Kelompok 5
mempersembahkan….
Evapro Post
               LIPUTAN SEPUTAR MATA KULIAH EVALUASI PROYEK            Selasa, 24 Januari 2012




     Perkiraan Biaya Proyek....
                                        Prakata                       24.1 perkiraan biaya dan
                                                                      cost engineering 24.2
                                                                      Proses penyusunan
                                        24.1 perkiraan biaya dan
                                                                      perkiraan biaya dan
                                        cost engineering 24.2
                                                                      anggaran 24.3 organisasi
                                        Proses penyusunan
                                                                      kontrol proyek 24.4
                                        perkiraan biaya dan
                                                                      komponen biaya proyek 24.5
                                        anggaran 24.3 organisasi
                                                                      struktur biaya proyek 24.6
                                        kontrol proyek 24.4
                                                                      kualitas perkiraan biaya 24.7
                                        komponen biaya proyek 24.5
                                                                      survei dan pengkajian 24.8
                                        struktur biaya proyek 24.6
                                                                      metode perkiraan biaya 24.1
                                        kualitas perkiraan biaya 24.7
                                                                      perkiraan biaya dan cost
                                        survei dan pengkajian 24.8
                                                                      engineering 24.2 Proses
                                        metode perkiraan biaya
                                                                      penyusunan perkiraan biaya
                                        24.1 perkiraan biaya dan      dan anggaran 24.3
                                        cost engineering 24.2         organisasi kontrol proyek
                                        Proses penyusunan             24.4 komponen biaya proyek
                                        perkiraan biaya dan           24.5 struktur biaya proyek.
                                        anggaran
>>    0   >>       1        >>         2          >>             3           >>             4         >>
Azzam
Seni memperkirakan kemungkinan jumlah biaya yang
      diperlukan untuk suatu kegiatan yang di dasarkan
        pada informasi yang telah tersedia waktu itu.
                           ( NES-US )




>>   0    >>    1     >>      2         >>   3   >>   4   >>
aplikasi prinsip-prinsip teknik
         ilmu pengetahuan dalam masalah perkiraan biaya
                        pengendalian biaya
                           profitabilitas
                              ( AICM )



>>   0     >>      1     >>       2      >>   3    >>     4   >>
(1) Estimasi        (2) Anggaran
                 Biaya dan           dan Jadwal
                   Jadwal               Induk



              (4) Pengumpulan           (3)
                     dan            Pengendalian
               Pengembangan          Biaya dan
                    Data              Jadwal

>>   0   >>       1      >>     2     >>      3    >>   4   >>
1. Definisi Lingkup
                                2. Uraian Aktivitas
 3. Sumber Daya
                                4. Jadwal Aktivitas
 5. Perkiraan Biaya
                                6. Anggaran Proyek

>>       0    >>     1     >>   2    >>     3    >>   4   >>
Uraian         Jadwal
                        Aktivitas       Aktivitas
         Definisi
                                                        Anggaran
         Lingkup                                         Proyek

                        Sumber          Perkiraan
                         Daya            Biaya




>>   0       >>     1    >>         2     >>        3    >>        4   >>
Dimas
Manajer cost
                                           engineering (kontrol
                                                Proyek)




      Kabag. Perkiraan
                          Kabagperencanaan               Kabag pengendalian
         biaya dan                                                                  Kabag SIMP
                             dan jadwal                   biaya dan Jadwal
     pengembanan data




      Staff dan asisten       Staff dan asisten            Staff dan asisten       Operator SIMP




>>     0          >>      1           >>            2             >>           3   >>            4   >>
1.   Perkiraan Biaya dan Pengembangan Data
 2.   Perencanaan dan Penyusunan Jadwal
 3.   Pengendalian Biaya
 4.   Sistem Informasi Manajemen Proyek (SIMP)


>>     0   >>    1    >>    2   >>    3    >>    4   >>
Total biaya
                                proyek


                     Modal tetap       Modal kerja
                       (fixed           (working
                      capital)           capital)


                Biaya         Biaya tidak
              langsung         langsung


>>   0   >>     1        >>        2    >>      3    >>   4   >>
Bila implementasi fisik proyek diserahkan kepada kontraktor,
     maka anggaran proyek disamping klasifikasi di atas
     dikelompokkan sebagai berikut,
     1. biaya pemilik
     2. biaya kontraktor
     3. biaya lingkup kerja pemilik



>>      0     >>      1     >>      2     >>      3      >>     4   >>
Mahdi
( Berdasarkan Fungsinya )
     1. Struktur biaya pemilik
     2. Struktur biaya kontraktor
         Terbagi dua :
         - Pada waktu mengajukan
         - Pada waktu implementasi fisik


>>      0     >>      1     >>      2      >>   3   >>   4   >>
(b)
                                                     Anggaran biaya proyek

                                                         (project budget   )
                                                                                         (+) cadangan manajemen
                                                                                                 Kontijensi
                                                                                                  Eskalasi
                                                                                                 allowance

                                                                (a)
                                                   Anggaran dasar biaya proyek
                                                       (project base cost)




         Owner cost                                                                                       Owner scope
     •    Biaya                 Kontraktor                                                            •    Pembebasan
         pengelolaan                                                                                       Tanah
         proyek               (contractor price)                                    Modal kerja
                                                                                                      •    Lingkup
     •   Biaya              •    Pembayaran                                     (working capital)          proyek yang
         konsultan               kontraktor                                                                dikejakan
     •   overhead                                                                                          sendiri


>>          0          >>            1              >>           2             >>           3         >>           4     >>
(c)
                                      Harga proposal
                                      (proposal price)
                                                              lab
                                                               a
                                            (b)
                                       biaya proyek
                                                              (+) cadangan manajemen
                                                                     •Kontijensi
                                                                      •Eskalasi
                                                                     •allowance
                                          (a)
                                  Perkiraan biaya dasar




     Biaya Langsung                                             Biaya tidak langsung
                                                                •    Desain enginering
     •   Material
                                                                •    Fasilitas smentara
     •   Peralatan
                                                                •    Pralatn konstruksi
     •   Tenaga kerja                                           •    Supervisi
     •   Subkontrak                                             •    Overhead
>>        0             >>   1   >>         2            >>     3           >>            4   >>
(a)
                                      Harga kontrak
                                     (contract price)                laba

