SlideShare a Scribd company logo
1 of 3
Download to read offline
LEON CHACON
21550 Provincial Blvd_ VINEYARDS Apts —Katy, Texas 77450. Phone: 210-9926579/ 281-7867326
leon.chacon.ing@gmail.com
Engineering and Project Manager
Technical career with Manager Acumen experience during the 27 years working in Oil & Gas industry.
Experience worker improving systems solutions to increase productivity and
Proven ability to align business needs with Technology.
Solid knowledge and experience in Project Management, Finance Cost and Project Process Control. More
than 25 years of experience on Oil & Gas Industrial Projects. Experience Engineer in construction process for
major Oil & Gas Projects, including Electrical, Telecommunications, Automation Control and IT Operational
Industry Services. Technically competent and possess the management skills to effectively control the teams,
sub-contractors, vendors and field personal Knowledge, ensuring constant project management skills from
development of initial concept through design and implementation of solutions. Skilled PM leader that
completes project cost remained within budget and able to communicate accurately providing experienced
Customer Management.
Technical and Management Strengths:
 Oil Industrial Project
Management Experience.
 Asset Management: Value-
Purchasing- Inventory
 Oil Field Technical Industrial
Knowledge.
 Operations Management: Electrical-
Controls Systems & Safety.
 Control Variables & Field
Applications Instruments.
 Project Team Leader
Experience.
PROFESSIONAL EXPERIENCE
Dresser-Rand Houston-A Siemens Business -Feb-2008 to Present
DRGS Project Engineer:
a. As field Engineer coordinated all instrumentation installation and support on the Protection and
Sequencing Control Systems to provide monitoring to a power engine driving a Clark TCV-12
compressor unit #A at Petrobras Argentina S.A. Neuquén. June 2016.
b. As PM completed the installation of a 7.4 MW Hyundai Synchronous Generator and a MURRAY
Steam Turbine single casing, multistage impulse condense type for Tynes Bay Waste & Energy
facility in Bermuda. This project included all instrumentation engineering according to ANSI/ISA
& API standards, their purchasing & installation, all piping 600#, 300# & 150# for Lube Oil,
Steam & Instrumentation air with 65 Mechanical & Control valves. Besides, installation, electrical
wiring and trays, civil works for a Clark Cooling water system (CCW), a Graham Condenser Unit,
a Lube oil lubrication skid, a AB 2100 Motor Control Center MCC, Oil & Water Pumps, a 4.16KV
Hawker Switch Gear, a Turbine Generator Control system (TCS), a 125VDC Emergency Power
Source System & all Electrical Protection for the Hyundai Generator. -Year 2015.
c. As PM completed the installation of a New Steam Turbine -TC56145 at Jamaica Power
Company included all instrumentation & LCP unit with the commissioning of a 4.3 MW / 13.8 KV
Alconza Asynchronous Generator from October 27
th
to Dec 20
th
2014.
d. As Project Team Leader implemented at Pemex Offshore Gas Compressor Platforms the
Engineering and the Installation of all Instrumentation for GE Gas Turbines LM2500 driving a D-
R MTGB 742 & MTGB 733 Centrifugal Compressors, Instrumentation included including
Pressure Transmitters, Thermocouples, Vibration Probes & K-Phasors for the ENVISION
System Application. Potential Hazards to work in this environment were considered, evaluated,
and hazard assessment procedures were implemented. Year 2012 & 2014.
e. As Project leader completed the installation stage for a SAT to start a Steam Turbine and all
Instrumentation to provide advance monitoring to drive a 4.0 MW Synchronous Generator at
YPFB Bolivia Refinery Company. From June to October 2014.
f. As Project leader completed a major overhaul which included all instrumentation & control
