SlideShare a Scribd company logo
1 of 3
Corey F Jordan
2000 Pine Tree Rd, Longview, TX 75604
903-235-3311
coreyfjordan@yahoo.com
May 13, 2015
Human Resource Manager
Dear Human Resource Manager:
Your posting for an Industrial Electrician indicated requirements that closely match my background and
expertise. I have enclosed my resume to provide a summary of my qualifications and background for
your review.
The following are highlights of my qualifications and accomplishments:
* Industrial Electrician
* 15 years of experience in Industrial construction projects
* Installation of conduit, cable tray etc.
* Cable pulls and terminations
* Supervision of construction crews
* Knowledge of production equipment
With excellent organizational skills, an outstanding work ethic and the ability to work well in both team-
oriented and self-directed environments. I am positioned to exceed your expectations. I would welcome
an opportunity to meet with you to discuss my qualifications and candidacy in further detail. Thank you
for your consideration.
Corey Jordan
Enclosure
Corey F Jordan
2000 Pine Tree Rd, Longview, TX 75604
903-235-3311
coreyfjordan@yahoo.com
Work Experience
Premier Industrial Resources Longview, TX
Journeyman Electrician 11/15/12- current
Operate Electrical service truck
* Fabricate and install cable tray and conduit
* Build and install PLC control panels
* Calibrate control valves and transmitters
* Loop check
* Electric Heat tracing
Perform duties as Industrial electrician in the petrochemical and refining industry.
Conduct JSA/STA daily meetings with crew.
Perform facility maintenance as well as new construction projects (Delek Refining) (Enbridge Energy) and
(Markwest Energy).
Insco Instrument and Electric White Oak, TX
Journeyman Electrician 10/10/2010- 11/14/2012
* Operate Electrical Service Truck
* Build and install PLC
* Compressor control panel wiring
* Cable tray and rigid conduit
* Facility maintenance
PCE Constructors Baton Rouge, LA
Journeyman Electrician 06/01/09- 09/30/09
ADM Ethanol Refinery
* Install conduit
* Pull Cable
* Install switch gear and motor control centers
* Temporary Power for office complex
* Terminations of Motors, Transformers and controls
Fluor Services Tatum, TX
Journeyman Electrician 10/01/09-02/01/09
TXU Power Station
* Install cable tray
* Pull cable
* Temporary Power
* Facility Maintenance
Test Automation and Controls, Tengiz, Kazakhstan
I&E Supervisor 05/01/07- 06/30/08
Tengiz Chevron Oil and Gas Refinery
 Supervise Multinational Crews
 Train Local Workforce in Installation of Process Controls
 Coordinate with Management and other Contractors
 QA/QC and Commissioning
 System walk downs, status tracking and reporting
Gregg Industrial Insulators, Longview, TX
Electrical Construction Foreman 02/01/06 – 04/18/07
Texas Eastman Chemical
 Responsible for Organizing Tasks for Crew
 Conduct morning Safety Meeting
 Order necessary materials
 Supervise the Installation of Electric Heat Tracing
 Facility Maintenance

More Related Content

What's hot (20)

Elliot Calvert's curriculum vitae...
Elliot Calvert's curriculum vitae...Elliot Calvert's curriculum vitae...
Elliot Calvert's curriculum vitae...
 
1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cv
 
Laura Southers Resume 4-12-16
Laura Southers Resume 4-12-16Laura Southers Resume 4-12-16
Laura Southers Resume 4-12-16
 
Gabriel Gichinga Gen tech
Gabriel Gichinga Gen techGabriel Gichinga Gen tech
Gabriel Gichinga Gen tech
 
resume
resumeresume
resume
 
tahir
tahirtahir
tahir
 
Preetam_Goswami_Resume
Preetam_Goswami_ResumePreetam_Goswami_Resume
Preetam_Goswami_Resume
 
final resume -engg
final resume -enggfinal resume -engg
final resume -engg
 
Chris Diltsjan16
Chris Diltsjan16Chris Diltsjan16
Chris Diltsjan16
 
SEKHER
SEKHERSEKHER
SEKHER
 
ODUKOYA TAIWO FSE-REVISED
ODUKOYA TAIWO FSE-REVISEDODUKOYA TAIWO FSE-REVISED
ODUKOYA TAIWO FSE-REVISED
 
Resume Corey Dunn 2015
Resume Corey Dunn  2015Resume Corey Dunn  2015
Resume Corey Dunn 2015
 
James Hajdu Resume 1
James Hajdu Resume 1James Hajdu Resume 1
James Hajdu Resume 1
 
VINEESH 17 - CV
VINEESH   17   - CVVINEESH   17   - CV
VINEESH 17 - CV
 
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
 
Eng.Ahmed Madkour CV
Eng.Ahmed Madkour CVEng.Ahmed Madkour CV
Eng.Ahmed Madkour CV
 
VJ CV111 (2)
VJ CV111 (2)VJ CV111 (2)
VJ CV111 (2)
 
My cv
My cvMy cv
My cv
 
Attiq Ur Rehman CV Updated
Attiq Ur Rehman CV UpdatedAttiq Ur Rehman CV Updated
Attiq Ur Rehman CV Updated
 