                                         (b)                     (+) cadangan manajemen
                                                                        •Kontijensi
                                Anggaran biaya proyek
                                                                         •Eskalasi
                                                                        •allowance



                                           (c)
                               Anggaran biaya pengendalian
                                     (control budget)




          Biaya Langsung                                         Biaya tidak langsung
     •   Material                                                •   Desain enginering
                                                                 •   Fasilitas smentara
     •   Peralatan
                                                                 •   Pralatn konstruksi
     •   Tenaga kerja                                            •   Supervisi
     •   Subkontrak                                              •   Overhead

>>        0        >>      1   >>          2            >>   3           >>               4   >>
Rendy
Unsur-unsurnya :
     • Tersedianya Data dan Informasi
     • Teknik dan Metode yang Digunakan
     • Kecakapan dan Pengalaman Estimator
     • Tujuan Pemakaian Perkiraan Biaya




>>      0     >>     1    >>      2    >>   3   >>   4   >>
Tujuan : untuk mendapatkan informasi dan data.
     Survei dan pengkajian meliputi:
     1. Kondisi Lokasi
     2. Logistik, Komunikasi, transport
     3. Akomodasi dan Fasilitas Sementara
     4. Konstruksi dan Pabrikasi



>>      0     >>      1     >>      2     >>     3    >>   4   >>
topografi,            aspek ekonomi
                           penyediaan tenaga kerja,
     keadaan tanah, dan
                           tanggapan masyarakat terhadap
     penyediaan air.
                           kemungkinan adanya proyek
                           pembebasan tanah
                           dan lain -lain


>>     0    >>    1   >>   2      >>        3    >>        4   >>
>>   0   >>   1   >>   2   >>   3   >>   4   >>
>>   0   >>   1   >>   2   >>   3   >>   4   >>
Yang perlu diperhatikan adalah :
     1. tenaga kerja ( jumlah maupun produktifitasnya),
     2. peralatan konstruksi, dan
     3. fasilitas pabrikasi di lapangan.




>>      0    >>     1     >>    2     >>     3    >>      4   >>
Nendi
A. Metode Parametrik
         B.   Memakai Indeks Harga, Katalog, dan Informasi Proyek
                                  Terdahulu
                 C. Metode Analisis Unsur-Unsur Biaya
                            D. Metode Faktor
              E. Metode quantity take-off dan Harga Satuan
                          F. Metode Unit Price
               G. Memakai Data dan Informasi Proyek ybs.



>>   0   >>        1       >>        2        >>        3       >>   4   >>
Dasar hubungan matematis yang mengaitkan biaya
       atau jam-orang dengan karakteristik fisik
                      tertentu dari objek
       (volume, luas, berat, tenaga/watt, panjang, dll).



>>    0    >>     1     >>     2    >>     3     >>        4   >>
y
     a)   KURVA LINIER                    y



                Y = ax                            q



          Y = biaya (variabel cost)                                x

          x = variabel fisik
          a = parameter yg                y

             menerangkan
               hub. Y dgn x                       Y=ax


               Y = px + q
                                                                   x

          q = komponen tetap               y
          px= komponen variabel                Y=px + q



                                                          q


                                                                   x


>>    0      >>         1        >>   2   >>     3            >>       4   >>
KURVA PANGKAT
                                                   Y
            Y2 = Y1 [X2 / X1]n            y        biaya


                                                                 Y2 =Y1[X2/X1]n

     Y1 = biaya pembangunan instalasi A
     Y2 = biaya pembangunan instalasi B
     X1 = kapasitas instalasi A                                Kapasitas produksi


     X2 = kapasitas instalasi B
     n = indeks harga (= 0,60)

>>      0      >>      1     >>    2          >>           3          >>            4   >>
Korelasi harga di waktu yang lalu terhadap tingkat
     harga saat ini yang dapat ditemui dalam penerbitan berkala
                       sebagai indeks harga.




>>     0     >>      1     >>     2     >>      3     >>     4    >>
I = 0,37 Im + 0,081 Ie + 0,10 Ic + 0,19 Is + 0,26 Io

                                Keterangan :
                        I = total/komposit indeks
                   Im = indeks engineering mekanik
                     Ie = indeks engineering listrik
                      Ic = indeks engineering civil
                Is = indeks engineering lapangan (site)
                           Io = Indeks overhead


>>   0   >>       1       >>        2        >>           3      >>   4   >>
1                 2                   3
                     Engineering News Marshall and Swift      Chemical
                          Record          Installed        Engineering Plant
                                         Equipment            Cost Index
         Tahun          1967 = 100                            1959 = 100
          1975             207               444                 182
          1976             224               472                 192
          1977             241               505                 204
          1978             259               545                 219
          1979             281               599                 239
          1980             303               660                 261
          1981             330               721                 297
          1982             357               746                 314
          1983             380               761                 317
          1984             387               780                 323
          1985             392               790                 325
          1986             401               798                 318
          1987             412               814                 324
          1988             422               852                 343
          1989             429               895                 355
          1990             435               904                 356


>>   0   >>      1         >>         2        >>          3        >>         4   >>
1. Jelas menunjukkan hubungan antara komponen-komponen proyek,
        dan bila telah diberi beban biaya, berarti menunjukkan komponen-
        komponen biaya proyek
     2. Dapat dibandingkan dengan komponen biaya proyek lain yang
        sejenis; dan
     3. Mudah diukur atau diperhitungkan dan dinilai perbandingannya
        (rasio) terhadap data standar




>>        0    >>       1      >>      2      >>       3      >>      4    >>
Means                   Engineering News Record
         Substruktur                         Pekerjaan lahan (site)
         Superstruktur                       Pondasi
         Eksterior                           Lantai
         Interior                            Kolom interior
         Sistem Conveying                    Atap
         Sistem pemipaan                     Dinding eksterior
         Sistem HVAC                         Glazed opening
         Listrik                             Dinding interior
         Pondasi                             Pintu
         Fixed-equipment                     Pemipaan
         Persiapan site                      Listrik
         Kontijensi                          Sistem HVAC
                                             Sistem Conveying
                                             Mark-up


>>   0        >>              1     >>   2          >>                3       >>   4   >>
Aji
• Memperkirakan biaya proyek dengan asumsi bahwa
       terdapat korelasi (faktor) antara harga peralatan utama
       dan komponen terkait.
     • Biaya komponen terkait >> dihitung dg memakai faktor
       tertentu terhadap harga peralatan utama.
     • Perhitungan disederhanakan dengan RUMUS LANG.