system to monitor and provide diagnostic to prevent damage for a K- 1A 4 Cylinders Motor- Gas
Compressor unit at Chevron NGL Terminal Plant Ferndale Washington. All instrumentation and
electrical installation completion certification was provide. Potential Hazards to work in this
environment were considered, evaluated, and hazard assessment procedures were
implemented. From November 2011 to March 2012.
g. Completed the installation of seven (7) WCPX wall mount 5.0 Ton HVAC type Z pressurizing
units for Gas Compression Modules at PEMEX Offshore Cantarell Gas Compression Modules
(AKALJ & AKALC); included the Control Panel and all electrical connections to MCC. Potential
Hazards to work in this environment were considered, evaluated, and hazard assessment
procedures were implemented. From 2010 to 2014.
h. Completed the installation of two (2) Cuttler-Hammer ATS to MCC with 2 Magnum DS Circuit
Barkers & 2 -10 Distribution System Monitors. This was accomplished at PEMEX ABK-A
Offshore Compression Modules 1 & 2. Potential Hazards to work in this environment were
considered, evaluated, and hazard assessment procedures were implemented. From 2009 to
2010.
i. Completed the installation of five (5) DI-TRONICS Fire & Gas Control Panel System with 24
VDC 825 A-H battery banks to protect a Gas Compression Train, which included DR GT-61
Power Turbine, a GE LM2500 Gas Generator and the D-R MTGB 742 & 733 Centrifugal
Compressors. Included a FM200 Kidde Fire System and CO2 system for a Gas-Turbine Driven
enclosure. Fire, H2S and Gas Combustible detectors were installed. These systems were
installed at PEMEX Offshore Cantarell (3) & ABK-A (2). This project included all instrumentation
engineering and installation according to ANSI/ISA & API standards. Potential Hazards to work
in this environment were considered, evaluated, and hazard assessment procedures were
implemented. From 2009 to 2010.
j. Completed the replacement of the Power Cables for a Shaft Driven Generator of 960 KVA
Power Cables 3F-1 N Bostrig 125 Type P Marine and Offshore Cable SP2KVA(HD)-4/0 and
SP2KV(HD)-313. This project was executed at Pemex Cantarell AKAL-J4 Offshore Compressor
Gas Platforms. Potential Hazards to work in this environment were considered, evaluated, and
hazard assessment procedures were implemented. From 2009 to 2014.
k. Complete the installation hardware Al/0 Modules for Dry seals technology for ABK-A
Compression Modulo 1. .-Completed the Installation of May DL1 Platform -PEMEX Offshore
AILT SCADA III. This project included all instrumentation engineering and installation according
to ANSI/ISA & API standards. `Accomplished Installation Planning SCADA IV and Maintenance
Service for Offshore PEMEX ALT Oil production area on the following platforms: KAX-1, OCH-
TA, OCH-TB, UECH-TB, ENLACE & CITAM-101 during the 90 days assignment. Potential
Hazards to work in this environment were considered, evaluated, and hazard assessment
procedures were implemented. From 2008 to 2009.
l. Other Projects: a) Field Support Engineering of New Control Modules ABK-A 5&6 Permanente
to update a DI-TRONICS Fire & Gas Control Panel System— b) SICOP PEMEX ABK-A.- To
monitor a Gas Turbine LM2500 to continuously check speed, temperature & vibration. c)
Maintenance for SCADA IV “Litoral PEMEX”. D) Site Surveys for: Chevron LPG Ferndale
Terminal-WA & the Pandora Ammonia Plant-Beamount, Tx.
Boston, Massachusetts
Consulter at Ngisolutions, c.a.- 2005-2007
-Provided assistance as a consultant Engineer to design, develop, evaluated and integrate Controls & IT
Technologies Solutions according to Customer business objectives. Contribute to create operational
plans based on KPIs service level agreements.
PDVSA WEST, Venezuela
Project Engineer 1997-2003