Raju - Copy
Raju - CopyRaju - Copy
Raju - Copy
 

Viewers also liked

Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVJALAL ALASFAR
 
RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. JordanSteve Jordan
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)Amer Abbas
 
PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014Amir Y. Simon
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan Gilmer
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resumeMohammed Dawood
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in JordanLXLLLP
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansalDrMani Kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cvrejith raman
 

Viewers also liked (19)

NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
Hatem aldawi CV
Hatem  aldawi CVHatem  aldawi CV
Hatem aldawi CV
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CV
 
RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. Jordan
 
Samra
SamraSamra
Samra
 
Jordan CV
Jordan CVJordan CV
Jordan CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_Resume
 
Assign 1
Assign 1Assign 1
Assign 1
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resume
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
osama cv
osama cvosama cv
osama cv
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in Jordan
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 

Similar to Corey Jordan Resume 6-15-15

GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineerIram shahzad khan
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
new john frost resume
new john frost resumenew john frost resume
new john frost resumeJohn Frost
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)Ali Ahmad
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))MOHAMMAD KHALID MUSTAFA
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010kmccarthy1981
 
Electrical technician
Electrical technicianElectrical technician
Electrical techniciantanweer alam
 

Similar to Corey Jordan Resume 6-15-15 (20)

Resume 0001
Resume 0001Resume 0001
Resume 0001
 
FINAL RESUME DAD
FINAL RESUME DADFINAL RESUME DAD
FINAL RESUME DAD
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
Resume 5
Resume 5Resume 5
Resume 5
 
Stephen_LeeAlmond
Stephen_LeeAlmondStephen_LeeAlmond
Stephen_LeeAlmond
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
JHB Resume Current
JHB Resume CurrentJHB Resume Current
JHB Resume Current
 
farhan cv
farhan  cvfarhan  cv
farhan cv
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
new john frost resume
new john frost resumenew john frost resume
new john frost resume
 
Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)
 
Frank randazzo resume
Frank randazzo resumeFrank randazzo resume
Frank randazzo resume
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
Update CV
Update CVUpdate CV
Update CV
 
elec
elecelec
elec
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 

Corey Jordan Resume 6-15-15

  • 1. Corey F Jordan 2000 Pine Tree Rd, Longview, TX 75604 903-235-3311 coreyfjordan@yahoo.com May 13, 2015 Human Resource Manager Dear Human Resource Manager: Your posting for an Industrial Electrician indicated requirements that closely match my background and expertise. I have enclosed my resume to provide a summary of my qualifications and background for your review. The following are highlights of my qualifications and accomplishments: * Industrial Electrician * 15 years of experience in Industrial construction projects * Installation of conduit, cable tray etc. * Cable pulls and terminations * Supervision of construction crews * Knowledge of production equipment With excellent organizational skills, an outstanding work ethic and the ability to work well in both team- oriented and self-directed environments. I am positioned to exceed your expectations. I would welcome an opportunity to meet with you to discuss my qualifications and candidacy in further detail. Thank you for your consideration. Corey Jordan Enclosure
  • 2. Corey F Jordan 2000 Pine Tree Rd, Longview, TX 75604 903-235-3311 coreyfjordan@yahoo.com Work Experience Premier Industrial Resources Longview, TX Journeyman Electrician 11/15/12- current Operate Electrical service truck * Fabricate and install cable tray and conduit * Build and install PLC control panels * Calibrate control valves and transmitters * Loop check * Electric Heat tracing Perform duties as Industrial electrician in the petrochemical and refining industry. Conduct JSA/STA daily meetings with crew. Perform facility maintenance as well as new construction projects (Delek Refining) (Enbridge Energy) and (Markwest Energy). Insco Instrument and Electric White Oak, TX Journeyman Electrician 10/10/2010- 11/14/2012 * Operate Electrical Service Truck * Build and install PLC * Compressor control panel wiring * Cable tray and rigid conduit * Facility maintenance PCE Constructors Baton Rouge, LA Journeyman Electrician 06/01/09- 09/30/09 ADM Ethanol Refinery * Install conduit * Pull Cable * Install switch gear and motor control centers * Temporary Power for office complex * Terminations of Motors, Transformers and controls Fluor Services Tatum, TX Journeyman Electrician 10/01/09-02/01/09 TXU Power Station * Install cable tray * Pull cable * Temporary Power * Facility Maintenance
  • 3. Test Automation and Controls, Tengiz, Kazakhstan I&E Supervisor 05/01/07- 06/30/08 Tengiz Chevron Oil and Gas Refinery  Supervise Multinational Crews  Train Local Workforce in Installation of Process Controls  Coordinate with Management and other Contractors  QA/QC and Commissioning  System walk downs, status tracking and reporting Gregg Industrial Insulators, Longview, TX Electrical Construction Foreman 02/01/06 – 04/18/07 Texas Eastman Chemical  Responsible for Organizing Tasks for Crew  Conduct morning Safety Meeting  Order necessary materials  Supervise the Installation of Electric Heat Tracing  Facility Maintenance