>>      0     >>      1     >>      2     >>     3     >>        4   >>
MODAL TETAP = FL x PCE
     • FL = faktor Lang
     • PCE = harga pembelian peralatan

     Keterangan:
     • FL = 3,1 untuk istalasi yang memproses material yang sebagian besar
        padat
     • FL = 4,7 >> cair
     • FL = 3,6 >> campuran padat-cair

>>       0      >>       1       >>       2       >>       3      >>         4   >>
Contoh soal…
     • Buat perkiraan total biaya proyek industri yang
       memproses bahan padat bila total biaya komponen
       peralatan utama berjumlah Rp 1.000 juta!
     • Kerjakan dengan rumus lang..

      Total biaya proyek = modal tetap + modal kerja



>>     0     >>    1    >>     2    >>     3    >>       4   >>
Total Biaya Proyek = Modal Tetap + Modal Kerja


     • Mod tetap = FL x PCE
                  = 3,1 x 1000 jt
                  = 3.100 jt

     • TBP = 3.100 jt + 10% (3.100) = 3.410 jt.


>>     0     >>    1     >>    2     >>    3      >>   4   >>
• Membuat perkiraan biaya dengan mengukur kuantitas komponen2
       proyek dari gambar, spesifikasi, dan perencanaan.
     • Prosedur:
     - Klasifikasi komponen
     - Deskripsi dari butir komponen
     - Dimensi dari butir komponen
     - Memberi beban jam-orang
     - Memberi beban biaya

>>       0     >>      1     >>      2     >>     3     >>      4    >>
• Jika volume total pekerjaan belum dapat ditentukan
       dengan pasti, tetapi biaya per unitnya telah dapat
       dihitung.
     • Sering dijumpai pada proyek civil seperti membuat
       jalan, kanal, pekerjaan tanah, memasang pipa, dll.



>>      0    >>     1    >>     2     >>     3    >>        4   >>
• Data mencerminkan keadaan sesungguhnya
     • Butuh waktu tertentu, misal s.d. kemajuan desain
       engineering tertentu atau pembelian mencapai taraf
       tertentu.




>>      0    >>     1    >>     2    >>     3    >>     4   >>
Anda Tanya Kami (berusaha) Jawab…
1. Sirait ()
• Metoda perkiraan ? Korelasi antarproyek yg beda
  periode?
• Cth yg sesuai dg metode” tsb…
Angga Dimas
          Brilyan
      Isnendi Yakub
     Mahdi Muhammad
      Muhammad Aji
         Wibowo
>>   0   >>   1   >>   2   >>   3   >>   4   >>

More Related Content

What's hot

Istilah operasional terminal pelabuhan
Istilah operasional terminal pelabuhanIstilah operasional terminal pelabuhan
Istilah operasional terminal pelabuhan
Dhamar Pamilih
 
Precedence Diagram Method 2
Precedence Diagram Method 2Precedence Diagram Method 2
Precedence Diagram Method 2
Nurul Angreliany
 
02 contoh struktur organisasi proyek
02 contoh struktur organisasi proyek02 contoh struktur organisasi proyek
02 contoh struktur organisasi proyek
Ainul Yaqin
 
Contoh soal Teori antrian khusus Poisson
Contoh soal Teori antrian khusus PoissonContoh soal Teori antrian khusus Poisson
Contoh soal Teori antrian khusus Poisson
Lilies DLiestyowati
 
Program peningkatan keselamatan perkeretaapian hermanto dwiatmoko
Program peningkatan keselamatan perkeretaapian   hermanto dwiatmokoProgram peningkatan keselamatan perkeretaapian   hermanto dwiatmoko
Program peningkatan keselamatan perkeretaapian hermanto dwiatmoko
Indonesia Infrastructure Initiative
 

What's hot (20)

Manajemen Risiko
Manajemen RisikoManajemen Risiko
Manajemen Risiko
 
Perencanaan & Penjadwalan Proyek
Perencanaan & Penjadwalan ProyekPerencanaan & Penjadwalan Proyek
Perencanaan & Penjadwalan Proyek
 
8 Analisa IRR
8 Analisa  IRR8 Analisa  IRR
8 Analisa IRR
 
Ekonomi teknik
Ekonomi teknikEkonomi teknik
Ekonomi teknik
 
Manajemen Risiko - Analisis Risiko
Manajemen Risiko - Analisis RisikoManajemen Risiko - Analisis Risiko
Manajemen Risiko - Analisis Risiko
 
Strategi bisnis dan pendefinisian model bisnis pada pelabuhan
Strategi bisnis dan pendefinisian model bisnis pada pelabuhanStrategi bisnis dan pendefinisian model bisnis pada pelabuhan
Strategi bisnis dan pendefinisian model bisnis pada pelabuhan
 
Istilah operasional terminal pelabuhan
Istilah operasional terminal pelabuhanIstilah operasional terminal pelabuhan
Istilah operasional terminal pelabuhan
 
Tugas 2 cash flow
Tugas 2 cash flow Tugas 2 cash flow
Tugas 2 cash flow
 
Precedence Diagram Method 2
Precedence Diagram Method 2Precedence Diagram Method 2
Precedence Diagram Method 2
 
Merubah Satuan Ukur Google Earth Menjadi Meter, Kilometer Dengan Perlihatkan ...
Merubah Satuan Ukur Google Earth Menjadi Meter, Kilometer Dengan Perlihatkan ...Merubah Satuan Ukur Google Earth Menjadi Meter, Kilometer Dengan Perlihatkan ...
Merubah Satuan Ukur Google Earth Menjadi Meter, Kilometer Dengan Perlihatkan ...
 