Manage technical responsibilities for IT & Control System Projects. Supervised technical team liable for
2
nd
and 3
rd
level support for LAN / WAN area networks and Infrastructure for Data & Automation Control
Systems. Collaborated with team members from Field Operations and Account Managers to define
products and process services; provided innovative technology solutions under IT infrastructure Project
Management Skills. Integrated regional IT project plans; accountable for change control, budget
administration, and time management utilizing PERT / CPM techniques and PMP practices. Managed
execution of IT projects for voice, data and Industrial Integration Systems. Supervised up to 15 team
members. Key Achievements:
a. Managed a high performance IT for a Complex Building for Control and Automation Solution to
integrate new operational 3-buildings for PDVSA Oil & Gas Main Headquarters: El Menito
Project- Lagunillas. This was a 2.5 year project with a budget of $13.0 MM which included
Cisco LAN Network plus SYSTIMAX plus GigaSPEED solution.
b. Lead a Telecommunications Offshore Project for "Lago Maracaibo 2000 Vessel". Scope:
Evaluate various data transmission platforms required to operate and integrate data & control
applications for approximately 200 operational marine vessel units. Selected the Ericson EDACS
/ RDI system.
Operational Engineer PDVSA — Lagunillas, Venezuela 1982-1997
Managed all aspects of operational maintenance and troubleshooting of IT and SCADA field networks for
up to 3,000 users; Primary responsibilities involved technical support for Communication,
Instrumentation and Controls Systems under 7x24 availability. Defined projects scope, cost estimating
and budget administration for projects and operational services requirements. Accountable for
coordinating the execution and integration of Voice, Automation Control and Data Applications from
analog to digital technologies, and provided Operational Support on Natural Gas Field Instrumentation-
Offshore PDVSA Platforms. Designed and implemented network hardware integration for Voice & Data
architecture. Supervised a team of 12 Technicians and Engineers. Key Achievements:
-. Coordinated and Implemented a $3MM PDH Network at Hazardous classified locations (Offshore
Platforms: Lama - Lamar Gas & Lago Gas Compression Complex 11) - PDVSA LAKE PROJECT.
Scope: Telecommunication auto supported towers were constructed. Interconnection was provided to
Offshore Control System facilities. Electrical protection System was provided at platforms plus Fire
Detection & Extinguish Systems.
-. Coordinated the installation and operational services for a point to multipoint SR-500 system, which
interconnected Oil and Gas drilling vessel units at Maracaibo Lake (10.000 square Km covering).
EDUCATION AND CREDENTIALS
Bachelor in Electrical Engineering TEXAS A&M UNIVERSITY, Kingsville, Texas
Honors: Venezuelan government Scholarship; Eta Kappa Nu National Electrical Engineering
Honor Society
Professional Development
Project Management Trends to IP Technology • Industrial Control Automation Systems Instruments and
Controls. Manager Conference Program • Exponent at Lucent Tech International Congress • Exponent at
PDVSA & INTESA Seminars I&ll ■ Design Networking for IBS • 10 month Business Coaching Certification
• Experts on Networks - CMS Operator & Data Communication ■Signal Processing & Network
Determination Problems • Integrated Service Digital Network • Network Instrumentation Technician •
Internal-Combustion Gas Engines - Capacity Planning- PLCs Fundamentals- Modbus & RS-485
Protocols, Instrumentation & Technical Troubleshooting HIS for PC Windows 98/2000/XP-Vista/MS-DOS,
: X.25 Protocol, SCADA Networks, SDLC, SNS, ATM, Fiber Optics & IBS. Tools: MS- Project
Management, Visio, Word, Excel, Outlook, PowerPoint, PM Tools & Disciplines.

