the basis of progress achieved during the week. ∞ Providing next month's activities and targets to execution team in the light of master construction schedule(Level-III Plan) ∞ Preparing and monitoring the 4-Week look-ahead plan Using Primavera Project Planner. ∞ Workout work front available with execution team to achieve the monthly targets given in the four-week look-ahead plan based on access availability, drawing, material and consumable availability. ∞ Preparation of detail Level-4 Plan broken down to drawing/Isometric Level fixing the daily and weekly Supervisor wise Quantities and work force. ∞ Generate andanalyze standardreportsrelatedtoprogressonweeklyandmonthly basis, Man hour analysis reports, efficiency and cost reports on daily, weekly and monthly basis. ∞ Ensure proper implementation of PMS for proper effective planning, scheduling and monitoring. ∞ Coordinate with all departments regarding job schedules, constraints, material deliveries, Client requirements and resource requirements for various disciplines in charges. ∞ Responsible for Coordinating with Client, s Engineering Department for the required Engineering information for the project. ∞ Responsible for obtaining, reviewing and incorporate costs of materials and supply items such as, major plants and equipment from vendors. ∞ Responsible for overall quantities of the project works and material take-offs or Bill of Quantities. ∞ Ensure timely collection of information on resources such as human resources, Material resources and equipment and plant resources. ∞ Clarify queries raised internally by the execution teams or externally by the Client. ∞ Preparation and Submission of Monthly invoices along with the Supporting documents and administering Change orders and its follow up. ∞ Resolve all the Contractual affairs with Client with the Consultation of Project Manager.
  • 2. ∞ Coordinates with Sub-Contractors, checking their invoices and Claim as per Contract. Monitor of Project Budget with the Actual Data of the Project. ∞ Preparationof CostReportand Monthly Cost to Complete Reports by collection data from accounts, Store, payroll, E&P and Subcontract. ∞ Evaluate actual cost/expense againstall directandindirect cost Centers and analyze the data in the light of Standard Budget. ∞ Monitor, compile and cost evaluate the extra work /re-work which comes out during Execution of Job, design change or specification, modification and directly awarded by Client. Major Project: IGDE-E (PHASE-1) PACKAGE-3Civil andsteel structure work –HABSHAN-5GASCO The scope of this project includes Procurement and Construction of Civil and steel structure project. Petroleum Chemical and Mining Company KSA 2007 to 2015 Sr.Planning Engineer Major Project: SeaWater CoolingSupplyandReturnPipe lineWorks – Royal CommissionKSA The scope of thisprojectincludesProcurementandConstruction(PC)of SeaWaterCoolingSupplyandReturn Works (SWCSR) atRas Al-KhairIndustrial City(RIC)KSA withacapacityof 75,000m3/hour. The systemwill include parallel supplylines,single returnpipelinewithemergencydischarge toon-site industrystormwatersystems,return and drainage channels,outfall structure,systemisolationvalves,airvacuum/release valves,associatedelectrical, and control components. AluminumRollingMill Project-Ma'adenKSA Scope of workcomprisedof Constructionof AluminumRollingMill Project. Constructionof Amine Project- SaudiKayanJubail KSA Scope of workcomprisedof Constructionof Amine Project. Petro-Chemical complex- Saudi KayanJubail KSA Scope of workcomprisedof Constructionof CoolingWaterIsland. Turnarounds / Maintenance Project: Sharq PlantOverhaul of utilityarea2007 –Eastern PetroChemical CompanyJubail KSA Sasref oil refinery Overhaul of utilityarea2008 –Sasref Jubail KSA Descon Engineering, Pakistan 2006 to 2007 Engineer Subcontracting Responsibilities: During my stay in Descon Engineering, I got training on Prima vera project Planner (P-3) and other company software’s. I was involved in Subcontracts in project Support team. ∞ To arrange the vendors and preparation of comparative statement. ∞ Negotiate price of sub contract projects and work orders. ∞ Preparation of Sub-contract agreement document. ∞ Prepare Plan on P-3 Major Project: DG CementandChakwal cement PlantProject-PAK Scope includedconstructionof cementplant. Sitara Energy Limited Pakistan 2004 - 2006 Maintenance Engineer – Plant Maintenance Responsibilities: ∞ Maintained Equipment maintenance record. ∞ Equipment and repair parts data entry and management.
  • 3. ∞ Scope the full extent of maintenance work needed to conduct the relevant preventive / predictive maintenance of equipment / Plant. ∞ Prepared time scaled logic diagram for Major overhauling equipment which require Shut Down of Plant ∞ Assisted in Annual shutdown and routine maintenance of power Plants at various ∞ Assisted in preparation of annual budgets for maintenance activities. ∞ Maintained and Overhauled various models of engines (Niigata, Caterpillar), compressors and centrifugal pumps ∞ Participates in plant safety, health and environmental programs. ∞ Got introduction to oil & gas exploration and Production. Bachelorof Engineering(Mechanical), NationalUniversityof SciencesandTechnology(NUST) PakistaninJun2004. PROFESSIONAL AFFILIATIONS Member,Saudi EngineeringCouncil (SEC) as“Mechanical Engineer Member,Pakistan EngineeringCouncil (PEC) as“Mechanical Engineer Member,ProjectManagementInstitute (PMI) “MemberID4267850 PROFESSIONAL TRAININGS ∞ Fundamentalsof ProjectManagement (Contracts,ProjectPlanning,ProjectControls,Quality,HSSE&Closeout) PCMC-Internal training ∞ P-6(PrimaveraProjectPlannerPCMCin-house) ∞ PMP Preparation Course from PMI Pakistan Lahore Chapter SKILL SET ∞ Effective Team Player ∞ Adaptable and capable of interaction people with diverse background ∞ Eagerness and capabilities to learn new aspects in the field of work COMPUTER SKILL Proficient in computer software’s such as Primavera project planner P6, Primavera Risk Analysis (PRA), Microsoft Office Package (Excel, Word, Power Point, Access), Pro-Engineering, Introduction of SAP PERSONAL Date of Birth : Jan15, 1980 Marital Status : Married Passport# : BE9849582 INTERESTS Watching TV and Sports including Badminton and Cricket REFERENCES Could be furnished if required EDUCATION