02 contoh struktur organisasi proyek
02 contoh struktur organisasi proyek02 contoh struktur organisasi proyek
02 contoh struktur organisasi proyek
 
M keu-31
M keu-31M keu-31
M keu-31
 
Bahaya, kerentanan, resiko dan bencana
Bahaya, kerentanan, resiko dan bencanaBahaya, kerentanan, resiko dan bencana
Bahaya, kerentanan, resiko dan bencana
 
4 bunga nominal dan bunga efektif
4 bunga nominal dan bunga efektif4 bunga nominal dan bunga efektif
4 bunga nominal dan bunga efektif
 
Analisis kelayakan investasi
Analisis kelayakan investasiAnalisis kelayakan investasi
Analisis kelayakan investasi
 
Slack dan float
Slack dan floatSlack dan float
Slack dan float
 
Taraf signifikan
Taraf signifikanTaraf signifikan
Taraf signifikan
 
Contoh soal Teori antrian khusus Poisson
Contoh soal Teori antrian khusus PoissonContoh soal Teori antrian khusus Poisson
Contoh soal Teori antrian khusus Poisson
 
Program peningkatan keselamatan perkeretaapian hermanto dwiatmoko
Program peningkatan keselamatan perkeretaapian   hermanto dwiatmokoProgram peningkatan keselamatan perkeretaapian   hermanto dwiatmoko
Program peningkatan keselamatan perkeretaapian hermanto dwiatmoko
 
Ekonomi Teknik (rate of return)
Ekonomi Teknik (rate of return)Ekonomi Teknik (rate of return)
Ekonomi Teknik (rate of return)
 

Viewers also liked

Portal Dirjen Pajak Indonesia
Portal Dirjen Pajak IndonesiaPortal Dirjen Pajak Indonesia
Portal Dirjen Pajak Indonesia
Muhammad Amri
 
Graduation Project Proposal October 2014
Graduation Project Proposal October 2014Graduation Project Proposal October 2014
Graduation Project Proposal October 2014
ahmed gamal
 
AD-CONNECT SMS Presentation
AD-CONNECT SMS PresentationAD-CONNECT SMS Presentation
AD-CONNECT SMS Presentation
ADCONNECT
 
Smart School Blueprint
Smart School BlueprintSmart School Blueprint
Smart School Blueprint
Maria Ting
 
Harvard Student Information System Implementation Update
Harvard Student Information System Implementation UpdateHarvard Student Information System Implementation Update
Harvard Student Information System Implementation Update
kevin_donovan
 
Daftar Koreksi Fiskal Perpajakan
Daftar Koreksi Fiskal PerpajakanDaftar Koreksi Fiskal Perpajakan
Daftar Koreksi Fiskal Perpajakan
Hengky Manurung
 
Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)
Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)
Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)
Citasco
 
Slide p ph jasa konstruksi
Slide p ph jasa konstruksiSlide p ph jasa konstruksi
Slide p ph jasa konstruksi
rudihartono1973
 

Viewers also liked (20)

Portal Dirjen Pajak Indonesia
Portal Dirjen Pajak IndonesiaPortal Dirjen Pajak Indonesia
Portal Dirjen Pajak Indonesia
 
Graduation Project Proposal October 2014
Graduation Project Proposal October 2014Graduation Project Proposal October 2014
Graduation Project Proposal October 2014
 
Benefit Cost Ratio Persentasi
Benefit Cost Ratio PersentasiBenefit Cost Ratio Persentasi
Benefit Cost Ratio Persentasi
 
IKHTISAR BIAYA YANG DEDUCTIBLE DAN NON DEDUCTIBLE EXPENSES
IKHTISAR BIAYA YANG DEDUCTIBLE DAN NON DEDUCTIBLE EXPENSESIKHTISAR BIAYA YANG DEDUCTIBLE DAN NON DEDUCTIBLE EXPENSES
IKHTISAR BIAYA YANG DEDUCTIBLE DAN NON DEDUCTIBLE EXPENSES
 
Project Blueprint Networking
Project Blueprint NetworkingProject Blueprint Networking
Project Blueprint Networking
 
AD-CONNECT SMS Presentation
AD-CONNECT SMS PresentationAD-CONNECT SMS Presentation
AD-CONNECT SMS Presentation
 
Mark McClain - OpenStack Quantum Networking
Mark McClain - OpenStack Quantum NetworkingMark McClain - OpenStack Quantum Networking
Mark McClain - OpenStack Quantum Networking
 
E northeastaward2013 nic mizoram
E northeastaward2013 nic mizoramE northeastaward2013 nic mizoram
E northeastaward2013 nic mizoram
 
SPT Tahunan Badan dan OP Kategori PP No. 46 Tahun 2013
SPT Tahunan Badan dan OP Kategori PP No. 46 Tahun 2013SPT Tahunan Badan dan OP Kategori PP No. 46 Tahun 2013
SPT Tahunan Badan dan OP Kategori PP No. 46 Tahun 2013
 
Smart School Blueprint
Smart School BlueprintSmart School Blueprint
Smart School Blueprint
 
Modul rekonsiliasi-fiskal
Modul rekonsiliasi-fiskalModul rekonsiliasi-fiskal
Modul rekonsiliasi-fiskal
 
Jbptunikompp gdl-rudiramlan-28836-16-sistemi-
Jbptunikompp gdl-rudiramlan-28836-16-sistemi-Jbptunikompp gdl-rudiramlan-28836-16-sistemi-
Jbptunikompp gdl-rudiramlan-28836-16-sistemi-
 
PP NO. 46 TAHUN 2013 TENTANG PPh ATAS PENGHASILAN DARI USAHA WAJIB PAJAK YANG...
PP NO. 46 TAHUN 2013TENTANG PPh ATAS PENGHASILAN DARI USAHA WAJIB PAJAK YANG...PP NO. 46 TAHUN 2013TENTANG PPh ATAS PENGHASILAN DARI USAHA WAJIB PAJAK YANG...
PP NO. 46 TAHUN 2013 TENTANG PPh ATAS PENGHASILAN DARI USAHA WAJIB PAJAK YANG...
 