More Related Content

What's hot

SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1craig alden
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul Jennings
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)Ken Gates
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer Mahmoud Mohamed
 

What's hot (20)

SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
CV2014
CV2014CV2014
CV2014
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer
 
CV - M. Taj Arain
CV - M. Taj ArainCV - M. Taj Arain
CV - M. Taj Arain
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 

Viewers also liked

Viewers also liked (12)

MARITZAVELAZQUEZcustserv20166
MARITZAVELAZQUEZcustserv20166MARITZAVELAZQUEZcustserv20166
MARITZAVELAZQUEZcustserv20166
 
mary resume-1
mary resume-1mary resume-1
mary resume-1
 
Schnell_Lorne_Resume 2
Schnell_Lorne_Resume 2Schnell_Lorne_Resume 2
Schnell_Lorne_Resume 2
 
1
11
1
 
Resume11
Resume11Resume11
Resume11
 
Lee gross senior sales executive customer success consultant
Lee gross senior sales executive customer success consultantLee gross senior sales executive customer success consultant
Lee gross senior sales executive customer success consultant
 
Melissa Hansen_resume_2015
Melissa Hansen_resume_2015Melissa Hansen_resume_2015
Melissa Hansen_resume_2015
 
Soyring_Resume
Soyring_ResumeSoyring_Resume
Soyring_Resume
 
liz resume 4
liz resume 4liz resume 4
liz resume 4
 
Resume
ResumeResume
Resume
 
MaureenPorcelliResume09.12.16
MaureenPorcelliResume09.12.16MaureenPorcelliResume09.12.16
MaureenPorcelliResume09.12.16
 
DiSalvo Resume_081516
DiSalvo Resume_081516DiSalvo Resume_081516
DiSalvo Resume_081516
 

Similar to Leon Chacon Resume_Sept2016R

Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expRashesh Shah
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515Dan Lucey
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJames Stults
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 

Similar to Leon Chacon Resume_Sept2016R (20)

DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
abid1
abid1abid1
abid1
 
CV
CVCV
CV
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
CV_AD1
CV_AD1CV_AD1
CV_AD1
 
Resume McWhirterDerek
Resume McWhirterDerekResume McWhirterDerek
Resume McWhirterDerek
 
NS Resume S
NS  Resume SNS  Resume S
NS Resume S
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSU
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
MNC-14
MNC-14MNC-14
MNC-14
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 