Harvard Student Information System Implementation Update
Harvard Student Information System Implementation UpdateHarvard Student Information System Implementation Update
Harvard Student Information System Implementation Update
 
Daftar Koreksi Fiskal Perpajakan
Daftar Koreksi Fiskal PerpajakanDaftar Koreksi Fiskal Perpajakan
Daftar Koreksi Fiskal Perpajakan
 
Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)
Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)
Perencanaan PPh Badan Akhir Tahun ( Year-end Corporate Income Tax Planning)
 
Bab 1& 2 pengantar perpajakan
Bab 1& 2 pengantar perpajakanBab 1& 2 pengantar perpajakan
Bab 1& 2 pengantar perpajakan
 
Slide p ph jasa konstruksi
Slide p ph jasa konstruksiSlide p ph jasa konstruksi
Slide p ph jasa konstruksi
 
Pemodelan 2 dimensi
Pemodelan 2 dimensiPemodelan 2 dimensi
Pemodelan 2 dimensi
 
27801452 contoh-soal-pajak-dan-pembahasannya
27801452 contoh-soal-pajak-dan-pembahasannya27801452 contoh-soal-pajak-dan-pembahasannya
27801452 contoh-soal-pajak-dan-pembahasannya
 

Similar to Perkiraan Biaya Proyek

Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...
Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...
Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...
fajrikurniawan8
 
Project progress control
Project progress controlProject progress control
Project progress control
Julia Carolina
 
Rpl 4-proses perangkat lunak & metrik proyek
Rpl 4-proses perangkat lunak & metrik proyekRpl 4-proses perangkat lunak & metrik proyek
Rpl 4-proses perangkat lunak & metrik proyek
f' yagami
 
C6 Development&Quality plan
C6 Development&Quality planC6 Development&Quality plan
C6 Development&Quality plan
Ika Nurkasanah
 
materi meeting Teknik.pptx
materi meeting Teknik.pptxmateri meeting Teknik.pptx
materi meeting Teknik.pptx
surandi4
 
Mengenai development quality plan
Mengenai development quality planMengenai development quality plan
Mengenai development quality plan
Dian Lukitasari
 
30-08-2022 Project Quality Management - Quality Control.pptx
30-08-2022 Project Quality Management - Quality Control.pptx30-08-2022 Project Quality Management - Quality Control.pptx
30-08-2022 Project Quality Management - Quality Control.pptx
darmadi ir,mm
 

Similar to Perkiraan Biaya Proyek (20)

Manajemen Biaya PL.pptx
Manajemen Biaya PL.pptxManajemen Biaya PL.pptx
Manajemen Biaya PL.pptx
 
Manajemen proyek
Manajemen proyekManajemen proyek
Manajemen proyek
 
Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...
Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...
Fajri raizal kurniawan (22116573) & rafael fabian asher (25116935) kelomp...
 
Finna kurniasih,Prof. Dr. Hapzi Ali, CMA,Rancangan Sistem Pendukung Keputusan...
Finna kurniasih,Prof. Dr. Hapzi Ali, CMA,Rancangan Sistem Pendukung Keputusan...Finna kurniasih,Prof. Dr. Hapzi Ali, CMA,Rancangan Sistem Pendukung Keputusan...
Finna kurniasih,Prof. Dr. Hapzi Ali, CMA,Rancangan Sistem Pendukung Keputusan...
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Project progress control
Project progress controlProject progress control
Project progress control
 
Rpl 4-proses perangkat lunak & metrik proyek
Rpl 4-proses perangkat lunak & metrik proyekRpl 4-proses perangkat lunak & metrik proyek
Rpl 4-proses perangkat lunak & metrik proyek
 
MKI - PAPARAN REVIU PEMENUHAN PERSYARATAN TEKNIS.pdf
MKI - PAPARAN REVIU PEMENUHAN PERSYARATAN TEKNIS.pdfMKI - PAPARAN REVIU PEMENUHAN PERSYARATAN TEKNIS.pdf
MKI - PAPARAN REVIU PEMENUHAN PERSYARATAN TEKNIS.pdf
 
C6 Development&Quality plan
C6 Development&Quality planC6 Development&Quality plan
C6 Development&Quality plan
 
Modul Pembelajaran 8 Manajemen Biaya Proyek
Modul Pembelajaran 8 Manajemen Biaya ProyekModul Pembelajaran 8 Manajemen Biaya Proyek
Modul Pembelajaran 8 Manajemen Biaya Proyek
 
materi meeting Teknik.pptx
materi meeting Teknik.pptxmateri meeting Teknik.pptx
materi meeting Teknik.pptx
 
Mengenai development quality plan
Mengenai development quality planMengenai development quality plan
Mengenai development quality plan
 
191148953 management-proyek-4
191148953 management-proyek-4191148953 management-proyek-4
191148953 management-proyek-4
 
Contractor_Safety_Management_System.pdf
Contractor_Safety_Management_System.pdfContractor_Safety_Management_System.pdf
Contractor_Safety_Management_System.pdf
 
Panduan-HSE-Plan-Pertamina.pdf
Panduan-HSE-Plan-Pertamina.pdfPanduan-HSE-Plan-Pertamina.pdf
Panduan-HSE-Plan-Pertamina.pdf
 
Apsi kel 3
Apsi kel 3Apsi kel 3
Apsi kel 3
 
Pertemuan 7
Pertemuan 7Pertemuan 7
Pertemuan 7
 
Pengendalian Proyek_Materi Training 'PROJECT MANAGEMENT"
Pengendalian Proyek_Materi Training 'PROJECT MANAGEMENT"Pengendalian Proyek_Materi Training 'PROJECT MANAGEMENT"
Pengendalian Proyek_Materi Training 'PROJECT MANAGEMENT"
 
Pengendalian Proyek _Materi Training "PROJECT MANAGEMENT"
Pengendalian Proyek _Materi Training "PROJECT MANAGEMENT"Pengendalian Proyek _Materi Training "PROJECT MANAGEMENT"
Pengendalian Proyek _Materi Training "PROJECT MANAGEMENT"
 
30-08-2022 Project Quality Management - Quality Control.pptx
30-08-2022 Project Quality Management - Quality Control.pptx30-08-2022 Project Quality Management - Quality Control.pptx
30-08-2022 Project Quality Management - Quality Control.pptx
 

More from Muhammad Amri

More from Muhammad Amri (15)

Latihan Soal Akuntansi Pemerintah II
Latihan Soal Akuntansi Pemerintah IILatihan Soal Akuntansi Pemerintah II
Latihan Soal Akuntansi Pemerintah II
 
Latihan Pembukuan Belanja Negara
Latihan Pembukuan Belanja NegaraLatihan Pembukuan Belanja Negara
Latihan Pembukuan Belanja Negara
 
Pp 71 tahun 2010
Pp 71 tahun 2010Pp 71 tahun 2010
Pp 71 tahun 2010
 
analisis sumber penerimaan bontang
analisis sumber penerimaan bontanganalisis sumber penerimaan bontang
analisis sumber penerimaan bontang
 
Penerimaan permohonan SIDJP
Penerimaan permohonan SIDJPPenerimaan permohonan SIDJP
Penerimaan permohonan SIDJP
 
Contoh Kasus PPh Pasal 22
Contoh Kasus PPh Pasal 22Contoh Kasus PPh Pasal 22
Contoh Kasus PPh Pasal 22
 
Performance Based Budgeting
Performance Based BudgetingPerformance Based Budgeting
Performance Based Budgeting
 
IT of DJP Indonesia
IT of DJP IndonesiaIT of DJP Indonesia
IT of DJP Indonesia
 
General overview perekaman spt lokal
General overview perekaman spt lokalGeneral overview perekaman spt lokal
General overview perekaman spt lokal
 
Presentasi sosialisasi sop
Presentasi sosialisasi sopPresentasi sosialisasi sop
Presentasi sosialisasi sop
 
Prosedur Operasional Standar
Prosedur Operasional StandarProsedur Operasional Standar
Prosedur Operasional Standar
 
akuntansi aset tetap & penyusutan
akuntansi aset tetap & penyusutanakuntansi aset tetap & penyusutan
akuntansi aset tetap & penyusutan
 
Akuntansi Inventori
Akuntansi InventoriAkuntansi Inventori
Akuntansi Inventori
 
Analisis Proses
Analisis Proses Analisis Proses
Analisis Proses
 
Presentasi pph
Presentasi pphPresentasi pph
Presentasi pph
 

Recently uploaded

PPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptx
PPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptxPPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptx
PPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptx
dpp11tya
 
Latsol TWK Nasionalisme untuk masuk CPNS
Latsol TWK Nasionalisme untuk masuk CPNSLatsol TWK Nasionalisme untuk masuk CPNS
Latsol TWK Nasionalisme untuk masuk CPNS
dheaprs
 
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxBab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
ssuser35630b
 

Recently uploaded (20)

Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdfSalinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
Salinan dari JUrnal Refleksi Mingguan modul 1.3.pdf
 
ppt-modul-6-pend-seni-di sd kelompok 2 ppt
ppt-modul-6-pend-seni-di sd kelompok 2 pptppt-modul-6-pend-seni-di sd kelompok 2 ppt
ppt-modul-6-pend-seni-di sd kelompok 2 ppt
 
PPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptx
PPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptxPPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptx
PPT PERUBAHAN LINGKUNGAN MATA PELAJARAN BIOLOGI KELAS X.pptx
 
Latsol TWK Nasionalisme untuk masuk CPNS
Latsol TWK Nasionalisme untuk masuk CPNSLatsol TWK Nasionalisme untuk masuk CPNS
Latsol TWK Nasionalisme untuk masuk CPNS
 
PELAKSANAAN + Link-Link MATERI Training_ "Effective INVENTORY & WAREHOUSING M...
PELAKSANAAN + Link-Link MATERI Training_ "Effective INVENTORY & WAREHOUSING M...PELAKSANAAN + Link-Link MATERI Training_ "Effective INVENTORY & WAREHOUSING M...
PELAKSANAAN + Link-Link MATERI Training_ "Effective INVENTORY & WAREHOUSING M...
 
REFLEKSI MANDIRI_Prakarsa Perubahan BAGJA Modul 1.3.pdf
REFLEKSI MANDIRI_Prakarsa Perubahan BAGJA Modul 1.3.pdfREFLEKSI MANDIRI_Prakarsa Perubahan BAGJA Modul 1.3.pdf
REFLEKSI MANDIRI_Prakarsa Perubahan BAGJA Modul 1.3.pdf
 
aksi nyata sosialisasi Profil Pelajar Pancasila.pdf
aksi nyata sosialisasi  Profil Pelajar Pancasila.pdfaksi nyata sosialisasi  Profil Pelajar Pancasila.pdf
aksi nyata sosialisasi Profil Pelajar Pancasila.pdf
 
MODUL 1 Pembelajaran Kelas Rangkap-compressed.pdf
MODUL 1 Pembelajaran Kelas Rangkap-compressed.pdfMODUL 1 Pembelajaran Kelas Rangkap-compressed.pdf
MODUL 1 Pembelajaran Kelas Rangkap-compressed.pdf
 
Modul Ajar Bahasa Indonesia Kelas 4 Fase B
Modul Ajar Bahasa Indonesia Kelas 4 Fase BModul Ajar Bahasa Indonesia Kelas 4 Fase B
Modul Ajar Bahasa Indonesia Kelas 4 Fase B
 
PPT AKSI NYATA KOMUNITAS BELAJAR .ppt di SD
PPT AKSI NYATA KOMUNITAS BELAJAR .ppt di SDPPT AKSI NYATA KOMUNITAS BELAJAR .ppt di SD
PPT AKSI NYATA KOMUNITAS BELAJAR .ppt di SD
 
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxBab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
 
Kontribusi Islam Dalam Pengembangan Peradaban Dunia - KELOMPOK 1.pptx
Kontribusi Islam Dalam Pengembangan Peradaban Dunia - KELOMPOK 1.pptxKontribusi Islam Dalam Pengembangan Peradaban Dunia - KELOMPOK 1.pptx
Kontribusi Islam Dalam Pengembangan Peradaban Dunia - KELOMPOK 1.pptx
 
Prakarsa Perubahan ATAP (Awal - Tantangan - Aksi - Perubahan)
Prakarsa Perubahan ATAP (Awal - Tantangan - Aksi - Perubahan)Prakarsa Perubahan ATAP (Awal - Tantangan - Aksi - Perubahan)
Prakarsa Perubahan ATAP (Awal - Tantangan - Aksi - Perubahan)
 
presentasi lembaga negara yang ada di indonesia
presentasi lembaga negara yang ada di indonesiapresentasi lembaga negara yang ada di indonesia
presentasi lembaga negara yang ada di indonesia
 
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.pptLATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
LATAR BELAKANG JURNAL DIALOGIS REFLEKTIF.ppt
 