Leon Chacon Resume_Sept2016R

  • 1. LEON CHACON 21550 Provincial Blvd_ VINEYARDS Apts —Katy, Texas 77450. Phone: 210-9926579/ 281-7867326 leon.chacon.ing@gmail.com Engineering and Project Manager Technical career with Manager Acumen experience during the 27 years working in Oil & Gas industry. Experience worker improving systems solutions to increase productivity and Proven ability to align business needs with Technology. Solid knowledge and experience in Project Management, Finance Cost and Project Process Control. More than 25 years of experience on Oil & Gas Industrial Projects. Experience Engineer in construction process for major Oil & Gas Projects, including Electrical, Telecommunications, Automation Control and IT Operational Industry Services. Technically competent and possess the management skills to effectively control the teams, sub-contractors, vendors and field personal Knowledge, ensuring constant project management skills from development of initial concept through design and implementation of solutions. Skilled PM leader that completes project cost remained within budget and able to communicate accurately providing experienced Customer Management. Technical and Management Strengths:  Oil Industrial Project Management Experience.  Asset Management: Value- Purchasing- Inventory  Oil Field Technical Industrial Knowledge.  Operations Management: Electrical- Controls Systems & Safety.  Control Variables & Field Applications Instruments.  Project Team Leader Experience. PROFESSIONAL EXPERIENCE Dresser-Rand Houston-A Siemens Business -Feb-2008 to Present DRGS Project Engineer: a. As field Engineer coordinated all instrumentation installation and support on the Protection and Sequencing Control Systems to provide monitoring to a power engine driving a Clark TCV-12 compressor unit #A at Petrobras Argentina S.A. Neuquén. June 2016. b. As PM completed the installation of a 7.4 MW Hyundai Synchronous Generator and a MURRAY Steam Turbine single casing, multistage impulse condense type for Tynes Bay Waste & Energy facility in Bermuda. This project included all instrumentation engineering according to ANSI/ISA & API standards, their purchasing & installation, all piping 600#, 300# & 150# for Lube Oil, Steam & Instrumentation air with 65 Mechanical & Control valves. Besides, installation, electrical wiring and trays, civil works for a Clark Cooling water system (CCW), a Graham Condenser Unit, a Lube oil lubrication skid, a AB 2100 Motor Control Center MCC, Oil & Water Pumps, a 4.16KV Hawker Switch Gear, a Turbine Generator Control system (TCS), a 125VDC Emergency Power Source System & all Electrical Protection for the Hyundai Generator. -Year 2015. c. As PM completed the installation of a New Steam Turbine -TC56145 at Jamaica Power Company included all instrumentation & LCP unit with the commissioning of a 4.3 MW / 13.8 KV Alconza Asynchronous Generator from October 27 th to Dec 20 th 2014. d. As Project Team Leader implemented at Pemex Offshore Gas Compressor Platforms the Engineering and the Installation of all Instrumentation for GE Gas Turbines LM2500 driving a D- R MTGB 742 & MTGB 733 Centrifugal Compressors, Instrumentation included including Pressure Transmitters, Thermocouples, Vibration Probes & K-Phasors for the ENVISION System Application. Potential Hazards to work in this environment were considered, evaluated, and hazard assessment procedures were implemented. Year 2012 & 2014. e. As Project leader completed the installation stage for a SAT to start a Steam Turbine and all Instrumentation to provide advance monitoring to drive a 4.0 MW Synchronous Generator at YPFB Bolivia Refinery Company. From June to October 2014. f. As Project leader completed a major overhaul which included all instrumentation & control system to monitor and provide diagnostic to prevent damage for a K- 1A 4 Cylinders Motor- Gas Compressor unit at Chevron NGL Terminal Plant Ferndale Washington. All instrumentation and electrical installation completion certification was provide. Potential Hazards to work in this
  • 2. environment were considered, evaluated, and hazard assessment procedures were implemented. From November 2011 to March 2012. g. Completed the installation of seven (7) WCPX wall mount 5.0 Ton HVAC type Z pressurizing units for Gas Compression Modules at PEMEX Offshore Cantarell Gas Compression Modules (AKALJ & AKALC); included the Control Panel and all electrical connections to MCC. Potential Hazards to work in this environment were considered, evaluated, and hazard assessment procedures were implemented. From 2010 to 2014. h. Completed the installation of two (2) Cuttler-Hammer ATS to MCC with 2 Magnum DS Circuit Barkers & 2 -10 Distribution System Monitors. This was accomplished at PEMEX ABK-A Offshore Compression Modules 1 & 2. Potential Hazards to work in this environment were considered, evaluated, and hazard assessment procedures were implemented. From 2009 to 2010. i. Completed the installation of five (5) DI-TRONICS Fire & Gas Control Panel System with 24 VDC 825 A-H battery banks to protect a Gas Compression Train, which included DR GT-61 Power Turbine, a GE LM2500 Gas Generator and the D-R MTGB 742 & 733 Centrifugal Compressors. Included a FM200 Kidde Fire System and CO2 system for a Gas-Turbine Driven enclosure. Fire, H2S and Gas Combustible detectors were installed. These systems were installed at PEMEX Offshore Cantarell (3) & ABK-A (2). This project included all instrumentation engineering and installation according to ANSI/ISA & API standards. Potential Hazards to work in this environment were considered, evaluated, and hazard assessment procedures were implemented. From 2009 to 2010. j. Completed the replacement of the Power Cables for a Shaft Driven Generator of 960 KVA Power Cables 3F-1 N Bostrig 125 Type P Marine and Offshore Cable SP2KVA(HD)-4/0 and SP2KV(HD)-313. This project was executed at Pemex Cantarell AKAL-J4 Offshore Compressor Gas Platforms. Potential Hazards to work in this environment were considered, evaluated, and hazard assessment procedures were implemented. From 2009 to 2014. k. Complete the installation hardware Al/0 Modules for Dry seals technology for ABK-A Compression Modulo 1. .