PELAKSANAAN + Link-Link MATERI Training_ "Effective INVENTORY & WAREHOUSING...
PELAKSANAAN  + Link-Link MATERI Training_ "Effective INVENTORY &  WAREHOUSING...PELAKSANAAN  + Link-Link MATERI Training_ "Effective INVENTORY &  WAREHOUSING...
PELAKSANAAN + Link-Link MATERI Training_ "Effective INVENTORY & WAREHOUSING...
 
vIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsxvIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsx
 
Modul Projek - Batik Ecoprint - Fase B.pdf
Modul Projek  - Batik Ecoprint - Fase B.pdfModul Projek  - Batik Ecoprint - Fase B.pdf
Modul Projek - Batik Ecoprint - Fase B.pdf
 
RENCANA + Link2 Materi Pelatihan/BimTek "PTK 007 Rev-5 Thn 2023 (PENGADAAN) &...
RENCANA + Link2 Materi Pelatihan/BimTek "PTK 007 Rev-5 Thn 2023 (PENGADAAN) &...RENCANA + Link2 Materi Pelatihan/BimTek "PTK 007 Rev-5 Thn 2023 (PENGADAAN) &...
RENCANA + Link2 Materi Pelatihan/BimTek "PTK 007 Rev-5 Thn 2023 (PENGADAAN) &...
 
Modul Ajar Pendidikan Pancasila Kelas 5 Fase C
Modul Ajar Pendidikan Pancasila Kelas 5 Fase CModul Ajar Pendidikan Pancasila Kelas 5 Fase C
Modul Ajar Pendidikan Pancasila Kelas 5 Fase C
 