-Completed the Installation of May DL1 Platform -PEMEX Offshore AILT SCADA III. This project included all instrumentation engineering and installation according to ANSI/ISA & API standards. `Accomplished Installation Planning SCADA IV and Maintenance Service for Offshore PEMEX ALT Oil production area on the following platforms: KAX-1, OCH- TA, OCH-TB, UECH-TB, ENLACE & CITAM-101 during the 90 days assignment. Potential Hazards to work in this environment were considered, evaluated, and hazard assessment procedures were implemented. From 2008 to 2009. l. Other Projects: a) Field Support Engineering of New Control Modules ABK-A 5&6 Permanente to update a DI-TRONICS Fire & Gas Control Panel System— b) SICOP PEMEX ABK-A.- To monitor a Gas Turbine LM2500 to continuously check speed, temperature & vibration. c) Maintenance for SCADA IV “Litoral PEMEX”. D) Site Surveys for: Chevron LPG Ferndale Terminal-WA & the Pandora Ammonia Plant-Beamount, Tx. Boston, Massachusetts Consulter at Ngisolutions, c.a.- 2005-2007 -Provided assistance as a consultant Engineer to design, develop, evaluated and integrate Controls & IT Technologies Solutions according to Customer business objectives. Contribute to create operational plans based on KPIs service level agreements. PDVSA WEST, Venezuela Project Engineer 1997-2003 Manage technical responsibilities for IT & Control System Projects. Supervised technical team liable for 2 nd and 3 rd level support for LAN / WAN area networks and Infrastructure for Data & Automation Control Systems. Collaborated with team members from Field Operations and Account Managers to define products and process services; provided innovative technology solutions under IT infrastructure Project Management Skills. Integrated regional IT project plans; accountable for change control, budget administration, and time management utilizing PERT / CPM techniques and PMP practices. Managed execution of IT projects for voice, data and Industrial Integration Systems. Supervised up to 15 team members. Key Achievements: a. Managed a high performance IT for a Complex Building for Control and Automation Solution to integrate new operational 3-buildings for PDVSA Oil & Gas Main Headquarters: El Menito Project- Lagunillas. This was a 2.5 year project with a budget of $13.0 MM which included Cisco LAN Network plus SYSTIMAX plus GigaSPEED solution.
  • 3. b. Lead a Telecommunications Offshore Project for "Lago Maracaibo 2000 Vessel". Scope: Evaluate various data transmission platforms required to operate and integrate data & control applications for approximately 200 operational marine vessel units. Selected the Ericson EDACS / RDI system. Operational Engineer PDVSA — Lagunillas, Venezuela 1982-1997 Managed all aspects of operational maintenance and troubleshooting of IT and SCADA field networks for up to 3,000 users; Primary responsibilities involved technical support for Communication, Instrumentation and Controls Systems under 7x24 availability. Defined projects scope, cost estimating and budget administration for projects and operational services requirements. Accountable for coordinating the execution and integration of Voice, Automation Control and Data Applications from analog to digital technologies, and provided Operational Support on Natural Gas Field Instrumentation- Offshore PDVSA Platforms. Designed and implemented network hardware integration for Voice & Data architecture. Supervised a team of 12 Technicians and Engineers. Key Achievements: -. Coordinated and Implemented a $3MM PDH Network at Hazardous classified locations (Offshore Platforms: Lama - Lamar Gas & Lago Gas Compression Complex 11) - PDVSA LAKE PROJECT. Scope: Telecommunication auto supported towers were constructed. Interconnection was provided to Offshore Control System facilities. Electrical protection System was provided at platforms plus Fire Detection & Extinguish Systems. -. Coordinated the installation and operational services for a point to multipoint SR-500 system, which interconnected Oil and Gas drilling vessel units at Maracaibo Lake (10.000 square Km covering). EDUCATION AND CREDENTIALS Bachelor in Electrical Engineering TEXAS A&M UNIVERSITY, Kingsville, Texas Honors: Venezuelan government Scholarship; Eta Kappa Nu National Electrical Engineering Honor Society Professional Development Project Management Trends to IP Technology • Industrial Control Automation Systems Instruments and Controls. Manager Conference Program • Exponent at Lucent Tech International Congress • Exponent at PDVSA & INTESA Seminars I&ll ■ Design Networking for IBS • 10 month Business Coaching Certification • Experts on Networks - CMS Operator & Data Communication ■Signal Processing & Network Determination Problems • Integrated Service Digital Network • Network Instrumentation Technician • Internal-Combustion Gas Engines - Capacity Planning- PLCs Fundamentals- Modbus & RS-485 Protocols, Instrumentation & Technical Troubleshooting HIS for PC Windows 98/2000/XP-Vista/MS-DOS, : X.25 Protocol, SCADA Networks, SDLC, SNS, ATM, Fiber Optics & IBS. Tools: MS- Project Management, Visio, Word, Excel, Outlook, PowerPoint, PM Tools & Disciplines.