Perkiraan Biaya Proyek

  • 1.
  • 2. 3 >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 3. 2 >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 4. 1 >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 5. Project Detected >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 7. Evapro Post LIPUTAN SEPUTAR MATA KULIAH EVALUASI PROYEK Selasa, 24 Januari 2012 Perkiraan Biaya Proyek.... Prakata 24.1 perkiraan biaya dan cost engineering 24.2 Proses penyusunan 24.1 perkiraan biaya dan perkiraan biaya dan cost engineering 24.2 anggaran 24.3 organisasi Proses penyusunan kontrol proyek 24.4 perkiraan biaya dan komponen biaya proyek 24.5 anggaran 24.3 organisasi struktur biaya proyek 24.6 kontrol proyek 24.4 kualitas perkiraan biaya 24.7 komponen biaya proyek 24.5 survei dan pengkajian 24.8 struktur biaya proyek 24.6 metode perkiraan biaya 24.1 kualitas perkiraan biaya 24.7 perkiraan biaya dan cost survei dan pengkajian 24.8 engineering 24.2 Proses metode perkiraan biaya penyusunan perkiraan biaya 24.1 perkiraan biaya dan dan anggaran 24.3 cost engineering 24.2 organisasi kontrol proyek Proses penyusunan 24.4 komponen biaya proyek perkiraan biaya dan 24.5 struktur biaya proyek. anggaran >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 9. Seni memperkirakan kemungkinan jumlah biaya yang diperlukan untuk suatu kegiatan yang di dasarkan pada informasi yang telah tersedia waktu itu. ( NES-US ) >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 10. aplikasi prinsip-prinsip teknik ilmu pengetahuan dalam masalah perkiraan biaya pengendalian biaya profitabilitas ( AICM ) >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 11. (1) Estimasi (2) Anggaran Biaya dan dan Jadwal Jadwal Induk (4) Pengumpulan (3) dan Pengendalian Pengembangan Biaya dan Data Jadwal >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 12. 1. Definisi Lingkup 2. Uraian Aktivitas 3. Sumber Daya 4. Jadwal Aktivitas 5. Perkiraan Biaya 6. Anggaran Proyek >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 13. Uraian Jadwal Aktivitas Aktivitas Definisi Anggaran Lingkup Proyek Sumber Perkiraan Daya Biaya >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 14. Dimas
  • 15. Manajer cost engineering (kontrol Proyek) Kabag. Perkiraan Kabagperencanaan Kabag pengendalian biaya dan Kabag SIMP dan jadwal biaya dan Jadwal pengembanan data Staff dan asisten Staff dan asisten Staff dan asisten Operator SIMP >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 16. 1. Perkiraan Biaya dan Pengembangan Data 2. Perencanaan dan Penyusunan Jadwal 3. Pengendalian Biaya 4. Sistem Informasi Manajemen Proyek (SIMP) >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 17. Total biaya proyek Modal tetap Modal kerja (fixed (working capital) capital) Biaya Biaya tidak langsung langsung >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 18. Bila implementasi fisik proyek diserahkan kepada kontraktor, maka anggaran proyek disamping klasifikasi di atas dikelompokkan sebagai berikut, 1. biaya pemilik 2. biaya kontraktor 3. biaya lingkup kerja pemilik >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 19. Mahdi
  • 20. ( Berdasarkan Fungsinya ) 1. Struktur biaya pemilik 2. Struktur biaya kontraktor Terbagi dua : - Pada waktu mengajukan - Pada waktu implementasi fisik >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 21. (b) Anggaran biaya proyek (project budget ) (+) cadangan manajemen Kontijensi Eskalasi allowance (a) Anggaran dasar biaya proyek (project base cost) Owner cost Owner scope • Biaya Kontraktor • Pembebasan pengelolaan Tanah proyek (contractor price) Modal kerja • Lingkup • Biaya • Pembayaran (working capital) proyek yang konsultan kontraktor dikejakan • overhead sendiri >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 22. (c) Harga proposal (proposal price) lab a (b) biaya proyek (+) cadangan manajemen •Kontijensi •Eskalasi •allowance (a) Perkiraan biaya dasar Biaya Langsung Biaya tidak langsung • Desain enginering • Material • Fasilitas smentara • Peralatan • Pralatn konstruksi • Tenaga kerja • Supervisi • Subkontrak • Overhead >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 23. (a) Harga kontrak (contract price) laba (b) (+) cadangan manajemen •Kontijensi Anggaran biaya proyek •Eskalasi •allowance (c) Anggaran biaya pengendalian (control budget) Biaya Langsung Biaya tidak langsung • Material • Desain enginering • Fasilitas smentara • Peralatan • Pralatn konstruksi • Tenaga kerja • Supervisi • Subkontrak • Overhead >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 24. Rendy
  • 25. Unsur-unsurnya : • Tersedianya Data dan Informasi • Teknik dan Metode yang Digunakan • Kecakapan dan Pengalaman Estimator • Tujuan Pemakaian Perkiraan Biaya >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 26. Tujuan : untuk mendapatkan informasi dan data. Survei dan pengkajian meliputi: 1. Kondisi Lokasi 2. Logistik, Komunikasi, transport 3. Akomodasi dan Fasilitas Sementara 4. Konstruksi dan Pabrikasi >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 27. topografi, aspek ekonomi penyediaan tenaga kerja, keadaan tanah, dan tanggapan masyarakat terhadap penyediaan air. kemungkinan adanya proyek pembebasan tanah dan lain -lain >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 28. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 29. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 30. Yang perlu diperhatikan adalah : 1. tenaga kerja ( jumlah maupun produktifitasnya), 2. peralatan konstruksi, dan 3. fasilitas pabrikasi di lapangan. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 31. Nendi
  • 32. A. Metode Parametrik B. Memakai Indeks Harga, Katalog, dan Informasi Proyek Terdahulu C. Metode Analisis Unsur-Unsur Biaya D. Metode Faktor E. Metode quantity take-off dan Harga Satuan F. Metode Unit Price G. Memakai Data dan Informasi Proyek ybs. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 33. Dasar hubungan matematis yang mengaitkan biaya atau jam-orang dengan karakteristik fisik tertentu dari objek (volume, luas, berat, tenaga/watt, panjang, dll). >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 34. y a) KURVA LINIER y Y = ax q Y = biaya (variabel cost) x x = variabel fisik a = parameter yg y menerangkan hub. Y dgn x Y=ax Y = px + q x q = komponen tetap y px= komponen variabel Y=px + q q x >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 35. KURVA PANGKAT Y Y2 = Y1 [X2 / X1]n y biaya Y2 =Y1[X2/X1]n Y1 = biaya pembangunan instalasi A Y2 = biaya pembangunan instalasi B X1 = kapasitas instalasi A Kapasitas produksi X2 = kapasitas instalasi B n = indeks harga (= 0,60) >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 36. Korelasi harga di waktu yang lalu terhadap tingkat harga saat ini yang dapat ditemui dalam penerbitan berkala sebagai indeks harga. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 37. I = 0,37 Im + 0,081 Ie + 0,10 Ic + 0,19 Is + 0,26 Io Keterangan : I = total/komposit indeks Im = indeks engineering mekanik Ie = indeks engineering listrik Ic = indeks engineering civil Is = indeks engineering lapangan (site) Io = Indeks overhead >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 38. 1 2 3 Engineering News Marshall and Swift Chemical Record Installed Engineering Plant Equipment Cost Index Tahun 1967 = 100 1959 = 100 1975 207 444 182 1976 224 472 192 1977 241 505 204 1978 259 545 219 1979 281 599 239 1980 303 660 261 1981 330 721 297 1982 357 746 314 1983 380 761 317 1984 387 780 323 1985 392 790 325 1986 401 798 318 1987 412 814 324 1988 422 852 343 1989 429 895 355 1990 435 904 356 >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 39. 1. Jelas menunjukkan hubungan antara komponen-komponen proyek, dan bila telah diberi beban biaya, berarti menunjukkan komponen- komponen biaya proyek 2. Dapat dibandingkan dengan komponen biaya proyek lain yang sejenis; dan 3. Mudah diukur atau diperhitungkan dan dinilai perbandingannya (rasio) terhadap data standar >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 40. Means Engineering News Record Substruktur Pekerjaan lahan (site) Superstruktur Pondasi Eksterior Lantai Interior Kolom interior Sistem Conveying Atap Sistem pemipaan Dinding eksterior Sistem HVAC Glazed opening Listrik Dinding interior Pondasi Pintu Fixed-equipment Pemipaan Persiapan site Listrik Kontijensi Sistem HVAC Sistem Conveying Mark-up >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 41. Aji
  • 42. • Memperkirakan biaya proyek dengan asumsi bahwa terdapat korelasi (faktor) antara harga peralatan utama dan komponen terkait. • Biaya komponen terkait >> dihitung dg memakai faktor tertentu terhadap harga peralatan utama. • Perhitungan disederhanakan dengan RUMUS LANG. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 43. MODAL TETAP = FL x PCE • FL = faktor Lang • PCE = harga pembelian peralatan Keterangan: • FL = 3,1 untuk istalasi yang memproses material yang sebagian besar padat • FL = 4,7 >> cair • FL = 3,6 >> campuran padat-cair >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 44. Contoh soal… • Buat perkiraan total biaya proyek industri yang memproses bahan padat bila total biaya komponen peralatan utama berjumlah Rp 1.000 juta! • Kerjakan dengan rumus lang.. Total biaya proyek = modal tetap + modal kerja >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 45. Total Biaya Proyek = Modal Tetap + Modal Kerja • Mod tetap = FL x PCE = 3,1 x 1000 jt = 3.100 jt • TBP = 3.100 jt + 10% (3.100) = 3.410 jt. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 46. • Membuat perkiraan biaya dengan mengukur kuantitas komponen2 proyek dari gambar, spesifikasi, dan perencanaan. • Prosedur: - Klasifikasi komponen - Deskripsi dari butir komponen - Dimensi dari butir komponen - Memberi beban jam-orang - Memberi beban biaya >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 47. • Jika volume total pekerjaan belum dapat ditentukan dengan pasti, tetapi biaya per unitnya telah dapat dihitung. • Sering dijumpai pada proyek civil seperti membuat jalan, kanal, pekerjaan tanah, memasang pipa, dll. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 48. • Data mencerminkan keadaan sesungguhnya • Butuh waktu tertentu, misal s.d. kemajuan desain engineering tertentu atau pembelian mencapai taraf tertentu. >> 0 >> 1 >> 2 >> 3 >> 4 >>
  • 49. Anda Tanya Kami (berusaha) Jawab… 1. Sirait () • Metoda perkiraan ? Korelasi antarproyek yg beda periode? • Cth yg sesuai dg metode” tsb…
  • 50.
  • 51.
  • 52. Angga Dimas Brilyan Isnendi Yakub Mahdi Muhammad Muhammad Aji Wibowo >> 0 >> 1 >> 2 >> 3 >> 4 >>